HomeMy WebLinkAboutContract 61734-CO2Attest:______________________________
Jannette S. Goodall City Secretary
___________________________________
12/13/2024
Contract Time
(CD)
180
0
0
0
180
10
190
%
Date
Date
Date
Date
Darte
M&C Number M&C Date Approved
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and adminstration of this contract, including Nikita Watts
ensuring all performance and reporting requirements.Sr. Capital Projects Officer
N/A
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
Director -Property Management Department
N/A
0.20
Project Architect Date Assistant City Manager
Contractor's Company Name
Additional Funding (if necessary) -------------------------------------------------------------------------------------------------------------------$0.00
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)$1,517,093.75
Contractor Name Contractor Signature
31001 0800450 5740010 104389 004980 104389
CGC Generat Contractors, Inc Change Order #
Date
$1,453,146.25
Sr. Assistant City Attorney
2
Project Manager
$1,213,675.00
Original Funds Available for Change Orders -----------------------------------------------------------------------------------------------------$303,419.00
Remaining Funds Available for this CO -----------------------------------------------------------------------------------------------------------$63,947.75
Facility and Project
Description:
City Inspector:
Contractor:
Funding (FID) No.(s)
Juan Serrano
PMD Superintendent
Credits to Date -------------------------------------------------------------------------------------------------------------------------------------------$0.00
Pending Change Orders (in M&C Process)-------------------------------------------------------------------------------------------------------$0.00
Extras to Date---------------------------------------------------------------------------------------------------------------------------------------------
PMD Inspector Date Sr. Capital Projects Officer
682-402-9222Phone Number: Phone Number:817-201-0099
Date:
City Proj. No.
City Project Mgr.
City Sec No.61734
Lisa Pyper
Meadowbrook Golf Course Maintenance Facility
Amount of Proposed Change Order ----------------------------------------------------------------------------------------------------------------$74,146.25
Revised Contract Amount------------------------------------------------------------------------------------------------------------------------------
$0.00
Contract Cost to Date-----------------------------------------------------------------------------------------------------------------------------------$1,379,000.00
Original Contract Amount------------------------------------------------------------------------------------------------------------------------------
City Of Fort Worth
Change Order Request
Date
Change Order #2 increases the original contract amount ($1,213,675.00) plus CO #1 ($165,325.00) by $74,146.25 for a revised contract amount of
$1,453,146.25. This is a total increase of 20%.
This is for an unknown condition (not reflected in the geotech report); the building pad was found to be atop a layer of limestone. This required the removal of
approx 3 ft of limestone rock for entire bldg footprint, haul off of rock, haul in select fill and increase thickness of concrete building pad by 1".
Change Order #2 will increase contract duration by 10 days.
JUSTIFICATION (REASONS) FOR CHANGE ORDER
It is understood and agreed that the acceptance of this Change Order by the contractor consitutes an accord and satisfaction and represents payment in full (both
time and money) for all costs arising out of, or incindental to the above Change Order.
Austin DyerCGC General
Contract change
Provide all labor, material, equipment, services, and supplies to perform the following:
Original contract sum:
Net change from previous change orders:
Current Contract amount:
This change order total:
New Contract Amount:
Total Cost of All Change Orders:
A.
B. Subcontract summary
C. Time: As a result of this change order, a time extension of ____ calendar days will be required.
D. Terms and Conditions:
00
11/4/24
2403
CGC General Contractors
3212 Friendly Ln
Haltom City, Texas 76117
Meadowbrook Golf Course Maintenance Facility
-This proposal is to completely remove all the rock required to meet requirements from geotechnical specifications, haul in select fill as
backfill for building pad
-Changing from soil stabilization to adding 1" of concrete
$ 1,213,675.00
$ 166,747.23
$ 1,380,422.23
$ 74,146.25
$ 1,454,568.48
$ 240,893.48
10
962 Hunt Road Proposal, Good for 30 days
Gunter, TX 75058
Project: Meadowbrook Maintenance Building
Change Order Request: Change in Building Subgrade
and Change in paving from lime to Flex Base Type D
Specific Scope of Work Bid Items: Building and Paving subgrade change
1. The subgrade removes an additional 2 feet of rock, rock digging not in original plan.
2. Export additional 2 feet of building pad subgrade (Est: 135 loads, bobtails, @$195 per load)
Load price includes loading, hauling, and dump fees.
3. Import additional 2 of select fill (Est: additional 115 loads @$335 per load) Load price includes
materials, place, grade and compact.
