Loading...
HomeMy WebLinkAboutIR 7579 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7579 ��4oAry To the Mayor and Members of the City Council February 11 , 1992 Zi Subject: CONDITION OF I-30 (EAST FREEWAY) On Tuesday, January 21, 1992, Mr. Jeffrey A. Holt, 2525 Chicago Avenue, Fort Worth, Texas 76103 addressed City Council and presented a written report describing the poor condition of the East Freeway, especially the section from I-35W to Beach Street. Mr. Holt was echoing complaints about this section of freeway received from citizens by City staff over recent months. The very heavy Fall and Winter rains have had a devastating effect on the asphalt surface of I- 30 with the surface being pitted with pot holes. Staff has been in contact with the Texas Department of Transportation (TxDOT) , District 2 office, and has received a copy of their Preventive Maintenance and Rehabilitation Projects, City of Fort Worth, dated January 28, 1992. The sixteen projects listed are all scheduled for letting in April , May and June, 1992. All listed projects other than the two projects on I-30 are scheduled to be done in Summer, 1992. The two I-30 projects are shown to be done in Summer, 1993. In subsequent discussions with TOOT officials, they indicated that their original plan was to combine the two I-30 projects under one construction project and include in the contract the redecking of the Sycamore Creek Bridge and the installation of median barriers on certain sections of the East Freeway. They had intended on redecking the bridge and installing the median barriers first, then in the Sumner, 1993 complete all the asphalt overlay portion of the contract. However, due to the extensive deterioration that has occurred as a result of the recent rains, they plan to revise their construction sequence in order to complete the asphalt overlay work on I-30 during this coming paving season, or by November, 1992. The Texas Department of Transportation has indicated to staff that the section of I-30 from Lamar Street to Oakland Boulevard is basically sound. The asphalt overlay installed more than fifteen years ago however must be replaced. With appropriate base repair, the proposed asphalt overlay will provide an excellent riding surface which should last for years to come. If City Council needs additional information in this matter, staff can provide it as required. DAVID IVORY CITY MANAGER ISSUED BY THE CITY MANAGER FORT WORTH. TEXAS Attachment to I.R. No. 7579 TEXAS DEPARTMENT OF TRANSPORTATION PREVENTIVE MAINTENANCE AND REHABILITATION PROJECTS CITY OF FORT WORTH 1/28/92 LETTING HIGHWAY LIMITS TYPE OF WORK DATE WORK PERIOD IH 20 PARKER CO LINE TO REPLACE ASPH SURF ON MAY '92 SUMMER '92 SH 183 BRIDGES IH 30 LAMAR ST TO IH 35W PLANE SURF & JUN '92 SUMMER '93 ACP OVERLAY IH 30 IH 35W TO OAKLAND BLVD BASE REPAIR, PLANE SURF, JUN '92 it UNDRSL & ACP OVERLAY IH 35W WESTERN CENTER BLVD SEAL COAT FTG RDS APR '92 SUMMER '92 TO MEACHAM BLVD IH 35W IH 820 TO US 81 CONC PAV REPAIR MAY 192 of IH 35W US 81 TO DENTON CO LINE CONC PAV REPAIR MAY '92 it IH 820 BU 287—P TO WILBARGER ST SEAL COAT FTG RDS APR '92 it IH 820 TRINITY BLVD TO SP 303 CONC PAV REPAIR MAY '92 it IH 820 E END SH 26 O/P TO REPLACE ASPH SURF ON MAY '92 It S END LAKE WORTH BR BRIDGE IH 820 FM 156 TO BEACH ST SEAL COAT FTG RDS APR '92 if IH 820 IH 35W TO S END CONC PAV REPAIR MAY '92 " LAKE WORTH BR IH 820 SP 580 TO CHAPIN RD REPLACE ASPH SURF ON MAY '92 if BRIDGES IH 820 S END LAKE WORTH BR CONC PAV REPAIR MAY '92 of TO WESTPOINT BLVD US 377 SH 183 (N OF CIRCLE) SLURRY SEAL & SEAL MAY '92 " TO IH 20 COAT SHLDRS US 377 SP 580 TO HORNE ST BASE REPAIR & ACP MAY '92 OVERLAY SH 183 AT SH 360 REPLACE ASPH SURF ON MAY '92 " BRIDGES