HomeMy WebLinkAboutContract 54136-R3CITY OF FORT WORTH THIRD RENEWAL OF AGREEMENT CSC No. 54136-R3 WHEREAS, the City of Fort Worth, ("City"), and Gannett Fleming, Inc. (Previously known as Dannenbaum Engineering Corporation), ("Contractor"), entered into that ce1iain ORIGINAL AGREEMENT (City Secretary #54136, M&C 20-0459) for the PROJECT generally described as: As-Built/Record Drawing Support; and WHEREAS, the ORIGINAL AGREEMENT may be renewed up to 3 times as provided by M&C 21-0384; and WHEREAS, the City of Fort W01ih, ("City"), and Gannett Fleming, Inc. (Previously known as Dannenbaum Engineering Corporation) ("Contractor"), entered into that certain FIRST RENEW AL (City Secretary# 54136-Rl, M&C 21-0384); WHEREAS, the City ofF01i Worth, ("City"), and Gannett Fleming, Inc. (Previously known as Dannenbaum Engineering Corporation) ("Contractor"), entered into that ce1iain SECOND RENEWAL (City Secretary# 54136-R2, M&C 23-0254); WHEREAS, The City and Contractor desire to renew the ORIGINAL AGREEMENT for an additional term at the same price and funding for said THIRD RENEW AL is available in the budget of the Water and Sewer Capital Projects Fund, as appropriated in Ordinance# 26453-09- 2023. NOW, THEREFORE, it is agreed by the City and Contractor as follows: Article I The Scope of Services as set forth in the ORIGINAL AGREEMENT has not changed. Article II The Contractor's compensation shall be in the amount up to $300,000.00. The Term of this renewal agreement shall be effective as of the effective date and shall remain active until the funds are expended or programmed. Article III There are no other changes to any other terms or condi.tions of the ORIGINAL AGREEMENT. Second Renewal of Agreement Shield Engineering Group, PLLC City Project No. I 03324 As-Built/Record Drawing Support City Secretary No. 54136 Page I of2 EXECUTED by each party's duly authorized representative and EFFECTIVE as of the date subscribed by the City's designated City Manager. City of Fort Worth Jesica McEachern Assistant City Manager DATE: 03/05/2025 APPROVAL RECOMMENDED: Chris Harder, P .E. Director, Water Department Gannett Fleming, Inc. (Previously lmown as Dannenbaum Engineering Corporation) Charles E. Thomas II Vice President DATE: 12 February 2025 APPROVED AS TO FORM AND LEGALITY: Douglas Black (Mar 4, 202514:40 CST) Douglas W. Black Sr. Assistant City Attorney Contract Compliance Manager M&C: (Auth. M&C) 21-0384; (Fund. M&C) 24-0675 Date: 08/13/2024 Form 1295 No.: 2020-630278 By signing I aclmowledge that I am the person responsible for the monitoring and administratio n of is contract, including ensuring all performance and reporting requirements. Lawrence Ham'lton, P.E. Project Manager ATTEST: �A A:o::0i,0 a Jannette S. Goodall City Secretary Second Renewal of Agreement Shield Engineering Group, PLLC City Project No. 103324 As-Built/Record Drawing Support City Secretary No. 54136 Page 2 of2 .L7 N � < N O X � Q m >( 3 D � m � A ""{ � � N � S � v w � � � � N N .a C N N rt En � W 0 G o � o 0 '� o � o = o "0 N � � � w � � n � � w � o 0 (D o rt o !D o •• o A A w � � � � A 0 0 � N N m m � N � w J W A rn � w � v � �;� < < � o � � � � ��% N ^' V V � � m � m � °� o O � N `� �' D w W W W n 0 0 �' o �ow o � � � a �� N N S 0 � "'{ N � fD N f) 1 0 7 D� � � � � 0 0 0 � C 0 0 � (p 0 o r* � 0 0 0 0 D D � O p, � 3 � � � � D� �, v�, p o m 0 0 � c � 0 0 � ^ N O O O � 0 0 a o �' �' 3 3 �I V O -Q W W C rn rn � N � � Q N (T O � � � � � n u, cn � 7 A A fD � m m p, 0 0 � H9 tn tn fD — � �' < m m O � W W C - W W N f�D rn rn '� a � � � C m m O ' . � m cWo � � N N w N � � W � d � N N � � w w n � IJ IJ (p � rn rn � N (P Ui (T �oo��o o '<> > .