Loading...
HomeMy WebLinkAboutContract 62407CSC No. 62407 STATE OF TEXAS § Interlocal Agreement for § -Altamesa Road Extension COUNTY OF TARRANT § • This interlocal agreement (ILA) is entered into between Tarrant County, Texas, hereinafter referred to as the "COLTNTY", and the City of Fort Worth, hereinafter referred to as the "CITY", and collectively referred to as the "parties", for the purpose ofproviding funding through the Tarrant County-2021 Transportation Bond Program (2021 TBP) to a needed transportation project within the boundaries of both parties which the Commissioners Courtof the COUNTY and the governing body of. the CITY find serves a public purpose and promotes the public welfare of the citizens of Tarrant County. The COUNTY and the CITY make the following findings of fact: 1. 'This ILA is made pursuant to Chapter 791 of .the Texas Government Code and the Tarrant County 2021 Transportation Bond Program Policy, as amended; 2. To the extent necessary, the parties will use current revenues to pay obligations in this ILA; 3. The project benefits the public in that it is a needed transportation project; 4. The COUNTY and the CITY each has the legal authority to perform its obligations in this ILA; 5.- The division of costs provided in'this ILA constitute adequate consideration to each party; and 6. Both parties acknowledge they are each -a "governmental entity" and not a "business entity" as those terms are defined in Texas Government Code Section 2252.908, and therefore, no disclosure of interested parties is required. 1. PROJECT DESCRIPTI9N This project, hereinafter referred to as the "Project", will consist of the construction of the extension of Altamesa Road from Anglin Drive to Dick Price Road. The new extension consists of four (4) lanes for approximately 1.1 miles, 60 feet -wide arterial including streetlights, shared use paths, storm drainage, and a bridge crossing of Village Creek. II. SCOPE OF SERVICES PROVIDED BY CITY The services to be provided by the CITY shall include, but are not limited to, the following: A. All total project costs including .construction, right of way acquisition, utility relocation, engineering, hydrology and hydraulic study (H/H), schematics, planning, surveying, and governmental approval costs (collectively referred to as "Costs'); Altamesa Road Extension ILA: 2021 Transportation Bond Program OFFICIAL RECORD Page 1 CITY SECRETARY FT. WORTH, TX B.. Following project completion, the CITY will provide the overall total project cost summary with final cost share between funding partners; C. Construction agreement administration, site review, permitting, and inspection; D. The CITY agrees to facilitate the efficient operations of the Project through ongoing transportation system maintenance efforts, including signal timing optimization as applicable; E. Interagency coordination, including CITY notification to the North Central Texas Council of Government (NCTCOG) and the COUNTY of any amendments or modifications to NCTCOG's Transportation Improvement Program (TIP); F. A detailed project schedule documenting the percent complete for each major component of the Project shall be provided to the COUNTY with every reimbursement request; G. The CITY agrees to invite the COUNTY to any project groundbreaking or ribbon cutting events; and H. The CITY will include the following language on all public notices, web pages, and on -site signage related to the Project: "This project is funded by the City of Fort Worth and the Tarrant County Commissioners Court through the Tarrant County 2021 Transportation Bond Program." in. TERM This ILA shall become effective upon the approval of both parties and shall terminate on September 30, 2029, unless terminated as described in Section XII in this ILA or extended in writing and 'approved by both parties. IV. FISCAL FUNDING ACKNOWLEDGEMENT Tarrant County bond funds will be encumbered on a fiscal year basis in accordance with the Certification of Available Funds shown herein. In the event no funds or insufficient funds are appropriated and budgeted or are otherwise unavailable by any means whatsoever in any fiscal period for payments due under this ILA„then the affected party will immediately notify the other party of such occurrence and this ILA may be terminated on the last day of the fiscal period for which appropriations