HomeMy WebLinkAboutContract 62491-A2CT1'1- OF F-T_ WORTH CAMS%PM2.5 TCEQ CONTRACT NUMBER 532-23-40031
AI =NUM T 2
CITY SECRETARY
Texas Commission on Environmental Qnahry CONTRACT NO. 62491—A2
AMUENDMEN T 2
In accordance t-vith the General Term and Condition sub.A'ticle 1.2, Amendments, Texas
Commission on Environmental Quality- (TCEQ and the City- of Fort Worth agree to amend
Contract 382-23-40031 as follows-
1_ This Amendment extends the term of the Contract to August 31, 2025 by
exercising the second of three one-year renewal options in accordance -Mth Special
Term and Condition, article 1
2_ The total compensation possible under the Contract is increased by $64,431.21 for
Fiscal Year fflr 2025, raising the maximum compensation possible to $193,333.63_
TCEQ and the City- of Ft. Worth agree that the total compensation possible under
this Contract is increased as follows=
The Original Contract Amount (Fy23) $64,451.21
Contract Amendment 1 (FI-24 - Renewal) 564,451.21
Contract Amp-ndmi nt 1 (FY25 - Renewal) 564.451.21
The Total Contract Amount $193,353.63
3 _ TCEQ has reused the Scope of Work, hereby included in its entirety- as Attachment
A of this -
Amendment-4-
TCEQ has approi-ed the FY2 5 Cost Budget, hereby included in its entirety- as
Attachment B of this Arendment.
5_ TCEQhas updated the Notices, Project Representatives and records Location, OFFICIAL RECORD
hereby included in its entirety as Attachment C of tills Amendment. CITY SECRETARY
6_ The Term of Contract is extended to August 31, 2025_ FT. WORTH, TX
The City- of Ft_ Worth will continue to operate and maintain the air monitering stations in
Eagle Mountain Lake and Fort NVorth, Texas.
All ether conditions and requirements of Contract J82-23-40031 remain uncharged_
Texas Co=Wssion on
Environmental Quality
By-- ��
�►lithorized Signature
Brandv Brooks
Printed Name
Deputy Director_ Monitoring Division
Title
7151 -1
Date
APPROVED AS TO FORM AND LEGALITY:
Al. ke vin Air(a-s, //
M. Kevin Anders, II (Dec 19, 2024 09:56 CST)
AMNWfft O#y-AUO!'rleyo
City of Fort Worths
—At vw"et
BY- Uujene Washingtw 1M]. 2M 111D Mn
Authorized Signature
Ms- Valerie Wa hirgton
Punted N une
Assistant City Maragc rr
Title
Jul , 202
Date
ATTEST:
e+ s nrr r o
q }
!\/
r�1r �1 �•
�--�
By.
Jannette Goodall
City Secretary
RqE
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
ATTACHMENT A
Page 2 of 19
CITY OF FT. WORTH CAMS/PM2.5
I. FACTS/PURPOSE
TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
SCOPE OF WORK
The Performing Party will operate and maintain the air monitoring stations in
Eagle Mountain Lake and Fort Worth, Texas, listed below in Table I.A in accordance
with 40 Code of Federal Regulations (CFR) Parts 50 and 58, the effective Texas
Commission on Environmental Quality (TCEQ) quality assurance project plans
(QAPPs) pertaining to the State or Local Air Monitoring Stations (SLAMS) network,
Particulate Matter of 2.5 Micrometers or Less (PM2,5) program and the
Photochemical Assessment Monitoring Station (PAMS) networks, equipment
standard operating procedures (SOPS), and the Preventive Maintenance Instructions
(PMI) Manual. This documentation is available upon request.
Air monitoring stations are subject to relocation and sampler changes (including
changes in sampling frequency). In the event of site relocation, the Performing
Party will be notified 30 days prior to relocation. The Performing Party will operate
similar, additional, or relocated ambient air monitoring equipment as needed and
as agreed upon by both parties.
Table I.A lists all parameters and air monitoring stations operated and maintained
under this Contract. Additional auxiliary equipment needed for the data collection
is not listed.
