HomeMy WebLinkAboutContract 59387-CO1CSC No. 59387-COl
Fowr WORTH City of Fort Worth
Change Order Request
Project Name:1 Fort Worth Central City Section I: Part 10 -Water and Sanitary Sewer Relocations
Project No.(s):1 0600430107004301CO1780 i DOE No. I N/A
City Sec No.: 59387
City Proj, No.: C00969
Project Description:) Installation of a 12" water line, 8' water line, 24' sanitary sewer with 48' tunnel liner plate by other then open cut, 24' fiberglass sewer by other than
open cut, 8' sanitary sewer by other than open cut and abandonment of existing sanitary sewer with grouting.
Contractord William J. Schultz, Inc. dba Circle C. Construction Co. 1 Change Order #
City Project Mgr,l Liam Conlon
Phone Number: 817-392-6824
City Inspector:
Date: 1 11/1312024
Shane Behn
Phone Number:1 682-328-1264
Dept. Water (Non-FWCC) Sewer (FWCC) Totals
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
$1,198,664.00
$3,795,938.00
$4,994,602.00
$1,198,664.00
$3,795,938.00
$4,994,602.00
55 575.00
$409,688.00
465.263.00
$1, 5d,239.00
$4,205,626.00
$ ,459,865.00
$71,920.00
$189,797.00
$261,717.00
$71,920.00
$18%797,00
$261,717.00
$219,891.00
$219,891.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 9.32%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $6,243,252.50
J,UST(FICATION,(REASONS) FOR CHANGE ORDER
Contract Time
(Calender days
270
Change Order No. 1 will provide pay quantities for the following items that are necessary on the project: the
installation of a 411 foot segment of a project sewer main by hand tunneling in lieu of open cut due to unstable
soil material that was encountered during construction on N. Main Street and NE 11th Street; the
reconstruction of a pavement segment consisting of 8-inch reinforced concrete base and 6-inch asphalt with
11-inch pulverization and 3-inch asphalt due to extremely poor condition of the existing pavement; the removal
and replacement of existing storm drain structures and curb and gutter that are in direct conflict with the
project sewer main and the replacement of a segment of concrete pavement on Main Street that broke apart
during sewer main installation.
Staff concurs with the contractor's request for an additional 109 calendar days on the project.
270
109
379
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both lime and money) for all costs arising out of, or Incidental to, the above Change Order.
Contrectot's;Company.Name I Contrdatar;Name I �ontracto�Signature,_� .- __,I
Vlmllam J. Schultz, Inc. dba Circle C Construction Co, Teri Skellv 4f -2f/
Ins r Date Prote apes
EDlrector�ept) pate Con d n Supervisor (Vltater)
CGuu.cv�/aes fLaNder T. 5, 31/02/2025I/r—IN-tN
n<aalsi tani "
Senlor AsistIty Qttamey _ � Date Asslgtant City Manager
n1 mA19n9R (l1 /()R/ 5
)ou cBlack (Jan 6. 202512:35 CST) wl liam hn cn(J n6,202511:53C5TJ
3� Coupol6Aotion.(It Required)
M&C Number 1 24-1005 M&C Date Approved 1 11/1212024
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT Wo P,TH City of Fort Worth
-�-'�` Chan a Order Additions
Project Name Fort Worth Central City Section I: Part 10 -Water and Sanitary Sewer Relocations I Clty Sec No,: 59387
Project No.(s): I DOE No.1 N/A I City Proj. No.: ( C00969
