HomeMy WebLinkAboutContract 59115-A1Date Received: Dec 23, 2024
Time Received: 1:47 p.m.
City Secretary
Contract No.: 59115-A1
FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 59115
A COMMUNITY FACILITIES AGREEMENT BETWEEN
THE CITY OF FORT WORTH AND GBTM SENDERA, LLC
This FIRST AMENDMENT TO CITY SECRETARY CONTRACT NUMBER
59115 ("First Amendment") is made and entered into by and between the City of Fort Worth
("City"), a home -rule municipal corporation of the state of Texas, and GBTM Sendera, LLC
("Developer"), a Delaware limited liability company.
WHEREAS, the City and Developer entered into a Community Facilities Agreement
for the construction of public infrastructure improvements for a Project known as Sendera
Ranch Boulevard, City Project Number 103700, City Secretary Contract Number 59115
("CFA"); and
WHEREAS, upon completion of construction and reconciliation of the project costs,
the City discovered an error in the calculation of the City's participation in the project in the
cost summary table of the CFA; and
WHEREAS, the City and Developer desire to amend the CFA to correct the error and
reflect the final costs for the project;
NOW THEREFORE, City and Developer, acting herein by and through their duly
authorized representatives, enter into the following agreement, which amends City Secretary
Contract Number 59115:
1.
The fifth recital of the CFA is amended in its entirety to be and read as follows:
WHEREAS, the City desires to participate in this Agreement in an amount not to
exceed $2,099,326.49 to enlarge the scope of the Improvements beyond what Developer is
responsible for constructing to oversize approximately 1,127 linear feet of water main from
16-inches to 30-inches, 2,100 linear feet of water main from 12-inches to 30-inches, 875 linear
feet of water main from 8-inches to 30-inches and extend the water main an additional 747 linear
feet to meet regional demands as authorized by City Council through approval of M&C 23-0122
on February 14, 2023 ("City Participation"); and
FA
The sixth recital of the CFA is amended in its entirety to be and read as follows:
OFFICIAL RECORD
City of Fort Worth, Texas CITY SECRETARY
Amendment No. 1 to City Secretary Contract No. 59115
FT. WORTH, TX
Pagel of 5
W REAS, the City Participation includes reimbursement to Developer in amounts not
to exceed $2,011,209.28 for construction costs, $7,054.60 for material testing costs, and
$18,784.98 for IPRC engineering plan review fees. The remaining City Participation in the amount
of $62,277.63 shall not be paid to Developer, but will be used by City to pay for the City's portion
of construction inspection service fees, administrative material testing fees, and water lab testing
fees; and
3.
Section 37, subsection (a) of the CFA is amended in its entirety to be and read as follows:
(a) The City shall reimburse Developer in amounts not to exceed $2,011,209.28 for construction costs,
$7,054.60 for material testing costs, and $18,784.98 for IPRC engineering plan review fees. The
remaining City Participation in the amount of $62,277.63 shall not be paid to Developer, but will
be used by City to pay for the City's portion of construction inspection service fees, administrative
material testing fees, and water lab testing fees. During construction of the Improvements,
Developer will receive applications for payment from Developer's contractors. Developer shall
verify that each application for payment is due and payable under the construction contracts
between Developer and the contractors and that the Improvements that are the subject of the
application for payment have been constructed. Developer shall submit payment requests to the
City, in the form of an invoice, no more frequently than one time per month to obtain
reimbursement of the City Participation (each a "Payment Request"). Each Payment Request shall
be delivered to the City by email with the subject reading "Reimbursement Request/Sendera Ranch
Boulevard" and delivered to DSWS@FORTWORTHTEXAS.GOV. Each Payment Request
submitted by Developer shall be accompanied with proof that: (1) Developer has paid the
contractors for the amount included in the Payment Request; and (2) an affidavit and lien release
from the contractors indicating that Developer has paid the contractors in full for the amount
included in each Payment Request and the contractors have paid all subcontractors and material
suppliers in full. Developer must register as a vendor of the City in order for the City Participation
to be paid to Developer. City shall withhold 5% for retainage from each payment to Developer.