�33au� � � 0 � o c o"� �d . :il<,�. m � �. vi C � '� m ��3 � � o A 17 � J c0 � O W � O N N � O jp UNi A � N � J � � � X �q T�QfD 3 x� � m -• � - D o D O. 3 Q Q fD Q N 'm N N V1 N � 0 � v w 3 � Z iu � N O n ti n S 0 3 � � N � E .� a a � -ci o � no � �i f �. -� �n � � J O �� O � m � � N N N O � 6 y m � ' a N N � � � � a a a °c � 0 m O S m � � � m Z 3 � A rn N n 0 � C d � � c � 0 N � -o -v �� � o, o �• n N x� � O� .. � � � N O (n ` N m1 �� � W �T � y (D � n � o � a� 0 � C � �• � � rt C .�- - � 0 n � o = 7 � �d � � � to C) `D .-+ •'• � � iii � r-�- N � m � C � � � � Z p r n O 7� � __ ciNi 0 N F' C � � W � O v � ,.Z V � � W � O pp � n C p�p N � w � � � v � �, - m v � m n `-'• — °' O o � o � ' ~ — � J (/1 (N T 0 � J � N � � � .� � � � � N x X J �1 rn 0 N '< � � 0 m x Q m X � n � N O T A "'I 0 w � --i S N c � rt M 0 0 0 0 0 � � � fD � fD � w � fU � � � 'O o fD o rt o N o •• o � w N � N N � � A A m w � w w m I� w m m [�O � N N m � N m � o tv o � N rt � D (n m �, � � 0 � � � n o' � D� � 3 'm N � ' O C � 0 7 ry o �* � 0 D Z � C � 3a °' � � "� � D D � 3 fD O � � a 3 � ,-. 7 D� � O O m o C � 0�0�3 m 0 0 M 0 �' 3 3 w O 'O C rn � N �," a N 0 � 3 � � N � m r. � A fP �+ m Q, N 'D tq N v m �' < ia C O w � � m Q 7 � W � C m O � � � � N � � � � w � N d d WN � N � � m � � N < � T � � � 0 0�>> � �3 � a� � � � � O C p • °' � w w m��� � ' m o.�; n c � v ��� � � � � O A ZJJ � J t0 � O W � O N N � O ry No N � UNi A N A D (�J N 7. � � X Z1 3 D a a 'm � � 0 T --IQN X��� ' a � - �� _ o D � a m a m � N m m N � J J � � � n W V D ^ J m N � J W N oo � � c0 W N N cn m � '. m w O 3 N m J T .Z 0 � X m N ci 0 � a w � K Z w 3 m vC�T�Ci-� � � '7' � ° '� o 0 � cn n '� v � -n � � .. � a � N O c fD ,��, '� � 0.3 �xk �� m � � ' 7 • „ .. m � �Ao�oD2 w m m r.��i � N � (7� O � O N W � � N O �-y. � O \ � A � � � N O � � n. 7 rt ❑ T -i �v s1i � �� �' c cfl � N � � C � � Q � C7 0 � r--r O � � O � � � = O N j j N n ID C � � C � � �S " � � � _ � d � � � � � a � = .�". m � o � � � N � �. �. � .^. � � � > > S o a !^. .� v 3 � m � � � o � m v ry O 2 � � d N � _ � o < .. m m n � � � 1 a v o " h A m d N � g a 3 � mN o N � m m n F �D � � a � D � a � a A o � � �. � � o " m 0 � N n � N N O C I� � � � � � � S. � O � � n W O � � � 3 � < �p W m � v � � v � m O � � ii � — Ql � O 0 � F' — '� V °' "' o � � � � — N � � v1D, o o � � fi oi ? � X � N �I V � 0 � � � � "'I � N C � rt � 0 0 0 0 0 O � i�% � � n � � i�% � N n O � � � a o fD o rt o N o •• o � � N T � � (P N A A m m w w w rn � w rn m � � N w N m � � m � o � J O r} uN, fD o � D (n m � 0 0 � 0 fD C7 � � D� � 3 'm `� � 3 O C 7 ry o.+ � 0 D Z � c � � a IU � �� D D � � 7 C a � 3 r+ j � � O N N d C � 0 o fD ' m � O � 0 (� � D o , 3 3 W O '6 C rn � N �„ " a N � � � � n N � � rt � A fD .* �a "' v in m `� m �' < w C O w � �• m a 7 � y � C w O ' � • N � � 7 N rq' � W N � d � N d w W 7 =' N n - N fU � m �p � N 7 � � � � n O � � � � �3 � aN � o � �D m �� — o��A' ga w m � O � � � . N C ry � � � � � � � p p � N �" ' � n n a w � N N � O � O N N N A W N � J � X fD � 3 D a a 'm N N O O N 2 0 c 0 � N J � D n C � N m m A -n�pm x � �� . D � _ �� _ o D �a m a .. � N N w m N -a J J O l , � W J D ^ �w �;o N W < � m m m m u� m � f. m w O 3 � m 0 0 a 0 � x m N n O 3 � w 3 � Z d � fD � � � O � 0 � m m � -� �° cD� � ry � � �• ii vi O c fD ,-��. '� y N V � � �• � N c� i1: � fD T�,�,�,,D O m m � F N � o N N �• o N o � W NT � p � Y N � � � A � � � N O '1 � Q. � � '17 � � � 'a �• C (Q � N � rt c � � O � C� � � r-y� o � T o � � �' = o m � g ta (7 �o �--F K S�i O � " d � � � � d � � � p � c� � N a � '� » � m � � . �, � N � f �, � � � o -I S N � � O � o a !