Table I.A: Equipment
Station
I Address
I Equipment Type
I Operating
Schedule
Eagle Mountain
14290 Morris Dido
NOx analyzer
continuous
Lake
Newark Road
AQS# 484390075
Eagle Mountain, Texas,
CAMS 0075
76179
Fort Worth
1198 California Parkway
PM2.5 sampler (Primary)
continuous
California
North
Parkway North
Fort Worth, Texas,
AQS# 484391053
76115
PMz.s sampler
continuous
CAMS 1053
(Collocated)
Haws Athletic
600 %2 Congress Street
PM2.1 sampler
continuous
AQS# 484391006
Fort Worth, Texas,
CAMS 0310
76107
Keller
Federal Aviation
NOx analyzer
continuous
AQS# 484392003
Administration (FAA)
CAMS 0017
site off Alta Vista Road
Fort Worth, Texas,
76244
AQS - Air Quality System
CAMS - continuous air monitoring station
NO.- Oxides of Nitrogen
PM2.1- particulate matter of
2.5 micrometers or less in diameter
Page 3 of 19
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
II. TCEQ RESPONSIBILITIES/DESIGNATION OF STAFF
A. Provide all air monitoring equipment, parts, audit equipment, gas standards,
sample media, data collection equipment, and equipment related supplies for
the proper operation of the air monitoring stations.
B. Provide electricity and modem for data collection at the air monitoring
stations.
C. Provide shipping account information or shipping labels upon request for the
Performing Party to ship air monitoring equipment, parts, audit equipment,
and equipment related supplies to the TCEQ.
D. Provide Performing Party staff with individual virtual private network (VPN)
access accounts to check the site status remotely and update electronic
operator logs through the TCEQ's internal status report webpage during the
term of the Contract. Issuance of VPN access accounts to individuals is entirely
within the discretion of TCEQ and may be denied and/or revoked with or
without cause. All VPN access accounts issued pursuant to this Contract will be
revoked upon its expiration.
E. Provide training for equipment operations and other activities designed to
increase technical capabilities required to support this agreement upon request
by the Performing Party.
F. Provide contact information, troubleshooting, and technical support related to
TCEQ air monitoring equipment by phone, email, or on -site visits, during
regular business days between the hours of 8:00 AM and 5:00 PM Central
Standard Time (CST).
III. PERFORMING PARTY RESPONSIBILITIES
A. At a minimum, provide one primary operator with at least six months
experience with operating, maintaining, and troubleshooting continuous and
non- continuous air monitoring instrumentation and one backup site operator
with similar experience. These site operators must be electrical/mechanical
grade technicians capable of operating, troubleshooting, and performing
maintenance on meteorological hardware and electronic monitoring equipment.
Staff must be proficient with the use of Volt/Ohm meters, dry gas meters,
calibration/audit equipment, and personal computers.
B. Provide all site maintenance equipment (i.e., lawnmower, edge trimmer, ladder,
etc.) and tools (i.e. screwdrivers, wrenches, voltmeters, etc.)
C. Designate a project representative who receives communications from the
TCEQ, manages the work being performed, and acts on behalf of the
Performing Party as an authorized representative. Participate in regular phone
calls with the TCEQ Project Manager. Calls will be scheduled as agreed upon by
both parties and documented in writing by the TCEQ Project Manager.
D. Communicate effectively and promptly with TCEQ technical staff to
troubleshoot malfunctioning equipment. Address all warnings and failures as
soon as detected, or no later than the next business day.
E. At least one operator must be present during all TCEQ assessments or site
visits. At least one assessment per year should be expected. More frequent
assessments may occur if significant or persistent data quality issues occur. If
the data quality objectives are not met, the Performing Party must take
corrective action and if requested, produce a corrective action plan by the
required deadline.
Page 4 of 19
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
F. Operate monitoring equipment according to federal regulations, established
applicable SOPs, PMIs, QAPPs, and any other guidance documents. This
documentation is available upon request.
G. Operate air monitoring equipment according to Table VILA and ensure the
deliverables listed are performed adequately and on time. Document
completion and submit deliverables in the manner listed in Table VII.A.
H. Provide laptop to the operator(s) with current version of Windows, Microsoft
Office Suite, and other necessary software for an effective operation of the air
monitoring stations mentioned in Table I.A. Equipment specific software will be
provided by the TCEQ to be installed by the Performing Party.
I. Monitor the site status remotely through the agency's internal status report
webpage using the TCEQ-provided VPN access. Ensure individual VPN access
accounts remain active. If VPN access is lost, notify the TCEQ Project Manager
upon discovery. VPN access accounts are issued to individuals annually and
must not be shared amongst Performing Party's staff. VPN access accounts
issued pursuant to this Contract may only be used to complete TCEQ work.
J. Notify the TCEQ through electronic mail of the name and termination date for
any personnel who is terminated or removed from work on this Contract,
within one business day of the termination date. The Performing Party will
notify the TCEQ through electronic mail of the name of new personnel assigned
to work on this Contract within five business days.