Project "'J1allalAull Vick 14 ➢MMI IIIIC, U MAGI III IC, 44 Jdl I Idly bUMA Will 4V LUI III of 111101 Maio uy uuicl uian upun uut, 14
Description fiberglass sewer by other than open cut, 8" sanitary sewer by other than open cut and abandonment of existing sanitary
Contractor William J, Schultz, Inc, dba Circle C Construction Co. Change Order: 0 Date:
City Project Mgr. I Liam Conlon
_ ADDITIONS
11`kM DESCRIP I IUN
3
18
23
24
26
43
44
45
2
23
26
42
49
51
61
62
63
64
65
66
67
68
69
70
71
73
74
3311.02418" WATER PIPE
3201.0616 CONC PVMT REPAIR, ARTERIAL/INDUSTRIAL
3305.0109 TRENCH SAFETY
3311.0001 DUCTILE IRON WATER FITTINGS W/ RESTRAINT
3312,0117 CONNECTION TO EXISTING 4"-12" WATER MAIN
11' PULVERIZATION AND STABILIZATION
CEMENT
3"HMACTYD
3305.3010 24" FIBERGLASS SEWER CARRIER PIPE
3201.0616 CONC PVMT REPAIR, ARTERIAL/INDUSTRIAL
3216.0101 6' CONC CURB AND GUTTER
3331.3205 6' PRIVATE SEWER SERVICE
3339.1101 5' MANHOLE
3339,1103 5' EXTRA DEPTH MANHOLE
DEWATERING SHAFT
24 IN RCP REMOVAL
24 IN RCP INSTALLATION
10' INLET REMOVAL
10' INLET INSTALLATION
11' PULVERIZATION AND STABILIZATION
CEMENT
3' HMAC TY D
21 IN RCP REMOVAL
21 IN RCP INSTALLATION
5' INLET REMOVAL
18" FIBERGLASS SEWER CARRIER PIPE
B.O.T.O.C. WOOD BOX (STATION 24+00 TO STATION 28+11)
Page 2 of 4
City Inspector I Shane Bohn
DEPT Qty
Unit
UnitCost
Total
Water (Non-FVN 115.06 LF
$200.00
$23000,00
Water(Non-FN 334.00 SY
$150.00
$50:100.00
Water (Non-FN 115.00 LF
$5.00
$576,00
Water (Non-FV� 0.60 TN
$12,500.00
$7,600.00
Water (Non-FVI 2.00 EA
$8,500.00
$17,000.00
Water (Non-FVI 2,256.00 SY
$27.50
$62,040.00
Water (Non-FVI 36.00 TN
$625.00
$22,600.00
Water (Non-FVI 1,978.00 SY
$43.00
$85,054.00
Sewer (FWCC) 311.00 LF
$250.00
$77,750.00
Sewer (FWCC) 742.00
SY
$150.00
$111,300.00
Sewer (FWCC) 211.00
LF
$65.00
$13,715.00
Sewer (FWCC)11.00
LF
$125.00
$1,375.00
Sewer (FWCC) 3.00
EA
$12,500.00
$37,500.00
Sewer (FWCC) 35.00
VF
$400,00
$14,000.00
Sewer
FWCC) 1.00
LS
$3,600.00
$3,500.00
Sewer
FWCC) 24.00
LF
$50.00
$1,200.00
Sewer FWCC) 24.00
LF
$300.00
$7,200.00
Sewer FWCC) 1.000
EA
$1,600.00
$1,500.00
Sewer FWCC) 2,00
EA
$8,600.00
$17,000.00
Sewer (FWCC) 2544.00
SY
$27.50
$69,960.00
Sewer FWCC) 41.00
TN
$626.00
$25,625.00
Sewer FWCC) 2622.00
SY
$43.00
$112,746.00
Sewer FWCC) 40.00
LF
$50.00
$2,000.00
Sewer FWCC) 40.00
LF
$300.00
$12,000.00
Sewer FWCC) 1,00
EA
$1,500.00
$1,500.00
Sewer FWCC) 100.00
LF
$250.00
$25,000.00
Sewer FWCC) 411.00
LF
$1,550.00
$637,050.00
Water
(P•on-FWCC)
$267,769.00
,Sewer
(FWCC)
$1,171,921.00
'Additions
Sub Total
$1,439,690.00
FORT' ,Wa RT JA City of Fort Worth
-_- -_
-- Change Order Deletions
Project Name
Fort Worth Central City Section I: Part 10 - Water and Sanitary Sewer Relocations , City Sec No.: 59387
Project No.(s):
I DOE No. I N/A City Proj. No.: I C00969
Installation of a 12" water line, 8" water line, 24" sanitary sewer with 48" tunnel liner plate by other than open cut, 24"
Project Description I
fiberglass sewer by other than open cut, 8 sanitary sewer by other than open cut and abandonment of existing sanitary
Contractor
William J. Schultz, Inc. dba Circle 0. Construction Co. Change Order: Date
City Project Mgr.
