Loading...
HomeMy WebLinkAboutContract 55768-CO4Attest: FORT WORTH. City Of Fort worth Change Order Request Facility and Project Sycamore Community Center Renovation Description: Funding (FID) No.(s) 30100-0210410-5430101-104433-CAPEXP-9999 Contractor: I Muckleroy & Falls City Project Mgr.IAlfonzo Meza Phone Number: 1 (817) 392-8274 Original Contract Amount------------------------------- --------------------------- Extrasto Date------------------------------- •----------------------------------------- Credits to Date •------------------------------------------------ Pending Change Orders (in M&C Process) --------------------------- Contract Cost to Date------------------------------ •-------------------------------- Amount of Proposed Change Order ------------------------------------------------- Revised Contract Amount-------------------------------- ------------------------ Original Funds Available for Change Orders ----------------------------------------------- Remaining Funds Available for this CO ------------------------------------------------- Additional Funding (if necessary) ------------------------------------------------- CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) Change Order # City Inspector: Phone Number: CSC No. 57768-CO4 City Sec No. 157768 City Proj. No. 101655 ® Date: 1 5/12/2023 Lisa Pyper 1 (817) 392-2391 ---------------------- 52,150,000.00 ------- $67,758.00 •---------------------------------------0.00 I 0.00 ---------------- $2,217,-58.00 -----------------�16,748.00 ----------------------- i 52,234,506.00 •------0.00 •----------I 0.00 -------------------j ' 0.00 3. 3 $2,687,500.00 JUSTIFICATION (REASONS) FOR CHANGE ORDER Contract Time (CD) 175 243 0 0 418 418 It has been discovered that water service to room 132 was not active. A new water line must be run to this room to provide water. Water line will be run exposed along gym wall to reach room 132. Includes costs to paint water line where running exposed on gym walls. This change order includes costs to install a pressure reducing valve on the existing building water system. Existing water pressure is in excess of 100 PSI. This change order is represented as COR 023 & COR 020 from the Contractor. Contractor's Company Name Contractor Name I Contractor Signature Date Muckleroy as Josh Rohrer o May 15, 2023 PMD Inspector Date Sr Capital Projects Officer Date w May 16, 2023 May 17, 2023 PMD Superintendent Date erector/Property Management Department Date May 16, 2023rR.:� May 22, 2023 Project Manager Date Ass' ey Date Y� w May 16, 2023 May 22, 2023 Project Architect Date Assi n r Darte May 16, 2023 __Clf1 r May 23, 2023 M&C Number I N/A Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and adminstration of this contract, including ensuring all performance and reporting requirements. M&C Date Approved N/A 4�� Nikita Watts Sr Capital Projects Officer MUCKLEROY FALLS Sycamore Community Center 2525 E. Rosedale Street, Fort Worth, TX 76105 Change Order Request: 020 To: Lisa Pyper City of Fort Worth 401 W 13th St Fort Worth, TX 76102 Description Water Line to Utility 132 Reference Attached Notes PCO No Date Reference Description PCO 020 2/9/2023 Water Line to Utility 132 Change Order Request Detailed (with Breakdown of PCOs), Grouped by Each Number Project # 22033 HM & MF Ltd., d/ b/a MUCKLEROY & FALLS Tel: Fax: From: Joshua Rohrer HIM & MF Ltd., d/ b/a MUCKLEROY & FALLS 3200 Riverfront Dr Suite 200 Fort Worth, TX 76107 Category