Loading...
HomeMy WebLinkAboutContract 62103-CO1CSC No. 62103-COl IPROJECT NAME: I CONTRACT: ICFA # ICITY PROJECT # ICITY SECRETARY CONTRACT # IFID # IX# IFILE # INSPECTOR: PROJECT MANAGER: IORIGINAL CONTRACT IEXTRAS TO DATE ICREDITS TO DATE ICONTRACT TO DATE (AMOUNT OF PROP. CHANGE ORDER (REVISED CONTRACT AMOUNT (TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT DEVELOPER -AWARDED -PROJECT CHANGE ORDER The Foundry Mixed Use Water, Sewer, Drainage, & Paving 24-0080 105439 62103 30114-0200431-105439-EO7685 28103 W-3035 CITY PARTICIPATION:( NO CHANGE ORDER No: Victor Gutierrez Phone No: 817-739-5470 Ram Tiwari, P.E. Phone No: 817-392-2237 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS Developer Developer Developer Developer Cost City Cost Developer Cost City Cost Cost ity Cost Cost City Cost Cost City Cost $266,836.49 $98,623.28 $54,039.45 $0.00 $6,075.00 $0.00 $117,190.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ' $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 ' $0.00 $0.00 $0.00 $0.00 $0.00 $266,836.49 $98,623.28 $54,039.45 $0.00 $6,075.00 ' $0.00 $117,190.00 $0.00 $0.00 $0.00 $10,243.49 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $277,079.98 $98,623.28 $54,039.45 $0.00 $6,075.00 $0.00 $117,190.00 $0.00 $0.00 $0.00 $375,703.26 $54,039.45 $6,075.00 $117,190.00 $0.00 Dev. Cost: $454,384.43 City Cost: $98,623.28 $553,007.71 REVIEWED By TiwariR at 3:14 pm, Dec 06, 2024 I (CONTRACT i DAYS 60 60 0 60 OFFICIAL RECORD Revised: 12-17-2018 CITY SECRETARY Page 1 FT. WORTH, TX You are directed to make the following changes in the contract documents: UNIT I: WATER IMPROVEMENTS CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost City Cost TOTAL 2 3201.0151 9 LF Asphalt Pvmt Repair, Water Service $0.00 $222.00 $1,998.00 $0.00 $1,998.00 8 3311.0141 9 LF 6" Water Pipe $0.00 $40.00 $360.00 $0.00 $360.00 10 3312.0001 1 EA Fire Hydrant $0.00 $1,825.00 $1,825.00 $0.00 $1,825.00 11 3312.0117 1 EA Connection to Existing 4"-12" Water Main $0.00 $1220.49 $1,220.49 $0.00 $1,220.49 15 3312.3002 2 EA 6" Gate Valve $0.00 $2,420.00 $4,840.00 $0.00 $4,840.00 TOTAL UNIT I: WATER IMPROVEMENTS $10.243.49 $0.00 $10,243.49 Asterisk (*) indicates New Pay Item REVIEWED By TiwariR at 3:14 pm, Dec 06, 2024 Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER Added Fire Hydrant RECOMMENDED: APPROVED: APPROVED: Westwood Professional Services Parkway C&A, LP Digitally signed by Rob AP FW Foundry, LP lacobucci� By. !� % i �I 2 `I By: �c E�ac I" By. t KUb Ia(;(fUUGCi 0="Parkway C&A, LP", CN=Rob Jacob°cc' Sh am Patel Name: Elliott S. Wallace Name: Date: 2024.12.0614:59:27-06'00' Name: Shy am Project Engineer Title: Project Manager Title: Owner Representative APPROVAL RECOMMENDED: CFW - Water Department By: Name: aril�� \/� rll\ (J'hAGP Title: Engineering Manager APPROVED: CFW - Assistant City Manager ZSGRl1A/ BGL�LIGG(%v� By: Dana Bu rvhdnff fOPr`{q 2n�n dac tT) Name: Dana Burghdoff Title: RECOMMENDED: 9fORT°➢➢➢ -f000 CFW - *Contract Compliance Manager ATTEST %urraita %S�e aaa s By. Kam i iwan tuec n, may iu:uy" i) ➢aIlEop`4' Name: Ram rlwari Jannette S. Goodall Title: Senior Professional Engineer/PM City Secretary M&C Number: NSA M&C Date Approved: Revised:12-17-2018 APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney E) By: Richard McCracken Mpr lG Jnd nS•dt rM Name:Richard McCracken Title: * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. ❑There are NO City Funds associated with this Contract ElThere are City Funds associated with this Contract REVIEWED By TiwariR at 3:14 pm, Dec 06, 2024 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 3 I�4 W .; ❑ ❑ ❑ - _ _ - s-srA o-m - srA o«oo LINE - uxE w_z uxe w-a a^ .ATE v1LVENO , e .4 TEE XA DATE— sro ,r FRE LlE 1-1 DATE Y r i IN THE vuuiER iEp NC ---� I Iw_aaeLINE 16 A--' I----_. X EASPIE11 E%IS"NG INH/,MORE STREET i VALVE (60' RIGHT-OF-WAY) l W PROP 8" PUBLIC c W } MM, WATER MAIN <W C900-DR14 W z Z f~ n; aFIE o EXIST 6 PUXuc wATE Q ER C a�—ED—GT a aafi-„J. Fc 6Js) 'I�Fv�s e ,v. RG 636) COORDINATEII CONTACT DIG-TESS 1-800-DIG-TESS ATMOS ENERGY 1-800-332-8667 ONCDR ELECTRIC 972-888-1359 AT&T 1-817-589-1056 CHARTER SPECTRUM 1-817-205-8177 TXU 1-800-711-9112 TEXAS ONE CALL 81, I 48 HOURS PRIOR TO CONSTRUCTION I PR ED v -- aw_u ary )P. 8" PUBLIC WATER MAIN C900-DR14 �61 ER .o,sz 111N WTM N WH/TMORE STREET e / (60' RIGHT-OF-WAY) h8T E a6—� EID R-Cx1NxGAs / = 6 UNE TDB' / -TER MT x ER REF A 'P�Rn 7E /T z DR' ZONE ERZLY I I I j -----WX --- --. xz T/7T/Tl/� T/TT/T/7T/Tj EXIBTNG 8" SS LINE fl 0 REVIEWED a By TiwariR of 3_1$pm Dec 06, 202d w �EXISnNG - e 6^w WE/SENBERGER STREET $ (60RIGHT-OF72 -WAY) °w R L1. mal�xo REVISIONS s IisaE uN nomouPeYD T a/„E/iayHr z Q dVnh A a /\ DATE XE a ,o 20Vw- 0 HORIZONTAL SCALE IN FEET - - � L� A�n) % ---]_ — — PEE 'R' i �Baoao VA EIB % TT W El11- DETFCDR y BUILDING FOR PAT NOTE / Xci I I N6 (LS: -EXISTING 6" CAST IRON WATER MAIN TO BE PRIORREMOVED BEGINNINNGCONSTRUCTIO - — — — — OF PROPOSED 8" PVC �•.�--�� —e'ss • _•-_ -__ _��_t-_ WATER MAIN 'T/TI/IT/TT/` /r n n "A.. E H —� I -CONTRACTOR TO REMO / //jj�l'� �Va aee->. Fc ,zo) .L--- - ---- AND SALVAGE ALL / IT OOP AIx EASENEx / EXISTING APPURTENANCE / (INsi rvo Lozzovso4s) ON THE EXISTING 6" WATER MAIN BEING REMOVED -CONTRACTOR TO RECONNECT EXISTING SERVICES AND LATERALS AFTER CONSTRUCTING T PROPOSED 8" WATER LIN '-- / // ///// AL EX — LINE 11 V L ,_,u, ,=*uGHTETANDARD e z' E.IIEITLI"E ,x�p SiOEu SE.1 MAN OLE was WpiER VNiK wA R NE w/ BEND P v ®Fz AsrHALT NIu & —ILAY RaE HroB xT ® ETAI 6 ON AREEE B & ,0 X*YRE6i0N EARTLfY 'O{ti, 138J8 CEXSE� ? ��aBkNAL fW4 311 THE EAL A "11T ozaFAH HOER THE MILE 1 CONTRACTOR TO ADJUST EXISTING METERS AND UTILITIES TO FINISH GRADE 2 CONTRACTOR TO NOTIFY ENGINEER IF EXISTING WATER LINES ARE NOT AS SHOWN IN PLAN. TX REG ENGINEERING FIRM F-11756 TX REG SURVEYING FIRM LS-10074301 N Westwood Foa;�� NT":',6;o a .azalss CONSTRUCTION NOTES VE NOTE THE D-TRACTOR SHALL c TACT FOUOWNG AT LEAST 4E 10— PRIOR TO EXCAVATING AT EACH LOCAnDN S FORT WORTTH WATER DE FORT WORT1 T&PW (81J) 871-8100 AnONs (et]) 392-8296 ATMDRS ENERGY L(817)) 2 5-4366 O (817) 215-6214 TXC ENERGY 1E800-233-2133 NE (6I]) 336-66I9 ALL OTHER TH RCOACIUTFS 5800-6OIG2EXI TESS 3363 HE HORIZONTAL & VERTICAL CONTROL E ITTNEI� °6E�n�N11CA11ILL= T—MNIII5TRE85 IxroE�x a N_I Ru ®' AND MEIEEUBEROER _EET. xER AT THE Fri£ pF�ns�T= ..l<a Cr GRRa1 smEEr s. "EET AND VACEx :ETC1 .luN A =IXE A?IN B NaE > 321"DN '174 Cltt PROJECT NO 105439 6OIPRC RECORD N0. IPRC24-0033 MAPSCO NO. TAR-F62- I -I FID NO. 30114-020107685 TAO — 10. 03376524 W W/SS STVPY #I S 2022-XXXX FILE NO, W-3035 CITY OF FORT WORTH, TEXAS A 6•w THE FOUNDRY 1 MIXED USE IMPROVEMENTS s � somrvG A WATER PLAN HIPS JOB NO, i�Tw.T1 DRAWN DESIGNED ESW I D033928J.03 1 DATEAPR 2024 I ]Ill OFT51 F