Liam Conlon City Inspector I Shane Behn
DELETIONS
ITEM
DESCRIPTION
DEPT
Qty Unit
IUnitCost Total
15
3201.0132 5' WIDE ASPHALT PVMT REPAIR, INDUSTRIAL
Water (Non-FWCC)
1,218,00 LF
$125.00 $152,250.00
3201,0203 ASPHALT PVMT REPAIR BEYOND DEFINED WIDTH, Water (Non-FWCC)
17
INDUSTRIAL
19.00 SY
$65.00 $1,235.00
42
9999.0003 CONSTRUCTION ALLOWANCE
Water (Non-FWCC)
0.9784833 LS
$60,000.00 $58,709.00
1
3331.4324 24" FIBERGLASS SEWER PIPE
Sewer (FWCC)
411.00 LF
$376.00 $154,125.00
3201.0400 TEMPORARY ASPHALT PAVEMENT REPAIR (7
Sewer (FWCC)
18
HMAC ON 6" CEMENT TREATED BASE)
411.00 LF
$38.00 $15,618.00
19
3201.0132 5' WIDE ASPHALT PVMT REPAIR, INDUSTRIAL
Sewer (FWCC)
346.00 LF
$85.00 $29,410.00
20
3201.0135 8' WIDE ASPHALT PVMT REPAIR, INDUSTRIAL
Sewer (FWCC)
521.00 LF
$150,00 $78,150.00
3201.0203 ASPHALT PVMT REPAIR BEYOND DEFINED WIDTH, Sewer (FWCC)
22
INDUSTRIAL
385.00 SY
$150.00 $57,750.00
33
3305.0109 TRENCH SAFETY
Sewer (FWCC)
411.00 LF
$5.00 $2,055.00
38
3331.3105 4" PRIVATE SEWER SERVICE
Sewer (FWCC)
1.00 LF
$125.00 $125.00
58
9999,0007 CONTAMINATEED MATERIAL HANDLING
Sewer (FWCC)
750.00 LF
$350.00 $262,500.00
59
9999.0008 CONTAMINATED MATERIAL LOADING
Sewer (FWCC)
500.00 CY
$125.00 $62,500.00
60
9999.0009 CONSTRUCTION ALLOWANCE
Sewer (FWCC)
1.00 LS
$100,000.00 $100,000.00
Water (Nan-FWCC) $212,194.00
Sewer (FWCC) $762,233.00
Page 3 of 4 Deletions Sub Total $974,427.00
MlWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Same as original Contract Miscellaneous $0.00
Total $0.00
Previous Change Orders _
Co# DATE AMOUNT
- Total $0.00
Page 4 of 4
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, November 12, 2024 REFERENCE NO.: **M&C 24-1005
LOG NAME: 60WSSRFWCCS1P10001-CIRCLEG
SUBJECT:
(CD 2) Authorize Execution of Change Order No. 1 in the Amount of $465,263.00 to the Contract with
William J. Schultz, Inc. dba Circle C Construction Company for the Fort Worth Central City Project Water &
Sanitary Sewer Main Relocations for the Fort Worth Central City Project, Section 1: Part 10 — Water &
Sanitary Sewer Relocations - City Project Trinity River Vision Phase 1, Adopt Resolution Expressing Official
Intent to Reimburse Expenditures with Proceeds of Future Debt, and Adopt Appropriation Ordinances to
Effect a Portion of Water's Contribution to the Fiscal Years 2025-2029 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Change Order No. 1 in the amount of $465,263.00 to City Secretary Contract
Number 59387 a contract with William J. Schultz, Inc. dba Circle C Construction Company for the Fort
Worth Central City Project Water & Sanitary Sewer Main Relocations for the Fort Worth Central City
Project, Section 1: Part 10 — Water & Sanitary Sewer Relocations - City Project Trinity River Vision
Phase 1 for a revised contract amount of $5,459,865.00;
2. Adopt the attached resolution expressing official intent to reimburse expenditures with proceeds from
future debt and/or annual payments from the Tarrant Regional Water District for the Fort Worth
Central City Water & Sewer Relocations project;
3. Adopt the attached appropriation ordinance adjusting appropriations in the Water & Sewer
Commercial Paper Fund by decreasing appropriations in the Commercial Paper project (City Project
No. UCMLPR) in the amount of $2,698,901.65 and increasing appropriations in Trinity River Vision,
Phase 1 project (City Project No. C00969) by the same amount;
4. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the
Sewer Capital Legacy Fund by decreasing estimated receipts and appropriations in the Trinity River
Vision, Phase 1 (City Project No. C00969) in the amount of $31,608.79, and increasing estimated
receipts and appropriations in the Unspecified All -Funds project (City Project No. UNSPEC) by the
same amount for the purpose of substituting funding sources and to make funds available for other
eligible Water and Sewer projects;
5. Adopt the attached appropriation ordinance decreasing estimated receipts and appropriations in the
Trinity River Vision, Phase 1 (City Project No. C00969) within the Water & Sewer Capital Projects
Fund, in the amount of $22,629.00, for the purpose of substituting of funding sources and to make
funds available for other eligible Water and Sewer projects;
6. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the
Water/Sewer Bond 2016 Fund, by decreasing estimated receipts and appropriations in the Trinity
River Vision, Phase 1 (City Project No. C00969) in the amount of $245,930.86, and increasing
estimated receipts and appropriations in the Unspecified All -Funds project (City Project No. UNSPEC)
by the same amount for the purpose of substituting funding sources to make funds available for other
eligible Water and Sewer projects;
7. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the
Water & Sewer Bond 2015A Fund by decreasing estimated receipts and appropriations in the Trinity
River Vision, Phase 1 (City Project No. C00969) in the amount of $1,083,136.00, and increasing
estimated receipts and appropriations in the Unspecified All -Funds project (City Project No. UNSPEC)
by the same amount for the purpose of substituting funding sources and to make debt proceeds
available for other eligible Water and Sewer projects;
8. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the
Water & Sewer Revenue Bonds Series 2021 Fund by decreasing estimated receipts and
appropriations in the Trinity River Visions, Phase 1 (City Project No. C00969) in the amount of
$443,312.00, and increasing estimated receipts and appropriations in the Unspecified All -Funds
project (City Project No. UNSPEC) by the same amount for the purpose of substituting funding
sources to make debt proceeds available for other eligible Water and Sewer projects; and
9. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the
Water & Sewer Revenue Bonds Series 2022 Fund by decreasing estimated receipts and
appropriations in the Trinity River Vision, Phase 1 (City Project No. C00969) in the amount of
$407,022.00, and increasing estimated receipts and appropriations in the Unspecified All -Funds
project (City Project No. UNSPEC) by the same amount for the purpose of substituting funding
sources and to make debt proceeds available for other eligible Water and Sewer projects and to
effect a portion of Water's contribution to the Fiscal Years 2025-2029 Capital Improvement Program.
DISCUSSION:
On April 11th, 2023, by Mayor and Council Communication (M&C) 23-0239 the City Council authorized a
construction contract with William J. Schultz, Inc. dba Circle C Construction Company in the amount of
$4,994,602.00 for Fort Worth Central City Project Water & Sanitary Sewer Main Relocations for the Fort
Worth Central City Project, Section 1: Part 10 — Water & Sanitary Sewer Relocations - City Project Trinity
River Vision Phase 1.