4. Two additional pieces of equipment and added time of compaction.
NOTE: If we are required to demobilize again it will be billed at $10,500.00, and $10,500.00 to
mobilize back on site. We will not be able to provide a timeline for remobilization.
Change in paving from lime to Flex Base Type D
CO Price= Credit on original contract: $8430.50
1. Subgrade in paving change to additional 1 inches Thickened paving.
2. Original lime $17946.00, added 1 cut and haul = 10 loads of extra haul off @$195 per load=
$1950.00. Credit $17946.00-$1950.00=$15996.00
3. One extra day for 3 pieces of equipment to achieve the added cut and haul, $3000.00. Credit
(15996.00-$3000.00) =$12996.00
4. Added survey for changes $4565.50. Credit (12996.00-$4565.50) =$8430.50
General Exclusions: not included in proposal unless specifically noted above.
Removal of spoils from other trades. Demolition is based solely on civil plans and deduction of utility cuts. Structural excavation
of any kind. Cushion sand & bedding gravel. Flume, sidewalk stabilization, or excavation of any kind. Dewatering of other trades
(Alford Excavation LLC work only). Safety caps for silt fence or SWPPP designs, removal & maintenance of erosion devices,
riprap, skimmers, or temp vegetation. Pad cutbacks or Pad certifications. Temporary water meter, backflow preventer, or rental
of any kind. Proof rolling after final density test of final grading. Permits of any kind/ site or site work excluded verbatim per
contract. BIM modeling. Termite treatment. Certified as-builts. Removal/ capping of underground utilities, potholing. Pads for
staging areas of any kind. Additional purchasing or placement of drying agents. Testing of any kind. Hand Labor of any kind.
Tree protection &/or arborists work to clear trees from power lines. Backfill existing or proposed buildings, existing or proposed
structures, proposed retaining walls. Barricades or traffic control devices of any kind. Regrade due to damage by others.
Please contact Ronnie Striplin with any questions or concerns.
Email: ronnie@alfordexcavation.com office: 903-433-3220
Doug Cell: 9038212132/ Ronnie Cell: 9038180135 Dwayne Cell: 9038214244
Proposal, Good for 30 days
Project: Meadowbrook Maintenance Building
Change Order Request: Change to Drawings
Specific Scope of Work Bid Items: 10 x 137 Rip Rap base (no grout)
1. New Survey for building, off-sets, and paving BOC. $4765.50
2. .
General Exclusions: not included in proposal unless specifically noted above.
Removal of spoils from other trades. Demolition based solely on civil plans and deduction of utility cuts. Structural excavation of
any kind. Cushion sand & bedding gravel. Flume, sidewalk stabilization, or excavation of any kind. Dewatering of other trades
(Alford Excavation LLC work only). Safety caps for silt fence or SWPPP designs, removal & maintenance of erosion devices,
riprap, skimmers, or temp vegetation. Pad cutbacks or Pad certifications. Temporary water meter, backflow preventer, or rental
of any kind. Proof rolling after final density test of final grading. Permits of any kind/ site or site work excluded verbatim per
contract. BIM modeling. Termite treatment. Certified as-builts. Removal/ capping of underground utilities, potholing. Pads for
staging areas of any kind. Additional purchasing or placement of drying agents. Testing of any kind. Hand Labor of any kind.
Tree protection &/or arborists work to clear trees from power lines. Backfill existing or proposed buildings, existing or proposed
structures, proposed retaining walls. Barricades or traffic control devices of any kind. Regrade due to damage by others.
Please contact Ronnie Striplin with any questions or concerns.
Email: ronnie@alfordexcavation.com office: 903-433-3220
Doug Cell: 9038212132/ Ronnie Cell: 9038180135 Dwayne Cell: 9038214244
Joseph Montero
From: Austin Dyer
Sent: Tuesday, November S, 2024 7:09 AM
To: Joseph Montera
Subject: Fw: Meadowbrook addition
Get Outlook for iOS
From: Jorge Villarreal <jvconcrete1981@gmail.cam>
Sent: Thursday, October 31, 2024 12:22:34 PM
To: Austin Dyer <Austind @cgctexas.com>
Subject: Meadowbrook addition
Hey Austin for the extra addition for Meadowbraak, it'll be $11,500 more. Let me know what you think.
Thank you,
Jorge Villarreal-940-73�-6647
Cynthia Villarreal-9[33-821-6138
Sherman TX 75090
ail.com