Loading...
HomeMy WebLinkAboutContract 58032-FP1FORT WORTHo TRANSPORTATION AND PUBLIC WORKS -FPl NOTICE OF PROJECT COMPLETION City Secretary No: 58032 02/13/2025 Date Received: ciry rrojecr N_: 103052 Regarding contxar,t 58032 Drainage Improvements for Lebow Channel at 28th st. for as requiced by the TRANSPORTATIONANDPUBLICWORKSDI?PARTMENTasappsovedbyCityCouncilon6/28122_ through M&C 22-0527 the director of the TRANSPORTAT[ON AND PUBLIC WORKS DEPARTMENT upon the xecommendahon of the Assistant Dircctox of thc Txanshartation & Public Woxks Dchar[mcnt has acccptcd thc projcct as complete. Original Caitract Amount: Amount of Approved Change Orders: Revised Contract Amount Total Cost Worlc Completed: Less Deduc[ions: Liqnidated llamages: Pavement Deficiencies: Totai Deduction Amount: Total Cost Worlc Completed: Less Previous Yayments: Final Paymen[ Due GaYviaia L. WaclsaaK Recommended for Acceptance Asst. Director, TPW - Capital Delivery � 4,899,910.00 n;,�s 305 S-421 ,OHZ.rJG Ns 2__ Days Added by CO � 78 �c 4,478,827.44 Total pays 483 $ 4,47$,827.44 Days Charged 44� Days @ $ / Day $ $ 4,478,827.44 $ 4,254,886.07 $ 223,941.37 Feb 5, 2025 Date �....%.4 Accep[ed Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT ���,�, Asst. City Manager Comments: Feb 6, 2025 Date Feb 6, 2025 Date OFFICIAL RECORD GTY SECRETARY FT. WORTH, TX C-620 Signature Page Contractor's App ' �o`j'tle`� City of Fort Worth P � FW020-0000008423 Number: Pro�ect 103052 City Secretary Contract 58�32 Number: Application For Paymenl Orders � for Payment Invoice No. 15-Final oicing Pcriod (From-To)�. Incoicc Datc: Se tember 1, 2024 - Se tembec 30, 2024 10/1/2024 m(Conh-acto�): Rcmit to (�f Not Automatic Dcposit ): Humplu�ey � Morton ConsWc[ion Co Inc rtracW�'s CFW Vendor No.- 00000�asax c000-a�c Draina e Ini rovements for Lebow Channel at 2811, St. n�,me g P � � � � � - - - � - � - � - � - TOTALS $207967.49 $629,OSOAS NET CHANGE BY _$qZ1,082.56 CHANGE ORDBRS Contractor's Cerfi(ication The Coutrac[or certifies n�itl� Uie submit[al of tliis dooumen[ and associa[ed Pavmeu[ Reques[ Submittal o� the Ciry of Fort Worth Bnzasa�c system tliat m the best of tlieic A o�rledge: (q all p�e��io�s pmgress pa}�nen[s receiced from O�tner on acconnt of Work done under [he Contrac[ ha��e been applied on o��[ m discharge Con[racm� s legitima[e obligations i�co�red fn co��ec[io� «itli Work co� eced by prfor Applicatio�s foc Pn�mient (2) htle of all Wock, mntecials nnd equfpmeut inco�porated in snid Wock oc otl�eruise Ifs[ed in or coceceA b�° Uus Applfoafio� for Payme�t �rfll pass [o Ouner a[ bme of pa.nne�t &ee and clear of all Lie�s, secnriro interests a�d enwmbrances (emept s�ch as are co��e�ed 67 a Bond accep[able [o Onner indemnifving O���ner against any such Liens, secwiM interest or nmbrances); a�d (3) all Wo�k co�ered by this Application for Pa�nne�t is i� accorda�ce ��ith the Con[rac[ Docnments and fs no[ defecGve- �GI✓lG� S. �'fUVYJI�G�f'P� DavidS.Humphirey(Dec23,2 2409:34CST) l. ORIGINAL CONTRACT PRICH :.......................................................... $ $4,899.910.00 2. Net change by Change Orders ................................................................. $ -$421,082.56 3. Current Contract Price (Line 1 t 2) ........................................................ $ $4,478.527.44 4. TOTAL COMPLETED AND STORED TO DATE (Progress Es[ima[e, Cons[ruction Allowance and Change Orders)....... $ $4,47S,S27.44 5. RETAINAGE: a X $4.478,827.J4 Wm�kCompleted.......... $ h. X Not Used $ c. Total Retainage (Line Sa+ Line 56) ................................ $ 6. AMOUNT ELIGIBLE TO DATE (Line 4- Line Sc) ............................. $ $4,478,527.44 7. LESS PREVIOUS PAYMENfS (Line 6 Gom prior Applica[ion)........ $ $4,254,586.07 S. AMOUNT DUE THIS APPLICATION ................................................. $ $223,941.37 9. BALANCE TO FIMSH, PLUS RETAINAGE (Column G on Progrus Estima[e+ CA + COs + Line 5 above) .............. $ 10. CONTRACT TIME: �, Days Awarded 305 b, Daps Added by CO 178 �, Total Days qg9 d, Days Charged qq� e. Days Remaining 42 � � This document has been modifed from its original form as an EJCDC document and the user did not highlight ihe modifications. You are encouraged to read the document carefully and consult Legal Counsel prior to its execution. Progress Estimate ""`°'""0 Drainage Improvemen[s fur Lebo��� Channel a[ 2811, St. �� u�aaa���. SephmberL,2U7A-Seplember3U,1A2A �.,m�nrv��. iR032 �� Contractor's Applicatioo u.,aNu��_,. L4Fiva1 noaai�. IWIRUZA $o59a=�cc $'9 $21� 519 $3 eoa ca �52�oDG $a5 $$�6 815a 31,990.�0 811 � e� � ProgressEstimate ��tisr���� �R��2 Contractor'sApplicatioo Progress Estimate ""`°'""0 Drainage Improvemen[s fur Lebo��� Channel a[ 2811, St. �� "°aP°"°�. SeptemberL,2U1A-Seplember311,?A2A I� ��nsn��m> �R�;2 Contractor'sApplicatioo u.,aNu��_,. L4Fiva1 noaai�. IWIRUZA Progress Estimate ��nsn��m> �R�;2 Contractor'sApplicatioo rioiNaO� Drainage Improvemen[s fur Lebo��� Channel a[ 2811, St. - "'"""". "` L�-Riurl °onPano�. SeptemberL,2U1A-Sephmber311,?A2A - u.,awie. IWInUZA 5a.zzLsssss asao cna�ye ome� Progress Estimate Construction Allowance Usage Contractor's Application ADDITIONS ,. Drmm�Ke hnpv�emenls 1'm� Lebo�a CTannel nt 2Nll, tit. ""i°. 103052 ,.���, �����. 5xwz "'°"N°'"�". li-Final �`a_"`�. 8e�rtember1,2021-3e{�tember30,202-1 "'°"�'�` �uivlol� ��m,w�a e., ' . maa� u��.v.,x am�io��,���n �: �,�y �,wn ' . . � . o i.,i�, .i,�„_ � v- � ��.��N �N��� t�,w s,��,� ,�_� e) c_' ., �oo e� � � _ - . �� ��.. . i Su.�� Y'_:��.�� .i � .�� SSSoaao ��o�o _ � .. _ aa m.a .. - . Y'a�a� S13_���.�� . � Y-i�aaau _. _ �r�_ 11� . � � i�n ...� [i� ...0.[ �no [ � [o,. . . 1. S]O�IOI I�10°a �n. �-� - � .. � � ,�„ Y4o�u.ou .,�� , ,� �� 54����o S4�oouo i in_ ,_�i- u.� ev � vu�u�]i,.a .s ��„�,,,, Y�:��.� si.�� iuo��,��� s.