HomeMy WebLinkAboutContract 59571-CO2FORT WORTH City of Fort Worth
Change Order Request
CSC No. 59571-C02 Project Name: I Additional Gas Line for Biosolids Drying Facility Project No.(s):I 56002/0700430/5740010/103011 I City Sec No.: :=I =5 =95=7=1 ========: M&C: l.--2-3--0-4-10--,I City Proj. No.: �I _1_03_0_11 ___ � Project Description: Biogas pipeline that conveys digester gas from the Village Creek Water Reclamation Facility to the BiosolidsManagement and Beneficial Reuse Facility. Contractor:! R Construction Civil, LLC City Project Mgr. I Suzy Abbe �-=================: Phone Number:! 817-392-8209 Dept. Sewer Original Contract Amount $4,828,791.50 Extras to Date $96,790.00 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $4,925,581.50 !Amount of Proposed Change Order $0.00 Revised Contract Amount $4,925,581.50 Original Funds Available for Change Orders $193,152.00 Remaining Funds Available for this CO $96,362.00 Additional Funding (if necessary)Change Order# �I __ 2_� Date: City Inspector: I Nick Momo �-==============: Phone Number:! 817-392-5930 Totals
,;<ii.•! ? ;,.J t li 'j l"J $4,828,791.50 'JTh:--'P a ��□�□$96,790.00 }a u {} u -��r r�Ll
� c--? n�d.'.' $4,925,581.50 $0.00 $4,925,581.50 -�1,,: '.] 111 �"';. $193,152.00 $96,362.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS% OF ORIGINAL CONTRACT 2.00% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $6,035,989.38 JUSTIFICATION (REASONS) FOR CHANGE ORDER Change Order No. 2 provides for the following: •Additional 23 linear feet of 8-inch HDPE gas line by other than open cut to avoid conflict with existing utilities.Staff concurs with the contractor's request for an additional 150 calendar days on the project for the change order.1/10/2025 Contract Time
(Calender days) 360 0150 :.-iV' c..: 510 150 660 It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. R Construction Civil, LLC Brody Maedgen Date 1/27/25 Date
02/20/2025
Council Action (If Required) M&C Number N/A M&C Date Approved Date 2/18/2025 Date 1/27/25 Date N/A
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Atlditional Gas Line for Biosolids Drying Facility City Sec No.: 59571
Project No,(s): 56002/0700430/5740010/103011 DOE No. 23-041 City Proj. No.: 103011
Project
Description
Biogas pipeline that conveys tligester gas from the Village Creek Water Reclamation Facility to the Biosolids
Management and Beneficial Reuse Faciliry.
Contractor R Construction Civil, LLC Change Order:�2 Date: 1/10/2025
City Project Mgr. Suzy Abbe City Inspector Nick Momo
ADDITIONS
DEPT Qt Unit Unit Cost Total
4 8" HDPE Gas Line by Other than Open Cut Sewer 23.00 LF $200.00 $4,600.00
Sewer $4,600.00
Page 2 of 4 Atlditions Sub Total $4,600,00
F�RT WORTH City of Fort Worth
Change Order Deletions
Project Name Additional Gas Line for Biosolids Drying Facility City Sec No.: 59571
Project No.(s): 56002/070043015740010/103011 DOE No. 23-04 City Proj. No.: 103011
Project Description
Biogas pipeline that conveys digester gas from the Village Creek Water Reclamation Facility to the Biosolitls
Management and Beneficial Reuse Facility.
Contractor R Construction Civil, LLC Change Order; �2 Date 1/10/2025
City Project Mgr. Suzy Abbe City Inspector: Nick Momo
ITEM DESCRIPTION
35 Construction Allowance
DELETIONS
DEPT Qty Unit Unit Cost Total
Sewer 0.0575 LS $80,000.00 $4,600.00
r �$4,600.00
Page 3 of 4
letions Sub Total �$4,600.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 4 of 4
MIWBE Breakdown for this Change Order
12/20/2024
CPN 103011
Additional Gas Service to Biosolids Drying Facility
Chan�e Order 2 Notes
� Additional 23 linear feet of 8" HDPE gas line by other than open cut. During construction, the
proposed location of the bore exit pit would have been on an existing line. The exit pit was
shifted east to avoid the conflict.
• 150 days of additional contract time. Start up and commissioning of this project requires
Synagro to modify programming of the dual fuel train controls and to bring in new I/O points
into their SCADA system. Synagro is currently worlcing on upgrades to the dryer facility and is
not ready to test the new gas line in December. Synagro requested that commissioning of the
gas line be postponed until the dryer facility is bacl< in service after their improvements are on
line. They expect to be ready to start commissioning the gas line in March.
.Contract Compliance Manager
By signing I aclmowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery
Title
ATTEST:
Jannette Goodall
City Secretary