HomeMy WebLinkAboutContract 61420-AR1foRTWORTH. City of Fort Worth Construction Allowance Request Project Namel Trinity Boulevard Phase 2 -Salado Trail to Thames Trail Client Project #(s) 103280 City Sec# 61420 �-------------------------------------� Des:�;�:� Trinity Boulevard Phase 2 Salado Trail to Thames Trail -Roadway, Drainage, Waterline, Landscape and Illumination Improvements ContractoriJackson Construction, Ltd. City Project Mgr.I Mitch Aiton UNIT or DEPT Original Contract AmountExtras to Date Credits to Date Current Contract Amount!Amount of Proposed AllocationOriginal Allowance Available to AllocationAllowance Funds Previously Allocated Revised Allowance Balance Unit I, Ill & IV $7,117 637.00 $7 117 637 .00 $6140.00$350,000.00 $0.00$343 860.00 CA #�I----� Datel 1/28/2025 Unit II - $4 981,705.00 $4 981 705.00 $0.00 $0.00$150,000.00 $150 000.00 $0.00 City Inspector!Stan Sutterfield -Totals $12 099 342.00 $12 099 342.00 $0.00 $6140.00$500 000.00$0.00 $0.00 $493 860.00 JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: Oncor poles where existing street lights are hung need to be removed for next phase of construction once the large waterline is complete in March 2025. To improve visibility of roadway alignment, staff has recommended adding strobe lights on the traffic control barrels similar to what was done in Phase 1. Jackson Construction proposes to install 80 strobe lights for a lump sum cost of $290 and a Monthly Maintenance of $975/MO afterwards, as requested by the city. The total cost per unit including 6 months maintenance after installation is $76.75/EA. On Trinity Blvd Phase 1 (CPN 102101) the cost was $81/EA. Staff deems the proposed price reasonable. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Com n Name Jackson Construction, Ltd. lnsll8Clornnsll8Clion Supervisor H•� .. Jt 1�e"!lt����:-�,a12t d Program Manager £,dLJrJh-... Assistant Director (Deotl &tti:ir I «/2-4 z--6 Potrid•L.w»cl>..:kjf<lb5,202SH:2'CST) Assistant Citv Attorney ·- DolJslHBlod<(fob7,:Wl1:0llCST} ATTEST: r'� Jannette Gooda ll, City Secretary Contractor Name Ali Jones Date Project and Contract Compliance ManaQer Jan 30, 2025 11.'.J.,1�,,, J;.1,.,.,. «crwdA:tDn{Jan29,202'5111:00CSTj Date Senior Capital Project Officer Jan 30, 2025 -.11. -�(./00'1,l(lllllll:MCSTJ Date Director, Contractill!I Deoartment (Deotl Feb 5, 2025 � .,_ .......,l'Jie",(Febl,Nl!lot:2,fSTI Date Assistant Citv Manager Feb 7, 2025 � Construction Allowance SUMMARY Page 1 of 4 Date Jan 30, 2025 Date Jan 29, 2025 Date Jan 31, 2025 Date Feb 6, 2025 Date Feb 10, 2025 CSC No. 61420-ARl FORT WORTH City of Fort Worth � Construction Allowance Additions Project Name Trinit Boulevard Phase 2- Salado Trail to Thames Trail ity Sec #� Client Project # 103280 Contractor Jackson Construction, Ltd. PM Mitch Aiton Inspector Stan Sutte�eld Construction Allowance Submittal # 0 ate � ADDITIONS Construction Allowance Additions Page 2 of 4 FORT WORTH:, City of Fort Worth ""'�+�� Construction Allowance Value Project Name Trinit Boulevard Phase 2- Salado Trail to Thames Trail City Sec #� Client Project # 103280 Contractor Jackson Construction, Ltd. PM Mitch Aiton Inspector Stan Sutterfield Construction Allowance Submittal # � Date � CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total Unit 1 Item 59 9999.0007 Construction Allowance 0.017543 LS $350,000.00 $6,140.00 Construction Allowance Value 3of4 MISBE for this Construction Allowance Request M/SBE Sub I Tvae of Service I Amount for this CAR Total � $0.00 Previous Construction Allowance Requests CAR # DATE AMOUNT Total $0.00 Construction Allowance MSBE Data Page 4 of 4 Trinity Blvd Phase 2- Salado Trail to Thames Trail Martin Bauer Project Manager Temporary Illumination NO CHANGE INCREASE IN COST DECREASE IN COST � CONTRACT NO. PRIME CONTRACTOR � • • • • � IEST FOR INFORMATION REQUESTING PARTY ORG. PHONE DATE OF REQL • • • • � 1 1. NO CHANGE $ 6,140.00 INCREASE IN TIME DECREASE IN TIME # of Days = # of Days = The Oncor Poles need to come down for next phase of construction after the Waterline is complete in March 2025 and temporary illumination will be needed. We can do temporary illumination similar to Phase 1. We can install the temporary lights on barrels for an initial fee of $290 with periodic maintenance fees of $975.00/MO afterwards to change batteries/etc. on lights not working. Mitch Aiton Sr Professional Engineer 682-715-9424 Ol /O6/25 Ol /16/25 Please move forward with the temporary illumination and we'll do the maintenance when requested by the city. The proposed price for the initial installation of the temporary lights will be $290/LS with maintenance cost of $975/MO to maintain all 80 lights. Assuming 6 months of maintenance after installation the cost is $76.75/EA. On Trinity Blvd Phase 1 102101 the installed temporary lights on barrels for $81 /EA that included maintenance. Staff deems the proposed price reasonable. No Schedule Impact Mitch Aiton, Sr Professional Engineer ���.�_ `_�_ Ol /23/25 ��t� Jackson Construction, Ltd. Project: Trinity Boulevard Ph2 Project No.: 28018 Change Order Request City: Fort Worth Date: 16-Jan-25 Item Description Quantity UM Bid Price Mobilization (Install 80 D-Cell Type AIC Barricade $ _ __ .�. .. Lights w/Battery and LED Bulb 1.000 EA $ 290.00 $ ;_._.---__--.. _ $ #_ _ Monthly Maintenance 1.000 MO $ 975.00 $ � ......�_ _. __ __.__-_ _.._ ..... _ . ___ � ;�..._._ . . _ __ ;_..._ . �.__ _._ _.__.. _. .. _ _ _. _.__ . . . . _ ..._ $ __ ___ _.._.�_.__ �. __... _ _ i. _ _ � _ . __._ _.. _ , _ _ _._ _.��.. _..._ _ _ . . _ .._ � _ _ _. _ __ -- ._.._._ . ._..._.. . . _:..._. _ � ... . . _� ._. $ _.._ _ ...__ . _. _. . _..._ ._ _..._ _;.._,. . _._..._ .. _ _.. _ _ __ $ _ � _ ,_..._ �..._ .. $ _ _. . _. _ .. _ __ _. � �.._. _.,_. _ _ �- $ __ _ _ _ _._. _ - _,.. $ . _ . ..... . _ . ._ _. _._ , _ _ _ _ _.... �. .. _ .... . . , ...� _ . _... �- --.... ; � '......_.. __ .._..__. .._.:.._ _._ ..--- -._.. ..._ . ___ .... _ ' $ _ _._ _ � . ._ � _ �_ � � -__ ___._ _ .. .__.___ _...__ _._ _ .... _ _.---... . ....____ _...._ _... _ . ._. __ . ��__.__1.._ .___..__. � �__ ,.._._..._.._ . ...._....._.._ ......r._ ...... ._..._ ....... ... ........ . ...