Loading...
HomeMy WebLinkAboutContract 60740-CO3PROJECT NAME: CONTRACT: CFA# CITY PROJECT# Fl □# X# CITY SECRETARY CONTRACT# FILE# INSPECTOR: PROJECT MANAGER: ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT Revised: 12-17-2018 DEVELOPER-AWARDED-PROJECT CHANGE ORDER Buttercup Lane & Boswell Drive 16-lnch Water Main Rehabilitation (A) Water (B) Paving CFA23-0166 I CITY PARTICIPATION:! YES 105037 30114-0200431-105037 -E07685 X-27912 60740 N/A Phone No: Russell Rogers Sandip Adhikari Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER DRAINAGE Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost $98,221.29 $1,228,942.19 $0.00 $0.00 $0.00 $0.00 $0.00 $20,408.39 $24,758.96 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $118,629.68 $1,253,701.15 $0.00 $0.00 $0.00 $0.00 $0.00 $2,329.75 $15,531.69 $0.00 $0.00 $0.00 $0.00 $0.00 $120,959.43 $1,269,232.84 $0.00 $0.00 $0.00 $0.00 $0.00 CSC No. 60740-CO3 CHANGE ORDER No: PAVING STREET LIGHTS CONTRACT DAYS Developer City Cost Cost City Cost $322,315.48 $0.00 $0.00 120 $0.00 $0.00 $0.00 8 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 128 $0.00 $0.00 $0.00 0 $322,315.48 $0.00 $0.00 128 $1,390,192.27 $0.00 $0.00 $322,315.48 $0.00 Dev. Cost: $120,959.43 �City Cost: $1,591,548.32 $1,712,507.75 Page 1 N N m N a E a T � a 3 d z N d N V 9 C Y N .� N Q REASONS FOR CHANGE ORDER 1 While hand digging around the existing water line on Lancaster Ave. a joint on the existing line failed once the surrounding area was excavated. After the initial assessment with the CoFW Inspector and valve crews ff was determined that addffional fittings are needed to repair the pipe, but this repair could be completed during normal buisness hours. However, the CoFW later received a call that residents of the surrounding area were without service and requested that WMC work to repair the failed joint and complete the tiein as soon as possible. The above pricing is for the labor, equipment, fuel, and addffional material needed to complete the repair & tie-in on Lancaster Ave. This change order impacts City Cost Participation GMcivil By: !h� Name: Ryan Spears Title: Project Engineer APPROVAL RECOMMENDED: CFW -Water Department By: :s,,,;/-V�Pc Name: Suby Varughese Mid-Cities Logistics Owner, LLC Western Municipal Construction of Texas, LLC By: Name: Title: 3?Ft�"� ..____,,,, � Name: Clint Wilson s1thorized Signatory =!.!!....'-'-'-'=.!..._ _________ _ Title: Project Manager APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW -Assistant City Manager CFW-Assistant City Attorney XWta Klft�ftqef.l By: Dimi1Burghdoff(Dec16;-10l41 By: Richard!ilcC111d<l,n(DttlS,lDU21,20CST) Name: Richard McCracken Name: Dana Bur.e_hdoff ------------------------- Revised: 12-17-2018 Title: Engineering Manager RECOMMENDED: By: CFW -·contract Compliance Manager � Title: Assistant City Manager ATTEST �A Ji= Name: Sandip Adhikari Jannette S. Goodall Title: Sr Professional EnRineer M&C Number: 23-1073 ------------ M&C Date Approved: 12/12/2023 -------- City Secretary Title: Sr. Assistant City Attorney * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. □There are NO City Funds associated with this Contract 0There are City Funds associated with this Contract Page 3