Change Order No. 1 in the amount of $465,263.00 (Water $55,575.00, Sewer $409,688.00) will provide pay
items quantities for the following that are necessary on the project: the installation of a 411 foot segment of
a project sewer main by hand tunneling in lieu of open cut due to unstable soil material that was
encountered during construction on N. Main Street and NE 11th Street; the reconstruction of a pavement
segment with 8-inch reinforced concrete base and 6-inch asphalt with 11-inch pulverization and 3-inch due
to extremely poor condition of the existing pavement; the removal and replacement of existing storm drain
structures and curb and gutter that are in direct conflict in with the project sewer main and the replacement
of a segment of concrete pavement on Main Street that broke apart during sewer main installation. Staff
concurs with the contractor's request for an additional 260 calendar days on the project.
This M&C will fund the part of the contract that is being reimbursed by the Tarrant Regional Water District
and decrease appropriations in various Funds accordingly. The original contract amount is $4,994,602.00
and change order #1 is for $465,263.00 for a total revised amount of $5,459,865.00. M&C 60Water FY2023
and FY2024 FWCC Reimbursement, in the 10/29/2024 Council Agenda, has reimbursed a total of
$1,587,899.35 for Sewer charges ($571,599.21 from Fund 59607 and $1,016,300.14 from Fund 56005).
The City is responsible for $1,173,064.00 of the total Water costs. For a remaining reimbursable amount of
$2,698,901.65, which is being appropriated in this M&C out of Commercial Paper.
This project is anticipated to be repaid from a series of annual reimbursements from the Tarrant Regional
Water District (TRWD) as part of the Fort Worth Central City Water & Sewer Relocations project. In the
event any bond -eligible costs are not fully reimbursed by TRWD, those costs would be anticipated to be
included in a future revenue bond issue for the Water & Sewer Fund. Available cash within the Water and
Sewer portfolio and the City's portfolio along with the appropriation authority authorized under the Callable
Commercial Paper Program (CP) will be used to provide interim financing for this project until the debt is
issued. Once payment is received from TRWD and/or debt associated with the unreimbursed portions of
this project is sold, those funds will be used to reimburse the Water and Sewer portfolio and the City's
portfolio in accordance with the attached reimbursement resolution. Under federal law, debt must be issued
within approximately three years in order for these expenses to be reimbursable. Adoption of the attached
resolution does not obligate the City to sell bonds but preserves the ability of the City to reimburse itself
from tax-exempt bond proceeds.
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY),
instead of within the annual budget ordinance, as projects commence, additional funding needs are
identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of
the Water's portion of the City of Fort Worth's Fiscal Years 2025-2029 Capital Improvement Program, as
follows:
60WSSRFWCCS1 P10001-CIRCLEC
60WATER
60SWM FWCC
Current FY2023
60WSSRFWCC
GRAND AVE
Approp ANDFY2024
S1P10001-
CONSTRUCTION Total Approp
FWCC
CIRCLEC
CO2WATER-SJL
REIMB
56002 W&S
$ $
$
$
Capital
Projects
2,457,887.00 8,466,851.96
(22,629.00)
10,902,109.96
156005
$ $
$
Water/Sewer Bond 2016
6,855,400.00 (4,745,941.62)
(245,930.86)
1,863,527.52
156007 Water
& Sewer
$ $
$
$
Bond
6,167,422.45 (2,249,571.96)
(1,083,136.00)
2,834,714.49
2015A
56019 W&S
$
$
$
Rev Bonds
Series 2021
443,312.00
(443,312.00)
-
56020 W&S
Rev Bonds
$
$
$
Series
407,022.00
(407,022.00)
-
2022
56023 W&S
$ $
$
$ $
Commercial
Paper
1,518,400.00 (777,632.61)
2,698,901.65
253,192.00 3,692,861.04
39007
Specially
$
$
Funded
5,852,657.94
5,852,657.94
Projects
59601 Water
$ $
$
Capital
14,404,708.40 (7,750.00)
14,396,958.40
59607
Sewer
$ $
$
$
Capital
7,769,673.12 (608,873.21)
(31,608.79)
I
7,129,191.12
Legacy
.45,876,482.91 77,082.56
465,263.00
253,192.00 46,672,020.47
Funding is budgeted in the Trinity River Vision, Phase
1 project within
various Funds and in the
Commercial Paper
project with in the Water & Sewer Commercial Paper Fund for the purpose of funding
the Trinity River
Vision, Phase 1.