�� 5, Siioauo oiu asao cna�ye ome� - ----�-��--��- asao cna�ye ome� Progress Estimate Coostruc[ioo Allowaoce Usage Contractor's Application CONSTRUCTION ALLO�VANCE ITEMS TO BE REDUCED aor(a�no-a.tl- 1�30$2 Dr�iinugeLn�ru�v.�neursfurLebo�vChmuelut381L,5t. ��anN��n�bar. li-Finnl °o°v"�°°. September1,2U23-Septem6cr30,202; °anDa1a' LU/1/1o3J asao cna�ye ome� Progress Estimate Change Order Number 0 Contractor's Application ADDITIONS o..�e�,ir 103052 Dramage hnpro.emeurs ror Lebo.a [7�anud ar 2x14 s�. sbaiz �oO" �°"�otlf. li-Final �'�'�a'°�� September1,2U23-September30,2023 °oO��` twv20u ' ..,i . � .i,m:� e. crca.� u.�n .., � � iym �m uo�i a.,,. _ a.� .�. v �,wn -. .,�, . . : o. � - ,i��.. " �.,i �. �.i �..�. � w ��i ° ..� ___ .�. �.�, . .. �,�n .�+e>u � . . m� � ,����� Y�.e53.o� £i ae�.�� _ i Y:� ns1�� £i se�.�� Y_ . _ i.. u� nn n,: .i.� o� . ������ Si1�3.�i Si� ���.ii . Y�� ��. �� Y�� ��. �� Y�. _ _ i n. � v.. . � k.. �_ „� �.. i._. _ s � �� �� ... ,� Si.. > > w ��� �. Y�_3�� �a _�3 �u.� asao cna�ye ome� - ----�-��--��- asao cna�ye ome� Progress Estimate Chaoge Order Number 0 Contractor's Application DELETIONS Dr�iinuge Ln�ru�v.�neurs fur Lebo�v LTmuelut381L,5t. 'w°""`0- 103052 °o"�°m�`. li-Final "°°Veio°' September1,2U23-September30,2023 °onD"°' twv20u �-i.. ,0�,.�4����0�.� _s ������� an�aeu s .ceu asao cna�ye ome� Progress Estimate Chaoge Order Number 0 Contractor's Application ADDITIONS "°""""�- 1030$2 D��uo�e�I�np��u���n��hr���bu..�a�eN��un811,5[. ��U32 ���o�Numnu. IS_Finnl ""va'°�. Septemberl,2021-September3D,2021 "°"�°" lo/1no1J � .. ..._�i, - � ie ��� � "� '" ��,,,i - _ r o� ., _Nn. �e ��.i .� ��. ua a Fn��a ,. �., ) ` e) �,_ w�,� � ��.�� . +e�u - vm� ei e ��� .< < Siuo Sssaou . � Ye���o Sssaou Ss�aou i_ ._ nos i�.. . ���w� _. . �. Ybv.�� S]]e0� . . . - S]]eou S] _ �� ..+ .. �a u�in. . _ Yea3 �� Ss3a pu _ » Ss3a ou Ss___ _ — on� ,��. � u .` _ . . .S..E.oD SJ3v1uD .. . F .,xx Y'La J _ ? ,u .. . Y- .. . SJ-V.oi S.�H . . S�Sw�� Y�:��.ou _ v�: �ncv�n.u4 _ t .�cl �- ,_. Sa�3 F.. ... . � S&EOJX�i YL6�.bJ _ .n.f- Fw a�r�fn �alaua�� ��� � ���u Y �5 Y�oi3 _ouoouo�u � S. a YFoi oau asao cna�ye ome� Progress Esfimate Change Order Number 0 Contractor's Application DELETIONS a�r(��no-�,�)- 1030$2 D��uo�e�I�np��u���n��hr���bu..�a�eN��unS11,5c ���a��w����oer. IS-Finnl nN,vQ���. Septemberl,2021-September3D,2021 °un�"" lUl12o2J .. - � a:.i �ft�.o, si.as��.; . ua�,�«, azoo s.uauo - ��x.��.e> sioo s.� �.:�1 S�i.�i� %$�.�]:�� .enJ�l� Claes 1 Y�: ]� �� Y�e d�se �� _ �e�nLui6r6-6-PooHieli) Seu 59.6 n]� �nv) �� Y$�b.u� S3ie��� 1ian1i1�i1� Y'163.uo 'Y65.a3]_oa epe�{epr��b01a-6Np ' ����li_�M) Y$a�bui� SI:S*],i�� g,il��v r.�.eiu�u�e Y[����i� Y�gi���u � ... Y � Y_$�.�� Y ee) S3v�� S.] � �i� i�y.e�R) - Y'-b��� $1Ssia�i� Y'�:9�� Si �a� uo ms�uu) S]�o S_.� %a. �t�.�� St:��t�.ui� :J3}'IU.U� asao cna�ye ome� Progress Estimate Chaoge Order Number 0 Contractor's Application ADDITIONS "°""""�- 1030$2 D��uo�e�e.Lnpru��e�nu�hr��Lebu.rQ�erv�AunS11,5c �N�32 uo�Numn,.. 1;-Final iiPaio�� Septemberl,2021-September3D,2021 u°"��" l0/1l2o2J �nM.�c.�_'�— � ' ,r i.v�,: �, i���:i�-,,: :.a�- si�. ��,.., ,,. ��1. .,�-:'. : i„ �i, � , i � i �i�) No i ... i _ w�,. � ��� .< < � « ,. ..,. , . � «ei � _ asao cna�ye ome� - -----------�- asao cna�ye ome� Progress Esfimate Change Order Number 0 Contractor's Application DELETIONS a�rc��ne�,�)- 1030$2 D��uo�e�I�np��u���n��hr���bu..�a�eN��unS11,5c ���o��w����oer. 1;-Final nN,vQ���. Septemberl,2021-September3D,2021 "'°"�"" lo/V2UZJ asao cna�ye ome� Progress Estimate Chaoge Order Number 0 Contractor's Application ADDITIONS "°""""�- 1030$2 D��uo�e�e.Lnpru��e�nu�hr��Lebu.rQ�erv�AunS11,5c �N�32 uo�Numn,.. 1;-Final iiPaio�� Septemberl,2021-September3D,2021 u°"��" l0/1l2o2J � � � mw. � � � ���� i eow�ei��o�s� rv� °' � ,.,���N ��n,�.. Y � �� ww�na i �.� � Fn��a .��e� ��i �a o i. _ asao cna�ye ome� - -----------�- asao cna�ye ome� Progress Esfimate Change Order Number 0 Contractor's Application DELETIONS a�rc��ne�,�)- 1030$2 D��uo�e�I�np��u���n��hr���bu..�a�eN��unS11,5c ���o��w����oer. 1;-Final nN,vQ���. Septemberl,2021-September3D,2021 "'°"�"" lo/V2UZJ asao cna�ye ome� Progress Estimate Chaoge Order Number 0 Contractor's Application ADDITIONS "°""""�- 1030$2 D��uo�e�e.Lnpru��e�nu�hr��Lebu.rQ�erv�AunS11,5c �N�32 uo�Numn,.. 1;-Final iiPaio�� Septemberl,2021-September3D,2021 u°"��" l0/1l2o2J � � � mw. � � � ���� i eow�ei��o�s� rv� °' � ,.,���N ��n,�.. Y � �� ww�na i �.� � Fn��a .��e� ��i �a o i. _ asao cna�ye ome� - -----------�- asao cna�ye ome� Progress Esfimate Change Order Number 0 Contractor's Application DELETIONS a�rc��ne�,�)- 1030$2 D��uo�e�I�np��u���n��hr���bu..�a�eN��unS11,5c ���o��w����oer. 1;-Final nN,vQ���. Septemberl,2021-September3D,2021 "'°"�"" lo/V2UZJ asao cna�ye ome� Progress Estimate Chaoge Order Number 0 Contractor's Application ADDITIONS "°""""�- 1030$2 D��uo�e�e.Lnpru��e�nu�hr��Lebu.rQ�erv�AunS11,5c �N�32 uo�Numn,.. 1;-Final iiPaio�� Septemberl,2021-September3D,2021 u°"��" l0/1l2o2J �,.. �, i�... i _ w�,. � ���.<< ' ..�,.� �.i.,, � « .n�w _.,.�. � _ � eiu `��� �i,-a� asao cna�ye ome� - -----------�- asao cna�ye ome� Progress Esfimate Change Order Number 0 Contractor's Application DELETIONS a�rc��ne�,�)- 1030$2 D��uo�e�I�np��u���n��hr���bu..�a�eN��unS11,5c ���o��w����oer. 1;-Final nN,vQ���. Septemberl,2021-September3D,2021 "'°"�"" lo/V2UZJ asao cna�ye ome� Progress Estimate Chaoge Order Number 0 Contractor's Application ADDITIONS "°""""�- 1030$2 D��uo�e�e.Lnpru��e�nu�hr��Lebu.rQ�erv�AunS11,5c �N�32 uo�Numn,.. 1;-Final iiPaio�� Septemberl,2021-September3D,2021 u°"��" l0/1l2o2J :�n�. �i.,i =. �K�r ��,.., �,�` ,�,:c.��w- sr«i��;._ .v��..�,� u�.r.,,. :.a�- . ,,._�1. i�.w�-,r�,.�-. � , e ' a�� �i� �n-v1 asao cna�ye ome� Progress Esfimate Change Order Number 0 Contractor's Application DELETIONS a�rc��ne�,�)- 1030$2 D��uo�e�I�np��u���n��hr���bu..