K. Reply in writing to all TCEQ requests by set deadlines. Promptly respond to and
comply with verbal and written guidance from the TCEQ Project Manager and
technical support staff.
L. Document all site activities in the electronic operator log, including but not
limited to requirements listed in SOPs, before leaving a site where access to
electronic log is available or within two business days where site access to
electronic logs is not available.
M. Ensure the certification for all equipment and gas cylinders is current.
Equipment must be sent to TCEQ for verification prior to expiration. Prior
approval is required to use any expired equipment or cylinders.
N. Document all equipment and gas cylinder changes in Hardware Tracker within
two business days of the change.
O. Make travel arrangements and cover expenses for staff to attend all requested
trainings, competency evaluations, and meetings.
P. Maintain and provide as needed: documentation of shipping expenses,
insurance costs (required) whether using the TCEQ account or other, and any
additional information necessary to track equipment.
Q. When visiting the TCEQ headquarters, all staff must enter through the front of
the building, check -in with the security guard, and be escorted by TCEQ staff.
R. Notify the TCEQ Project Manager immediately of any damages due to accident
or vandalism. Provide pictures, police reports, and communications to provide
remedy within 48 hours of discovery. The TCEQ is not responsible for damages
due to negligence of the Performing Party or its subcontractors. The
Performing Party must provide adequate replacement for equipment that is
lost, stolen, or damaged due to negligence by the Performing Party or any
subcontractor.
S. Provide arrangements to convey equipment to and from the site to TCEQ
employees at mutually agreed upon locations for exchange, delivery, or
Page 5 of ig
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
transfer. The Performing Party is responsible for its own fuel, vehicle, and any
other expenses associated with the requested conveyance.
T. Upon request by the TCEQ, provide guided tours of the monitoring sites, not to
exceed four hours per quarter.
U. Complete the Basic Siting Criteria checklist annually and submit a copy to the
TCEQ Project Manager by the requested deadline. Notify the TCEQ Project
Manager of any non-conformance or obstructions to the monitoring path upon
discovery.
V. Complete the CAMS Operator and Safety Checklists monthly and note its
completion in the electronic operator log. Maintain a copy on site. Notify the
TCEQ Project Manager about any unresolved safety issue and non-conformance
upon discovery.
W. Provide limited logistical support related to relocating or establishing a new air
monitoring site. This may include, but is not limited to, assistance with locating
a new site, providing access to contractors and utility companies for site
construction, and reviewing and documenting site construction activities.
X. Perform transitional services. Given the nature and importance of the services
requested under this Contract, TCEQ must maintain uninterrupted services.
The Performing Party will provide services as needed to assist in the smooth
transition of a replacement contractor. Transitional services include, but are
not limited to:
a) the Performing Party will provide one week of training to the replacement
contractor;
b) the Performing Party will provide reports, maps, property site contact
information, keys, equipment, and other TCEQ property to the replacement
contractor upon execution of said future Contract;
c) the Performing Party will report to the replacement contractor any pending
problems being investigated or for which equipment repair is incomplete;
d) upon request by TCEQ, the Performing Party will provide to the replacement
contractor access to site trailers, buildings, utilities, or other locked areas;
e) the Performing Party will notify the TCEQ Project Manager in writing when
the transition of services is complete; and
f) at all times, the Performing Party will provide complete cooperation,
courtesy, civility, and professionalism when providing transitional services
and communicating with the replacement contractor staff.
IV. DESCRIPTION OF DELIVERABLES
The Performing Party must operate and maintain the air monitoring stations and
the associated equipment listed in Section I according to all applicable federal
regulations and all effective TCEQ QAPPs, SOPS, and PMIs, as well as any additional
guidance provided by the TCEQ Project Manager to meet existing, and future,
federal and state air monitoring requirements. If there are discrepancies between
the TCEQ SOPs and this Contract, the Performing Party must contact the TCEQ
Project Manager for clarification and approval. TCEQ documents can be accessed
through the TCEQ Rhone page and are also available upon request.
V. ACCEPTANCE CRITERIA
A. The Performing Party is required to provide the TCEQ at least an 85 percent (%)
quarterly data return from all monitors and samplers. If the 85% data return is
not achieved, assignable cause must be identified within a week after each
Page 6 of ig
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
month end. Assignable causes may include acts of nature (tornadoes,
hurricanes, hail, etc.), vandalism, or circumstances beyond the control of the
Performing Party. Neglect of the site is not an assignable cause.