Funding for Trinity
River Visions, Phase 1 are depicted below:
Capital
Project 11 FY2025 CIP
Authority
Budget Budget Budget Change Revised
Fund Name
Name Appropriations
Change Change (Inc/Dec) FY2025
(Inc/Dec) (Inc/Dec) 60SWM FWCC Budget
5600—�
C00969
Water &
—Trinity
Sewer
River
Capital
Vision,
Projects
Phase
Fund
1
C00969
56005— —Trinity
Water/Sewer River
Bond 2016 Vision,
Phase
1
C00969
56007 — —Trinity
Water & River
Sewer Bond IVision,
2015A Phase
1
56019 -
W&S Rev
Bonds
Series 2021
56020-W&S
Rev Bonds
Series 2022
C00969
1—
56023 —
Trinity
Commercial
River
Vision,
Phase
,Paper
1
59601 —
Water
Capital
59607 —
Sewer
Capital
Legacy
C00969
— Trinity
River
Vision,
Phase
1
C00969
— Trinit
60WATER 60WSSRFWCC GRAND AVE
FY2023 AND S1910001- CONSTRUCTION CO2
FW2024 FWCC CIRCLE C
REIMB WATER-SJL
M&C 60WATER FY2023 AND
$0.00 FY2024 FWCC REIMB
$8,466,851.96
Recom #3
M&C 60
WSSRFWCCS1P10001-
CIRCLE C
M&C 60WATER FY2023 AND
$0.00 FY2024 FWCC REIMB
($880,824.03)
Recom #5
M&C 60WATER FY2023 AND
$0.00 FY2024 FWCC REIMB
($3,865,117.59)
Recom #5
M&C 60
WSSRFWCCSI P10001-
CIRCLE C
M&C 60WATER FY2023 AND
$0.00 FY2024 FWCC REIMB
($2,249,571.96)
Recom #6
M&C 60
($22,629.00)
($245,930.86)
WSSRFWCCS1 P10001-
($1,083,136.00)
CIRCLE C
M&C 60
WSSRFWCCS1 P10001-
($443,312.00)
CIRCLE C
M&C 60
IWSSRFWCCSI PI OCOI-
($407,022.00)
CIRCLE C
M&C 60WATER FY2023 AND
$0.00 FY2024 FWCC REIMB ($777,632.61)
Recom #4
WC 60
WSSRFWCCS1 P10001-
CIRCLE C
60SWM FWCC GRAND AVE
CONSTRUCTIONCO2WATER-
SJL
M&C 60WATER FY2023 AND
$0.00 FY2024 FWCC REIMB ($7,750.00)
Recom #7
y M&C 60WATER FY2023 AND
River $0.00 FY2024 FWCC REIMB
Vision, ($37,274.00)
Phase Recom #8
1
M&C 60WATER FY2023 AND
FY2024 FWCC REIMB ($571,599.21)
Recom #8
M&C 60
WSSRFWCCSI P10C01-
CIRCLE C
1
$2,698,901.65
($31,608.79)
$8,466,851.96
($22,629.00)
($880,824.03)
($3,865,117.59)
245 930.86
($2,249,571.96)
($1,083,136.00)
($443,312.00)
($407,022.00)
($777,632.61)
$2,698,901.65
$253,192.00 $253,192.00
($7,750.00)
($37,274.00)
($571,599.21)
($31,608.79)
$77,082.5611 $465,263,0011
$253,192.0011 $795,537.5611
A portion of the water line in the amount of $55,575.00 of this Change Order Is considered Trinity River
Vision (TRV)-relocated work. The sanitary sewer $409,688.00 amount of this Change Order is considered
(TRV)-related work, are eligible for funding from Tax Increment Reinvestment Zone No.9 (TRVA TIF)
pursuant to the TRVA Project Plan. Having met its $26.6 million commitment to the TRV Project, the City will
be reimbursed the water line amount of $81,175.00 and the sanitary sewer amount of $4,205,626.00 by
Tarrant Regional Water District (TRWD) on an annual basis, in accordance with provisions of the executed
Interlocal Agreement between the City and the TRWD (City Secretary Contract No. 43425 as amended).
