HomeMy WebLinkAboutContract 60740-CO4PROJECT NAME:
CONTRACT:
CFA#
CITY PROJECT#
FID#
X#
CITY SECRETARY CONTRACT#
FILE#
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT PER
UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
Revised: 12-17-2018
DEVELOPER-AWARDED-PROJECT CHANGE ORDER
Buttercup Lane & Boswell Drive 16-lnch Water Main Rehabilitation
l{A) Water (B) Pavinq
CFA23-0166 I CITY PARTICIPATION:! YES
105037
30114-0200431-105037-E07685
X-27912
60740
N/A
Phone No: Russell Rogers
Sandip Adhikari Phone No: 817-392-8424
CONTRACT UNIT
WATER SEWER DRAINAGE
Developer Developer Developer
Cost City Cost Developer Cost City Cost Cost City Cost Cost
$98,221.29 $1,228,942.19 $0.00 $0.00 $0.00 $0.00 $0.00
$22,738.14 $40,290.65 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$120,959.43 $1,269,232.84 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $9,880.00 $0.00 $0.00 $0.00 $0.00 $0.00
$120,959.43 $1,279,112.84 $0.00 $0.00 $0.00 $0.00 $0.00
CSC No. 60740-(04
CHANGE
ORDER No:
PAVING STREET LIGHTS CONTRACT DAYS Developer
City Cost Cost City Cost
$322,315.48 $0.00 $0.00 120
$0.00 $0.00 $0.00 8
$0.00 $0.00 $0.00
$322,315.48 $0.00 $0.00 128
$0.00 $0.00 $0.00 1
$322,315.48 $0.00 $0.00 129
$1,400,072.27 $0.00 $0.00 $322,315.48 $0.00
Dev. Cost: $120,959.43 !city Cost: $1,601,428.32
$1,722,387.75
Page 1
You are directed to make the following changes in the contract documents:
PAY (TEM # � Cill' BI�D ITEM � QUANTI"fY J UNtT � tTEM DESCRiPTtON C Pri en't � UNt7 PRtCE I DeCosPer � City Cost � TO7AL
3346.3001 43' 95 LF 6" Trench Drain $104.00 $0.00 $9,880.00 $9,880.0
TOTAL UNIT 1: WATER IMPROVEMENTS 0.00 9 880.00 9 880,00
Asterisk (*) indicates New Pay Item
Revised: 12-17-2018 Page 2
REASONS FOR CHANGE ORDER
1 Where ground water is flowing out of the valve stem guide at Station 26+15, Western Municipal Construction (WMC) will install a 6" Trench Drain and connect it to the existing
storm drainage system at the intersection of Lancaster & Boswell. This will alleviate ground water from flowing up through the valve stem guide.
This change order impacts City Cost Participation
GMcivil Mid-Cities Logistics Owner, LLC Western Municipal Construction
of Texas, LLC
By: tr�
Name: Ryan Spears =••• J=ft,;�wles
'---11,HtMnz<::d S1gna1u1y
By:�
Name: Clint Wilson
Title: Project Engineer Title: Title: Project Manager
APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY:
CFW -Water Department
:Su&._ V � I',: ....
CFW -Assistant City Manager CFW -Assistant City Attorney
By:
_
_ � _____________ By:
Name: Suby Varughese Name:
Title: Engineering Manager Title:
RECOMMENDED:
J&na��t(� � oanaBurghdoff{;;e<:£o1'.u3:Sn By: RichardttcCl'kken(llec1s,m�21:20csT)
Dana Burghdoff Name: __ R_i ch_ar_d _M_cC_r_a _ck_e_n ________________ _
Assistant City Manager Title: Sr. Assistant City Attorney
CFW -*Contract Compliance Manager ATTEST * Contract Compliance Manager (Project Manager):
By: rt.�
Name: Sandip Adhik ari Jannette S. Goodall
Title: Sr Professional Engineer
M&C Number: 23-1073 ----------
M&C Date Approved: _1_2
_
11
_
21
_
2_0
_
2
_
3
______
_
City Secretary
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
□There are NO City Funds associated with this Contract
EIThere are City Funds associated with this Contract
Revised: 12-17-2018 Page 3