were received without penalty or expense to the affected party of any kind whatsoever, except to the portions of annual payments herein agreed upon for which funds shall have been appropriated_ Altamesa Road Extension ILA: 2021 Transportation Bond Program Page 2 V. REIMBURSEMENT PROCESS The COUNTY agrees to reimburse the CITY for the actual eligible PROJECT costs in an amount not to exceed $7,280,000.00. Any reimbursement request from the CITY should include: I) a copy of the invoice or billing for design services, right-of-way acquisition purchase, and construction; and 2) a copy of the check, a certification letter, or other documentation to verify the CITY's proof of payment. The final reimbursement payment to the CITY will be contingent upon the City Manager or Mayor providing written notification to the COUNTY that the project is complete along with identification of final project costs. COUNTY bond funds for the Project are allocated as follows: County Pavaient bv'Phase* H/H Study: $73,550A0 Design, ROW Acquisition $7.206.450.00 & Construction: TOTAL: $7,280,000.00 TBP Funding Category: 2021 Countywide Initiatives and Partnerships * Reimbursement payments will be issued by the COUVTYfor eligible expenses incurred during the Fiscal Year for which bond f rnds are certified by the Tarrant County Auditor. The CITY understands that the CITY will be responsible for cost overruns and any other expenses incurred by the CITY in performing the services described herein. The CITY agrees that the COUNTY retains control over when reimbursement payments will be disbursed to the CITY. VI. AGENCY -INDEPENDENT CONTRACTOR Neither the COUNTY nor any employee thereof is an agent of the CITY, and neither the CITY nor any employee thereof is an agent of the COUNTY. This ILA does not and shall not be construed to entitle either party or any of their respective employees, if applicable, to any benefit, privilege or other amenities of employment by the other party. The COUNTY will have no right to control the manner or means of construction of the CITY's contractor for this PROJECT. VII. ASSIGNMENT Neither party may assign, in whole nor in part, any interest it may have in this ILA without the prior written consent of the other party. VIII. THIRD -PARTY BENEFICIARY EXCLUDED No person other than a party to this ILA may bring a cause of action pursuant to this ILA as a Altamesa Road Extension ILA: 2021 Transportation Bond Program Page 3 third -party beneficiary. This ILA may not be interpreted to waive the sovereign or governmental immunity of any party to this ILA to the extent such party may have immunity under Texas law. IX. AUDIT OF RECORDS The CITY's records regarding this PROJECT shall be subject to audit by the COUNTY during the term of this ILA and for five years after the completion of the PROJECT. X. ENTIRE AGREEMENT This ILA represents the entire understanding of and between the parties and superseded all prior representations. This ILA may not be varied orally but must be amended by written document of subsequent date duly executed by these parties. XI. VENUE This ILA shall be governed by the laws of the State of Texas and venue for any action under this ILA shall be in the district courts of Tarrant County, Texas. XII. TERMINATION Until funded by the COUNTY as described in Section V, this ILA may be terminated by either party by providing written notice to the other party at least thirty (30) days prior to the intended date of termination. Such notice shall be deemed given when personally delivered or mailed by certified or registered mail (with return -receipt and postage prepaid) and addressed to: COUNTY: CITY: County Administrator City Manager Tarrant County City of Fort Worth 100 E. Weatherford Street, Ste. 404 100 Fort Worth Trail Fort Worth, Texas 76196 Fort Worth, TX 76102 XIII. SOVEREIGN POWERS The COUNTY and the CITY agree and understand neither Party waives nor surrenders any of its governmental powers by execution of this ILA. , XIV. COMPLIANCE WITH LAWS In providing services required by this Agreement, CITY and any contractors the CITY engages to perform these services must observe and comply with all applicable federal, state and.Iocal Altamesa Road Extension ILA. 2021 Transportation Bond Program Page 4 statutes, ordinances, rules and regulations, including, without