The TRV Program Manager in the FW Lab Department will be responsible for collecting the full
reimbursement from TRWD at the end of each Fiscal Year.
*Numbers rounded for presentation purposes.
Business Equity — William J. Schultz, Inc. dba Circle C Construction Company, has agreed/committed to
maintain its initial Business Equity participation commitment of 12.13 percent that was made on the original
agreement. William J. Schultz, Inc. dba Circle C Construction Company, has also agreed to commit to all
prior change order/s up to and inclusive of this Change Order No. Therefore, William J. Schultz, Inc. dba
Circle C Construction Company, remains in compliance with the City's Business Equity Ordinance and
attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form
executed by an authorized representative of its company.
This project is located in COUNCIL DISTRICT 2.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the Commercial Paper project within the W&S
Commercial Paper Fund and in the Trinity River Vision, Phase 1 project within W&S Capital Projects,
Water/Sewer Bond 2016, Water & Sewer Bond 2015A, W&S Rev Bonds Series 2021, W&S Rev Bonds
Series 2022 and Sewer Capital Legacy Funds, and upon approval of the above recommendations and
adoption of the attached appropriation ordinances, funds will be available in the W&S Commercial Paper
Fund, for the Trinity River Vision, Phase 1 project to support the above recommendations and execution of
the change order. Prior to any expenditures being incurred, the Water Department has the responsibility of
verifying the availability of funds.
FUND IDENTIFIERS (FIDs):
TO
Fund Department ccoun Project Prog y ram ctivit Budget Reference # moun
ID ID Year (Chartfield 2) 1
FROM
Fund Department �Accounj Project Program ctivityl Budget Reference # �Amounj
ID ID II Year I (Chartfield 2)
CERTIFICATIONS:
Submitted for City Manager's Office by: William Johnson (5806)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Liam Conlon (6824)
ATTACHMENTS
1. 60WSSRFWCCS1P10C01-CIRCLEC FID Table.xlsx (CMInternal)
2.60WSSRFWCCS1P10C01-CIRCLEC.docx (CFW Internal)
3. 60WSSRFWCCSIP10C01-CIRCLEC MAP.ndf (Public)
4. Compliance Memo -Circle C.ndf (CFW Internal)
5.ORD.APP 60WSSRFWCCS1P10001-CIRCLEC 56002_A025(r5).docx
(Public)
6.ORD.APP 60WSSRFWCCSlP10C01-CIRCLEC 56005 AO25(r6l.docx
(Public)
7.ORD.APP 60WSSRFWCCS1P1000l-CIRCLEC 56007 A025(r7).docx
(Public)
8. ORD.APP 60WSSRFWCCSlP10C01-CIRCLEC 56019_A025(r8).docx
(Public)
9.ORD.APP 60WSSRFWCCS1P1000I-CIRCLEC 56020_AO25 r9l(l).doex (Public)
10. ORD.APP 60WSSRFWCCS1P1000I-CIRCLEC 56023 A025(r3).docx
(Public)
11. ORD.APP 60WSSRFWCCSlP1000I-CIRCLEC_59607_AO25(r4).docx
(Public)
12. PBS CPN C00969.ndf (CFW Internal)
13. Res.60WSSRFWCCS1P10C01-CIRCLEC (Rev).docx (Public)
14. SKM C250124081409070 Form 1295.pdf (CFW Internal)
6OWSSRFWCCSIPlOWSSRC01-CIRCLEC FID Table
3
56023
0600430
C00969
j
2025
$
81,175.00 Reimbursed by FWCC
3
56023
0700430
C00969
!
