Loading...
HomeMy WebLinkAboutContract 62025-CO1CSC No. 62025-CO1 FORTW°ORTH ' -. .. City of Fort Worth Change Order Request Project Name:! Marine Creek Sanitary Sewer Parallel Interceptor M-279 & M-2458 Part 1 Slipllne I City Sec No.: I 62025 :==:======� Project No.(s):I 103497 DOE No. I N/ A I City Pro]. No.: I 103497 Project Description: Slip lining of the existing 60-inch sanitary sewer pipe crossing UPRR right-of-way, Contractor:! S.J. Louis Construction ofTexas Ltd. City Project Mgr.j Liam Conlon �==========::::: Phone Number:! 817-392-6824 Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date !Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) Sewer $2,893,650.00 $2,893,650.00 $63,865.52 $2,957,515.52 $144,683.00 $144,683.00 � - Change Order# I Date: City Inspector. I Nakia McCain Phone Number:! 682·319-6130 Totals �� ,I $2,893,650.00 $2,893,650.00 $63,865.52 $2,957,515.52 r;,,,• "'17"::_,.7.! $144,683.00 $144,683.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS¾ OF ORIGINAL CONTRACT 2.21% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25¾) $3,617,062.50 JUS1ilFICAllllQN''(REAS0NS) F8R CMANGE\ORBER 2/4/2025 Contract Time (Calendar days) 150 If] � 150 45 195 The originally proposed Type A manhole does not provide adequate work space to perform sllplinlng and the connecting of existing sanitary sewer lines at the manhole location. Change Order No. 1 provides for the installation of an adequately sized manhole. Staff concurs with the constructor's request for an additional 45 days on the change order for the time to manufacture the fiber glass manhole. It ls understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment In full (both time and money) for all costs arising out of, or Incidental to, the above Change Order. Contra9ro�s Com an Name Contractor .Name S.J. Louis Construction of Texas Ud. Adam Lunsford Ins ector. M&C Number NIA M&C Date Approved NIA FORT WORTH City of Fort Worth Change Order Additions Project Name Marine Creek Sanitary Sewer Parallel Inlerce lor M-279 & M-245B Part 1 Slipline City Sec No.: 62025 Project No.(s): 103497 DOE No. N A City ProJ. No.: 103497 Project Description Slip linfng of the existing 60-inch sanitary sewer p(pe crossing UPRR right-of-way, Contractor S.J. Louis Construction of Texas Ltd. Change Order: �1 Date: 2/412025 City Project Mgr. Liam Conlon City Inspector Nakia McCaln ADDITIONS Page 1 of 3 FORT t�ORTH city of Fort wortn Change Order Deletions Project Name Marine Creek Sanitary Sewer Parallel Interceptor M-279 & M-245B Part 1 Slipline City Sec No.: 62025 Project No.(s): 103497 DOE No. N/A City Proj. No.: 103497 Project I Slip lining of the existing 60-inch sanitary sewer pipe crossing UPRR right-of-way, I Descriplion Cont�actor S.J. Loufs Construction of Texas Ltd. Change Order: � Date 2�412025 City Project Mgr. Liam Conion City Inspector: Nakia McCain DELETIONS Page 3 of 3 02/04/2025 Marine Creek Sanitary Sewer Parallel Interceptor M-279 & M245B Part 1 Slipline CSC: 62025 CPN: 103497 Change Order 1 Notes Staff has reviewed the requested prices and addition to calendar days and considers them to be fair and reasonable. .Contract Compliance Manager By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Signature Liam Conlon Name of Employee Project Manager Title ATTEST: Jannette Goodall City Sec re ta ry