limitation, workers' compensation laws, minimum and maximum salary and wage statutes and regulations, and non-discrimination laws and regulations. CITY shall be responsible for ensuring its compliance with any laws and regulations applicable to its business, including maintaining any necessary licenses and permits. APPROVED on this day the tq 4day of WG7 bW , 2024, by Tarrant County. TARRANT COUNTY, TEXAS Tim O'Hare, County Judge APPROVED AS TO FORM. District Attorney'sfffice— Criminal* Commissioners Court Order No. _[q 4 30� CITY OF FORT WORTH f Jesica McEachern, Assistant City Manager M&C 24-0149 Date: 2024 Ocag3as B'ack (Sep 26, 2024 23:2C COT) Doug Black, Sr. Assistant City Attorney d49UOnb a.s°°' °moo 9 d V OVo8=d° dd *' o *fie Jannette Goodall, City Secretary as°I nex 4gggb OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX AEtamesa Road Extension ILA: 2021 Transportation Bond Program Page ; * By law, the Criminal District Attorney's Office may only approve contracts for its clients. We reviewed this document as to form from our client's legal perspective. Other parties may not rely on this approval. Instead, those parties should seek contract review from independent counsel. CERTIFICATION OF AVAILABLE FUNDS IN THE AMOUNT OF: 73,55h, CZ) as follows: Fiscal year ending September 30, 2025: $73,550.00 2021 TBP Countywide Initiatives and / Partnerships — Pct 1 and Pct 2 �, �,, � �• 1�1LC Grit. Auditor's Ace Altamesa Road Extension ILA: 2021 Transportation Bond Program Page 6 919124, 3:54 PM M&C Review official site of the City o` Fort 'North, Texas CITY COUNCIL AGENDA Create New From This M&C DATE: 8/27/2024 REFERENCE NO.: CODE: C TYPE FORT IVORTH **M&C 24- 20EAST ALTA MESA BLVD 0749 LOG NAME: EXT. FROM ANGLIN DR TO DICK PRICE RD CONSENT PUBLIC NO HEARING: SUBJECT: (CD 8) Authorize Execution of an Interlocal Agreement with Tarrant County for County Participation in an Amount Not to Exceed $7,280,000.00 for the Extension of East Alta Mesa Boulevard from Anglin Drive to Dick Price Road, Adopt an Appropriation Ordinance, and Amend the Fiscal Year 2024 - 2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution of an Interlocal Agreement with Tarrant County for county participation in the East Alta Mesa Boulevard Extension from Anglin Drive to Dick Price Road project (City Project No. 105686) in an amount not to exceed $7,280,000.00; 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Intergovernmental Contribution Fund in the amount of $7,280,000.00, from Tarrant County contributions, for the purpose of funding the East Alta Mesa Boulevard Extension from Anglin Drive to Dick Price Road project (City Project No. 105686); and 3. Amend the Fiscal Year 2024 - 2028 Capital Improvement Program. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the City Manager to execute an Interlocal Agreement with Tarrant County in the amount of $7,280,000.00 for the county's participation in the East Alta Mesa Boulevard from Anglin Drive to Dick Price Road Project. The project requires complex design elements and construction will include pavement, box culverts, shared -use path, streetlights and other transportation elements. This project is one of four projects that will traverse the far south side of Fort Worth connecting multiple communities and serve as a regional connection between the southwest and southeast suburbs. It will offer the most direct east -west alternative to Interstate 20 and serve as a potential freight route. Additionally, it will connect new subdivisions and facilitate infill economic development and service in the area. Fort Worth is partnering with Tarrant County (through 2021 bond funds) and later North Central Texas Council of Governments (NCTCOG, through Federal Highway Administration (FHWA) funds) to provide this connection. This proposed connection will increase mobility for the region. This agreement states that Tarrant County will reimburse the City for the costs associated with the design, hydrologic study, right-of-way acquisition, and other associated planning costs (including surveys, schematics, governmental approval costs, utility relocation), and remaining costs for the construction of East Alta Mesa Boulevard within the project limits. The schematic, right-of-way acquisition, hydrology and hydrology study and designs are anticipated to utilize the entire funding amount. The