HomeMy WebLinkAboutContract 59320-AR2CSC No. 59320-AR2
�-
City of Fort Worth
Construction Allowance Request
Project Namel.---G -ra-nd_A_v_e _O_u _tf_al -1 --------------------------. City Sec# 59320
Client Project #(s)I 103664/103665/C00969
Project This will be the continuation in Phase 2 which will include the installation of (3)-72" RCPs to connect the existing Grand Avenue line with the new
Description outfall to the West Fork downstream of the isolation gates
Contractor! S.J. Louis Construction of Texas, LTD
City Project Mgr. I Max Aransen
UNIT or DEPT Stonn Drain
Original Contract Amount �Ll,114,74ti.UU
Extras to Date
Credits to Date
Current Contract Amount $21,114,746.00
!Amount of Proposed Allocation $0.00
Original Allowance Available to Allocation $100,000.00
Allowance Funds Previously Allocated $21,972.34
Revised Allowance Balance $78,027.66
CA#.._l ___ 2 __ __,Datel 12/18/2024
Water Dept UNIT 3 or Dept
$1,tiJ5,JJo.5U
$1,635,338.50
$8,994.34 $0.00
$50,000.00
$41,005.66 $0.00
City Inspector ! Jeremy Koonce
UNIT 4 or Dept Totals
�LL, 75U,U04.5U
$22,750,084.50
$0.00 $8,994.34
$150,uuu.oo
$21,972.34
$0.00 �119,033.32
JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
This CA will be for the installation of a 12" DIP SS pipe from Station 3+13.58 to STA 4+41.91, not including a 40' section that will be bored. This section was initially 12" PVC pipe;
however, per the direction of the water department and the bore required, the entire line was updated to 12" DIP. The Contractor has agreed to use the price of the PVC
installation for the DIP installation. Per the review of the design engineer, project manager, and construction manager, the costs for these unique items seemed fair and
reasonable.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction
and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request.
The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this
contract, including ensuring all performance and reporting requirements.
Contractor's Com Name
S.J. Louis Construction ofTexas, LTD
Jannette Goodall, City Secretary
Contractor Name
01
Adam Lunsford
Date
1/18/2025
Date
18/2025
Date
02/05/202
Date
Construction Allowance SUMMARY
Page 1 of 4
Date
01/13/2025
Date
01/18/2025
Date
Date
Date
02/10/202
FORT WORTH., City of Fort Worth
� Construction Allowance Additions
Project Name Grand Ave Ouffall City Sec #�
Client Project # 103664I103665/C00969
Contractor S.J. Louis Construction of Texas, LTD PM Max Aransen Inspector Jeremy Koonce
Construction Allowance Submittal # �2 �ate �
ADDITIONS
� � . ' • �����
� - � • - �-� :• �� � ', � �. �
- __--_
■ -_---
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�- �
� --�--
� --��-
� �. ���I
�' � �I
� �-� � ii
- . �-� � ii
��
Construction Allowance Additions
Page 2 of 4
FORT WORTH:,, City of Fort Worth
`�r Construction Allowance Value
Project Name Grand Ave Outfall City Sec # 5�
Client Project # 103664/103665/C00969
Contractor S.J. Louis Construction of Texas, LTD PM Max Aransen Inspector Jeremy Koonce
Construction Allowance Submittal # �2 Date �
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
9999.0009 Contingency Allowance (to cover the cost of improvements not
previously advertised. All Work completed under this shall be approved by
53 the Cit in writin . 1.00 LS $50,000.00 $50,000.00
Note to Preparer: Delete example information in cells and add the CONSTRUCTION ALLOWANCE contract
bid item number being used, description, UNIT or DEPT, Qty, Unit and Unit Cost in the lines above. Three
lines are provided for those cases when up to 3 different Construction Allowance types are being impacted. I�
most cases only one Construction Allowance type will be impacted. Delete these instructions from the form.
Construdion Allowance Value
3 of 4
MISBE for this Construction Allowance Reauest
M/SBE Sub I Tvpe of Service I Amount for this CAR
Total � $0.00
Previous Construction Allowance Requests
CAR # DATE AMOUNT
1 10/18/2024 $21,972.34
Total $21,972.34
Construction Allowance MSBE Data
Page 4 of 4
i
�+
O
�
�
C�
V
G1
�
�
O
U
io
'�
a�+
R
�
N
C
'a
c
0
�
a�
�
C�
7
�
O
�
#
�
�
U
O
U
m
a
w
i
�
N
.�
m
N
�
O
i
A
0
�
�
'
x°
A
0
�
� A m
0
+
o � Q
u3
�
�
O o N
O m N W
� C �
O
V3
O
0
0
�
0
0
ua
N N
N N �
u� �
O A m p O O O O O O H y O
o + � o 0 0 0 0 � o n
o ° N o 0 0 0 o N a N
y� � Q �p u> u> u> u> u> � c U �
� � � �
�o � v
i0 ry N
O e W O O O O O
O m N L N O O O O O N
O y � O O O O O �
� O � Ui Ui Ui Ui Ui N
�
`o
LL �
N !a
O �
U d
A q
.. �
�
'c
�
0
0
va
d
R
�.
