HomeMy WebLinkAboutContract 60740-CO4PROJECT NAME: CONTRACT: CFA# CITY PROJECT# FID# X# CITY SECRETARY CONTRACT# FILE# INSPECTOR: PROJECT MANAGER: ORIGINAL CONTRACT EXTRAS TO DATE CREDITS TO DATE CONTRACT TO DATE AMOUNT OF PROP. CHANGE ORDER REVISED CONTRACT AMOUNT TOTAL REVISED CONTRACT AMOUNT PER UNIT REVISED COST SHARE TOTAL REVISED CONTRACT Revised: 12-17-2018 DEVELOPER-AWARDED-PROJECT CHANGE ORDER Buttercup Lane & Boswell Drive 16-lnch Water Main Rehabilitation l{A) Water (B) Pavinq CFA23-0166 I CITY PARTICIPATION:! YES 105037 30114-0200431-105037-E07685 X-27912 60740 N/A Phone No: Russell Rogers Sandip Adhikari Phone No: 817-392-8424 CONTRACT UNIT WATER SEWER DRAINAGE Developer Developer Developer Cost City Cost Developer Cost City Cost Cost City Cost Cost $98,221.29 $1,228,942.19 $0.00 $0.00 $0.00 $0.00 $0.00 $22,738.14 $40,290.65 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $120,959.43 $1,269,232.84 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $9,880.00 $0.00 $0.00 $0.00 $0.00 $0.00 $120,959.43 $1,279,112.84 $0.00 $0.00 $0.00 $0.00 $0.00 CSC No. 60740-(04 CHANGE ORDER No: PAVING STREET LIGHTS CONTRACT DAYS Developer City Cost Cost City Cost $322,315.48 $0.00 $0.00 120 $0.00 $0.00 $0.00 8 $0.00 $0.00 $0.00 $322,315.48 $0.00 $0.00 128 $0.00 $0.00 $0.00 1 $322,315.48 $0.00 $0.00 129 $1,400,072.27 $0.00 $0.00 $322,315.48 $0.00 Dev. Cost: $120,959.43 !city Cost: $1,601,428.32 $1,722,387.75 Page 1 You are directed to make the following changes in the contract documents: PAY (TEM # � Cill' BI�D ITEM � QUANTI"fY J UNtT � tTEM DESCRiPTtON C Pri en't � UNt7 PRtCE I DeCosPer � City Cost � TO7AL 3346.3001 43' 95 LF 6" Trench Drain $104.00 $0.00 $9,880.00 $9,880.0 TOTAL UNIT 1: WATER IMPROVEMENTS 0.00 9 880.00 9 880,00 Asterisk (*) indicates New Pay Item Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER 1 Where ground water is flowing out of the valve stem guide at Station 26+15, Western Municipal Construction (WMC) will install a 6" Trench Drain and connect it to the existing storm drainage system at the intersection of Lancaster & Boswell. This will alleviate ground water from flowing up through the valve stem guide. This change order impacts City Cost Participation GMcivil Mid-Cities Logistics Owner, LLC Western Municipal Construction of Texas, LLC By: tr� Name: Ryan Spears =••• J=ft,;�wles '---11,HtMnz<::d S1gna1u1y By:� Name: Clint Wilson Title: Project Engineer Title: Title: Project Manager APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW -Water Department :Su&._ V � I',: .... CFW -Assistant City Manager CFW -Assistant City Attorney By: _ _ � _____________ By: Name: Suby Varughese Name: Title: Engineering Manager Title: RECOMMENDED: J&na��t(� � oanaBurghdoff{;;e<:£o1'.u3:Sn By: RichardttcCl'kken(llec1s,m�21:20csT) Dana Burghdoff Name: __ R_i ch_ar_d _M_cC_r_a _ck_e_n ________________ _ Assistant City Manager Title: Sr. Assistant City Attorney CFW -*Contract Compliance Manager ATTEST * Contract Compliance Manager (Project Manager): By: rt.� Name: Sandip Adhik ari Jannette S. Goodall Title: Sr Professional Engineer M&C Number: 23-1073 ---------- M&C Date Approved: _1_2 _ 11 _ 21 _ 2_0 _ 2 _ 3 ______ _ City Secretary By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. □There are NO City Funds associated with this Contract EIThere are City Funds associated with this Contract Revised: 12-17-2018 Page 3