Status Required By Days Req 2/27/2023 0 Notes Date: 2/20/2023 Amt Prop Days Req Category Reason 12,718 0 This PCO includes costs to run a water line from Corridor 120 to Utility 132 per the attached sketch. Existing sink in room 132 was replaced per PCO 005. Upon discussion with community center staff it was discovered that water service to this room was not active. A new water line must be run to this room to provide water. Water line will be run exposed along gym wall to reach room 132. PCO also includes costs to paint water line where running exposed on gym walls. This PCO is issued to incorporate the scope of work items as specifically detailed on the attached cost summary and supporting documents. This Proposed Change does not include any additional scope provisions not specifically included herein. If additional costs become apparent at a later date, or additional information regarding this scope of work becomes available, we reserve the right to price any additional cost and/or schedule impacts as they become known. Item No Item Description Amt Prop Reference 001 Plumbing - Paramount - Water Line to Utility 132 8,742 002 Painting - McSweeney - Paint Water Line and Patch 2,820 Ceilings Prolog Converge Printed on: 2/20/2023 MuckleroyFallsProlog Amt Req 12.718 Page 1 Change Order Request Detailed (with Breakdown of PCOs), Grouped by Each Number 003 Muckleroy and Falls - Overhead at 10% 1,156 Approved By: Signature Name Date Prolog Converge Printed on: 2/20/2023 MuckleroyFallsProlog Page 2 (P) PARAMOUNT PLUMBING 1005 N Henderson Street Fort Worth, TX 76107 817.900.2030 Date: 02-03-23 Job: Sycamore Community Center To: ESTIMATING Plumbing bid per job walk and specs. Including the following fixtures; • Bid is good for no more than 30 days • Pro -press copper from existing • Add %" cold water line from existing water main at hallway by custodian closet to new sink location • Drian water line from main for water connection • Water route to be approve per route sketch below • Pricing based on normal work hours M-Thursday, no expedited schedule. MATERIAL $ 4,228.17 46.5 LABOR $ 3,719.12 0.1 OH/P $ 794.73 TOTAL $ 8,742.02 Base Bid Plumbing $8,742.02 (SEE NEXT PAGE FOR BREAKOUTI No sales tax included Exclusions; No HVAC condensate. No Gas. NO BIM or ENGINEERED DRAWINGS. No rock excavation. No soil retainage/void systems. No taps, meters, or fees. No coring, saw cut in post tension slab. No XRAY.No saw cut or pour back. No pour back of existing leave outs. No painting of any pipe. No spoil haul off. No low voltage wiring if required. No sub -meter unless noted above, no backflow unless noted above. No DEMO or REPLACEMENT of ceilings, walls, wall coverings, floors, flooring, cabinets, or any other item covering or encasing any plumbing to tie into or demo. NO SAW CUT OR POUR BACK IN POST TENSION OR CARTON FORM SLAB. Saw cut and pour back pricing based on slab on grade no more than 6" thick, if post tension or carton form pricing will be adjusted. IF PRICING IS GIVEN IT IS FOR SLAB ON GRADE ONLY. Anyjackhammering will be additional. No housekeeping pads. Thank You, Juan Tobias M-22558 Texas State Board of Plumbing Examiners https://tsbpe.texas.gov/ 929 E. 4111 Austin,Tx 78751 512-936-5200 Qty Size Description Unit Price Matl Disc Net Price Net Total Unit Hours Adj Hours 20 % Plain Threaded Rod $ 2.20 0.44 $ 0.97 $ 19.32 0.02 0.6 15 % Hex Nuts $ 0.21 0.80 $ 0.17 $ 2.52 0.00 0.0 164 % Type L Hard Copper Tube $ 10.29 0.45 $ 4.63 $ 758.76 0.05 6.6 5 1 Type L Hard Copper Tube $ 14.68 0.45 $ 6.61 $ 33.03 0.06 0.2 12 3 Plain Standard Clevis Hanger $ 18.72 0.39 $ 7.30 $ 87.61 0.40 9.9 4 <None> WALL COREDRILL $ 195.00 1.00 $ 195.00 $ 780.00 2.00 2.0 164 <None> INSULATION $ 5.00 1.00 $ 5.00 $ 820.00 0.08 13.1 1 <None> RENTAL $ 980.00 1.00 $ 980.00 $ 980.00 2.00 2.0 1 <None> WATER TIE IN $ 50.00 1.00 $ 50.00 $ 50.00 4.00 4.0 65 % ProPress Joint $ - 1.00 $ - $ - 0.00 0.0 2 1 ProPress Joint $ - 1.00 $ - $ - 0.00 0.0 62 % Plain Washer $ 0.04 1.00 $ 0.04 $ 2.48 0.00 0.0 16 3/4 Viega ProPress 90 Ell $ 7.89 0.48 $ 3.79 $ 60.60 0.15 1.9 4 3/4 Viega ProPress 45 Ell $ 6.95 0.48 $ 3.34 $ 13.34 0.15 0.5 2 % Viega ProPress Tee $ 13.06 0.48 $ 6.27 $ 12.54 0.19 0.3 5 % Viega ProPress Coupling $ 6.67 0.48 $ 3.20 $ 16.01 0.14 0.6 4 % Viega ProPress Cap $ 16.05 0.48 $ 7.70 $ 30.82 0.07 0.2 1 1X3/ Viega ProPress Reducing Tee $ 27.20 0.48 $ 13.06 $ 13.06 0.21 0.2 2 % Viega 2971.1ZL Brz Press Ball Valve $ 56.23 0.48 $ 26.99 $ 53.98 0.14 0.2 31 112 Galy Insulation Prot Shield $ 40.87 0.39 $ 15.94 $ 494.12 0.17 4.2 $ 4,228.17 46.5 z t§� W= s F" N p D L g Q 3 E E C > J° x aoi — E-� U E 0 U c W o mz�=o �, Ir & NMI, MI, a +L1 ' � O O - LO p LO04 g aaa M,- spa 3!s a r�,8 sil m - fah=_ a po Ss is M = lea ma 3= "wW3= so s=m wF �swLLo=oa=o iI UP sego= M:�d =o III u m O n 0 0 � 0 3 s O HI u License: McSweeney Commercial Painting 2222 S. Pipeline Rd. Euless TX 76040 817 283-4244 To: MUCKLEROY FALLS 3200 Riverfron Dr. Suite 200 FT WORTH TX 76107 The contractor agrees to perform and the owner agrees to pay for the following changes to this contract. Ordered By: Customer Order: Description of Work Negative changes will lower the overall contract price requiring no additional payment by owner. Owner: Change Order Order#: 8 Order Date: 02/17/2023 Project: 22310 Sycamore Community Center 2525 E Rosedale St FT WORTH TX 76105 Requested Amount of Change Date: Plans Attached ❑ Specifications Attached ❑ Amount 2,820.00 Contractor: Date: Change Order Continued... Description of Work Prep and Paint Patches and Water Pipe. Order: 8 Date: 02/20/2023 Amount 2,820.00 Page 2 of 2 MuCKLEROY FALLS Sycamore Community Center 2525 E. Rosedale Street, Fort Worth, TX 76105 Change Order Request: 023 To: Lisa Pyper City of Fort Worth 401 W 13th St Fort Worth, TX 76102 Description Pressure Reducing Valve Reference Attached Notes PCO No Date Reference Description PCO 023 4/13/2023 Pressure Reducing Valve Item No Item Description 001 Plumbing - Paramount - Pressure Reducing Valve 002 Muckleroy and Falls - Overhead at 10% Approved By: Signature Name Prolog Converge Change Order Request Detailed (with Breakdown of PCOs), Grouped by Each Number Project # 22033 HM & MF Ltd., d/b/a MUCKLEROY & FALLS Tel: Fax: From: Joshua Rohrer HIM & MF Ltd., d/b/a MUCKLEROY & FALLS 3200 Riverfront Dr Suite 200 Fort Worth, TX 76107 Category Status Required By Days Req 4/20/2023 0 Notes Date: 4/13/2023 Amt Prop Days Req Category Reason 4,030 0 This PCO includes costs to install a pressure reducing valve on the existing building water system. Existing water pressure is in excess of 100 PSI per attached photo. Also attached is a spec from the specified flush valve, noting that it is only rated for pressure of up to 80 PSI. In order to maintain the warranty and proper operation of plumbing fixtures, a pressure reducing valve must be installed. This PCO is issued to incorporate the scope of work items as specifically detailed on the attached cost summary and supporting documents. This Proposed Change does not include any additional scope provisions not specifically included herein. If additional costs become apparent at a later date, or additional information regarding this scope of work becomes available, we reserve the right to price any additional cost and/or schedule impacts as they become known. Printed on: 4/13/2023 MuckleroyFallsProlog Amt Prop Reference 3,664 366 Date Amt Req 4,030 Page 1 (P) PARAMOUNT PLUMBING 1005 N Henderson Street Fort Worth, TX 76107 817.900.2030 Revised Change Order Proposal Date: 4-13-23 Job: Sycamore CC To: ESTIMATING Plumbing bid per job walk and specs. Including the following fixtures; • Pro press copper pipe from existing • Install pressure reducing valve to adjust water pressure on building • PRV to be installed inside the building where water comes in to feed the building • PRV to be per the cut sheet below • Pricing based on normal work hours Monday -Thursday, no expedited schedule • MEP ceiling coordination meeting will be required prior to overhead piping Fixture $ 1,311.98 Labor $ 1,584.00 Material $ 435.00 OH/Fee $ 333.10 $ 3,664.08 Base Bid Plumbing $ 3,664.08 Exclusions; No HVAC condensate. No Gas. NO BIM or ENGINEERED DRAWINGS. No rock excavation. No soil retainage/void systems. No taps, meters or fees. No coring, saw cut or XRAY in post tension slab. No saw cut or pour back. No pour back of existing leave outs. No painting of any pipe. No spoil haul off. No low voltage wiring if required. No sub -meter unless noted above, No backflow unless noted above. No DEMO or REPLACEMENT of ceilings, walls, wall coverings, floors, flooring, cabinets or any other item covering or encasing any plumbing to tie into or demo. NO SAW CUT OR POUR BACK IN POST TENSION OR CARTON FORM SLAB. IF PRICING IS GIVEN IT IS FOR SLAB ON GRADE ONLY Thank You, Juan Tobias M-22558 Texas State Board of Plumbing Examiners 929 E. 4111 Austin,Tx 78751 512-936-5200 Plumbing Submittal SYCAMORE COMMUNITY CENTER Submitted by PARAMOUNT PLUMBING 4/13/2023 MOORE SUPPLY CO 7801 SOUTH COOPER ARLINGTON, TX 76001 Phone: 817 784-2340 Fax: 817 784-2335 www.mooresupplyarlington.com Spec# Table of Contents ---------------------- ---------------------- PRESSURE REDUCING VALVE ---------------------- ---------------------- 2013886 WATTS LF25AUB-Z3 0009465 2 TXT BRONZE 25-75PSI WTR PRESS RED VLV SET AT 50PSI LEAD FREE Disclaimer; The speciiicatian sheets proTIded herein ii-et-e }3-iztten and prodded by the product's manufacturer and not by Hajoca Corporation, C omequently. Hajoca Corporation cannot a-3ume and discLaims any respousibilitY for errors, omi14i0ns or IR misstatements in the product specifications prodded herein. Spec Seq#: 1 PRESSURE REDUCING VALVE Spec Seq#: 2 ES-LF25AU B Job Name Job Location Engineer Approval Series LF25AUB-Z3 Water Pressure Reducing Valves** Sizes:'/2" - 2" Series LF25AUB-Z3 Water Pressure Reducing Valves are designed to reduce incoming water pressure to a sensible level to protect plumbing system components and reduce water consumption. This series is suitable for water supply pressures up to 300psi (20.7 bar) and may be adjusted from 25 — 75psi (172 — 517 kPa). The LF25AUB-Z3 features Lead Free` construction to comply with Lead Free* installation requirements. The standard setting is 50psi (345 kPa). All parts are quickly and easily service- able without removing the valve from the line. The standard