Loading...
HomeMy WebLinkAboutContract 61809-CO1CSC No. 61809-CO1 FORTV\TORTH City of Fort Worth Change Order Request Project Name:I Emergency Bypass Pumping 33-inch Sanitary Sewer (M-292) Project No.(s):I N/A DOE No. �I _N_/ A __ � City Sec No.: I 61809 :::· ============:::::: City Proj. No.: �I _1_05_6_50 ___ � Project Description: 33-inch Sanitary Sewer (M-292) main break adjacent to 5301 E. Belknap Street, Haltom City, affecting Little Fossil Creek Contractor:! United Rental (North America), Inc. City Project Mgr. I Tony Sholola Phone Number:! 817-392-6055 Change Order# I Date: City Inspector: I John Robinson Phone Number:! 817-392-8452 2/3/2025 Dept. Sewer Totals Contract Time (Calender days) Original Contract Amount $800,000.00 � � Extras to Date r;, c...T Credits to Date U' rti C"I Pending Change Orders (in M&C Process) t' JC', Contract Cost to Date $800,000.00 !Amount of Proposed Change Order $1,000,000.00 Revised Contract Amount $1,800,000.00 Original Funds Available for Change Orders f)�l{n Remaining Funds Available for this CO 11 Additional Funding (if necessary)II CHANGE ORDERS to DATE {INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) JUSTIFICATION (REASONS) FOR CHANGE ORDER $800,000.00 N/A $800,000.00 $1,000,000.00 $1,800,000.00 This Change Order authorized by the attached memorandum of January 24, 2025 which supplements the July 29, 2024 emergency memorandum resulting in City Secretary Contract No. 61809 with United Rental (North America), Inc. for emergency by-pass pumping near 5301 E. Belknap Street, Haltom City. The change order will provide additional funding for increased work scope as described in the attached supplement memorandum dated January 24, 2025. ,-£, n� n It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. CouncilAoli M&C Number N/A M&C Date Approved FO RT WO� RT H City of Fort Worth Change Order Additions Project Name Emergency Bypass Pumping 33-inch Sanitary Sewer (M-292) City Sec No.: 61809 Project No.(s): NIA DOE No. N/A City Proj. No.: 105650 Project Description 33-inch Sanitary Sewer (M-292) main break adjacent to 5301 E. Belknap Street, Haltom City, affecting Little Fossil Creek Contractor United Rental (North America), Inc. Change Order:�1 Date: 213/2025 City Project Mgr. Tony Sholola City Inspector John Robinson ADDITIONS DEPT Qt Unit Unit Cost Total 2 Additional By-pass Pumping Sewer 1.00 LS ��,000,000.00 $1,000,000.00 Sewer $1,000,000.00 Page 1 of 1 Additions Sub Total $1,000,000.00 FO RT WO RT H City of Fort Worth Change Order Deletions Project Name Emergency Bypass Pumping 3�inch Sanitary Sewer (M-292) City Sec No.: 61809 Project No.(s): NIA DOE No. N/A City Proj. No.; 105650 Project Description 33-inch Sanitary Sewer (M-292) main break adjacent to 5301 E. Belknap Street, Haltom City, affecting Little Fossil Creek Contractor United Rental (Norih America), �nc. Change Order: �1 Date 21312025 City Project Mgr. Tony Sholola City Inspector: John Robinson DELETIONS Previous Change Orders co # DATE AMOUNT Total $0.00 Page 1 of 1 MIWBE Breakdown for this Change Order INTEROFFICE MEMO Date: Januaiy 24, 2025 To: William Johnson, Assistant City Manager From: Chris Harder, P.E., Water Dii•ector Via: Doug Black, Senioi• Assistant City Attoi•ney Brandy Hazel, Interim Chief Procurement Officer (Purchasing) Subject: SUPPLEMENT TO 07/29/2024 MEMORANDUM / CITY SECRETARY CONTRACT NO. 61809 This memo is submitted to request authoi•ization for additional funding foi• emeigency seivices outlined below, at increased cost of $1,000,000.00. On Fi•iday, May 3, 2024, Watei• Field Operations crews discovered a segment of a 33-inch Sanitai•y Sewer Main near 5301 E. Belknap St��eet, Haltom City to be severely exposed as result of creek bank erosion from recent rains. No sewer dischai•ge was encountei•ed at that time. However, on May 5, 2024 the exposed pipe was found to be leaking from additional points along with three other close by segments of the sewer main. United Rentals (North America), Inc., under a standing contract, was engaged to set up by-pass pumping, which was immediately mobilized to implement pumping around exposed section