B. Failure to meet 85% quarterly data returns without assignable cause may result
in discretionary payment reductions. Considerations for the reduction of
payment will consist of evaluation of the Performing Party's performance of
required operating procedures, quality control procedures, and effective and
timely communication of non-compliance issues. Any payment adjustment
made under this section is cumulative with all other remedies, and non-
compliance issues may require additional corrective action.
C. The parties agree that the following payment reductions represent a reasonable
calculation of damages to the TCEQ in the event that the Performing Party fails
to meet the required 85% quarterly data return without an assignable cause.
a. The TCEQ may reduce payment to the Performing Party for non-
compliant quarter by up to 2 5% of the total amount invoiced.
b. Payment reductions made under this section may not reduce the total
amount paid to the Performing Party for an entire fiscal year by more
than 2 5% of the total amount invoiced. After receipt of the fourth
quarter invoice, TCEQ will perform an accounting of all payment
reductions and make necessary adjustments to the final payment to
ensure that Performing Party is paid at least 75% of the total amount
invoiced for the fiscal year.
VI. VENDOR PERFORMANCE EVALUATION
Failure to meet Contract deliverables will be noted and documented in the TCEQ
Project Manager's performance evaluation of the Performing Party and may
determine the continuation of this Contract.
VII. SCHEDULE OF DELIVERABLES
The Performing Party must provide the deliverables listed in Table VII.A to the
TCEQ in accordance with the noted timeframes.
Table VII.A: Contract Deliverables
Deliverable I Equipment I Summary of Tasks and Timeframes I Submit to:
Data Collection all . Operate all samplers according to LEADS via VPN or
applicable Standard Operating Procedures through the on -site
(SOPs) and the U.S. EPA Monitoring data logger
Schedule.
. Review continuous data in Leading
Environmental Analysis and Display
System (LEADS) daily to ensure sampler
function and communication.
Equipment all . Respond to equipment warnings, failures Project Manager,
Failure Response or malfunctions by visiting the site on the TCEQ equipment
same day if feasible, but no later than the support staff, and
next business day. LEADS via VPN
• Notify the TCEQ in writing within one
business day of problem resolution.
Page 7 of 19
CITY OF FT. WORTH CAMS/PM2.5
Deliverable
Equipment
Failure and
Sample Loss
Report
Monthly
Verification and
Report
Quarterly Audit
and Report
Equipment
all
TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
Summary of Tasks and Timeframes I Submit to:
• Follow the TCEQ's technical advice and
instructions without exception when
troubleshooting equipment.
• Document all equipment actions and
subsequent resolution in the electronic
operator log and hardware tracker if
applicable.
• Report equipment failures or
malfunctions in writing the same day as
discovered. Include symptoms or cause of
failure and contact information for the
Performing Party personnel immediately
available to troubleshoot.
• Report in writing within one business day
if any continuous monitor fails to collect
data for more than 48 consecutive hours
or when two consecutive non -continuous
samples are missed or invalid. Include
reason for data loss and corrective action.
PM2.5 • Perform verifications monthly within first
continuous ten business days of the month.
• Perform verification procedures as
defined by instrument SOPs.
• Perform calibrations as needed or when a
monthly verification fails.
• For each verification, use the latest
version of the worksheet found on Rhone.
• Document all verifications in the
electronic operator log, identifying the
sampler, the results, and the date of the
verification. The originator must review
the worksheet for accuracy.
• Verification reports must be reviewed by
someone other than the originator prior
to submission to the TCEQ to ensure
accuracy. The review must be
documented in the worksheet.
• Submit verification report within five
business days of completion.
• If corrections are requested by the TCEQ
the Performing Party will correct and
return the worksheet within the requested
timeframe.
PM1, • Perform quarterly audits within first ten
continuous business days of the quarter for PM,.,.
Quarters are defined by instrument SOPS.
• Perform additional audits after
instrument repair, modification, or
replacement.
• For each audit, use the latest version of
the worksheet found on Rhone.
• Document all audits in the electronic
operator log, identifying the sampler, the
TCEQ equipment
support staff,
Project Manager,
and LEADS via VPN
bm@tcea.texas.gov
and Project
Manager
bm@tcea.texas.Lov
and Project
Manager
Page 8 of i9
CITY OF FT. WORTH CAMS/PM2.5
TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
Deliverable I Equipment I Summary of Tasks and Timeframes
results, and the date of the audit. The
originator must review the worksheet for
accuracy.
• Audit reports must be reviewed by
someone other than the originator prior
to submission to the TCEQ to ensure
accuracy. The review must be
documented in the worksheet.
• For PM2.5, submit audit reports within five
business days of completion.
• If corrections are requested by the TCEQ,
the Performing Party will correct and
return the worksheet within the requested
timeframe.
Laboratory NOx
• Perform eight LCCs per year, two per
Control Check
calendar quarter, approximately 45 days
(LCC) and Report
apart per instrument.
• For each LCC, use the latest version of the
worksheet found on Rhone.
• Document all LCCs in the electronic
operator log, identifying the analyzer, the
results, and the date of the LCC. The
originator must review the worksheet for
accuracy.
• LCC reports must be reviewed by
someone other than the originator prior
to submission to the TCEQ to ensure
accuracy. The review must be
documented in the worksheet.
• Submit LCC reports within five business
days of LCC completion.
• If corrections are requested by the TCEQ
the Performing Party will correct and
return the worksheet within the requested
timeframe.
Preventive all
• Perform all the PMIs mentioned in the
Maintenance
equipment SOPS by the set deadlines
Instruction (PMI)
• Detailed information of the PMIs can be
Completion
found on the current version of the PMI
Manual located on the Rhone web page at
httD: //rhone /c gi-bin/Dmi_ do c s.bl.
• Perform any future PMIs developed for
the equipment listed in Table I.A with
TCEQ notification.
• Enter the completion of each PMI, the PMI
number, and the date of completion, in
the electronic operator log.
• Track PMI completion using the TCEQ PMI
tracker and submit monthly by the tenth
calendar day of the following month.
Submit to:
lcc@tcea.texas. Lyov
and Project
Manager
LEADS via VPN and
Project Manager
Page 9 of i9
CITY OF FT. WORTH CAMS/PM2.5
TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
Deliverable I Equipment
I Summary of Tasks and Timeframes
I Submit to:
On -Site Quality all
. Submit completed pre -audit
TCEQ Data Quality
Assurance (QA)
questionnaires by set deadlines.
Team and Project
and Performance
• At least one site operator responsible for
Manager
Evaluation (PE)
the equipment of interest must be
Audits
present during the audit.
• If requested, assist TCEQ staff or U.S. EPA
auditors on -site during audits and
assessments.
• When notified of failures or warnings,
troubleshoot and if requested, produce a
written response by the deadline.
• If requested, provide a corrective action
plan to the final audit report by the set
deadline.
Site Maintenance site
. Maintain site free of vegetation higher
Project Manager
than six inches and trash or debris.
. Ensure site remains locked and secure
when staff are not on -site.
• Obtain written approval from the TCEQ to
change the site lock or combination and
major site modifications prior to the
change.
• Record all site maintenance in the
electronic operator log.
• Complete the Siting Criteria Checklist
annually and submit it to the TCEQ
Project Manager by the requested
deadline. Notify the TCEQ Project
Manager of any threats to siting criteria
when threats occur, such as the growth of
trees or construction of nearby
structures.
• Complete the CAMS Operator and Safety
Checklists monthly and note its
completion in the electronic operator log.
Checklists must be kept at the site either
electronically or as a physical copy. The
checklists are located on the TCEQ Rhone
page.
• Notify the TCEQ Project Manager about
any unresolved safety issue and non-
conformance or concern on the day of
discovery.
Page 10 of 19
CITY OF FT. WORTH CAMS/PM2.5
TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
Deliverable I Equipment
I Summary of Tasks and Timeframes
I Submit to:
Invoice and all
• Submit invoices at the following intervals:
Project Manager
Release of
o September - November
and
Claims
■ due December 31st
Contract Specialist
Submission
o December - February
■ due March 31st
o March
■ due April 30th
o April - May
■ due June 301
o June - August
■ due October 301
• Submit completed Release of Claims form
with the final contract invoice.
• Invoices must include an organized and
detailed breakdown of all expenditures.
• Invoice submittal extensions must be
requested at least one week before due
date.
• Any inappropriate expenditure, including
items not related to the project, will
result in the invoice being rejected.
If an invoice is rejected, the Performing
Party must submit a revised invoice by
the requested date.
Inventory all
• Document any equipment or gas cylinder
Project Manager
Management and
replacement or change in the electronic
Reports
operator log and Hardware Tracker
according to the requirements listed in
Section III of this Contract.
• Ship inoperable equipment to the TCEQ
within five business days of replacement.
Coordinate with the TCEQ Project
Manager if the equipment cannot be
shipped.