^. ,� 0 9 � N � � � o N � -`° � m N � ; � o � ^ m (i � � o l �' a c, � O � � w N � � a � � W o � � H a N � � � d< ' o n � D H a .� a p � � o d � � S ,� o " m 0 S N n � N � O C N � � � � < V � O W � n � � � � 3 � � m W � � � � � � m o � fD Cl �—� � o 0 � J - � m � J O � J - N G � l�n O o � '' f1 p� �' � X -{ A X N V J � N � m £ 3 3 � 0 _ — � O o D F _ � � � � Cify of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, June 8, 2021 REFERENCE NO.: **M&C 21-0384 LOG NAME: 60ASBUILTSUPPORTP1A1-DANNENBAUM SUBJECT: (ALL) Authorize Execution of Amendment No. 1 to a Professional Services Agreement with Dannenbaum Engineering Corporation n/k/a DE Corp to Provide for Three Renewal Terms, Authorize Execution of the First Renewal in the Amount of $300,000.00 for Water and Sewer As-Built and Record Drawing Project, Part 1 and Adopt Attached Appropriation Ordinance RECOMMENDATION: It is recommended that the City Council: 1. Authorize execution ofAmendment No. 1 to City Secretary Contract No. 54136, a professional services agreement with Dannenbaum Engineering Corporation n/k/a DE Corp for the As-Built and Record Drawing project, Part 1(City Project No. 100258) to provide for up to three renewals of the contract; 2. Authorize execution of the first renewal of City Secretary Contrat No. 54136 in the amout of $300,000.00; and 3. Adopt the attached appropriation ordinance increasing receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $320,000.00, transferred from available funds within the Water and Sewer Fund, for the purpose of funding the As-Built/Record Drawing Support, Part 1 project (City Project No. 100258). DISCUSSION: On June 23, 2020, Mayor and Council Communication (M&C 20-0459), the City Council authorized a professional services agreement with Dannenbaum Engineering Corpora#ion n/k/a DE Corp in the amount of $300,000.00 for Water and SewerAs-Built andRecord Drawing project, Part 1. The agreement provided for the preparation of as-built record drawings for approximately 150 plan sets of water and sanitary sewer drawings for developer and old capital impravements projects. As-built record drawings were previously prepared by the Transportation and Public Works Department who no longer has the staff for this work. As-built/record drawing preparation is now included in the scope of services for Water Department design engineering agreements, This first effort was successful and staff desires for it to continue. This amendment and the first renewal will allow for the preparation of an additional 150 plan sets of as- built record drawings out of the current backlog of drawings. In addition to the contract amount, $20,000.00 (Sewer: $10,000.00; Water: $10,000.00) is required for project management. This project will have no impact on the Water Department's operating budget when completed. Appropriations for the As-Built and Record Drawing project are as depicted below: Fund Existing Additional Project Appropriations Appropriations Totai* W&S Capital Projects - Fund $320,000.00 $320,000.00 $640,000.00 56002 Project Total $320,000.00 $320,000.00 $640,000.00 *Numbers rounded for presenta#ion purposes. Business Equity: Dannenbaum Engineering Corporation n/k/a DE Corp agrees to maintain its initial SBE commitment of 10 percent that it made on the original agreement and extend and maintain that same SBE commitment of 10 percent to this first amendment. Therefore Dannenbaum Engineering Corporation n/k/a DE Corp remains in compliance with the City's BDE Ordinance and attests to its commitment by its signature on the Acceptance of Previous SBE Commitment form executed by an authorized representative of its company. The project is located in ALL COUNCIL DISTRICTS. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are available in the current operating budget in the Water & Sewer Fund, and upon approval of the above recommendations and adoption of attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the As built and Record Drawing project to support the approval of the above recommendations and execution of the amendment to the engineering agreement. Prior to any expenditure being incurred, the Water Department is responsible to validate the availability of funds. FUND IDENTIFIERS (FIDs): TO Fund Department cc ID FROM Fund Department cc ID unt Project Progra ID unt Project Progra ID Activit Bud et Reference # mou Y J Year (Chartfield 2) Activity Budget Reference # mou Year (Chartfield 2) Dana BurghdofF (8018) Chris Harder (5020) . Lawrence Hamilton (2626) CERTIFICATIONS: Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: ATTACHMENTS 1. 494902 F'orm 1295 Certificate 100754279,pdf (CFW Internal) • 2. 60ASBUILTSUPPORTP1A1-DANNENBAUM FID Table (WCF 03.29.21).xlsx (CFW Internal) 3. 60ASBUILTSUPPORTP1A1-DANNENBAUM funds avail.docx (cFW Internal) 4. 60ASBUILTSUPPORTP1A1-DANNENBAUM SAM.pdf (cFW Internal) 5.60ASBUILTSUPPORTP1A1-DANNENBAUM 56002 A021(r2)_(1)r.docx (Publtc) 6. APCF 54136 for W&S As Built Record Support Part 1 A1.pdf (cFw Internaq � 0 a � m � a � � ro 0 � a b � � � H � � City of Fort Worth, Texas Mayor and Council Communication DATE: Tuesday, August 13, 2024 REFERENCE NO.: **M&C 24-0675 I�iZH�1a1Jd�.1 [Y191�[.`l�l�Zi7��'7i1C�.�J\�I�I��I7l9�1 SUBJECT: (ALL) Adopt Appropriation Ordinance in the Amount of $320,000.00 to Fund the As-BuilURecord Drawing Support Project Contract Renewal and Effect a Portion of Water's Contribution to the Fiscal Years 2024- 2028 Capital Improvement Program RECOMMENDATION: It is recommended that the City Council adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the Water and Sewer Capital Projects Fund in the amount of $320,000.00, transferred from available PayGo funds within the Water and Sewer Fund, for the purpose of funding the As-Built/Record Drawing Support project (City Project No.100258) Part 1 and effect a portion of Water's contribution to the Fiscal Years 2024-202II Capital Improvements Program. DISCUSSION: On June 23, 2020, Mayor and Council Communication (M&C) 20-0459, the City Council authorized a professional services agreement with Dannenbaum Engineering Corporation n/k/a DE Corp (City Secretary No. 54136) in the amount of $300,000.00 for Water and Sewer As-Built and Record Drawing project, Part 1. The agreement provides for the preparation of as-built record drawings for approximately 150 plan sets of water and sanitary sewer drawings for developer and old capital improvements projects. As-built/record drawing preparation is now included in the scope of