Loading...
HomeMy WebLinkAboutContract 61572-AR1CSC No. 61572-AR1 FoRr�oRTH® City of Fort Worth Construction Allowance Request Project Name 2024 Concrete Restoration Contract �-nencrruiecclI 105193 er,%l Project) Description Concrete panel replacement at various locations. ContractorCapko Concrete Structures LLC ty Project Mgr. Iretomiwa Otuyelu UNIT or DEPT Original Contract Amount Extras to Date Credits to Date Current Contract Amount JAmount of Proposed Allocation Original Allowance Available to Allocat Allowance Funds Previously Allocated Revised Allowance Balance City Sec # I 61572 CA #I 1 I Date 11/21/2024 City Inspector I Charles Hayes TPW $2,593,525.00 UNIT 2 or Dept UNIT 3 or Dept UNIT 4 or Dept I Totals $2,593,525.00 $2,593,525.00 $2,593,525.00 $2 250.00 $0.00 $0.00 $0.00 $2 250.00 $100, 000.00 $100,000.00 $0.00 $97,750.00 $0.00 $0.00 $0.00 $97 750.00 JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE This construction allowance will add anew bid item to the contract to install an asphalt transition at the intersection of Wilbarger St. and Foard St. As this is a concrete restoration project, the scope of work at this location was limited to concrete panel replacement on Foard St. However, field assessment at this location indicates a significant elevation difference between the asphalt pavement on Wilbarger St. and the concrete pavement on Foard St., which requires installing an asphalt transition at the intersection to provide smooth traffic between both streets. Staff have compared the pricing of this work with similar projects and determined them to be fair and reasonable. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Capko Concrete Structures I John capko IV Dec 2, 2024 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date Dec 4, 2024 '90 Dec 2, 2024 rogram Manager Date Senior Capital Project Officer Date Z e (a0-1A aP Dec 5, 2024 Dec 5, 2024 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date z^ 1 ' ^ G Dec 5, 2024 Dec 6, 2024 Assistant City Attorney Date Assistant City Manager Date aw Dec 10, 2024 Dec 10, 2024 ATTEST: A a— Jannette Goodall, City Secretary nIl Il a � � pORl�9�dd O _Fo oaa4Il�og6q OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Construction Allowance SUMMARY Page 1 of 4 FORD City of Fort Worth Construction Allowance Additions Project Name 1 2024 Concrete Restoration Contract 3 1 City Sec # 1 61572 1 Client Project # I 105193 1 ContractorCapko Concrete Structures LLC PM I Iretomiwa Otuyelu I Inspector) Charles Hayes Construction Allowance Submittal # Date 1#########1 ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 29 3212.0401 HMAC Transition TPW 6.00000000 TN $375.00 $2,250.001 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I I I I I 1 I 1 I 1 I 1 I 1 I 1 I 1 I 1 I TPA/ 1 I I I I I I I 1 I 1 I 1 I 1 I I $2,250.001 UNIT 2 or Dept $0.001 UNIT 3 or Dept $0.001 UNIT 4 or Dept $0.001 Total Additions $2,250.001 Construction Allowance Additions Page 2 of 4 FORT WORTH City of Fort Worth Construction Allowance Value Project Name 1 2024 Concrete Restoration Contract 3 City Sec # 1 615/2 1 Client Project # 1 105193 1 Contractor) Capko Concrete Structures LLC I PM I Iretomiwa Otuyelu I Inspectorl Charles Hayes l Construction Allowance Submittal # 0 Date 1 11/21/2024 1 CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total 28 9999.0003 Construction Allowance 0.02 LS $100,000.00 $2,250.00 Construction Allowance Value 3of4 M/SBE for this Construction Allowance Request M/SBE Sub I Type of Service I Amount for this CAR Total $0.00 Previous Construction Allowance Requests CAR # I DATE I AMOUNT Total I $0.00 I Construction Allowance MSBE Data Page 4 of 4 FORT WORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: 2024 CONCRETE RESTORATION CONTRACT 3 M&C: 24- 0384 CPN: 105193 CSO: 61572 DOC#: 1 Date: To: Name Department Initials Date Out 1. Lakeshia Lynch (BSP) BSP Dec 2, 2024 2. John Capko Vendor Dec 2, 2024 3. Charles Hayes (Inspector) TPW Dec 4, 2024 4. Iretomiwa Otuyelu (PM) TPW 15. Dec 2, 2024 5. Zelalem Arega (PGM) TPW Dec 5, 2024 6. Mary Hanna (SCPO) TPW Dec 5, 2024 7. Patricia Wadsack (AD) TPW AD Dec 5, 2024 8. Lauren Prieur (Director) TPW Director Dec 6, 2024 9. Doug Black (ACA) Legal AL Dec 10, 2024 10. Jesica McEachern (ACM) CMO a` Dec 10, 2024 11 Jannette Goodall (CS) CSO J G TG Dec 11, 2024 12. TPW Contracts TPW CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts ALSO List: - Bus Sppt: Lakeshia Lvnch: Prg Mgr Zelalem Arega: Sr CPO — Mary Hanna DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File Return To: Please notify TPWContracts(afortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!