• Upon request, promptly assist the Project
Manager with maintaining inventory
control and with Inventory Management
Database (IMD) requests.
• Track and submit quarterly TCEQ asset
inventory reports on the following
schedule:
o September - November
■ due December 3151
o December - February
■ due March 315t
o March - May
■ due June 301
o June - August
■ due October 301
Documentation all
• Ensure all site operators successfully
Project Manager
of Competency
complete and maintain all applicable
(DOC)
DOCs.
• Site operators must complete and submit
Page 11 of 19
CITY OF FT. WORTH CAMS/PM2.5
TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
Deliverable
Equipment
Summary of Tasks and Timeframes
Submit to:
a Contractor Competency Evaluation
Form (CCEF) to the TCEQ Project Manager
for all equipment within 90 days after the
effective date of this Contract or
deployment of new equipment.
• If an operator is hired after the effective
date of this Contract, submit a CCEF for
all applicable equipment within six
months of the operator's hire date. The
new operator may not work
independently until his/her CCEF has
been completed.
• Maintain copies of the completed CCEFs
and any supporting documentation for a
minimum of seven years. Make this
documentation available to TCEQ upon
request.
Quality all
. Read all QAPP documents applicable to Project Manager
Assurance
Performing Party's program and complete
Project Plan
QAPP Review Signature Form. Submit the
(QAPP)
signed form to the TCEQ Project Manager
within 30 days of Contract issuance and/
or QAPP revision. The signature form is
available upon request from the TCEQ
Project Manager.
FOSTAT all
• Read all applicable FOSTAT SOPS and Project Manager
Standard
complete SOP Review Signature Form.
Operating
Submit the signed form to the TCEQ
Procedures
Project Manager within ten business days
(SOPS)
of Contract issuance and/ or SOP
effective date. The signature form is
available upon request from the TCEQ
Project Manager.
DOC - documentation of competency
U.S. EPA - United States Environmental Protection Agency
FRM - federal reference method
LEADS - Leading Environmental Analysis and Display System
met - meteorological equipment with sensors for monitoring temperature, wind speed, and wind direction
NOx - Oxides of Nitrogen
PM,.,- particulate matter of 2.5 micrometers or less in diameter
QAPP - quality assurance project plan
site - trailer, fence, electrical equipment, and site pad, and any encroaching vegetation
SOP - standard operating procedure
TCEQ - Texas Commission on Environmental Quality
VPN - virtual private network
Page 12 of 19
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
Attachment B:
Page 13 of 19
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
Cost Budget
Cooperative Reimbursement Contract
for State Agencies and Local Governments
1. Budget. Authorized budgeted expenditures for work performed are as follows:
Budget
Cost for Work to be
Category
Performed
Salary / Wages
$40,000.00
Fringe Benefits
$20,451.21
Travel
$ 0.00
Supplies
$0.00
Equipment
$0.00
Contractual
$0.00
Construction
$0.00
Other
$0.00
Indirect Costs
$4,000.00
Total
$ 64,4 51.21
2. Indirect Cost Reimbursable Rate. The reimbursable rate for this Contract is 10% of
(check one):
❑ salary and fringe benefits
❑ modified total direct costs
® other direct costs base
If other direct cost base, identify: Salary only
This rate is less than or equal to (check one):
❑ Predetermined Rate —an audited rate that is not subject to adjustment.
❑ Negotiated Predetermined Rate —an experienced -based predetermined rate agreed
to by Performing Party and TCEQ. This rate is not subject to adjustment.
® Default rate —a standard rate of ten percent of salary/wages may be used in lieu of
determining the actual indirect costs of the service.
3. Other. If Budget Category "Other" is greater than $25,000 or more than 10% of
budget total, identify the main constituents:
Page 14 of 19
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
4. Travel. In order to be reimbursable, travel costs must be specifically authorized in
advance of the travel. Travel costs will be reimbursed only in the amount of actual
costs, up to the maximum allowed by law for employees of the State of Texas at the
time the cost is incurred.
S. Budget Categories. The Budget Categories above have the definitions, requirements
and limitations stated in TxGMS. Construction costs are not reimbursable without
prior, specific written authorization from TCEQ.
6. Budget Control.
a. Cumulative transfers equal to or less than 10% of the Total Budget. Performing
Party may transfer amounts between the approved direct cost budget categories so
long as cumulative transfers from direct cost budget categories during the
Contract Period do not exceed ten percent (10%) of the Total Budget amount.
