Loading...
HomeMy WebLinkAboutOrdinance 15421Ordinance No. ~ ~~~' AN ORDINANCE INCREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN THE SEWER CAPITAL PROJECT FUND IN THE AMOUNT OF $298,915.00 FROM AVAILABLE FUNDS FOR THE PURPOSE OF FUNDING AMENDMENT NO. 1 WITH WADE AND ASSOCIATES, INC. FOR THE MAIN 286 AND CDSL32T DRAINAGE AREAS SANITARY SEWER EVALUATION STUDY AND IMPROVEMENTS; MAKING THIS ORDINANCE CUMULATIVE OF PRIOR ORDINANCES IN CONFLICT HEREWITH; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS: SECTION 1. That in addition to those amounts allocated to the various City departments for Fiscal Year 2002- 2003 in the Budget of the City Manager, there shall also be increased estimated receipts and appropriations in the Sewer Capital Project Fund in the amount of $298,915.00 for the purpose funding an Amendment No. 1 with Wade and Associates, Inc. for the Main 286 and CDSL32T Drainage Areas Sanitary Sewer Evaluation Study and Improvements. SECTION 2. That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void for any reason by a court of competent jurisdiction, such decision, opinion or judgment shall in no way impair the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall be and remain in full force and effect. SECTION 3. That this ordinance shall be cumulative of Ordinance No. 15184 and all other ordinances and appropriations amending the same except in those instances where the provisions of this ordinance are in direct conflict with such other ordinances and appropriations, in which instance said conflicting provisions of said prior ordinances and appropriations are hereby expressly repealed. SECTION 4. This ordinance shall take effect upon adoption. AP RO S T FORM AND LEGALITY: Assistant Cit Attorney ADOPTED AND EFFECTIVE: ~/~ ~`~~ C'it,~ of ' Fort Worth, ~'exas Mayor and Council Communication DATE REFERENCE NUMBER LOG NAME PAGE 1/28/03 **C_~gq.q.$ 60SEWER 1 oft SUBJECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 TO THE ENGINEERING AGREEMENT WITH WADE & ASSOGIATES, INC. FOR THE MAIN 286 AND CDSL32T DRAINAGE AREAS SANITARY SEWER EVALUATION STUDY AND IMPROVEMENTS RECOMMENDATION: It is recommended that the City Council: 1. Authorize the transfer of $298,915 from the Water and Sewer Operating Fund to the Sewer Capital Project Fund; and 2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Sewer Capital Project Fund in the amount of $298,915 from available funds; and 3. Authorize the City Manager to execute Amendment No. 1 with Wade & Associates, Inc. for the Main 286 and CDSL32T Drainage Areas Sanitary Sewer Evaluation Study and Improvements, thereby increasing the amount of the agreement by $298,915, from $998,881 to $1,297,796. DISCUSSION: On June 4, 2002 (M&C C-19111), the City Council authorized the City Manager to execute an engineering agreement with Wade & Associates, Inc. for the Sanitary Sewer Main 286 and CDSL32T Drainage Areas Sanitary Sewer Study and Improvements. Mains 286 and CDSL32T are two adjoining drainage basins located in southwest Fort Worth within the Clear Fork drainage basin, and are generally bound on the north by the Clear Fork of the Trinity River, on the east by Hulen Street, on_the west by the City of Benbrook, and on the south by Benbrook Lake. After comprehensive field investigation, Wade & Associates, Inc. recommends that additional small diameter pipe cleaning and closed circuit television (CCTV) inspection be performed within the Main 286 and CDSL32T drainage areas in order to identify defects that might be contributing to sanitary sewer overflows and backup problems in the area. Under Amendment No. 1, the engineer will perform approximately 170,000 linear feet of pipe cleaning and CCTV. Furthermore, as part of the City's plan to develop the geographic information system (GIS) mapping, the engineer will update the current sanitary sewer base maps based on global positioning satellite (GPS) survey data and field verification of the entire study area to reflect changes in the wastewater collection system. The GIS mapping will include the most current and accurate data collected to date by the City and Wade & Associates, Inc. This project is located in COUNCIL DISTRICTS 3 and 6. Wade & Associates, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional 79% M/WBE participation on this Amendment No. 1. The City's goal on this amendment is 30%. City of b'oa't Worth, Z'eacas Mayor and Council Communication DATE 1/28/03 REFERENCE NUMBER ~'*C-1944 LOG NAME 60SEWER PAGE 2 of 2 SUBJECT APPROPRIATION ORDINANCE AND AMENDMENT NO. 1 TO THE ENGINEERING AGREEMENT WITH WADE & ASSOCIATES, INC. FOR THE MAIN 286 AND CDSL32T DRAINAGE AREAS SANITARY SEWER EVALUATION STUDY AND IMPROVEMENTS FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that upon approval of recommendation No. 1 and adoption of the attached appropriation ordinance, funds will be available in the current capital budget, as appropriated, of the Sewer Capital Projects Fund. MO:k Submitted for City Manager's FUND ACCOUNT CENTER AMOUNT CITY SECRETARY Office by: (to) 1)P171 472045 070171140030 $298,915.00 Marc Ott 847G 2) P171 531200 070171140030 $298,915.00 Originating Department Head: Dale Fisseler 8207 (from) APPROVED 1/28/03 3) P171 531200 070171140030 $298,915.00 ORD. #15421 Additional Information Contact: 1) PE45 538070 0709020 $298,915.00 Dale Fisseler 8207