services for Water Department design engineering agreements. The agreement was subsequently revised by Amendment No. 1 and Renewal No.1 authorized by M&C 21-0384 on June S, 2021 that provided for up to three renewals of the contract and allowed for the preparation of an additional 150 plan sets of as-built record drawings out of the current backlog, and Renewal No. 2 authorized by M&C 23-0254 on April 11, 2023 and allowed for the preparation of an additional 180 plans of as-built record drawings out of the current backlog. In addition to the contract amount, $20,000.00 (Water: $10,000.00; Sewer: $10,000.00) is required for project management. This project will have no impact on the Water DepartmenYs operating budget when completed. It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year, instead of within the annual budget ordinance, as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of the Water's portion of the City of Fort Worth's Fiscal Years 2024-2028 Capital Improvement Program, as follows: 60ASBUILTSUPPORTP1 R3-DANNENBAUM Capital Revised Fund Project FY2024 Authority Budget Change FY2024 Name Name CIP Appropriations (IncreaselDecrease) gud et 9 Fund 100258 56002 - — As- W&S Bndt $0.00 This M&C $320,000.00 $320,000.00 Capital Record Projects Drawing Funding is budgeted in the Transfer to Water/Sewer account of the Sewer operating budget for both the Water and Sewer portion of this project for the purpose of funding the As-Built and Record Drawing project within the Water & Sewer Capital Projects Fund. FY2024 — Water PAYGO Appropriations per City Ordinance 26453-09-2023 FY2024 Additions/ FY2024 Fund/Account Name Appropriations YTD M&C Remaining Reductions Balance 56001- Transfer to $g4,505,035.00 $0.00 $70,529,565.36 $13,975,469.64 5956001 Water/Sewer Note: there may be other pending actions or recently approved actions that are not reflected in the table due to timing. Appropriations for the As-Built and Record Drawing project are depicted below: �Fund Existing Additional project Total'` Appropriations Appropriations W&S Capital Projects - $960,000.00 $320,000.00 $1,280,000.00 Fund 56002 Project Total $960,000.00 $320,000.00 $1,280,000.00 `Numbers rounded for presentation purposes, The project is located in ALL COUNCIL DISTRICTS. FISCAL INFORMATION / CERTIFICATION: The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and upon approval of the above recommendation and adoption of the attached appropriation ordinance, funds will be available in the W&S Capital Projects Fund for the As built and Record Drawing project. Prior to any expenditure being incurred, the Water Department has the responsibility to validate the availability of funds. FUND IDENTIFIERS (FIDs): Fund Department Accoun Project Program ctivity Budget Reference # mou ID ID Year (Chartfield 21 FROM Fund Department Accoun Project Program ctivity Budget Reference # moun ID ID Year (Chartfield 2) CERTIFICATIONS: Submitted for City Manager's Office by_ Dana Burghdoff (8018) Originating Department Head: Chris Harder (5020) Additional Information Contact: Lawrence Hamilton (2626) ATTACHMENTS 1. 60ASBUILTSUPPORTP1R3-DANNENBAUM 2.docx (CFW Internal) 2. 60ASBUILTSUPPORTPIR3-DANNENBAUM FID Table (WCF 12.27.23).xlsx (CFW Internal) 3. Entitvinformation Dannenbaum Engineering Corporation.pdf (cFw Internal) 4.ORD.APP 60ASBUILTSUPPORTP1R3-DANNENBAUM 56002 A024(r1).docx (Public) 5. PBS CPN 100258.pdf (CFW Internal)