2025
$
2,617,726.65 Reimbursed by FWCC
3
56023
0600430
UCMLPR
2025
$
(2,698,901.65)
4
59607
0700430
4925002
C00969
C01789
$
(31,608.79)
4
59607 I
0600430
4925002
UNSPEC
UN1300
$
31,608.79
4
59607
0700430
C00969
C01789
$
(31,608.79)
f 4
59607
0600430
UNSPEC
UN1300
$
31,608.79
5
56002
070G430
49SS001
C00969
2025
$
(22,629.00) Do not return approp to UNSPEC
1 5
j 56002
0700430
C00969
2025
$
(22,629.00)I
6
56005
0600430
4905520
C00969
2025
$
(25,600.00) Return approp to UNSPEC
j 6
56005
070D430
4905520
000969
2025
$
(220,330.86) Return approp to UNSPEC
6
56005
0600430
4905520
UNSPEC
2025
$
245,930.86 To keep Fund balanced
6
56005
I
0600430
C00969
2025
$
(25,600.00)
6
56005
0700430
C00969
2025
$
(220,330.86)
6
56005
0600430
UNSPEC
I
2025
$
245,930.86
7
56007
0700430
4905430
C00969
2025
$
(1,083,136.00) Return approp to UNSPEC
7
-16007
01500430
4905430
UNSPEC
2025
$
1,083,136.00 To keep Fund balanced
7
56007
0700430
C00969
2025
$
(1,083,136.00)
7
56007
0600430
UNSPEC
2025
$
1,083,136.00
8
56019
0700430
4905431
C00969
2025
$
(443,312.00) Rem approp to UNSPEC
8
56019
060043D
4905431
UNSPEC
2025
$
443,312.00 ITo keep Fund balanced
8
56019
0700430
C00969
2025
$
(443,312.00) 1
8
56019
0600430
UNSPEC
2025
$
443,312.00 j
IRen-
9
I 56020
0600430
4905147
C00969
2025
$
(330,130.00) approp to UNSPEC
9
56020 j
0700430
4905147
C00969
2025
$
(76,892.00) To keep Fund balanced
9
56020
0600430
UNSPEC
2025
$
407,022.00
I 9
56020
0600430
C00969
2025
$
(330,130.00)
9
I 56020
11700430
C00969
2025
$
(76,892.00)
9
56020 1
0600430
UNSPEC
2025
$
407,022.00
4
59607
0700430
4925002
UNSPEC
UN1300
$
(31,608.79)
5
56002
0700430
4956001
C00969
C01730
9999
5
22,629.00
5
56002
0600430
4956001
UNSPEC
UNSPEC
9999
$
(22,629.00)
6
56005 1
0600430
4905520
C00969
C01780
2016
I
$
25,600.00
6
56005
0700430
4905520
C00969
C01780
2016
$
220,330.86
6
56005
0600430
4905520
UNSPEC
UNSPEC
9999
$
(245,930.86)
7
56007
0700430
4905430
C00969
C01783
2015
$
1,083,236.00
7
56007
0600430
4905430
UNSPEC
UNSPEC
9999
$
(1,083,136.00)
8
1
56019
0700430
4905431
C00969
C01780
9999
$
443,312.00
8
56019
0600430
4905431
UNSPEC
UNSPEC
9999
$
(443,312.00)
9
56020
0600430
4905147
C00969
C01480
$
330,130.00
9
56020
0700430
4905147
C00969
C01480
$
76,892.00
9
56020
0600430
4905147
UNSPEC
UNSPEC
9999
$
(407,022.00)
2
56023
0600430
5740010
C00969
C01780
9999
1 $
55,575.00 Pay to Contractor
NC0#1
3
56023
0700430
5740010
C00969
C01780
9999
1 $
409,688.00 Reimbursed by FWCC
I CO#1
2
56023
0600430
5740010
C00969
C01780
9999
1 $
25,600.00 Pay to Contractor
I Original CSC
3
56023
0700430
5740010
C00969
C01780
9999
1 $
2,208,038.65 Reimbursed by FWCC
l0riginal CSC
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
1X ` �h
Signature
Liam Conlon
Name of Employee
Project Manager
Title
ATTEST:
Jannette Goodall
City Secretary