Loading...
HomeMy WebLinkAboutContract 61894-CO10 o nnnn -44 I.g PVo °=d 0 qa�.�.. A .�m.9 aa4Il nEXp?o4 Attest: Jannette S. Goodall City Secretary Facility and Project�PSB Municipal Building Roof Description: FORT WORTH. City Of Fort Worth Change Order Request Funding (FID) No.(s) �0100 0210410 5430101 104428 CAPEX 9999 Contractor: iCowboys Roofinq, LLC City Project Mgr.i Juan Serrano Phone Number: 1(682) 352- 8186 CSC No. 61894-COI City Sec No. I61894 City Proj. No. I104428 ChangeOrder# Date: 1 12I4I2024 1 City Inspector: JJason Buchanan Phone Number: 1(682)201-1882 OriginalContract Amount ------------------------------------- —---------------------------------------------------- —----------------------------- — Extrasto Date--------------------------------------------------------------------------------- ----- Creditsto Date--------------------------------------------------------------------- ----------------------------------- Pending Change Orders (in M&C Process) ------------------------------------ ------------------------------------------------------------------ ContractCost to Date ------------------------------- —----------------------------------------------- ------------------------------------------------ Amount of Proposed Change Order --------------------------------------------------------------------------------------------------------- RevisedContract Amount ------------------------------------------------- —------------------------ —----- -------------------------------------- Original Funds Available for Change Orders ----------------------------------------------------------------------------------------------------- Remaining Funds Available for this CO ---------------------------------------------------------------------------------------------------------- Additional Funding if necessary) ------------------------------------------------------------------------ CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 5685,716.40 0.00 -0.00 '0.00 $685,-16.40 42,000.00 $ 27,716.40 80,000.00 38,000.00 0.00 6.12 % $857,145.50 Contract Time (CD) 120 0 0 0 120 20 140 The purpose to Change Order #1 will add scope of work to the project to include the replacement of existing roof drains on the 4th floor of the Public Safety Building. Change Order #1 will add funds to the construction contract for PSB Municipal Building Roof Replacement. An increase of $42,000.00 to the original contract amount ($685,716.40) for a revised contract amount of $727,716.40, a 6.12% increase to the original contract, approved by M&C 24-0584. This results in an increase in project sum with an additional 20 calendar days of project time. Cowboys Roofing, LLC was selected as the Contractor in July of 2024. Funding is provided by PMD Facilities Capital Expenditure. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to the above Change Order. ny Name Cowboys Roofing, LLC Contractor Name Tim Ebel Tim Ebel Tim Ebel (Dec 4, 202410:19 CST) Dec 4, 2024 PMD Inspector Sr. Capital Projects Officer Ja n Buchanan (Dec 4, 2024 14:24 CST) Dec 4, 2024 Dec 12, 2024 D Superintendent Date Director -Property Management Department Date Dec 4, 2024 Dec 13, 2024 Project Manager Sr. Assistant City Attorney Date JvAw = Se-rra.nw, Dec 4, 2024 Dec 13, 2024 Project Architect Date Assistant City Manager Darte Harold Stebhens Harold Stephens (Dec 7, 262410:47 CST) Dec 7, 2024 Dana Burghdoff Dana Burghdoff (Dec 16, 202413:54 CST) Dec 16, 2024 M&C Number Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX M Nikita Watts Sr. Capital Projects Officer Proposed Change Request # Job # 24073 Project: PSB ROOF Client: CFW Attn: Harold Stephens From Tim Ebel 4 Description: Repair/Replace Roof Drain lines UPDATED Description Date: 12/2/2024 Provide labor and material to repair/replace necessary damaged drains on Roof B. Includes removing and hauling off debris. Protection of finishes included. Work during regular business hours. EXCLUSIONS: Furniture move, Desks, Filing cabinets, Computers, lights, ceiling fans, new ceiling tile, abatement demo. Total Schedule impact: 20 Days Accepted: ❑ Rejected: By: / Date Subtotal Supervision Subtotal Overhead Subtotal Profit Subtotal Sales Tax Amount $ 39,900.00 $ 39,900.00 $ 2,100.00 $ 42,000.00 0% $ - $ 42,000.00 0% $ - $ 42,000.00 0.00% $ - $ 42,000.00