�.___.�.....�...._....-.. .....�......... .,.......... .. . .'....."'"_'""._......... _... �....:... . �. .. . ........ . �...._.._,. . ._.._...........__ "'"..:,�_. . .. .. � : � ....._._.__..._.._ ._.u. ._... ._ .�.. _.... .� . ........ . . ... .. . . .. . . � I. i � . . .. �.. _ ... . . ........ t�.,_�.�.. .... �......_.._ _ .,. ..� ...... . . ........... . ..._....._.... . ......._... . ... ', . . _ .._...... . ........�. .._..._ ._.... _ . ..... ............ . ' „ �Q` . ..... .',... . , ....r ... ... .... .. .... ... __..... . ..._..._..... ,.. _ ., .. _ . ....,.. ......_..._. .. ,.. .....,,- ... . . _'_I .. �7 '"' " .._...�........ _ .. . .. 1 � ..___ _. _ ._.___ ....__� __. .._ . .._ __ - _____ __ - _ ._... _. ._ _ ....--- - . _...... .._ ; . _ .. .._ _. .. _I_..�._.._..,__ . _..... _ � � _ ' , � _._... . _ . _ _ _._�. . ._� . ._ _... _ ._ + _. _._.__.. _._ _ _ . _ ..;.., � _ � __. ..-- -- ._�_ _._ _.. ___� � ' � ; �____ _., ,. _.. _ ..._ . � _.._. _ . ._ __ . . ..__. _.. _ _ .,. . . ._ . ._. �.._ ..._ . .. . ..__.. - - -._ �___�. _. . ..� .___ i __. .. � _ .. . _ _ _ � __. ___. � ---�.. _ _. �._...__ _ -- ---_�._ _ _ _ _ . -. _-t � .__ _� _ __._...----;--.---.-------_�.._�`._ __ _. _.. __ _ _ , --- --�. __ �_ _ ._._�_ ._ I_._.. ___ - -- $ $ � Amount 290.00 975.00 Page 1 of 1 1116/2025 2:14 PM � Outlook Fort Worth - Trinity Boulevard Phase 2 Salado Trail to Thames Trail - 01-16-25 Change Order From Gary Ishmael <gary@dlbinc.net> Date Thu 16-Jan-25 1:18 PM To steveh@jacksontx.net <steveh@jacksontx.net> Remote Desktop Redirected Printer poc (393).pdf; Fort Worth - Trinity Boulevard Phase 2 Salado Trail to Thames Trail - 01-16-25 Change Order.pdf; Thank you and we appreciate your business, � I,1'1'�l's � ��,�11ILI{'.allE: .L�.www�.o�siNc.N� o�w � a�sr� enawrnw000 • w�co GArR1� ISFIMAEL Senior EstimatoK �_II :U.� L� r i15` �� 0 I:..rv�::JlLii _�r_. .,,,,,,��,,,.:,.� Q :Ts�.v. �H.��imc�ai.,cd pa. uallu�_ 1!. "rstl�. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE:Trinity Blvd Ph 2 CA #1 M&C: N/A CPN: 103280 CSO: 61420 DOC#: N/A Date: 1/28/2025 To: Name Department Initials Date Out 1. Jessica Rodriguez TPW - Review 2. Mitch Aiton TPW - Signature 3. Ali Jones Jackson - Signature 4. Stan Sutterfield (Inspector)– TPW Signature 5. Raul Lopez TPW - Signature 6. Lissette Acevedo – TPW Signature 7. Patricia Wadsack – TPW Signature 8. Lauren Prieur – TPW Signature 9. Doug Black – Legal Signature 10. Jesica McEachern – CMO Signature 11. Jannette Goodall CSO - Signature 12. TPW Contracts CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER’S SIGNATURE: All documents received from any and all ’City Departments requesting City Manager s signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and take the next steps. NEEDS TO BE NOTARIZED: YES No RUSH:YES No SAME DAY:YES No NEXT DAY:YES No ROUTING TO CSO: YES No Action Required: Attach Signature, Initial and Notary Tabs As Requested For Your Information Signature/Routing and or Recording Comment File Return To: Please notify TPWContracts@fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!