DEVELOPER-AWARDED-PROJECT CHANGE ORDER
MADERO PHASE 16
(UNIT 1) WATER, (UNIT II) SEWER, (UNIT Ill) STORMWATER, (UNIT IV) PAVEMENT, & (UNIT V) CHANGE
STREET LIGHTS ORDER No:
22-0186 I CITY PARTICIPATION: I YES
104386
60711
FID # 30114-0200431-104386-E07685
W-2897
Richard Walden
Sandip Adhikari
Phone No:
Phone No:
WATER SEWER
Developer
Cost CitvCost Developer Cost CitvCost
$1,073,257.19 $138,231.81 $956,962.00 $0.00
$2,904.00 $0.00 $108,912.00 $0.00
$0.00 $0.00 $0.00 $0.00
$1,076,161.19 $138,231.81 $1,065,874.00 $0.00
$0.00 $0.00 $0.00 $0.00
$1,076,161.19 $138,231.81 $1,065,874.00 $0.00
$1,214,393.00 $1,065,874.00
682-249-3078
817-392-8424
CONTRACT UNIT
PAVING
Developer Cost CitvCost
$3,391,141.50 $0.00
$0.00 $0.00
($66,192.84) $0.00
$3,324,948.66 $0.00
($102,974.00) $0.00
$3,221,974.66 $0.00
$3,221,974.66
3
DRAINAGE
Developer
Cost CitvCost
$1,283,316.00 $0.00
$0.00 $0.00
$0.00 $0.00
$1,283,316.00 $0.00
$0.00 $0.00
$1,283,316.00 $0.00
$1,283,316.00
CSC No. 60711-(03
STREET LIGHTS CONTRACT
Developer DAYS
Cost Citv Cost
$344, 120.00 $0.00 260
$47,914.00 $0.00 0
$0.00 $0.00 0
$392,034.00 $0.00 260
$0.00 $0.00 0
$392,034.00 $0.00 260
$392,034.00
Dev. Cost: $7,039,359.85 �City Cost: $138,231.81
$7,177,591.66
Page 1
You are directed to make the following changes in the contract documents
SENDERA RANCH BOULEVARD MASTERINFRASTRUCTURE
UNIT IV: PAVING IMPROVEMENTS
CITY BID ITEM CFW Unit Developer
PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost
3 3213.0105 (594.00) SY 10" Conc Pvmt $0.00 $86.00 ($51,084.00
20 9999.0029 28 LF REFL PAV MRK TY IfW1f8"1(SNGIISLDI �o.00 $5.00 5140.00
PAY ITEM #
Asterisk (') indicates New Pay Item
RANCHO CANYON WAY MASTER INFRASTRUCTURE
UNIT IV: PAVING IMPROVEMENTS
CITY BID ITEM CFW Unit Developer
# QUANTITY UNIT ITEM DESCRIPTION Price UNIT PRICE Cost
3213.0105 (605.00) SY 10" Conc Pvmt �0.00 $86.00 (�52 030.0C
AL
Cost I TOTAL
Revised: 12-17-2018 Page 2
REASONS FOR CHANGE ORDER This revision pertains to a quantity correction caught by the inspector for the Sendera Ranch Blvd pavement markings. This change order a/so corrects quantity errors
for 1 O" Concrete Pavement for both the Sendera Ranch Blvd and Rancho Canyon Way sections.
THERE IS NO IMPACT TO CITY COST PARTICIPATION ON THIS CHANGE ORDER FORM
RECOMMENDED:
LJA Engineering, Inc
i'WYd &tfrttt,By: Daniel Betten (Feb 17, 202507:32CSD
Name: Daniel Betten, PE
Title: Project Manager
Email: dbetten@lja,con,
APPROVAL RECOMMENDED:
CFW -Water Department
Su&'l-t/�Pc By: ff ----------------
Name: Suby Varughese
Title: Engineering Manager
RECOMMENDED:
CFW -*Contract Compliance Manager
By: .r
Name: Sandi_p Adhikari
Title: Sr. Professional En_gineer
M&C Number: N/A ----------
M&C Date Approved: _N_/_A _______ _
APPROVED:
GBTM Sendera, LLC
By:�
Name: Bobby Samuel
Title: Authorized Signer
APPROVED:
Conatser Construction
B(or;tMY,i!jn5 By: BrockHuggins(Febl7,l(i
Name: Brock Huggins
Title: President
Email: bsamuel@greenbrickpartners.com Email: brock.@conatserconstruction.com
APPROVED:
CFW -Assistant City Manager
By:�
Name: Jesica McEachem
Title: Assistant City Manager
ATTEST
r1�
Jannette S. Goodall
City Secretary □
APPROVED AS TO FORM AND LEGALITY:
CFW -Assistant City Attorney?2=r By: Richard r:tcCl".:lcken (Feb 20, 2025 20:01 csn
Name: Richard McCracken
Title: Senior Assistant City Attorney
* Contract Compliance Manager (Project Manager):
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
There are NO City Funds associated with this Contract
0 There are City Funds associated with this Contract