�a�eN��unS11,5c ���o��w����oer. 1;-Final nN,vQ���. Septemberl,2021-September3D,2021 "'°"�"" lo/V2UZJ asao cna�ye ome� Progress Estimate Chaoge Order Number 0 Contractor's Application ADDITIONS "°""""�- 1030$2 D��uo�e�e.Lnpru��e�nu�hr��Lebu.rQ�erv�AunS11,5c �N�32 uo�Numn,.. 1;-Final iiPaio�� Septemberl,2021-September3D,2021 u°"��" l0/1l2o2J � � � mw. � � � ���� i eow�ei��o�s� rv� °' � ,.,���N ��n,�.. Y � �� ww�na i �.� � Fn��a .��e� ��i �a o i. _ asao cna�ye ome� - -----------�- asao cna�ye ome� Progress Esfimate Change Order Number 0 Contractor's Application DELETIONS a�rc��ne�,�)- 1030$2 D��uo�e�I�np��u���n��hr���bu..�a�eN��unS11,5c ���o��w����oer. 1;-Final nN,vQ���. Septemberl,2021-September3D,2021 "'°"�"" lo/V2UZJ City Sac�c[ary Con[rnc[ Num: I �5032 AppGca[ion Pa�iod�. City of Fort Worth Summary Drainage Improvements for Lebow Channel at 2811, St. eptember 1, 2024 - September 30, 202 A�E of Charges P o ��ozo-000000sazs 1�-Final Funding Identification (FID) Total Completed Amt Remaining Original Contract 52007-0200431-5740010-103052-002880-9999 $4,270,859.95 $629,050.05 0 0 0 0 0 0 0 0 0 0 Change Order 1 52007-020043'I-57400'10-103052-002880-9999 0 _ 0 0 0 0 0 0 0 0 0 Change Order2 52007-0200431-5740010-103052-002880-9999 0 0 0 0 0 0 0 0 0 0 $86,680.00 $121,287.49 (586,680.00) ($542,370.05) Project Numbar: 1030�2 Applfcanon Date�. 10/1/2024 Gross Retainage Net City Sac�c[ary Con[rnc[ Num: I �5032 AppGca[ion Pa�iod�. City of Fort Worth Summary Drainage Improvements for Lebow Channel at 2811, St. eptember 1, 2024 - September 30, 202 A�E of Charges P o ��ozo-000000sazs 1�-Final Project Numbar: 1030�2 Applfcanon Date�. 10/1/2024 Funding Identification (FID) Total Completed Amt Remaining Gross Retainage Net Change Order 3 52007-020043'I-57400'10-103052-002880-9999 0 0 0 0 0 0 0 0 0 0 Change Order 4 52007-0200431-5740010-103052-002880-9999 0 0 0 0 0 0 0 0 0 0 Change Order 5 52007-020043'I-57400'10-103052-002880-9999 0 0 0 0 0 0 0 0 0 0 City Sac�c[ary Con[rnc[ Num: I �5032 AppGca[ion Pa�iod�. City of Fort Worth Summary Drainage Improvements for Lebow Channel at 2811, St. eptember 1, 2024 - September 30, 202 A�E of Charges P o ��ozo-000000sazs 1�-Final Project Numbar: 1030�2 Applfcanon Date�. 10/1/2024 Funding Identification (FID) Total Completed Amt Remaining Gross Retainage Net Change Order 6 52007-020043'I-57400'10-103052-002880-9999 0 0 0 0 0 0 0 0 0 0 Change Order 7 52007-0200431-5740010-103052-002880-9999 0 0 0 0 0 0 0 0 0 0 Change Order 8 52007-020043'I-57400'10-103052-002880-9999 0 0 0 0 0 0 0 0 0 0 City Sac�c[ary Con[rnc[ Num: I �5032 AppGca[ion Pa�iod�. City of Fort Worth Summary Drainage Improvements for Lebow Channel at 2811, St. eptember 1, 2024 - September 30, 202 A�E of Charges P o ��ozo-000000sazs 1�-Final Project Numbar: 1030�2 Applfcanon Date�. 10/1/2024 Funding Identification (FID) Total Completed Amt Remaining Gross Retainage Net Totals 52007-020043'I-57400'10-103052-002880-9999 $4,478,827.44 ($0.00) 0 0 0 0 0 0 0 0 0 0 Grand Total $4,478,827.44 ($0.00) $0.00 ($223,941.37) $223,941.37 CSC No. 58032-ARl FORT WORTH,., City of Fort Worth `—��� Construction Allowance Request Project Name Z$th Street at Decatur HROM City Sec # 58032 Client Project #(s) Project Lebow Channel improvements at 28th Street. CPN103052 Description Contractor Humphrey & Morton Construction Co, Inc. CA # 1 Date 1/12/2023 City Project Mgr. Michael Wellbaum City Inspector Charles Hayes Dept. Original Contract Amount Extras to Date Credits to Date Current Contract Amount Original Allowance Available to Allocation Aliowance Funds Previously Allocated Remaining Funtls Available for this Allocation TPW ,899,910.00 ,899,910.00 48,900.00 400,000.00 351,100.00 Contract Time Totals CD 4,899,910.00 305 4,899,910.00 305 48,900.00 40Q000.00 305 351,100.00 IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACTOR SHALL: Remove antl replace a 10-inch water line in conflict with the proposetl improvements and in accortlance with information providetl by the engineer. This work was not indudetl in the original bitl. Contract items antl quantities have evaluated by City Staff and were fountl reasonable when compared to City standard prices and the recently bid Westcliff Drainage Improvements, Phase 1 project. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. Contract Time will be adjusted on the basis of the time shown on this Construction Allowance Request by a later Changer Order, if necessary. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Com an Name Contractor Name Contract Si nature Date Humphrey& Morton Construction Company, Inc. �OSII GIII � FeI7 3� 2�23 ATTEST: �� ,� �, � Jannette Goodall, City Secretary anIl aF Fo►rr�aa a.►�o��� �° Od0 c°�g o9-1d0 C�*�o d �d�d QEXA544q �FFICIAL RECORD CITY SECRETARY FT. WORTH, TX city of Fort wortn Construction Allowance Additions Project Name 28th Street at Decatur HROM City Sec # 58032 Client Project # Contractor Humphrey & Morton Construction Co, Inc. PM Inspector Charles Hayes Construction Allowance Submittal #�1 Date 1/12/2023 ADDITIUNS ��IL�1'{� ' • •' �'.9i��ii��� � '• ��� •• � , � , . � - � r�. • -.• �• - � � •���iul�`�� �� ���1�I� � 1 � . 1 .- -r- �- - '� 1111111111� �� �11 '� �1111 � 111 � • � � �• �• ' � 11111111 � �� 11 11 '� 11 11 II� 1 1 1� ._ ' .' r' �' ' 1 1 � 11 11111111 � �� 1 11 '� 111 11 �� 1 • • � • � � � � 11111111 � �� 11 11 '� 111 11 I�I�iii�l ..11 11 1�� . � �' �' ' 1 .111 . -'� 11111111� ��•11111 '�.11111 �1 1 1 � • . � �• �• • 1 � 11111111� �� 1111 '� 1111 I� --��- I� --��� I� --��- I� --��� !� ����� � ����� � ����� � ����� I� ����� !� ����� !� ����� I� ����� � ����� � ����� � ����� I� ����� i� ����� � ����� � ����� � ����� i� ����� I� ����� i� ����� !� ����� � ����� � ����� � ����� I� ����� !� ����� '� ����� i� ����� I� ����� '� ����� � ����� � ����� I� ����� � ����� � ����� �� ����� i� ����� !