The City Participation was calculated as follows:
City Participation Exhibit-Sendera Ranch Blvd
Unit of
Alternate Unit
Contractors
Description- IPRC22-0093 CP14 103700
Measure
Quantity
Price
Unit Price
1 TRENCH SAFETY
LF
4890
51.12
$2.00
2 D.L FITTINGS W,1 RES
TN
0.81
$10,000.00
$9,500.00
3 16" WATER PIPE
LF
162
$76.45
$180.00
430" DIP WATER
LF
4728
$418.25
$465.00
5 IMPORTED EMBEDMENT,' CZSMBACKFILL
CY
84
$97.16
$250.00
616"GATE VALVE&VAULT
EA
1
$14,029.33
$22,500.00
T48" CASING BY OPEN CUT
LF
35
$600,00
$950.00
Sa30" AW WA BUTTERFLY VALVE, W" VAULT
EA
4
$135,000.00
$48.500.00
9 4" CONE30 AIR VALVE ASSEMBLY
EA
1
$15,000.00
$28.500.00
1W" BLOW' OFF VALVE
EA
3
$30,000.00
$14.500.00
11 CONNECT TO EXISTING 30" WATER LINE
EA
2
$11,088.89
$11.500.00
12 CATHODIC PROTECTION
LS
1
$ 165,132.35
$176,000.00
Lowest unit price -BOLD
TOTAL
$
City Participation 80.9%
$
Developer Cost 19.1%
$
City of Fort Worth, Texas
Amendment No. 1 to City Secretary Contract No. 59115
Page 2 of 5
Bi
2,486,043.60
2, 011, 209.28
474,834.33
4.
Section 39 of the CFA is amended in its entirety to be and read as set forth in Exhibit "A"
of this First Amendment, which is attached hereto and incorporated herein by reference.
5.
a. All other provisions of City Secretary Contract Number 59115 which are
not expressly amended herein, shall remain in full force and effect.
b. All terms in this First Amendment that are capitalized, but not defined,
shall have the meanings ascribed to those terms in City Secretary Contract Number
59115.
[REMAINDER OF PAGE INTENTIONALLY BLANK]
City of Fort Worth, Texas
Amendment No. 1 to City Secretary Contract No. 59115
Page 3 of 5
IN TESTIMONY WHEREOF, the City and Developer have executed this First
Amendment to be effective on the date signed by the City's Assistant City Manager.
CITY OF FORT WORTH
Dana Burghdoff (De 3, 2024i :48 CST)
Dana Burghdoff
Assistant City Manager
Date: Dec 23, 2024
Recommended by:
Dwayne Hollars
Contract Compliance Specialist
Development Services
Approved as to Form & Legality:
Richard McCracken (Dec 23, 202411:09 CST)
Richard A. McCracken
Sr. Assistant City Attorney
M&C No. N/A
Date: N/A
ATTEST:
J fannette S. Goodall
City Secretary
DEVELOPER
GBTM Sendera, LLC
1��F
Bobby Samuel
Authorized Signer
Date: Dec 23, 2024
Contract Compliance Manager:
By signing, I acknowledge that I am the
g4Upn
FORr000d
person responsible for the monitoring and
�,�o , °�10o
administration of this contract, including all
.
apQ,� % o=a
performance and reporting requirements.
aQ loo
a� nEX
Rebecca Owen (Dec 23, 202411:03 CST)
Name: Rebecca Diane Owen
Title: Development Manager
City of Fort Worth, Texas OFFICIAL RECORD
Amendment No. 1 to City Secretary Contract No. 59115 CITY SECRETARY
Page 4 of 5 FT. WORTH, TX
Project Name: Sendera Ranch Boulevard
CFA No.: 22-0182
Items
A Water and Sewer Construction
1. Water Construction
2. Sewer Construction
Water and Sewer ConstFvchon To tar
EXHIBIT A
39.
Cost Summary Sheet
City Project No.: 103700 IPRC No.: 22-0093
B. TPW Construction
1. Street
2. Storm (Drain
3. Street Lights Installed by Developer
4. Signals
TPW Con structron Cost To tar
Total Construction Cast (excluding the fees)
Estimated Construction Fees:
C. Construction Inspection Service Fee
❑. Administrative Material Testing Service Fee
E. Water Testing Lab Fee
F. M aterial Testing Cust
F. IPRC Plan Review Fees
Total Estimated Construction F ees;
TOTAL PROJECTCOSr
Financial Guarantee
Bond = 100%
Deve lope r"sCost City%Cost Total Cost
3 1,1365,195.72 $2,011,209.28 $ 3,1376,4135.00
$ $ $
5 1,065,195.72 #2,011.209.28 5 3,076,405.00
$
1,314,316.65
5
- $
1,314,816.65
5
713.545.00
5
- $
718,545.00
3
S
304,479.00
$
$
- $
$
304,479.00
#
2,337,840.65
5
- 5
2,337,840.65
S 3.403.036.37 S2,011,209,28 S 5.414.245.65
5 12,701 .50
3
53,793 50
3
66.50G.00
5 1,956.03
5
8,284.97
$
10,241.00
$ 45.84
$
19416
$
240.00
5 1.665.55
$
7,05460
3
8,72G.15
5 4.435.02
5
18,784.98
5
23.220.00
S 20.803.94 S 88.117.21 S 108.921.15
S 3,423,840.31 S 2,09%326M S %523,166.00
Amount Choice
5 3,403,035.37 I X
* Amounts above include Change Orders 1 and 2
City of Fort Worth, Texas
Amendment No. 1 to City Secretary Contract No. 59765
Page 5 of 5