Loading...
HomeMy WebLinkAboutContract 57832-A2City of Fort Worth, Texas Amendment No. 2 to City Secretary Contract No. 57832 Page 1 of 7 Date Received: _______________ City Secretary Time Received: _______________ Contract Number: __________ SECOND AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 57832 A COMMUNITY FACILITIES AGREEMENT BETWEEN THE CITY OF FORT WORTH, HPC WELLINGTON NANCE DEVELOPMENT CORPORATION, AND 170 NORTHSTAR RANCH DEVELOPER, INC. This SECOND AMENDMENT TO CITY SECRETARY CONTRACT NUMBER 57832 (“Second Amendment”) is made and entered into by and between the City of Fort Worth a home-rule municipal corporation of the state of Texas (“City”),HPC Wellington Nance Development Corporation, a Texas corporation (“HPC”), and 170 Northstar Ranch Developer, Inc., a Texas corporation (“Northstar”), each acting by and through their duly authorized representatives. WHEREAS, the City, HPC, and Northstarentered into a Community Facilities Agreement for the construction of public infrastructure Improvements for a Project generally described as M- 584 Sewer Line, City Project Number 103521, City Secretary Contract Number 57832 (“CFA”); and WHEREAS, HPC’s contractor completed construction of the Improvements pursuant to the CFA and the Improvements passed all inspections; and WHEREAS, a portion of the Improvements are located in an easement that was obtained by Northstar on behalf of the City that was granted to the City by Fossil Creek Estates Homeowners Association, Inc. (“HOA”); and WHEREAS, the HOA delivered to the City a Notice of Violation of Easement and Demand to Cure in connection with the gabions that were installed in two locations within the easement; and WHEREAS, the HOA has delivered to the City a release of claims related to the replacement of the gabions with turf mats, but the HOA has not released any other claims it may have in connection with the project; and WHEREAS, the work necessary to replace the gabions with turf mats was publicly bid under a separate city project number; and WHEREAS, the City, HPC and Northstar desire to amend the CFA to reflect the additional work to be performed to replace the gabions with turf mats; NOW THEREFORE, City, HPC, and Northstar, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends CFA as follows: City of Fort Worth, Texas Amendment No. 2 to City Secretary Contract No. 57832 Page 2 of 7 1. The CFA is amended to add the following recitals: WHEREAS, the scope of the project has been expanded to increase the City Participation by $64,184.91 for the replacement of gabions with turf mats and the restoration of disturbed areas as set forth in the M-584 Erosion Control Project, City Project Number 105742, as authorized by the City Council through approval of M&C 25-0023 on January 14, 2025 (“Additional Work”); and WHEREAS, City shall be responsible for 59.7%, HPC shall be responsible for 31.3%, and Northstar shall be responsible for 9% of the cost of the Additional Work as more particularly described in this Agreement; and WHEREAS, the City Participation for the Additional Work includes reimbursement to HPC in amounts not to exceed $55,674.49 for construction costs, $693.12 for IPRC plan review fees, and $5,286.05 for public bid advertising costs. The remaining City Participation for the Additional Work in the amount of $2,531.25 shall not be paid to HPC or Northstar, but will be used by the City to pay for the City’s portion of construction inspection service fees; and 2. Section 6 of the CFA is amended in its entirety to be and read as follows: This Agreement shall be effective on the date this Agreement is executed by the City’s Assistant City Manager (“Effective Date”). HPC has completed construction of Segment 1 and Segment 2 of the Improvements. HPC shall complete the Additional Work, and obtain the City’s acceptance of the Additional Work by July 1, 2025. If construction of the Additional Work has started, HPC and Northstar may request an additional period of time to complete construction of the Additional Work (“Extension Period”). All Extension Periods shall be agreed to in writing by the parties as set forth in a written amendment to this Agreement. 3. Section 37, subsection (a) of the CFA is amended in its entirety to be and read as follows: (a) The City Participation for the project shall be as follows: i. City will pay HPC 59.7% of the construction costs of the Improvements in an amount not to exceed $5,756,729.09 and will pay HPC 59.7% of the public bidding advertisement costs in an amount not to exceed $5,290.40. The remaining City Participation in the amount not to exceed $18,750.00 shall not be paid to HPC or Northstar by the City, but will be used by the City to pay the City’s share (15%) of the construction inspection service fees. The City will not participate in the cost of administrative material testing service fees or water testing lab fees. HPC shall pay 75% and Northstar shall pay 25% of the cost of: (1) obtaining any approvals or City of Fort Worth, Texas Amendment No. 2 to City Secretary Contract No. 57832 Page 3 of 7 permits from