� ����� � ����� � ����� �� ����� '� ����� � ����� � ����� I� ����� � ����� � ����� '� ����� '� ����� i� ����� i� ����� �,,: ��� �� � � � � .. ��� . �,�: ��� �� Change Order Additions Page 2 of 3 F�R_��H c�ty of Fo�t wortn Construction Allowance Deletions Project Name 28th Street at Decatur HROM City Sec # 58032 Client Project # Contractor Humphrey & Morton Construction Co, Inc. PM Inspector Charles Hayes Construction Allowance Submittal #�1 Date 1/12/2023 DELETIONS �IL�1'1� ' ' •' S'L�����i' 1�� ' •• ��1� � ����� � ����� � ����� !� ����� i� ����� I� ����� I� ����� � ����� � ����� �� ����� I� ����� '� ����� � ����� � ����� � ����� � ����� � ����� � ����� !� ����� � ����� � ����� � ����� !� ����� I� ����� � ����� � ����� � ����� '� ����� � ����� � ����� i� ����� � ����� � ����� � ����� I� ����� I� ����� � ����� � ����� � ����� I� ����� '� ����� I� ����� I� ����� � ����� � ����� �� ����� i� ����� '� ����� � ����� � ����� � ����� '� ����� � ����� � ����� I� ����� I� ����� '� ����� � ����� � ����� �,� �� � � � � .. �- - � �,� �� Change Order Deletions Page 3 of 3 Fo��r�V���r��� Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: M&C: N/A Construction Allowance Request CPN: 103052 CSO: 58032 DOC#: Date: To: 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. I Name Josh Gill josh@humphreyandmorton.com Charles Hayes Michael Wellbaum Linda Young Lissette Acevedo Michael Owen Lauren Prieur Doug Black William Johnson Melissa Brunner Jannette Goodall Allison Tidwell Tpw SW Contract Department Contractor TPW - Inspector TPW - Project Manager TPW - Program Manager TPW — Interim Sr. CPO TPW - Interim Assistant Director TPW - Interim Director Legal - Assistant City Attorney CMO—Assistant City Manager CSO — City Secretary CSO — City Secretary C50 — City Secretary TPW Stormwater Initials L� � Date Out Feb 3, 2023 Feb 3, 2023 Feb 3, 2023 Feb 3, 2023 Feb 4, 2023 Feb 5, 2023 Feb 5, 2023 Feb 6, 2023 Feb 7, 2023 Feb 7, 2023 Feb 7, 2023 Feb 9, 2023 NEEDS TO BE NOTARIZED: ❑YES �No RUSH: ❑YES �No SAME DAY: ❑ YES ❑No ROUTING TO CSO: �YES ❑No Action Required: � Signature/Routing and or Recording NEXT DAY: ❑YES ❑No Return To: TPWContracts @FortWorthTexas.�ov at ext. 7233 for pick up when completed. FORT WORTH:, City of Fort Worth Change Order Request CSC No. 58032-CO1 Project Name 28th Sireet al Decatur HROM City Sec # 58032 Client Project #(s) Project Lebow Channel improvements at 28th Street. CPN103052 Description Contractor Humphrey & Morton Construclion Co, Inc. Change Order # 1 Date 11/20/2023 City Project Mgr. Michael Wellbaum City Inspector Chades Hayes DepL Onginal Contract Amount Exiras to Date Credits to Date Pending Change Orders (in M8C Process) Conlract Cost to Date Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) TPW Contract Time Totals (CD) ,899,910.00 305 ,899,910.00 305 136 ,899,910.00 441 ,224,977.50 ,224,977.50 CHANGE ORDERS to DATE (INCLUDING THIS ONEJ AS % OF ORIGINAL CONTRACT 0.00% MAX ALLOWABLE CONTRACTAMOUNT (ORIGINAL CONTRACT COST+ 25%J $6,124,887.50 This change order provides for additional pay items that are ofiset by a reduclion in lhe overall consW ction allotvance. The origina� plans required concrete encasement of a 24-inch sanitary sewer line lhat runs under lhe channel improvements. In order to perform the bypass pumping and CCN inspection, it was determined that a new manhole had to be installed to accommodate the pumping equipment and allow for CCN, The original plan to utilize an existing manhole in Decatur Road was nof going to work due to size limitalions and traKc pattems. When conducling lhe inifial CCTV inspection, a significant sag was discovered in lhe sanilary sewer line. There was a 28-day delay while waler department management reviewed the data and determined a path fonvard. This delay incurred lhe cosl of slandby time for the pumping equipment. TPW Slormwater staff has reviewed ihe costs, compared them to recent bids where applicable, and considers lhe price appropriate for lhe work performed. The change order also provides for additional days. The sanitary sewer encasement issue listed above resulted in 28 days. There was a water line relocation that occurred in January, 2023 lhat resulted in a 14-day delay. The property located at 2812 Decalur Road went to condemnation in January, 2023 which delayed channel excavation for 21 days. Throughout the project, rain delays and excess water in �he channel caused 28 days in lost work and slow production. The landscaping subcontractor had tlifficulty sourcing plants in the quanlilies and species required to meet the US Army Corps of Engineers permit requirements. After researching options with the design engineer and conducting a natiomvide search, the issue was resolved with a resulting delay of 14 days. Due to the excessive heat lhrough August, we suspended the planting for 31 days to allow for more favorable planting conditions. The resuli of all of these issues is an additional 136 days added to the construction contract. It is important to note that Ihe It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all cos[s arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Coniractors Com an Name Contractor Name Cohiract Si naWre Date Humphrey&MortonConstruction JoshuaGilf Nov2s,2o23 ATTEST: �.,..... A .dz�.. Jannette Goodall, City Secretary M&C Number NIA M&C Date Approved N/A Po�zrWotalH City of Fort Worth �`?"