N
7
O
W
C
R
W
U
N
�
m
N
�
v
a
w
BenMark Supply Company Inc.
12621 N Saginaw BLUD
Fort Worth, TX 76179
Bill To:
S.J. Louis Construction of Texas, Ltd.
P O Box 834
Mansiield, TX 76063
USA
817-477-0320
Customer ID: 103207
QUOTATION
Order Number
1463138
Order Date Page
10/15/2024 14:36:05 1 of 1
Quote Expires On: 11/14/2024
Ship To:
S.J. Louis Construction of Texas, Ltd.
520 S 6th Ave
Mansfield, TX 763063
USA
Requested By: Brandon Mims
PO Number Ship Route Taker
Grand Ave CO DICKENSONB
Quantities Pricing
Item ID DOM Llnit Extended
Ot�dered Allocated Remaining UOM °� Item Desc►zption pY1Le Price
Unit SiZe q Unit SiZe
6
2
140
Total Lines: 3
0 6 EA CS24-1320-CSCR-8
1.0 24"x12" Carbon Steel Center Restraint 8"
0 2 EA ES2412
1.0 24" x 12" End Seal
0 140 FT DI350-120-P401
1 A 12° CL 350 DI Pipe P401 Lined
EA 109.2857 655.71
1.0
EA 96.2857 192.57
1.0
FT 95.0000 13,300.00
1.0
SUB-TOTAL: 14,148.28
TAX: o.00
AMOUNT DUE: 14,148.28
U.S. Dollars
19.13681 - 09/23/19
BenMark Supply Company Inc.
12621 N Saginaw BLVD
Fort Worth, TX 76179
Bill To:
S.J. Louis Construction of Texas, Ltd.
P O Box 834
Mansfield, TX 76063
USA
817-477-0320
Customer ID: 103207
QUOTATION
Order Number
1463138
Order Date Page
10/15/2024 14:36:05 1 of 1
Quote Expires On: 11/14/2024
Ship To:
S.J. Louis Construction of Texas, Ltd.
520 S 6th Ave
Mansfield, TX 763063
USA
Requested By: Brandon Mims
6 0 6 EA CS24-1320-CSCR-8 EA 109.2857 655.71
1.0 24"x 12" Carbon Steel Center Restraint 8" 1.0
2 0 2 EA ES2412 EA 96.2857 192.57
1.0 24" x 12" End Seal 1.0
140 0 140 FT DI350-120-P401 FT 95.0000 13,300.00
1.0 12" CL 350 DI Pipe P401 Lined 1.0
Total Lines: 3 SUS-TOTAL: 14,148.28
TAX: o.00
AMOUNT DUE: 14,148.28
U.S. Dollars
19.1.3G81 - 09J23/19
F�������
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Grand Ave Outfall Construction Allowance 2
M&C
CPN: 103664,103665, CSO: 59320 DOC#:
C00969
Date:
To: Name Department Initials Date Out
1 Adam Lunsford Contractor � 01 /13/2025
AdamL@SJLouis.Com '
2. Jeremy Koonce TPW - Inspector �
JK
3. Max Aransen TPW - Project Manager � 01/18/2025
4. Thanaa H. Maksimos TPW — Program Manager �— 01 /18/2025
5, Lissette Acevedo TPW — Sr. CPO �f 02/03/2025
(. Patricia Wadsack TPW — Assistant Director �7(�'�/' 02/05/2025
'J. Lauren Prieur TPW - Director �
g, Doug Black Legal - Assistant City Attorney �
9. Jesica McEachern CMO — Assistant City Manager � 02/10/2025
10. Jannette Goodall CSO — City Secretary �.Z�z o2/� �/2025
11. Allison Tidwell CSO — City Secretary � 02/14/2025
12, Tpw_SW_Contract TPW Stormwater
CC: Program Manager — Thanaa Maksimos, Sr. CPO — Lissette Acevedo, TPW BSPAP Recon
Team — Cindy Sengathith
DOCUMENTS FOR CITY MANAGER'S SiGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRTATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES �No
RUSH: ❑YES �No SAME DAY: ❑YES �No NEXT DAY: ❑YES �No
ROUTING TO CSO: �YES ❑No
Action Repuired:
❑ As Requested
❑ For Your Information
� Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tpw sw contracts(a�,fortworthtexas.�ov Call 817-229-3283 with questions. Thank you!