bypass feature permits the flow of water back through the valve into the main when pres- sures, due to thermal expansion on the outlet side of the valve, exceed the pressure in the main supply. Features • Standard construction includes Z3 sealed spring cage and stainless steel corrosion resistant adjusting & cage screws • Union inlet connection • Integral stainless steel strainer • Replaceable seat module • Lead Free* cast copper silicon alloy construction • Serviceable in line • Bypass feature controls thermal expansion pressure*** • High temperature resistant reinforced diaphragm for hot water Specifications A Water Pressure Reducing Valve with integral strainer shall be installed in the water service pipe near its entrance to the building where supply main pressure exceeds 60psi (413 kPa) to reduce it to 50psi (345 kPa) or lower. The water pressure reducing valve shall be constructed using Lead Free* materials. Lead Free* regulators shall comply with state codes and standards, where applicable, requiring reduced lead content. The valve shall feature a Lead Free* cast copper silicon alloy suitable for water supply pressures up to 300psi (20.7 bar). Provision shall be made to permit the bypass flow of water back through the valve into the main when pressures, due to thermal expansion on the outlet side of the valve, exceed the pressure in the main supply. Water Pressure Reducing Valve with built-in bypass check valves will be acceptable. Approved valve shall be listed to ASSE 1003 and IAPMO and certified to CSA B356. Valve shall be a Watts Series LF25AUB-Z3. Product is for interior or exterior applications. Product should not be buried directly in the ground. For exterior applications where the valve will be situated Contractor Approval Contractor's P.O. No. Representative LF25AUB-Z3 'N Bypass valve N assembly for 1'/4" — 2" (32 — 50mm) sizes �D EPDM Union inlet diaphragm connection Bypassfor Integral (15 — 25mm) stainless sizes steel strainer Replaceable seat module Materials Body: Lead Free* copper silicon alloy Seat: 1/"-1" (15-25mm) Replaceable engineered polymer (10% glass filled Noryl°) 1'/4"-2" (32-50mm) Replaceable stainless steel Integral Strainer: Stainless steel Diaphragm: Reinforced EPDM with PTFE wetted surface Valve Disc: EPDM in a vault or pit or be in contact with the ground, the valve should be installed *The wetted surface of this product contacted by consumable water contains less in a meter box/vault, accessible for repair and adjustment, per local code. than 0.25% of lead by weight. The information contained herein is not intended to replace the full product **A water saving test program concluded that reducing the supply pressure from installation and safety information available or the experience of a trained 80-50psi (551-345 kPa) resulted in a water savings of 30%. product installer. You are required to thoroughly read all installation instruc- ***The bypass feature will not prevent the pressure relief valve from opening on the hot tions and product safety information before beginning the installation of this water supply system with pressure above 150psi (10.3 bar). product. Watts product specifications in U.S. customary units and metric are approximate and are provided for reference only. For precise measurements, please contact Watts Technical Service. Watts reserves the right to change or modify product design, construction, specifications, or materials with- X%IWATM out prior notice