� — Change Order Additions Project Name 28th Street al Decatur HROM City Sec # 58032 Clienl Project # Contractor Humphrey & Morton Construc6on Co, Inc. PM Michael Well6aum Inspector Chades Hayes Change Order Submittal #� �ale 1112012023 AUDIIIONS ty ntl nit osl ota ypass umping tan y ime ays 1, ew 5 iameter Samlary ewer an e , 5. anitary ewer an e xUa ept > 5. po�ry an e mer 5. .5 oncrele rust oc s al xishng anitary ewer me TPW $86,680.00 u ota itions Change Order Additions Page 2 of 4 PoEii VVo�z'r�� Clty of Fort Wolth —~'�'� - Change Order Deletions Project Name 281h Street al Decalur HROM City Sec # 58032 Clienl Projecl # Contractor Humphrey & Morion Conslruction Co, Inc. PM Michael Wellbaum Inspector Chades Hayes Change Order Submiltal #_�__1� Dale 1112012023 DELETIONS ry mt nit ost ota onstruchon owance TPW $86,680.00 u ota e etions Change Order Deletions Page 3 of 4 .., MISBE for this Change Order FORT WORTH City of Fort Worth � Change Order Request CSC No. 58032-0O2 Project N2me ZSih Slreet at Decatur HROM City Sec # 58032 Client Project #(s) Project Description Lebow Channel improvemen�s at 281h Streef. CPN103052 Contractor Humphrey & Morlon Construc6on Co, Inc. Change Order # 2 Date 41212024 City Project Mgr. Michael Wellbaum City Inspector Chades Hayes Dept. Original Contract Amount Extras to Date Credits lo Dale Pending Change Orders (in M&C Process) Contract Cost lo Date TPW Contract Time Totals CD 899,910.00 305 136 899.910.00 441 Original Funds Available ior Change Orders Remaining Funds Available for this CO Additional Funding (if necessaryJ CHANGE ORDERS fo �ATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT MAX ALLOWABLE CONTR.QCT AMOl1NT (ORIGINAL CONTRACT COST+ 25%) $4,478,827.44 483 S1,224,977.50 51,224,977.50 -8.59% $6,124,887.50 JUSTIFICATION (REASONS) FOR CHANGE ORDER change order adds a line item (or the installation of °No Mow" signage along ihe channel banks to protect the US Army Corp of Engineers 404 Mifigation Area. The item includes "No Trespassing" signage along both channel banks. The additional cost for Ihis item is consistenl with similar items on previous channel projects and is fair and onable. The balance of lhe additions and deletions are all bid ilems that are being reconciled wifh this change order. This change order also includes additional days for age implementation. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full �both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ConlractorsCom an Name Contractor Name ContractSi nature Date �� Ju111,2024 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX GAoaFOR� �p M&C Number 24-0571 M&C Dale Approved 6125/2024 � �E6�*.� � ..�Siae.� � pF,o° oe �Y�+a � Pp.1.o° o� ��9 �O c_o °-+d Jannette Goodall, City Secretary pv° '=p Op � ��o o� i�� da4�rfXAs 4a nnn0004 Fot;r Wor.n� City of Fort Worth �`T�— Change Order Additions Projecl Name 281h Street at Decatur HROM City Sec # 58032 Client Project # Contractor Humphrey & Morfon Construclion Co, Inc. PM Michael Wellbaum Inspeclor Chades Hayes Change Order Submittal #�2 Dale 41212024 ADDITIONS ty nit nit ost ota emove xishng oncrete iprap 1-19 Remove Conc. Curb & Gutler TPW 169.00000000 LF 28.00 1•21 6"-12" Tree Removal TPW 2.00000000 EA 389.00 1-23 18"-24" Tree Removal TP 1.00000000 EA 633.00 1-24 2A" and Larger Tree Removal TPW 1.00000000 EA 1,333.00 1-29 6" Conc. Curb & Guller TPW 169.00000000 LF 26.00 1•31 Orill Shafl (30 IN) TPW 4.00000000 LF 344.00 1-40 Geobag a I TPW 176.00000000 SF 54.00 1-46 Coir Log Along Toe TPW 114.00000000 F 17.00 1-47 Turf Reintorcemenf Malting TPW 2,868.00000000 SY $28.00 1-49 Seed Mix • Nalive Prairie Grass Area (301bs per acre) TPW 20,043.00000000 SF R23 CO2-1 Funish and Inslall Signs TPW 14.00OOOODO EA 613.00 CO2-2 Impacf Fees Relaled fo Waler Meler Inslallalions TPW 2.00000000 EA 1,006.00 TPW $121,287.49 Sub Total Additions 121,267.49 Change Order Additions Page 2 of 3 FoitrWutrrH Clty of Fott Worth -�'��- Change Order Deletions Project Name 28th Streel al Decatur HROM City Sec # 58032 Client Projecl k Contractor Humphrey & Morton Conslruclion Co, Inc. PM Michael Wellbaum Inspeclor Charles Hayes Change Order Submittal #�2 Date 412I202A DELETIONS ty m rnl ost ola - ra ic onlro 1-6 SWPPP >_ 1 Acre TPW 0.05000000 LS 21,627.00 1-7 Temporary Sedimenl Conlrol Fence (InstalllRemove) TPW 73D.00000000 LF $7.00 1-8 Filler Tubes QnslalllRemove) TPW 2,550.00000000 LF 10.00 t-9 In el Proteclion TPW 90.00000000 LF 531.00 1-10 ConsUuclion EnUance TPW 417.00000000 SY 21.00 1-11 Rock Check Dam (InslalllRemove) TPW 175.00000000 LF 61.00 , 75. 1-12 Soil Retenlion Blanket, Type A, Class 1 TPW 347.00000000 SY 82.00 1-20 WaterServiceAban onmenl TPW 12.00000000 EA 1,574.00 1-25 Tree Prolection TP 8A,00000000 EA 48,00 1-26 Temporary Construclion Fencing - Chain Link (68•Foot High) TPW 2,460.00000000 LF 4.00 1-27 6" Conc. Driveway (Mainl Ramp) TPW 17.00000000 SF 514.00 t-28 6" Conc. Pvmt (MainL Ramp) TPW 3.000OOOOD SY 106.00 135 Riprep (Slone Proteclion)(12 IN) TPW 399.00000000 CY 5163.00 1-36 Riprap (Special)(Cobble-61N) TPW 294.00000000 CY 66.00 1•37 Riprap (Slone Proleclion)(26 IN) TPW 2.00000000 CY �136.00 � 7. 1-38 Grouted Slone Riprap Drop Slruclure TPW 1.00000000 C 5227.00 7. 1-43 Small Tree (30 gal) TPW 19.00000000 EA 640.00 1-50 Buf(alo Grass Sotl TPW 2,93D.00000000 SF 1.00 1-54 Concrele Encasement For U�lity Lines (Sanitary Sewer) TPW 110.00000000 CY 565.00 1-55 Pre-CCN Inspeclion (Sanitary Sewer) TPW 61.00000000 LF 39.00 1-56 Posl-CCN Inspeclion (Sanilary Sewer) TPW 251.00000000 LF $39.00 ,7 .0 t-59 Final-Manhole CCN Inspection (Sanilary Sewer) TPW 2.00000000 EA 556.00 1-67 18" RCP, Class III TPW 6.00000000 LF 5136.00 1-62 24" RCP, Class III TPW 9.00000000 LF 159.00 1-63 36" RCP, Class III TPW 2.00000000 LF 5255.00 1-65 Post-CCN Inspectian (Slorm Sevrer) TPW 190.00000000 LF 7.00 1•66 renc Sa ety P 67.00000000 L 1.00 1-66 Utility Markers TPW 1.00000000 LS 53,546.00 1-72 Construclion Allowance TPW 0.66105000 LS 400,000.00 TPW 5542,370.05 Su6 Total Deletions 542,370.05 Change Order Deletions Page 3 of 3 City of Fort Worth, Texas Mayor and Council Communication DATE: 06/25/24 M&C FILE NUMBER: M&C 24-0571 LOG NAME: 20SWM 28TH STREET AT DECATUR HROM CHANGE ORDER 2 SUBJECT (CD 