Change Order Request
Project Name: I Holly Wf P Electrical Upgrades
Project No.(s):I 53004/0600430/57 40010/005480 ! DOE No. I NIA
I City Sec No.: l
:==6=05=99=======�I City Proj. No.: I 103410-3
Project Description: Installation of Backup Generators and Switchgear Replacement and other Improvements at Holly Water TreatmentPlant
Contractor:! C.F. McDonald Electric, Inc.
City Project Mgr.I David R. Townsend, P.E.
Phone Number:! 817-392-8430
Dept. Water
Original Conlracl Amount $19,373,469.00 Extras lo Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Dale $19,373,469.00 !Amount of Proposed Change Order $32,519.88 Revised Contract Amount $19,405,988.88 Original Funds Available for Change Orders $290,602.00 Remaining Funds Available for this CO $290,602.00 Additional Funding (if necessary)
Change Order# I Date:
City Inspector: I Ronnie Cardenas
Phone Number: I 682-309-3761
Totals
$19,373,469.00
$19,373,469.00 $32,519.88 $19,405,988.88
$290 602.00
$290,602.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
0.17% $24,216,836.25
JUSTIFICATION (REASONS) FOR CHANGE ORDE-R
811312024
Contract Time
(Calender days) 1,090
1 090 03 1 093
Excavation work adjacent to existing High Service Pump Station structure revealed the presence of existing concrete foundations and/or concrete grade beams. The decision was made to reconfigure this ductbank to route above these existing grade beams and Install a dyed and stamped concrete sidewalk above the ductbank to cl early Identify it's presense at a shallow burial depth.
Staff concurs with the contractor's request for 3 additional calendar days to the project for the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental lo, the above Change Order.
C.F. McDona Id Electrlc, Inc.R.Brad Hibbetts
j,5.
12/31/20
M&C Number NIA M&C Dale Approved NIA
FORT WORTH City of Fort Worth
�— Change Order Additions
Projecl Name Holly WTP Electrical Upgrades City Sec No.: 60599
Project No.(s): DOE No.� City Proj. No.: 103410-3
Project
Description
! Installation of Backup Generators and Switchgear Replacement and olher improvements at Holly Water Trealmenl
I Plant
Contractor C.F, McDonaltl Electric, Inc. � Change Order:� Date: 8/13/2024
Cily Project Mgr. David R, Townsend, P.E. Cify Inspecfor Ronnie Cardenas
ADDITIONS
�� ' ' ' � ' ' " ���
� • � � �. � �• ' �- ' 11� 11� '� � ii ', � SS
_ . � � � . � • I . � . --_-�
_ -_--
_ ��_--
� ��_--
� --_-
_ --_--
_ _-_--
_ --_-�
�_
� -- �-
� --�_�
= --_--
� ����C
� ����
C �����
� ���C�
� C�C�
� �C�C�
� �C���
� �����
� �
� C �
� �
� .::
�
. .,
. �
.,.. .. .::
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Holly WTP Electrical Upgratles City Sec No.: 60599
Project No.(s): DOE No. � City Proj. No.: 103410-3
Project Description
Installation of Backup Generators and Switchgear Replacement and other improvements at Holly Water
Treatment Plant
Contractor C.F. McDonald Electric, Inc. Change Ortler: �1 Date 8/13/2024
City Project Mgr. David R. Townsend, P.E. City Inspector: Ronnie Cardendas
DELETIONS
Page 4 of 4
CHANGE PROPOSAL CP-004.2
DATE: 8/ 13/2024
&
TO: Freese and Nichols
ATTN: Alan Cossabone, CCR McDonald Municipal & Industrial
A Division of C, F. McDonald Electric, Inc.
EMAIL: alan.cossabone(r7i freese.com
SUBJECT PROJECT: City of Foi•t Worth - Holly Water Treatment Plant Backup Powei•
WE PROPOSE TO FURNISH THE LABOR AND MATERIALS FOR THE WORK AS FOLLOWS
Provide the follo�ving:
1 Reconfigw�e ductbank A14 along side of building to route over concrete foundations.
2 Install dyed and stamped sidewalk over shallow ductbank A14 along side of building.
3 Additional coutract days
Exclusions:
1 Removal of conci•ete required to install ductbank A 14 in the roadway.
2 Any items not identified in the scope of work.
Reconfigure ductbank to route above foundations
Concrete sidewalk above ductbank
Price
$ 16,132.24
$ 14,670.39
Additional contract days: 3
Subtotal Price: $ 30,802.63
General Conditions (3%): $ 924.08
Bonds and Insurance (2.5%) $ 793.17
Total Price: $ 32,519.88
This change proposal is valid for a period of 14 days.
Approved by:
Date:
Should you have any further questions or comments, please do not hesitate to contact me at anytime.
Best Regards
C.F. McDonald Electric, Inc.
R. Bi•ad Hibbetts, P.E.
CeIL• 832-726-2399
Office: 713-921-1368
�1'3C�(C(�I11CC�OIIZ�C�IIlC.00111
WWW.IIlCd0111�C�1RC.COI71
SCOPE OF WORK
Concrete Removal
1 Reconfigure ductbank A 14 to i•oute across the top of existing foundations at $ 16,132.24
the side of existing building. Install storm di•ainage modifications. Pi•ovide
concrete protective tombstones above grade where long radius elbows turn up
above grade at building. This change proposal is based on document "Holly
PS option one 6-25-2024" provided by FNI on 6/25/2024.
2 Install a 4", dyed and stamped concrete sidewalk above ductbank A 14 along $ 14,670.39
side of building. This change proposal is based on document °Holly PS
option one 6-25-2024" provided by FNI on 6/25/2024.
Additional Contract Days
3 Additional contract days 3
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Digitally signed by David R. Townsend, David R. Townsend, PE PE
Signature
David Townsend
Name of Employee
Engineering Manager
Title
ATTEST:
Jannette Goodall
City Secretary
Date: 2022.12.28 16:43:46 -06'00'