entities, other than the City, necessary for construction of the Improvements; (2) IPRC engineering review fees; (3) material testing costs; and (4) administrative material testing service fees. ii. City will pay HPC 59.7% of the cost of the Additional Work in an amount not to exceed $55,674.49 for construction costs, $693.12 for IPRC plan review fees, and $5,286.05 for public bid advertising costs. The remaining City Participation for the Additional Work in the amount of $2,531.25 shall not be paid by City to HPC or Northstar, but will be used by the City to pay for the City’s portion of construction inspection service fees iii. The City shall not be liable to Northstar for any costs related to this Agreement. HPC must register as a Vendor of the City in order for the City Participation to be paid to HPC. The cost of any change orders must be agreed upon in writing by the parties and the party or parties benefitting from the change order must pay the costs as outlined in the written change order signed by the parties. 4. Section 38, Subsection (b)(13) of the CFA is amended in its entirety to be and read as follows: (13) Construction of the Additional Work shall be completed and final accepted by July 1, 2025. 5. Section 40 of the CFA is amended in its entirety to be and read as set forth in Exhibit A of this Second Amendment, which is attached hereto and incorporated herein by reference. 6. The Cost Estimates in the CFA are amended to add the information in Exhibit B of this Second Amendment, which is attached hereto and incorporated herein by reference. 7. a. All other provisions of City Secretary Contract No. 57832 which are not expressly amended herein, shall remain in full force and effect. b. All terms in this Second Amendment that are capitalized, but not defined, shall have the meanings ascribed to those terms in City Secretary Contract No. 57832. City of Fort Worth, Texas Amendment No. 2 to City Secretary Contract No. 57832 Page 4 of 7 IN TESTIMONY WHEREOF, the City, HPC, and Northstar have executed this Second Amendment to be effective on the date signed by the City’s Assistant City Manager. CITY OF FORT WORTH Dana Burghdoff Assistant City Manager Date: Recommended by: Dwayne Hollars Contract Compliance Specialist Development Services Approved as to Form & Legality: Richard A. McCracken Sr. Assistant City Attorney M&C No. 25-0023 Date: 1/14/2025 Form 1295: 2024-1239941; 2024-1240211 ATTEST: Jannette Goodall City Secretary HPC HPC Wellington Nance Development Corporation Ben Luedtke Executive Vice President Date: NORTHSTAR 170 Northstar Ranch Developer, Inc Kim Gill Vice President Date: Contract Compliance Manager: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including all performance and reporting requirements. Rebecca Diane Owen Development Manager City of Fort Worth, Texas Amendment No. 2 to City Secretary Contract No. 57832 Page 5 of 7 EXHIBIT A 40. Cost Summary Sheet Project Name: M-584 Sewer Line CFA No.: CFA22-0044 IPRC No. IPRC21-0158 City Project No.: 103521 *Numbers in chart above do not reflect any change orders for the project. City of Fort Worth, Texas Amendment No. 2 to City Secretary Contract No. 57832 Page 6 of 7 Project Name: M-584 Erosion Control Project CFA No.: CFA22-0044 IPRC No. IPRC24-0155 City Project No.: 105742 TOTAL COST (BOTH PROJECTS) $ 3,159,701.32 $ 912,940.67 $ 5,844,954.40 $ 9,917,596.39 00 42 43 Option 1 DAP - BID PROPOSAL Page 1 of 1 1 3292.0200 Seeding, Broadcast 32 92 13 SY 1894.00 $0.65 $1,231.10 2 9999.0001 Remove 12" Gabion Mattresses 00 00 00 SY 1894.00 $30.00 $56,820.00 3 9999.0002 Erosion Control Mat - Excel PP5-PRO 00 00 00 SY 1894.00 $18.59 $35,206.00 $93,257.10 UNIT I: SANITARY SEWER IMPROVEMENTS - SEGMENT 1 Total Construction Bid $93,257.10 Bid Summary SECTION 00 42 43 Project Item Information UNIT PRICE BID Bidder's Application Bidder's Proposal Developer Awarded Projects - PROPOSAL FORM M-584 Erosion Control-CoFW Participation Specification Section No. Unit of Measure Bidlist Item No. UNIT I: SANITARY SEWER IMPROVEMENTS - SEGMENT 1 Description TOTAL UNIT I: SANITARY SEWER IMPROVEMENTS - SEGMENT 1 $93,257.10 Bid Quantity Unit Price Bid Value CITY OF FORT WORTH STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Form Version May 22, 2019 M-584 Erosion Control City Project No. 105742 1-Armor Site Services- Bid Table Section 00 42 43 City of Fort Worth, Mayor and Texas Council Communication DATE: 01/14/25 M&C FILE NUMBER: M&C 25-0023 LOG NAME: 60WELLINGTON CFA AMENDMENT N0.2 EROSION CONTROL SUBJECT (CD 10) Authorize Execution of Amendment No. 2 to City Secretary Contract No. 57832 with HPC Wellington Nance Development Corporation and 170 Northstar Ranch Developer, Inc., Increasing City Participation in an Amount Up to $64,184.91 and Developer Participation in an Amount Up to $55,962.55 for Sewer Main M-584 Erosion Control Located in North Fort Worth RECOMMENDATION: It is recommended that the City Council authorize the execution of Amendment No. 2 to City Secretary Contract No. 58732 with HPC Wellington Nance Development Corporation and 170 Northstar Ranch