2) Authorize Execution of Change Order No. 2 to a Contract with Humphrey & Morton Construction Company, Inc., Reducing the Amount by $423,096.16, for the Construction of the 28th Street at Decatur Hazardous Road Overtopping Mitigation Project, thereby Decreasing the Total Contract Amount to $4,476,813.84 RECOMMENDATION: It is recommended that the City Council authorize execution of Change Order No. 2 to City Secretary Contract No. 58032 with Humphrey & Morton Construction Company, Inc., reducing the contract amount by $423,096.16 for the construction of the 28th Street at Decatur Hazardous Road Overtopping Mitigation project (City Project No. 103052), thereby decreasing the total contract amount to $4,476,813.84. DISCUSSION: This Mayor and Council Communication (M&C) wiil authorize Change Order No. 2 to reconcile the contract quantities with actual construction quantities now that construction is complete. This contract for the construction of the 28�h Street at Decatur Hazardous Road Overtopping Mitigation (HROM) project (City Project No. 103052) was awarded on June 28, 2022 (M&C 22-0527). It also provides for the installation of signage to protect the channel and environmental mitigation areas from trespass. Forty-two (42) additional days will be added to the contract to complete the added scope. The net result of this change order is a reduction in the contract amount of $423,096.16, thereby decreasing the total contract amount to $4,476,813.84. The major reason for the overall cost reduction is the recovery of unused construction contingency funds. Construction Contract Date Contract Amt Change Order Description Original Contract 06/28/2022 $4,899,910.00 (M&C 22-0527) Change Order No. 1 12/12/2023 $0.00 Additional work and days for (Administrative) unplanned sanitary sewer adjustments Change Order No. 2 Pending ($423,096.16) Contract Reconciliation Revised Contract $4,476,813.84 Amount This project is located in COUNCIL DISTRICT 2. A Form 1295 is not required because: This contract legally does not require City Council approval. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available, as previously appropriated, in the Stormwater Rev Bonds 2020 Fund for the 28th Str at Decatur HROM project to support the approval of the above recommendation and execution of the change order. Prior to any expenditure being incurred, the Transportation and Public Works Department has the responsibility to validate the availability of funds. Submitted for Citv Manager's Office bv: Jesica McEachern 5804 Originating Business Unit Head: Lauren Prieur 6035 Additional Information Contact: Signature; Linda Young 2485 Email: Douglas.Black@fortworthtexas.gov Signature; Signature: Email: jesica.mceachern@fortworthtexas.gov Signature: Email: jannette.goodall@fortworthtexas.gov Email: allison.tidwell@fortworthtexas.gov 1 C�3Ci52 ���� �� �t �e������� �;�� � Final Audit Report 2024-07-16 Created: 2024-07-10 By: Sadie Ishmael (Sadie.lshmael@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAHwNgLgaalpYiRaez3eWlvAa7gdlkOpT6 "103052 28th St at Decatur CO 2" History �'`l Document created by 5adie Ishmael (Sadie.lshmael@fortworthtexas.gov) 2024-07-10 - 9:04:23 PM GMT- IP address: 204.10.90.100 ���5 Document approved by Sadie Ishmael (Sadie.lshmael@fortworthtexas.gov) Approval Date: 2024-07-10 - 9:12:57 PM GMT - Time Source: server- IP address: 204.10.90.100 �-_'; Document emailed to david@humphreyandmorton.com for signature 2024-07-10 - 9:12:59 PM GMT `,'"1 Email viewed by david@humphreyandmorton.com 2024-07-11 - 8:02:47 PM GMT- IP address: 137.27.173.38 �%, Signer david@humphreyandmorton.com entered name at signing as David S. Humphrey 2024-07-11 - 8:05:51 PM GMT- IP address: 137.27.173.38 �5(.; Document e-signed by David S. Humphrey (david@humphreyandmorton.com) Signaiure Date: 2024-07-11 - 8:05:53 PM GMT - Time Source: server- IP address: 137.27.173.38 �': Document emailed to Charles Hayes (charles.hayes@fortworthtexas.gov) for signature 2024-07-11 - 8:05:56 PM GMT `�:1 Email viewed by Charles Hayes (charles.hayes@fortworthtexas.gov) 2024-07-11 - 8:37:32 PM GMT- IP address: 166.205.58,24 �i, Document e-signed by Charles Hayes (charles.hayes@fortworthtexas.gov) Signature Date: 2024-07-11 - 8:38:2II PM GMT - Time Source: server- IP address: 166.205.58.24 �-' Document emailed to Troy Gardner (troy.gardner@fortworthtexas.gov) for signature 2024-07-11 - 8:38:30 PM GMT `,'`l Email viewed by Troy Gardner (troy.gardner@fortworthtexas.gov) 2024-07-11 - 8:38:54 PM GMT- IP address: 204.10.90.100 �''ORT WORTH, P�wered by -� Adobe Acrobat Sign � �%; Document e-signed by Troy Gardner (troy.gardner@fortworthtexas.gov) Signature Date: 2024-07-11 - 8:39:41 PM GMT - Time Source: server- IP address: 204.10.90.100 �`': Document emailed to Michael Wellbaum (Michael.Wellbaum@fortworthtexas.gov) for signature 2024-07-11 - 8:39:44 PM GMT `�"i Email viewed by Michael Wellbaum (Michael.Wellbaum@fortworthtexas.gov) 2024-07-11 - 8:40:01 PM GMT- IP address: 204.10.90.100 h�; Document e-signed by Michael Wellbaum (Michael.Wellbaum@fortworthtexas.gov) Signature Date: 2024-07-11 - 8:40:19 PM GMT - Time Source: server- IP address: 204.10.90.100 �': Document emailed to Justin Naylor (Justin.Naylor@fortworthtexas.gov) for signature 2024-07-11 - 8:40:21 PM GMT ','`l Email viewed by Justin Naylor (Justin.Naylor@fortworthtexas.gov) 2024-07-11 - 9:15:10 PM GMT- IP address: 204.10.90.100 ���, Document e-signed by Justin Naylor (Justin.Naylor@fortworthtexas.gov) Signature Date: 2024-07-11 - 9:16:02 PM GMT - Time Source: server- IP address: 204.10.90.100 �--'; Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature 2024-07-11 - 9:16:04 PM GMT �%> Document e-signed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Signature Date: 2024-07-15 - 3:21:44 PM GMT - Time Source: server- IP