HomeMy WebLinkAboutContract 53641-CO51/31/2025 Contract Time (Calendar days) 400 0405 805 805 Date Date Date Date M&C Number M&C Date Approved Contractor Name CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT $7,182,281.25 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change order number 5 provides for additional traffic control, and concrete collar replacements on sanitary sewer manholes, water gate valve due to damage found after HMAC pavement construction on Downtown streets. 21.72% 56016/0700430/002397 Main 34, 100 and D100 Drainage Areas Sanitary Sewer Improvements Part 1 City Sec No.: Remaining Funds Available for this CO Pending Change Orders (in M&C Process) 817-392-8480 Phone Number: Sanitary Sewer Extras to Date Dept. $4,826,550.00Original Contract Amount $1,754,439.78 Amount of Proposed Change Order Original Funds Available for Change Orders $144,797.00 Credits to Date 5 Date 02397DOE No. $45,964.00 Water $1,754,439.78 $919,275.00 Totals $1,248,168.89 N/A City Inspector: $5,745,825.00 Carmen Drake William J. Schultz, Inc. dba Circle C Construction Co. Contract Cost to Date Date $0.00 Project Manager MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. Inspector $0.00 Phone Number: John Kasavich 817-392-8371 City Project Mgr. $835,164.78 Date Contractor Signature Council Action (If Required) Senior Assistant City Attorney Date Teri Skelly Director (Water Dept) N/A N/A Assistant City Manager Construction Supervisor (Water Dept) City of Fort Worth Additional Funding (if necessary) Contractor's Company Name $0.00 $0.00 Revised Contract Amount $6,993,993.89 -$90.00 $6,993,903.89 $190,761.00 $413,004.11 $5,239,554.11 -$90.00 $5,239,464.11 William J. Schultz, Inc. dba Circle C Construction Co. Change Order Request Change Order # Project Description: 53641 Project No.(s): Replacement of Existing Sanitary Sewer Mains and Water Mains in the Downtown Central Business District City Proj. No.: Contractor: Project Name: 01/31/2025 Main 34, 100 and D100 Drainage Areas Sanitary Sewer Improvements Part 1 CSC: 53641 CPN: 02397 Change Order 5 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. City Project Mgr. Concrete Collar Water Gate Valve Concrete Collar Traffic Control (Includes Flaggers) 2.00 $10,000.00 $5,500.00 Water 1.00 EA $750.00 $750.00 Sanitary Sewer 1.00 EA $5,500.00 Unit Cost $500.00 Unit 77 1.00 LF MO $10,000.00 Traffic Control Details - Plan and Implementation DESCRIPTION Sanitary Sewer DEPT Qty John Kasavich City Inspector City of Fort Worth Change Order Additions Project Name Main 34, 100 and D100 Drainage Areas Sanitary Sewer Improvements Part 1 1/31/2025 56016/0700430/002397 DOE No.N/AProject No.(s): Project Description Replacement of Existing Sanitary Sewer Mains and Water Mains in the Downtown Central Business District Contractor William J. Schultz, Inc. dba Circle C Construction Co.5Change Order: 02397 City Sec No.:53641 Additions Sub Total Date: Sanitary Sewer Water Carmen Drake City Proj. No.: Total ADDITIONS Sanitary Sewer 45 ITEM $1,000.00 75 $17,250.00 $16,500.00 $750.00 47 Page 1 of 1 5 8 $260.00LF10.009 8" PVC SDR-26 Sewer Pipe Sanitary Sewer City of Fort Worth Change Order Deletions Project Name Main 34, 100 and D100 Drainage Areas Sanitary Sewer Improvements Part 1 Project Description Contractor 1/31/2025 Carmen Drake Replacement of Existing Sanitary Sewer Mains and Water Mains in the Downtown Central Business District 56016/0700430/002397 DOE No.N/A Date Unit Cost DELETIONS City Project Mgr.John Kasavich City Inspector: Project No.(s): ITEM DESCRIPTION DEPT Total Sanitary Sewer 31.00 William J. Schultz, Inc. dba Circle C Construction Co. Change Order:5 Qty LF Unit $250.00 Sanitary Sewer 24.00 LF $260.00 10" SDR-26 PVC SDR-26 Sewer Pipe 15" PVC SDR-26 Sewer Pipe Sanitary Sewer Deletions Sub Total Water $6,240.00 $7,750.00 $2,600.00 $16,590.00 City Sec No.: 53641 City Proj. No.: 02397 $16,590.00 Page 1 of 1 $0.00Total M/WBE Breakdown for this Change Order Previous Change Orders $0.00Total CO #DATE AMOUNT Type of Service Amount for this COMWBE Sub Page 1 of 1 01/31/2025 Main 34, 100 and D100 Drainage Areas Sanitary Sewer Improvements Part 1 CSC: 53641 CPN: 02397 Change Order 5 Notes Staff has reviewed the requested prices and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature John R. Kasavich Name of Employee Engineering Manager Title ATTEST: Jannette Goodall City Secretary