Developer, Inc., increasing City participation an amount up to $64,184.91 and Developer participation in an amount up to $55,962.55 for the sewer main M-584 erosion control located in north Fort Worth. DISCUSSION: On May 10, 2022, the City Council approved Mayor & Council Communication (M&C) 22-0361 to authorize the execution of a Community Facilities Agreement (CFA) to oversize the M-584 Sewer Line (Wellington Offsite sewer) main to serve the Wellington, Nance, and Northstar Ranch Developments. The Wellington Offsite Sewer project was assigned City Project No. 103521 and Accela System Record Infrastructure Plan Review Center (IPRC) Number IPRC21-0158. Pursuant to the terms of the CFA, the sewer line was built in two segments. Upon construction and passing of all tests for Segment 1, the City agreed to allow Segment 1 to be placed into service while Segment 2 was being constructed; however, the City would not accept the entire project until both segments were completed. In a letter dated November 29, 2023, the Fossil Creek Estates Homeowners Association (HOA) informed the City that gabion baskets installed at two creek crossings to protect the sewer line violated the easement granted by the HOA to the City for the project. On January 2, 2024, the City issued a letter accepting Segment 1 of the sewer line. On or about January 23, 2024, the City confirmed that Segment. 2 was completed. Through negotiations with the HOA, the HOA agreed to the replacement of the gabion baskets with turf mats. Amendment No. 1 to the CFA was executed to document the negotations with the developers for the future replacement of the gabions with the turt mats, use of the completed sewer line while the gabions are being replaced, and extending the deadline to complete construction. Amendment No. 1 did not authorize this additional work because the additional working had to be publicly bid. The purpose of this M&C is to authorize the execution of Amendment No.2 to the Community Facilities Agreement, to increase city participation for the replacement of gabions with turf mats, and restoration of disturbed areas. The additional work under Amendment No. 2 was bid out as a separate project. The M-584 Erosion Control project is assigned City Project No. 105742 and Accela System Record IPRC Number IPRC24-0155. This will result in the CFA encompassing two City project numbers. The project has been publicly bid. The City's cost participation in the additional scope of work is estimated to be in an amount up to $64,184.91 as shown in the table below. Payments to the Developer are estimated to be $55,674.49 for construction costs, $693.12 for IPRC fees, and $5,286.05 for public bid advertisement. The City's cost participation also includes $2,531.25 to cover the City's portion of construction inspection service fees. The following table shows the cost sharing breakdown for the project between all parties: Dev- A. Construction *Additional Dev- HPC Northstar City Cost Scope Cost (31.3%) Cost ( 9%) (59.7%) Total Cost Sewer $29,189.47� $8,393.14� $55,674.49� $93,257.1 Inspections & Testing (40 Construction Inspection Fee %/21 %/15% IPRC Plan Review Fees �. Public Bid Advertisement ee otal Project Cost $10,800.00� $3,543.75� $2,531.25� $16,875. $363.39 $2,771.41 $104.49� $693.12� $1,161. $796.89� $5,286.05� $8,854. $43,124.28� $12,838.27� $64,184.91� $120,147 *Numbers will be rounded up for accounting purposes. The reimbursement of the City participation, excluding inspection and material testing fees, is not a lump-sum amount and may be less than the stated amount depending upon the actual quantities and unit prices from the Notice of Final Completion package, commonly referred to as the Green Sheet package. Funding is budgeted in the Water/Sewer Bond 2016 Fund for the Water Department for the purpose of funding the CFA-M-584 Erosion Control project, as appropriated. Funding for the CFA —M-584 Erosion Control project as depicted in the table below: Fund Existing Additional Project Total* Appropriations Appropriations Water/Sewer Bond 2016 - Fund $65,000.00 $0.00 $65,000.00 56005 Project Total $65,000.00 $0.00 $65,000.00 *Numbers rounded for presentation purposes. BUSINESS EQUITY- A goal is not required under Business Equity Ordinance 25165-102021 when City spending participation on Community Facilities Agreements is less than $1,000,000.00 dollars. A change order or amendment may be made by the City manager up to the amount allowed by relevant law and the Fort Worth City Code and does not require specific City Council approval as long as sufficient funds have been appropriated. This project is located in COUNCIL DISTRICT 10. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Water/Sewer Bond 2016 Fund for the CFA-M-584 Erosion Control project to support the approval of the above recommendation and execution of the amendment. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. Submitted for City Manager's Office bk William Johnson 5806 Originating Business Unit Head: Chris Harder 5020 Additional Information Contact: Suby Varguhese 8009 Melissa Harris 8028