address: 204.10.90.100 �--'; Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for signature 2024-07-15 - 3:21:46 PM GMT '�"i Email viewed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) 2024-07-15 - 5:16:02 PM GMT- IP address: 204.10.90.100 �5�, Document e-signed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) Signature Date: 2024-07-15 - 5:16:11 PM GMT - Time Source: server- IP address: 204.10.90.100 %>J Document si nin automaticall dele ated to Mont Hall Mont Hall fortworthtexas. ov b Lauren Prieur 9 J Y 9 Y � Y� @ J) Y (Lauren. Prieur@fortworthtexas.gov) 2024-07-15 - 5:16:13 PM GMT �':. Document emailed to Monty Hall (Monty.Hall@fortworthtexas.gov) for signature 2024-07-15 - 5:16:13 PM GMT �- ': Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature 2024-07-15 - 5:16:13 PM GMT FORT�ORTH, Poweredby � Adobe Acrobat Sign i'"i Email viewed by Monty Hall (Monty.Hall@fortworthtexas.gov) 2024-07-15 - 7:20:51 PM GMT- IP address: 204.10.90.100 �%"; Document e-signed by Monty Hall (Monty.Hall@fortworthtexas.gov) Signature Date: 2024-07-15 - 7:21:28 PM GMT - Time Source: server- IP address: 204.10.90.100 �'; Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2024-07-15 - 7:2129 PM GMT '�:`�'- Document declined by Douglas Black (Douglas.Black@fortworthtexas.gov) Decline reason: Why is CA and ACM signing on a separate form and not directly on the CO in the spaces provided?thx. 2024-07-16 - 12:58:27 PM GMT- IP address: 204.10.90.100 �''ORT WORTH, Powered by �� Adobe Acrobat Sign FORT�ORTH�H� �� Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Construction Chan�e Or•der 2 M&C: CPN: 103052 CSO: 58032 DOC#: Date: To: Name Department Initials Date Out 1 David Humphrey Contractor �S , (david c�liumphreyandmorton.com) D5� �U� 11 2024 2. Chacles Hayes TPW Inspector � Jul 11, 2024 3. Troy Gardner TPW Inspector � .1u11�, 2024 4. Michael Wellbaum TPW Project Mgr. �- Jul 11, 2024 5. Justin Naylor TPW Program Mgr. �� Jul 11, 2024 6. Lissette Acevedo TPW Sr. CPO o� Jul 15, 2024 7. Patricia Wadsack TPW Asst. Dir. � Jul 15, 2024 8. Lauren Pi•ieur TPR Dir. (M� Jul 15, 2024 9. Doug Black Legal aa Jul 23, 2024 10. Jesica McEachern CMO — J u l 29, 2024 11. Ronald Gonzales CSO 12. Jannette Goodali CSO „ Jul 29, 2024 13. Allison Tidwell CSO Jul 30, 2024 1�}. TPW SW Contracts TPW SW CC: Program Manager — Linda Young, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon Team — Cindy Sengathith DOCUMENTS T'OR CITY MANAGER'S SIGNATURE: All documents received ti�om �iny and all City Departments requesting City Managei's sign�ture fo�� apl�roval MUST BE ROUTED TO THE APPROPRIATE ACM fo�- approval first. Oncc tl�e ACM l�as sigtted the routing slip, David �vill review �u1d take the ne�t steps. NEEDS TO BE NOTARIZED: ❑YES �No RUSH: ❑Y�S �No SA1VI� DAY: ❑Y�S ❑No N�XT DAY: ❑YES ❑No ROUTING TO CSO: �YES ❑No Action Requirecl: ❑ As Requested ❑ For Your Information � Signature/Routing and or Recording ❑ Comment ❑ File Return to: tp��� sw conh•acts(rr�,foi•t�vorthtexas.�ov ❑ Attach Signature, Initial and Notar,y Tabs Call 817-229-3283 �vith questions. Thank you! F� RT WU RT H TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: Drainage Improvements for Lebow Channel at 28th st. CITY PROJECT NUMBER: 103052 PIPE LAID Main FIRE HYDRANTS: N/A PIPE ABANDONED N/A SIZE 10" SIZE N/A WATER TYPE OF PIPE PVC VALVES (16" OR LARGER) TYPE OF PIPE N/A LF LF 100 N/A N/A DENSITIES: All passed NEW SERVICES: N/A N/A N/A SEWER PIPE LAID SIZE TYPE OF PIPE LF N/A N/A N/A N/A PIPE ABANDONED N/A SIZE TYPE OF PIPE N/A N/A LF N/A DENSITIES: All passed NEW SERVICES: N/A N/A N/A TR�NSPORT:�TION 1�ND PUBLIC `��ORI�S The City- of Fort ��'orth • 1000 Thxockmarton Stxeet • Fort ��'orth, T� 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 ��������x� TRANSPORTATION AND PUBLIC WORKS December 19, 2024 Humphrey & Morton Construction Co. Inc. 5136 Vesta Farely Rd Fort Worth, Texas 76119 RE: Acceptance Letter Project Name: Drainage Improvements for Lebow Channel at @ 2gtn st Project Type: Drainage, Water, Sewer, Storm, Paving City Project No.: 103052 To Whom It May Concern: On January 9, 2024 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on March 15, 2024. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 15, 2024, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at Michael.wellbaum@fortworthtexas.gov. Sincerely, �.l��!�.� Michael Wellbaum P.E., Project Manager Cc: Charles Hayes, Inspector Troy Gardner, Inspection Supervisor Emanuel Nieto, Senior Inspector Linda S. Young P.E., Program Manager LAN Inc., Consultant Humphrey & Morton Construction Co., Contractor City of Fort Worth, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 CONSENT OF OWNER ❑ SURETY COMPANY ONTIRACTOR ❑ TO FINAL PAYMENT SURETY ❑ OTHER (SIMILAR TO AIA DOCUMENT G707) Bond No. 46BCSHZ1876 PROJECT: Drainage Improvements for Lebow Channel at 28th St., City Project No. 103052 (name, address) Fort Worth, TX TO (Owner) � � City of Fort Worth 200 Texas 5treet Fort Worth, TX 76102 ARCHITECT'S PROJECT NO: � CONTRACT FOR: � CONTRACT DATE: June 28, 2022 CONTRACTOR: Humphrey & Morton Consh•uction Company, Inc. In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the (here insert name and address of Surety Company) Hartford Fire Insurance Company 3000 Internet Blvd., Suite 600 , SURETY COMPANY, r��s�o> TX 75034 on bond of (here insert name and address of Contractor) Humphrey & Morton Construction Company, Inc. P.O. Box 8057 Port Worth, TX 76124 ,CONTRACTOR, hereby approves of the final payment to the Contractor, and agrees that the final payment to the Contractor shall not relieve the Surety Company of any of its obligations to (here insert name and address of Owner) City of Fort Worth 100 Fort Worth Trail , OWNER, Fort Worth, TX 76102 as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, The Surety