Performing Party must timely submit a Budget Revision Request (BRR) Form
reflecting the revised budget. Upon approval by TCEQ the BRR will be
incorporated into this Contract as though it is a document revised under General
Term and Condition Section 1.2. The 10% limit does not reset with the approval of
each BRR. It resets when an amendment is signed by the parties reflecting changes
to the budget.
b. Cumulative transfers greater than 10% of the Total Budget. TCEQ must pre -
approve in writing all budget revisions that result in the cumulative transfer from
direct cost budget categories of funds greater than 10% of the Total Budget during
the Contract Period. The Performing Party must request to amend the Contract. A
contract amendment is required before Performing Party incurs these costs.
c. Performing Party may not transfer amounts to budget categories containing zero
dollars without TCEQ pre -approval in writing.
7. Invoice Submittal. Unless otherwise stipulated in the Contract, invoices must be
submitted to the individual named in the Notices, Project Representatives and
Records Location document at monthly intervals. Final invoices shall be submitted
within two (2) calendar months after completing the Scope of Work activities. TCEQ
may unilaterally extend this deadline by e-mail.
a. All invoices must be submitted in a format that clearly shows how the
budget control requirement is being met.
8. Supporting Records. Performing Party shall submit records and documentation to
TCEQ as appropriate for the review and approval of reimbursing costs. TCEQ may
reject invoices without appropriate supporting documentation. TCEQ has the right to
request additional documentation such as expenses for the invoice period, year-to-
date expenses, projected totals for the year (or applicable contract period), percent of
budget spent to date, and percentage of budget projected to be spent. Performing
Party shall maintain records subject to the terms of this Contract.
9. Indirect Costs. Performing Party's indirect costs will be reimbursed at the
reimbursable rate entered above. If no reimbursable rate is shown above, indirect
costs are not reimbursable under this Contract. The reimbursable rate must be less
than or equal to the rate authorized under TxGMS. To the extent that the
reimbursable rate is lower than Performing Party's actual indirect costs, Performing
Party is contributing its unreimbursed indirect costs to the successful performance of
this Contract, and waives any right it may have to reimbursement of those costs (if
Page 15 of i9
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
this Contract requires matching funds, Performing Party may claim its unreimbursed
indirect costs as part or all of its match). Performing Party must fund all
unreimbursed indirect costs from other funds. It is the Performing Party's
responsibility to ensure that unreimbursed indirect costs are not charged to other
projects which do not benefit from them, and that it uses funding sources that may
be properly used to fund its unreimbursed costs.
Page 16 of i9
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
Attachment C:
Page 17 of 19
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
NOTICES, PROJECT REPRESENTATIVES AND RECORDS LOCATION
Contract No. 582-23-40031
Contract Name: City of Fort. Worth Cams/Pm2.5
1. Representatives. The individual(s) named below are the representatives of TCEQ and
Performing Party. They are authorized to give and receive communications and
directions on behalf of the TCEQ and the Performing Party as indicated below. All
communications including official contract notices must be addressed to the
appropriate representative or his or her designee.
2. Changes in Information. Either party may change its information in this Notices,
Project Representatives and Records Location document by providing notice to the
other party's representative for contractual matters.
3. TCEQ Representatives
TCEQ CONTRACT MANAGER
(for Contractual Matters)
Paushiana Madison. Contract
Specialist
Business & Financial Services Section
Title
Texas Commission on
Environmental Quality
P.O. Box 13087
MC-165
Austin, Texas 78711-3087
Telephone No. (512) 239-1828
Email Address:
Paushiana.Madison@tcea.texas.Qov
4. Performing Party Representatives.
For Contractual Matters
Anthonv Williams
Proiect Manager
Title
City of Fort Worth
Telephone No. (817) 392-5462
Email Address:
Anthonv.Williams@fortworthtexas.Qov
TCEQ PROJECT MANAGER
(for Technical Matters)
Penelope Mendoza. Proiect Manager
Network Operations Section
Title
Texas Commission on Environmental
Quality
P.O. Box 13087
MC-165
Austin, Texas 78711-3087
Telephone No. (512) 239-1722
Email Address:
PenelODe.Mendoza@tcea.texas.gov
For Technical Matters
Daniel Fernandez
Senior Environmental Specialist
Title
City of Fort Worth
Telephone No. (817) 392-5444
Email Address:
Daniel.Fernandez@fortworthtexas.Qov
Page 18 of ig
CITY OF FT. WORTH CAMS/PM2.5 TCEQ CONTRACT NUMBER 582-23-40031
AMENDMENT 2
S. Invoice Submittal. Invoices must be submitted to the TCEQ Contract Manager,
unless another recipient is identified below:
® TCEQ Project Manager / ❑ TCEQ Disbursements Section / ❑ Other:
6. Designated Location for Records Access and Review. The Performing Party
designates the physical location indicated below for record access and review
pursuant to any applicable provision of this Contract:
200 Texas Street
Fort Worth, Texas 76102
(City / State ZIP)
Page ig of ig
Contract Compliance Manager:
By signing this document, I acknowledge that I am the person responsible for the monitoring
and administration of this contract, including ensuring all performance and reporting
requirements.