construction will be funded separately through FHWA funds and, if approved, the City's 2026 Bond funds, after a risk assessment has been completed and the project is determined feasible for construction. Fund Amount 30106 - Intergovernmental Contribution Fund $7,280,000.00 apps.cfwnet.org/council_packet/mc_review.asp?ID=32456&councildate=8/27/2024 112 919 24, 3:50 PM M&C Review Funding for this project was not included in the Fiscal Years 2024-2028 Capital Improvement Program as the project and funding sources were not known at the time of the CIP development. The action in this M&C will amend the FY2024-2028 Capital Improvement Program as approved in connection with Ordinance 26453-09-2023. A business equity goal is not assigned when purchasing from an approved purchasing cooperative or public entity. The portion of East Alta Mesa Boulevard is located in COUNCIL DISTRICT 8. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that upon approval of the above recommendations, execution of the Interlocal Agreement and adoption of the attached appropriation ordinance, funds will be deposited in the Intergovernmental Contribution Fund. The Transportation and Public Works Department (and Financial Management Services) is responsible for the collection and deposit of funds due to the City. Prior to expenditures being incurred, the Transportation and Public Works Department has the responsibility of verifying the availability of funds. TO Fund Department Account Project Program Activity Budget Reference # Amount I❑ ID Year (Chartfield 2) FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) Submitted for City Manager's Office by_ Jesica McEachern (5804) Originating Department Head: Additional Information Contact: ATTACHMENTS Lauren Prieur (6035) Kelly Porter (7259) Monty Hall (8662) AltaMesa FID Table Revised.xlsx (CFW Internal) M&C Mar) RTI Alta MesaExoansion.pdf (Public) ORD.APP 20EAST ALTA MESA BLVD �XT. FROM ANGLIN DR TO DICK PRICE RD AD (rz) 30106 ,(Rev8.08.24),docx (Public) TBP-2021-Fort-Worth-Altamesa-Road-Extension-New Format ILA Draft V5.pdf (CFW Internal) apps,cfwnet.org/council_packet/mc_review,asp?ID=32456&counciIdate=8127/2024 212 Consideration of an Interlocal Agreement between Tarrant County and the City of Fort Worth Related to the Altamesa Road Extension Project - 2021 Transportation Bond Program SIGNED AND EXECUTED this 25 day of November, 2024, COUNTY OF TARRANT STATE OF TEXAS Tim O'Hare County Judge 11 /25/2024 (�b 0Iq q3cpf, . 4 ��NT •. ' COMMISSIONERS COURT COURT ORDER NUMBER COMMUNICATION PAGE 1 OF 10 • DATE: 11/19/2024 SUBJECT: CONSIDERATION OF AN INTERLOCAL AGREEMENT BETWEEN TARRANT COUNTY AND THE CITY OF FORT WORTH RELATED TO THE ALTAMESA ROAD EXTENSION PROJECT - 2021 TRANSPORTATION BOND PROGRAM *** CONSENT AGENDA *** COMMISSIONERS COURT ACTION REOIFESTED It is requested that the Commissioners Court consider an Interlocal Agreement (ILA) between Tarrant County and the City of Fort Worth related to the Altamesa Road Extension project located in Precincts 1 and 2. BACKGROUND On September 5, 2023, the Commissioners Court, through Court Order # 141673, approved a total of nine (9) projects for funding in the CWI category in the 2021 TBP. The Altamesa Road Extension project is part of the nine (9) Countywide Initiatives and Partnerships (CWI) projects. The County is now proceeding with the execution of the ILA with the City of Fort Worth related to the Altamesa Road Extension project for financial support of up to $7,280,000.00. This project will be funded through the 2021 TBP, CWI funding category. This project will consist of the construction of the extension of Altamesa Road from Anglin Drive to Dick Price Road. The new extension consists of four (4) lanes for approximately 1.1 miles, 60' wide arterial including streetlights, shared use paths, storm drainage, and a bridge crossing of Village Creek. This ILA has been reviewed by the Auditor's Office and approved as to form by the Criminal District Attorney' s Office. FISCAL IMPACT The fiscal impact to Tarrant County for the entire project will be $7,280,000.00 in 2021 TBP funds. The fiscal impact for the FY 2025 will be $73,550.00 and is available in account 47800-2025 2021 TBP CWI / 6840100000 Transportation / 579061 County Projects. SUBMITTED BY Transportation Services PREPARED BY: Abbas Rastandeh APPROVED BY: Scott Hall