Company has hereunto set its hand this 23rd day of December , 2024 HARTFORD FIRE INSURANCE COMPANY Surety Company �, , � A By v Signature of ut orized Representative Attest: (Seal): Elizabeth Gray Attorney—in—Fact Title Note: This fonn is intended to be used as a companion document to the Contractor's Affidavit of Payment of Debts and Claims, Cunent Edition Direct Inquiries/Claims to: POWER OF ATTORNEY THE HARTFORD BOND, T-4 One Hartford Plaza Hartford, Connecticut 06155 call: 888-266-3488 or fax: 860-757-5835 KNOW ALL PERSONS BY THESE PRESENTS THAT: Agency Code: 46-501533 X� Har'tford Fire InsuranCe Company, a corporation duly organized under the laws of the State of Connecticut X� Hartford Casualty Insurance Company, a coiporation duly organized under the laws of the State of lndiana � Hartford Accident and Indemnity Company, a corporation duly organized wider the laws of the State of Connecticut � Hartford Underwriters Insurance Company, a corporation duly organized uncler the laws of the State of Connecticut � Twin City Fire lnsuranCe Company, a co�poration duly organized under the laws of the State of Indiana � Hartfor'd Insurance Company of Illinois, a corporation duly organized under the laws of dle State of Illinois � Hartford Insurance Company of the Midwest, a corporation duly organized under the laws of the State of Indiana � Hartford InsuranCe Company of the Southeast, a corporation duly organized under the laws of the State of Florida having their home office in Hartford, Connecticut, (hereinafter collectively referred to as the "Companies") do hereby make, constitute and appoint, up to the amount of unlimited: Charles D. Sweeney, Kyle W. Sweeney, Michael A. Sweeney, Bobby E. Mayo, Elizabeth Gray of Ft Worth, TX their true and lawful Attorney(s)-in-Fact, each in their separate capacity if more than one is named above, to sign its name as surety(ies) only as delineated above by �, and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other written instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. In Witness Whereof, and as authorized by a Resolution of the Board of Directors of the Companies on January 22, 2004 the Companies have caused these presents to be signed by its Assistant Vice President and its corporate seals to be hereto affixed, duly attested by its Assistant Secretary. Further, pursuant to Resolution of the Board of Directors of the Companies, the Companies hereby unambiguously affirm that they are and will be bound by any mechanically applied signatures applied to this Power of Attorney. ��,TrtaW y�twn�n �, y xF�,crs.y� s�rw�,� F,py���'e'''c.."'v�.! � a'�^'� �` a � ��P � ��� �.� f �'• �s d'"�1AM> w �, �:�wn�.ieuei�� ' LP�r * -�?'* * � _ 7ao'u`�.ro:�,_ x� ►.r '�,'�,,,'�' � � 1$67 .,� s� �L �'- ;a '� `r wNt � .. •. !,��r�r��,�vf� • ��at�w� � :y.y:1g79�e; iet� ID7sr "� I949 s � � t� •� �,- ;,. *� '�n ,yl, „►`�} �,`_ . {� i`'.Nr'�ihr���� �i•/,''ti.'� 4` .`i::�xd`' • ar: �,. �. : �- ^oewtN R e !. Y . i�.�.�.d �. �---�� �%r�e/6{y' '�,�ti��� f i� ` Wesley W. Cowling, Assistant Secretary STATE OF CONNECTICUT � ss. Hartford COUMTY OF HARTFORD M. Ross Fisher. Assistant Vice President On this 3�d day of March, 2008, before me personally came M. Ross Fisher, to me known, who being by me duly sworn, did depose and say: that he resides in the Courriy of Hartford, State of Connecticut; that he is the Assistant Vice President of the Companies, the corporations described in and which executed the above instrument; that he knows the seals of the said corporations; that the seals affixed to the said instrument are such corporate seals; that they were so affixed by authority of the Boards of Directors of said corporations and that he signed his name thereto by like authority. ate.ay� .,%c � r� �-, �% ts�'rf�TA�fi �'y � `_" - � � E �.. ,�...,.}<w� <:... ._...Gz.._ *t�� " Scott C. Paseka Notaiy Public CERTIFICATE My Commission Espires October 31, 2012 I, the undersigned, Assistant Vice President of the Companies, DO HEREBY CERTIFY that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which is still in full force effective as of December 23, 2024 . Signed and sealed at the City of Hartford. iY!#� ,tytlW°p7 e1 x�llt�y.:dJ 1Sl is�;Q �ew" � �+t� ,e,� - � i• "de`t+,C. � ' ;«� j��'_`��. i� y�> �rt �j �:���a���l.lftiPf � S� �I �+r� ��°'�r � ,�rtA1l��A Q�i� n � J� �o:�,' q � ',/7.�' P � 1667 .� !� f�Uj 7� f�`�_�-�' f :�_'� { •� Y�,�+� .�r -�,: `� ���T\f flV`;�� �{s�rraYw�� �y";'. 1g74�� 'a�'l, D701'S�"-� .,� I979 � .�,4�, . �..f 'S� t 4 �.��.',:9� �'b4.iN jYg'��'�v�� � • .,'e�� ���i���� L'�F��' a. _.y %' ,. ( � � �,� k �(,s.i„ . �.. _ . _ . r ,r,�� � y ( t (, Gary W. Stumper, Assistant Vice President AFF[DAVIT STATE OF' Texas COUNTY OF•' '['arrant Before me, the undersi�«ed authority, a notac•y p�blic in the state and county afaresaid, on this day personally appeared David S. Humphrey, CEO Of Humphrey & Mot-t�r� Constructian Co., Inc., knawn to me to be a credible person, who bei��g by me duly swor�i, upon his oach depased and said; That al[ persons, firms, assaciations, corporations, or othe►- organizations furnishEng labor and/or materials ha�e been paid in fUll; That the wage scale established by the C�ty Council in ihe City of Fort Worti� �as been paid in full; That ti�eE-e are «o claims pending for personal inj«ry and/or property darnages; On Contract described as; Lebow Cllannl at 28th St. Project #103052. : � � David . Hump lrey - CEO Subscribed and sworn before tne on this date 20th of Decet�iber, 2�24. 1 �-- 5 � 1VU ��y ! �C Tai•rant County, Texas � 'LaY..:--�.�' ' .. �. �..,.,a.���e.�_: ,,��PC'p�`�.. h;�R! RA� SPAFiK� :°/�14�: r�.otar�� �ubiic, State af TBxaS �*t�T`!* �y Ct>rr,mission �xp9res "' ��";�%Po= hr�ay 17, 2026 ? "''`••° �1`'°` vOTFlRY !D 5G0825-2 ,-.-, -.,.,..,-=.a,:,,_�a�,�.�-s ...,,,.,�.a