of the pipe. Water Field Operations Crews are not able to conduct by-pass pumping work of this magnitude. An eme�gency memorandum engaging Freese and Nichols, Inc. for design and William J. Schultz, Inc. dba Cii•cle C Construction Company for consti•uction (see attached) was issued on June 11, 2024. The project is within Haltom City and Fi•eese and Nichols, Inc. has been woi•king to ensure compliance with both their needs and oui•s. This resulted in the need foi• bypass pumping to continue. It was beyond the capacity of the standing contract to engage United Rentals for this eme�gency by-pass pumping. Under the July 29, 2024 Emergency Authorization (copy attached), the Water Department engaged United Rentals (Noi•th America), Inc. to pi•ovide and maintain the necessary by-pass pumping. The needed by-pass pumping was estimated to be $800,000.00. The emeigency by-pass was to remain in place until the emei•gency repair of the sewer main is completed. However, because rerouting is necessaiy into Haltom City right-of-way and also on private right-of-way, permission must be obtained from Haltom City and an easement must be secured from the affected private property ownei•. It has taken longei• than anticipated to obtain the permit and easement to allow foi• work to begin resulting in the exhaustion of the original funding. This memorandum provides for additional by-pass pumping costs in the amount up to $1,000,000.00 �mtil the emeigency r•epaii• woi•k is completed. A confirining M&C will be circulated to ratify the contract after the work has been performed. With the supplement, the revised contract amount is $1,800,000.00. SUPPLEMENT TO EM�RGENCY BY-PASS PUMPING-33-INCH SANITARY SEWER (M-292) MAIN BREAK APPROVED FOR EMERGENCY PROCUR�MENT: Recommended: Chtirtot2het Hard.et Christopher H.ardlr (Jan 31, 2025 16:38 CST) Chris Harder, P. E. Water Director ·/Jt;hL • OoualnBlick(Jinll,l01SJ7:l4CSll Approved as to form and Legahty: __________________ _Douglas W. Black, Sr. Assistant City Attorney ----0:'lU!ii� Approve: Brandy Hazel, Interim Chief Procurement Officer, (Purchasing) Approve: w1B!&'ib..0&c�1 William Johnson, Assistant City Manager INTEROFFICE MEMO Date: To: Fcom: Subject: July 29, 2024 Fernando Costa, Assistant City Manager Chris Hardec, P.E,, Water Director EM�RG�NCY BY-PASS PUMPING - 33-INCH SANITARY S�W�R (M-292) MAIN BR�AI{ ADJACENT TO 5301 �. B�LICNAP STRE�T, HALTOM CITY, AFI+�CTING LITTL� FOSSIL CRE�K On Friday, May 3, 2024, Water Field Operations crews discovered a segment of a 33-inch Sanitary Se�vec Main near 5301 E. Belknap Street, Haltom City to be severely exposed as result of creelc banlc erosion fi•om i•ecent ►•ains. No se�ver discharge �vas encountered at that time. Ho�vever, on IVIay 5, 2024 tlie exposed pipe was found to be lealcing from additional points along with thcee other close by segments of the sewer main. United Rentals (Noi•th America), Inc., undei• a standing coiitract, was engaged to set up by-pass pumpiiig, which was immediately mobilized to implement pumping acound the exposed section of the pipe. Water Field Opei•ations Ci•ews are not able to conduct by-pass pumping work of this magnitude, An emergency memorandum eugaging Freese and Nichols, Inc. for design and William J. Schultz, L�c. dba Circle C Construction Company for construction (see attached) tvas issued on June 11, 2024. The pcoject is ��ithin Haltom City and Freese and Nichols, Inc. has been worl<ing to ensure compliance with both their needs and ours. This has cesulted in the need for bypass pumping to continue, It is beyond the capacity of the standing contract to engage United Rentals for this emergency by-pass pwnping. This iuemo is submitted to inform the City Manager's Offce and the City Council that, puisuant to the emei•gency authority found in Chapter 2, Ai•ticle I, Section 2-9 of tl�e City's Code of Ordinances, the Water Department will initiate emergeucy procurement of the following contractor for tlie service and cost as indicated below to maintain emergency by-pass pumping to reroute the sanitary sewer main around the collapsed segments of the sewer u�ain. By-pass