Loading...
HomeMy WebLinkAboutIR 7678 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7678 "ANTIA,4 January 26, 1992 op ïż½QESOaT To the Mayor and Members of the City Council Subject: ACQUISITION OF TEMPORARY CONSTRUCTION EASEMENTS FOR SANITARY SEWER REHABILITATION M-146 In April 1992, the Environmental Protection Agency (EPA) issued an order to the City to eliminate overflows in the City's sanitary sewer collection system. A phased action plan has been developed to bring the City into compliance with the EPA order. Sanitary Sewer M-146 with its laterals are included in the EPA order with a scheduled completion date of May 30, 1994. The Monticello Drive/Hamilton Avenue area (Council District 7) is one of the City's areas experiencing inflow/infiltration problems during wet weather which result in manhole overflows and flooded homes. The City's sewer line serving this older area is located in an eight-foot permanent easement. Temporary construction easements are needed to provide working space to rehabilitate the line. (Current design practice is to require wider permanent easements so as to provide more working space for sewer repair and rehabilitation. ) Due to the need for early completion of this I project, homeowners were offered twenty-five percent (255) of the fee low value of their land for temporary construction easements rather than the usual payment of ten percent (10%) where dedication is not obtained from the property owner. The higher compensation was offered as an incentive to the owner(s) to reach agreement with the City so as to avoid lengthy eminent domain proceedings. As of this date, agreement on eleven (11) of the fourteen easements have been obtained; three others may require eminent domain proceedings. The estimated total cost for the fourteen easements is $29,600.00. The purpose of this report is to advise the City Council of the rationale for higher than normal payments for temporary construction easements with regard to this particular project. The M&C for Council authorization of securing these easemUentswi llow in two or three weeks. Bob err - 1 City Manager RD off%pl RICO RD Cffy SgRiTARY To, TL OPI BT:d t EMSEIRT1 H, TL -ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS