Loading...
HomeMy WebLinkAboutContract 60711-CO3PROJECT NAME: CONTRACT: CFA# CITY PROJECT# CITY SECRETARY CONTRACT# FID# FILE# INSPECTOR: PROJECT MANAGER: ORIGINAL CONTRACT EXTRAS TO DA TE CREDITS TO DATE CONTRACT TO DA TE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT Revised: 12-17-2018 DEVELOPER-AWARDED-PROJECT CHANGE ORDER MADERO PHASE 16 (UNIT 1) WATER, (UNIT II) SEWER, (UNIT Ill) STORMWATER, (UNIT IV) PAVEMENT, & (UNIT V) CHANGE STREET LIGHTS ORDER No: 22-0186 I CITY PARTICIPATION: I YES 104386 60711 FID # 30114-0200431-104386-E07685 W-2897 Richard Walden Sandip Adhikari Phone No: Phone No: WATER SEWER Developer Cost CitvCost Developer Cost CitvCost $1,073,257.19 $138,231.81 $956,962.00 $0.00 $2,904.00 $0.00 $108,912.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,076,161.19 $138,231.81 $1,065,874.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,076,161.19 $138,231.81 $1,065,874.00 $0.00 $1,214,393.00 $1,065,874.00 682-249-3078 817-392-8424 CONTRACT UNIT PAVING Developer Cost CitvCost $3,391,141.50 $0.00 $0.00 $0.00 ($66,192.84) $0.00 $3,324,948.66 $0.00 ($102,974.00) $0.00 $3,221,974.66 $0.00 $3,221,974.66 3 DRAINAGE Developer Cost CitvCost $1,283,316.00 $0.00 $0.00 $0.00 $0.00 $0.00 $1,283,316.00 $0.00 $0.00 $0.00 $1,283,316.00 $0.00 $1,283,316.00 CSC No. 60711-(03 STREET LIGHTS CONTRACT Developer DAYS Cost Citv Cost $344, 120.00 $0.00 260 $47,914.00 $0.00 0 $0.00 $0.00 0 $392,034.00 $0.00 260 $0.00 $0.00 0 $392,034.00 $0.00 260 $392,034.00 Dev. Cost: $7,039,359.85 �City Cost: $138,231.81 $7,177,591.66 Page 1 You are directed to make the following changes in the contract documents SENDERA RANCH BOULEVARD MASTERINFRASTRUCTURE UNIT IV: PAVING IMPROVEMENTS CITY BID ITEM CFW Unit Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost 3 3213.0105 (594.00) SY 10" Conc Pvmt $0.00 $86.00 ($51,084.00 20 9999.0029 28 LF REFL PAV MRK TY IfW1f8"1(SNGIISLDI �o.00 $5.00 5140.00 PAY ITEM # Asterisk (') indicates New Pay Item RANCHO CANYON WAY MASTER INFRASTRUCTURE UNIT IV: PAVING IMPROVEMENTS CITY BID ITEM CFW Unit Developer # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost 3213.0105 (605.00) SY 10" Conc Pvmt �0.00 $86.00 (�52 030.0C AL Cost I TOTAL Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER This revision pertains to a quantity correction caught by the inspector for the Sendera Ranch Blvd pavement markings. This change order a/so corrects quantity errors for 1 O" Concrete Pavement for both the Sendera Ranch Blvd and Rancho Canyon Way sections. THERE IS NO IMPACT TO CITY COST PARTICIPATION ON THIS CHANGE ORDER FORM RECOMMENDED: LJA Engineering, Inc i'WYd &tfrttt,By: Daniel Betten (Feb 17, 202507:32CSD Name: Daniel Betten, PE Title: Project Manager Email: dbetten@lja,con, APPROVAL RECOMMENDED: CFW -Water Department Su&'l-t/�Pc By: ff ---------------- Name: Suby Varughese Title: Engineering Manager RECOMMENDED: CFW -*Contract Compliance Manager By: .r Name: Sandi_p Adhikari Title: Sr. Professional En_gineer M&C Number: N/A ---------- M&C Date Approved: _N_/_A _______ _ APPROVED: GBTM Sendera, LLC By:� Name: Bobby Samuel Title: Authorized Signer APPROVED: Conatser Construction B(or;tMY,i!jn5 By: BrockHuggins(Febl7,l(i Name: Brock Huggins Title: President Email: bsamuel@greenbrickpartners.com Email: brock.@conatserconstruction.com APPROVED: CFW -Assistant City Manager By:� Name: Jesica McEachem Title: Assistant City Manager ATTEST r1� Jannette S. Goodall City Secretary □ APPROVED AS TO FORM AND LEGALITY: CFW -Assistant City Attorney?2=r By: Richard r:tcCl".:lcken (Feb 20, 2025 20:01 csn Name: Richard McCracken Title: Senior Assistant City Attorney * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. There are NO City Funds associated with this Contract 0 There are City Funds associated with this Contract Revised: 12-17-2018 Page 3