and without incurring any obligation to make such changes and modifications on Watts products previously or subsequently sold. Spec Seq#: 2 Pressure - Temperature Temperature Range: 33°F —160°F (0.5°C — 71 °C) Maximum Working Pressure: 300psi (20.7 bar) Adjustable Reduced Pressure Range: 25-75psi (172 — 517 kPa) Standard Reduced Pressure Setting: 50psi (345 kPa) Options Add Suffix 11 " Threaded female union inlet x NPT female outlet -S Solder union inlet x NPT female outlet -QC Quick -Connect union inlet (1/2" 3/4" 1 ") -LF Double union body less fittings (3/4" 1 " 11/4") -w/press**** Press inlet x press outlet (non union) -DU Double Union — NPT threaded union female inlet and outlet -S-DU Double Union —Solder union inlet and outlet -DU-PEX Double Union —PEX union inlet and outlet -DU-QC Double Union — Quick -Connect inlet and outlet (1/2", 3/4",1 ") -G Gauge tapping, 1/4" (1/2", 3/4"),1/8"(11/4"-2") -GG Gauge tapping and 160psi (11 bar) gauge -HP High pressure range 75-125psi (5.2 — 8.6 bar) t -LP Low pressure range 10-35psi (69 — 241 kPa) t -Z6 Water meter threaded connections and 71/2" (190mm) lay length for new or existing meter box installations, For 5/8", 5/8" x 1/4" or 1/4" meter setters or resetters t Not available on G or GG models Noryl° is a registered trademark of SABIC Innovative PlasticsTM ****Viega ProPress° connections are optional factory installed fittings on each end of the approved/certified assembly. Standards 8 NSF S 1003 Meets requirements of ASSE Standard 1003: ANSI A112.26.2: CSA Stan- dard B356; Southern Standard Plumbing Code and listed by IAPMO. Military Standard MIL-V-18146B Type I. Capacity kPa psi Sizes: 1/2"e 3/4"e 1 " 1 1/41e 11/2112" e 0 0 I i 34 5 CL cX y 69 10 ` `\ fA 103 15 138 20 \ \ 172 25 \ \ \ \ \ \I 1 11/4" 1 Yz" 2" 0 10 20 30 40 50 60 70 80 90 100gpm 0 38 76 114 152 190 228 266 304 342 3801pm Flow ------------- A2---------- G Dimensions — Weights A - LF25AUB-Z3 Al - LF25AUB-S-Z3 ET A2 - LF25AUB-DU-LF-Z3 Foc --------------- B - LF25AUB-DU-Z3 B, - LF25AUB-S-DU-Z3 B2 -LF25AUB-DU-THDxPEX-Z3 ET - NPT Engagement for tight joint ` ----- Es - Female sweat socket depth ;Es EP �__ EP - PEX end connection Foc - Quick -Connect union -- ---- A, Al ----- ---- --- B, B1, B2 -------------- F* (Max) C (Max) 1 LD.- A Al in. in. mm in. 1/2 51/8 137 55/6 3/4 55/6 135 51/2 1 6 152 61/4 11/4 8% 222 81 /16 11/2 8% 222 9 2 91/4 235 10 SIZE mm 135 140 159 227 229 254 A2 in. 53/6 51/4 57/8 81/4 81/4 83/4 mm 132 133 149 210 210 222 DIMENSIONS in. 67/16 61/2 73/8 103/4 10% 115/6 B mm 164 165 187 273 273 287 in. 63/8 67/8 713/16 11 113/6 121V6 B1 B2 mm in. mm 162 — — 175 63/4 171 198 711/16 195 279 — — 284 — — 322 — — c in. mm 7 178 7 178 8 203 9 229 91/2 241 11 'A 286 WEIGHT D F G ET Es EP Foc in. in. mm in. mm in. mm in. mm in. mm in. mm in. mm lbs. kgs. /2 11/2 38 9'/16 240 31/8 79 1/2 13 1/2 13 — — 11/2 38 3.5 1.6 3A 11/2 38 9'/16 240 31/8 79 1/2 13 3/4 19 % 16 111/16 42 3.5 1.6 1 13/4 44 107/16 266 35/8 92 5/8 16 15/16 23 13/6 21 1'A 45 6.5 3.0 11/4 21/8 54 117/16 291 3% 92 5/8 16 1 25 — — — — 10 4.5 11/2 2% 60 1115/16 304 41/16 103 % 16 11/16 28 — — — — 10 4.5 2 31/4 83 1311/6 348 41/4 121 5/8 16 15/16 34 — — — — 15 6.8 ° Dimension includes optional gauge Consult factory for dimensions with press connections. \%WATTS° USA: T: (978) 689-6066 • F: (978) 975-8350 • Watts.com Canada: T: (888) 208-8927 • F: (888) 479-2887 • Watts.ca Latin America: T: (52) 81-1001-8600 • Watts.com ES-LF25AUB 