Anthony Williams
NAME SIGs
Environmental Supervisor
TITLE
❑ This form is N/A as No City Funds are associated with this Contract
Printed Name Signature
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 06/25/24 M&C FILE NUMBER: M&C 24-0589
LOG NAME: 22TCEQ PM 2.5 CONTRACT FY2025
SUBJECT
(ALL) Authorize Execution of the Texas Commission on Environmental Quality Federally Funded Cooperative Agreement, Amendment No.2 in an
Amount Up to $64,451.21 for Ambient Air Monitoring Operations and Adopt Appropriation Ordinance
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the execution of the Texas Commission on Environmental Quality funded cooperative agreement, Amendment No. 2 for ambient
air monitoring operations with a maximum amount up to $64,451.21 for a one-year term beginning September 1, 2024, and expiring August
31, 2025; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Grants Operating Federal Fund in the
amount up to $64,451.21, subject to receipt of the grant, for the purpose of funding ambient air monitoring operations.
DISCUSSION:
The City of Fort Worth partners to operate an air quality program under four separate but related contracts with the Texas Commission on
Environmental Quality (TCEQ). This local air program benefits the City by ensuring that facilities are in compliance with air quality regulations and
by supporting data collection for air pollutants. Among the four contracts, this contract is fully -funded by the U.S Environmental Protection Agency
(US EPA) through its Section 103 Grant Program, administered by the TCEQ. There are no local matching funds required for this grant contract.
EPA Section 103 Grant Funds have been received annually by the City for the Air Pollution Control Program in cooperation with TCEQ to maintain
and operate various ambient air monitoring stations.
This contract specifically supports a portion of a regional, regulatory ambient air pollution monitoring network. This includes daily monitoring of
oxides of nitrogen and particulate matter. Upon authorization, this contract will continue to support City of Fort Worth operations for local
Continuous Air Monitoring Stations. Activities include air pollutant monitoring, calibration, operation, and regular audit and maintenance activities
for equipment under the terms of the contract. The TCEQ provides all air monitoring equipment and supplies for the operation of the air monitoring
sites. The contract period will be September 1, 2024, through August 31, 2025, with a maximum amount up to $64,451.21 for reimbursement of
expenses to the City.
DOCUMENT
Mayor & Council Communication (M&C) No.
APPROVAL DATE
��GRANTAMOUNT��
TOTAL
Initial Contract Fiscal Year (FY23)
��M&C 22-0507
06/28/22
$64,451.21
$64,451.21
Amendment 1 (FY24) M&C 23-0485 06/13/23
Amendment 2 (FY25) PENDING PENDING
The contract supports operations at the following regulatory air monitoring stations.
STATION ADDRESS EQUIPMENT
Eagle Mountain Lake 14290 Morris Dido Newark Road 1 NOx Monitor
California Parkway North 1198 California Parkway North ��2 PM 2.5 Monitors
11 11
$64,451.21 11 $64,451.21
$64,451.21 11 $64,451.21
TOTAL: $193,353.63
Haws Athletic Center 600 Congress Street 1 PM 2.5 Monitor
Keller 10218 Alta Vista Road 1 NOx Monitor
Upon approval, the City will execute the contract and accept the grant funding. This is a reimbursable grant and indirect cost will be recovered
under this grant.
This agreement will serve ALL COUNCIL DISTRICTS.
A Form 1295 is not required because: This contract will be with a governmental entity, state agency or public institution of higher education:
TEXAS
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds
will be available in the current operating budget, as appropriated, in the Grants Operating Federal Fund. The Environmental Services Department
(and Financial Management Services) will be responsible for the collection and deposit of funds due to the City. Prior to an expenditure being
incurred, the Environmental Services Department has the responsibility to validate the availability of funds. This is a reimbursement grant.
Submitted for Citv Manaaer's Office by
Oriainatina Business Unit Head
Additional Information Contact:
Valerie Washington 6199
Cody Whittenburg 5455
Julianne Ragland 7251
Wyndie Turpen 6982