pumping �vill cease as soon as soon as the emergency repaic wocl< is completed. • United Rentals (North America), Inc. (Emecgency by-pass pumping: $800,000.00) Waiting to bid and a�vard a conh•act to perform this �vork is not the best intecest of the health and safety of the City of Fort Worth, Iu addition to the citations, above, Section 252.022 of the Local Government Code exempts from normaf bidding rec�uirements e;cpenditures that are necessary to preserve or protect public health or safety of the municipality's residents and pcocurements necessary because of u►iforeseen damage to public inachinery, equipment, or properly. M&C �vill be circulated to ratify the above contracts after the worlc has been performed. APPROVED FOR EMERGENCY PROCUREMENT: Recommended: Approved as to form and Legality: Approve: Approve: �r/a4du risi<>pherH(d�l, 2024 16:42 CDT) Chris Hat·der, P.E., Director, Water Department -� Douglas Black (Aug 21 2024 13:13 CDT) Douglas W. Black, Sr. Assistant City Attorney Jo Gunn�O;:; 08:46 CDT) Jo Ann Gunn, Chief Procurement Officer, Purchasing � Fernando Costa, Assistant City Manage,· il �N��cr�or�l�� m��M� Datc: lune I 1, 2024 To; Fernando Cost�, Assistant City M�n�ger I'rom: Chris Harder, P.�., W�►ter Director Subject; �M�RG�NCY It�PAIIt- 33-INCH SANITARY S�W�R (M-292) MAIN B1t�AIC ADJAC�NT TO 5301 �. B�LI{IVAP ST1t��T, HALTOM CITY, AI�'r�CTING LITTL� I+OSSIL CIt��I� On rrid�y, May 3, 2024, Water Field Operations crews discovered a segment of a 33-inch Sanitary Sewer Main near 5301 � Bellrnap Street, HAltom City to be severely exposed as result of ereelc banlc erosion fi�om recent r�ius, No sewer discharge w�s encountered at this time, Bypass pumpii�g was immediately mobilized to implement puntping �round the exposed section in the event additional rainf�tll caused the pipe to collapse. Overnight storins delayed the co�npletion of this worl<. However on May 5, 2024 the exposed pipe was founcl to be lealcing along witl� three other elose by segments of the sewer main. This �nemo is submitted to inform the City Manager's Office and the City Council that, pursuant to the emergency autliority fouiid in Chapter 2, Article I, Section 2-9 of the City's Code of Ordinances, the W�ter Department will initiflte emergeney procurement of lhe followii�g contractor and consultaut for the services and costs as indicated below to perfocm emergency replaccment to reroute the snnitacy sewer mlin fi•om the creelc bed as sl�own on the attachment. Watee Field Operations Crews ace not able to conduct replacement worlc of this magnitude. o William J, Schultz, Inc, dba Circle C Construction Company (Etnergeucy water main replacement; $1,500,000,00) o ri•eese and Nichols, Ina (�ngineering Design $61,580,00) The contracts and worlc will be billed oii � taslc occier basis. The total of the coutr�cts is estimlted to be $1,5G1,580.00. The Water Deparhneut will coordin�te with Haltan City since this City of Fort Worth sanitary sewer main is located within Haltom City limits. W�iting to bid and award a conh•act to perform this worlc is not the best interest of the I�ellth and safety of the City of rort Worth. In flddition to the citations, above, Sectioii 252.022 of tl►e Loc�tl Government Code exempts fi•om normnl bidding requirements e�pendit�u•es thlt are necess�cy to preserve or protect public health or safety of tlie municipality's residents t�nd procorements necess�ry because of unforeseen d�mage to ptiblic machinerY, equipment, or property, M&C(s) will be cicculnted to ratify tlte aUove eonirlcts after the worlc has been pecformed. APPROVED FOR EMERGENCY PROCUREMENT: Recommended: Approved as to form and Legality: Approve: Approve: Ch�Irt�D11 Chris Hnrclcr, P.E., Dh·cctor, Wntcr Dcpnrtmcnt Douglas Black (J111111, 202410:25 COT) Douglns W. Blnck, Sr. Assislnnt City Attorney • JoGunr��7:58COT) Jo Ann Gunn, Chief Procurement Officer, Purclrnsing ,:;;.,.u::.i._ Fcrnnnclo Costn, Assistnnt City Mnnngcr .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. ToAJ �LIJ1 Signature Tony Sholola Name of Employee Assistant Water Director Title ATTEST: Jannette Goodall City Secretary