2044 0 2020 Watts #• ,r Y � fi Jr opt de d *Ofp Ile r flie • ; p yr �'� - r - �� • r r a � . y . FJ Code No. 0816195 OA� N@ Rev. 6 (02/15) INSTALLATION INSTRUCTIONS FOR EXPOSED ROYAL® FLUSHOMETERS _ 7Urinal Closet Flushometer Flushometer for 1'/2" Top Spud 4" Top Spud Closet Flushometer MODELS 110/111, ODEL 180 for 1'/2" Back Spud 113,115 & 116 MODELS 120, 121 & 122 FlushometerService Sink Flushometer " Top Spud for 1'/2" Top Spud ODEL 186 MODEL 117 �l LIMITED WARRANTY N Unless otherwise noted, Sloan Valve Company warrants this product, manufactured and sold for commercial or industrial uses, to be free from defects in material and workmanship for a period of three (3) years (one (1) year for special finishes, SF faucets, PWT electronics and 30 days for PWT software) from date of first purchase. During this period, Sloan Valve Company will, at its option, repair, replace, or refund the purchase price of any product which fails to conform with this warranty under normal use and service. This shall be the sole and exclusive remedy under this warranty. Products must be returned to Sloan Valve Company, at customer's cost. No claims will be allowed for labor, transportation or other costs. This warranty extends only to persons or organizations who purchase Sloan Valve Company's products directly from Sloan Valve Company for purpose of resale. This warranty does not cover the life of the batteries. THERE ARE NO WARRANTIES WHICH EXTEND BEYOND THE DESCRIPTION ON THE FACE HEREOF. IN NO EVENT IS SLOAN VALVE COMPANY RESPONSIBLE FOR ANY CONSEQUENTIAL DAMAGES OF ANY MEASURE WHATSOEVER. Before you install the flushometer, be sure the items listed below are installed. Also, refer to the rough -in diagram below. • Closet fixture *Drain line *Water supply line IMPORTANT: • ALL PLUMBING SHOULD BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES AND REGULATIONS. • WATER SUPPLY LINES MUST BE SIZED TO PROVIDE AN ADEQUATE VOLUME OF WATER FOR EACH FIXTURE. • FLUSH ALL WATER LINES PRIOR TO MAKING CONNECTIONS. —21/4"MIN. MODELS 110/11 1(57 mm) 113, 115, & 116 o Model 111 —11 Y2" (292 mm) Model 113 —16" (406 mm) Model 115 — 24" (610 mm) Model 116 — 27" (686 mm) �( 1 CENTERLINE OF WASTE� FIN. WALL MODELS 120, 121, & 122 1" I.P.S. SUPPLY �43M'—I (DN 25 mm) 21 mm) CENTERLINE OF FIXTURE —I —21/4"MIN. (57 mm) 1" I.P.S. SUPPLY DN 25 mm) 43/d' Model 120 —11 Y2" (292 mm) 021 mm) Model 121 —16" (406 mm) CENTERLINE W Model 122 — 24" (610 mm) FIXTURE —6b2"— (165 mm) MIN. FIN. —WALL i Sloan's flushometers are designed to operate with 15 to 80 psi (103 to 552kPa) of water pressure. THE MINIMUM PRESSURE REQUIRED TO THE VALVE IS DETERMINED BY THE TYPE OF FIXTURE SELECTED. Consult fixture manufacturer for minimum pressure requirements. Most High Efficiency water closets require a minimum flowing pressure of 25 psi (172 kPa). Many building codes and the ASME A112.19.2 fixture standard list Maximum static water pressure as 80 PSI (552 kPa). — 21/4' MIN. MODELS 180/186 (57 mm) — — 21/4" MIN 1" IRS (57 mm) SUPPLY ° (DN 25 mm) 111/i' —43/d (292 mm) (121 mm) ° CENTERLINE OF FIXTURE 24" (610 mm) CENTERLINE OF/WASTE i FIN. —FIN. FLOOR WALL MODEL 117 SUPPLY r43/a'� (DN 25 mm) 021 mm) CENTERLINE OF FIXTURE CENTERLINE OF WASTE FIN. WALL FIN. FLOOR III IMPORTANT III WHEN MOUNTED ON AN ADA ACCESSIBLE BOWL, THE ROUGH -IN TO THE SUPPLY INLET SHOULD BE NO HIGHER THAN 371/2" OR THE HANDLE WILL EXCEED MAXIMUM HEIGHT ALLOWANCES UNDER ADA GUIDELINES. FIN. FLOOR �, I i