HomeMy WebLinkAboutContract 61189-A3City of Fort Worth, Texas Eagle Mountain Water Treatment Plant Expansion
Prof Services Agreement Amendment Template CPN 105176
Revision Date: 12/08/2023
Page 1 of 2
AMENDMENT No.3
TO CITY SECRETARY CONTRACT No. 61189
WHEREAS, the City of Fort Worth (CITY) and CDM Smith Inc., (ENGINEER)
made and entered into City Secretary Contract No. 61189, (the CONTRACT)
which was authorized by M&C No. 24-0172 on the 27th day of February, 2024
in the amount of $3,695,990.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in
the amount of $0.00 administratively authorized on July 16th, 2024 and
Amendment No. 2 in the amount of $11,149,078.00 authorized by M&C 24-0729
on 7th, 202 ; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Eagle Mountain Water Treatment Plant Expansion, CPN 105176; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work at no additional fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $0.00, (This amendment provides for substitution of work
task at no additional cost).
2.
There is no fee increase to Article II of the CONTRACT.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Eagle Mountain Water Treatment Plant Expansion
Prof Services Agreement Amendment Template CPN 105176
Revision Date: 12/08/2023
Page 2 of 2
EXECUTED and EFFECTIVE as of the date subscribed by the City’s designated
Assistant City Manager.
APPROVED:ENGINEER
City of Fort Worth CDM Smith Inc.
Jesica McEachern Jessica L. Veach, P.E.
Assistant City Manager Associate
DATE: _______________DATE: _________________
ATTEST:
Jannette S. Goodall
City Secretary
APPROVAL RECOMMENDED:
Christopher Harder, P.E.
Director,Water Department
Contract Compliance Manager:
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
_______________________________
James McDonald, P.E.
Assistant Director
M&C No.#: ______N/A_________
APPROVED AS TO FORM AND LEGALITY:
M&C Date: _______N/A_________
Douglas W. Black Form 1295: ______N/A_________
Sr. Assistant City Attorney
CDM
Sm�th
December 19, 2024
Mr. James McDonald, P.E.
Project Manager
City of Fort Worth Water Department
1000 Throckmorton Street
Fort Worth, TX 76102
Subject: Eagle Mountain WaterTreatment Plant
Amendment No. 3
CDM Smith Project No.: 0515-294565
City Secretary No. 61189 - City Project No. 105176
Dear Mr. McDonald:
This letter is in reference to a contract between Consultant (CDM Smith Inc.) and the City of Fort Worth
(the City) dated February 27, 2024 referred to herein as the "Contract." CDM Smith is pleased to submit
our Amendment No. 3 for the City's Eagle Mountain Water Treatment Plant Phase IV Expansion —
Project No. 105176.
CDM Smith is eliminating the following services and as directed by the City. It should be noted that
some time in coordination was billed to this task before removal, therefor there are some charges to
this task:
Task 4.3 - Electrical Pre-Procurement — Added in Amendment 2.
Large electrical equipment across the country has a lengthy delivery schedule following receipt
of a purchase order that can impact construction schedules. To reduce the overall construction
schedule risk, the Engineer will prepare pre-procurement documents for long-lead electrical
gear, specifically transformers and switchgear.
Engineer will prepare front end technical specifications and associated drawings and figures
necessary for the pre-procurement of electrical gear to be provided for the EMWTP expansion
design. The proposal documents will include requirements for capital costs and warranty
provisions.
Owner will submit proposal documents to qualified equipment manufacturers. Engineer will
answer questions from the electrical equipment manufacturers, prepare required addenda, and
attend proposal opening.
Engineer will evaluate the received proposals with Owner and provide a recommendation of
award for the pre-selection equipment.
CDM Smith is also adding the following services to Task 9.2 as directed by the City:
Task 9.2 Survey and Subsurface Utility Engineering Services
75 State Street, Suite 701, Boston, Massachusetts 02109 � tel: 617 452-6000
CDM
Smith
Mr. McDonald
December 19, 2024
Page 2
Task 9.2.3 Subsurface Utility Engineering Services — Added in Addenda 3.
This task includes obtaining SUE work for up to twenty (20) test holes on site to inform the site-
civil design for critical crossings and connections on the Eagle Mountain WTP site. Data will be
included in the design drawings as part of the original agreement and made available to
potential Contractors during bidding and construction.
Budget Modifications
The elimination of scope and budget from Task 4.3 is being moved to the new Task 9.2.3 to be used to
expedite the Environmental Permitting and TWDB Report Documents to aid the City in maintaining the
project schedule. See budget modification details in Table 1 below:
Table 1— Task Budget Revision Summary Table:
Original Amendment Budget
Task Amount No.3 Revision
Task 4.3 - Electrical Pre-Procurement $111,418 ($105,847) $5,571
Task 9.2 — Survey and SUE Services $35,600 $105,847 $141,447
Total $147,018 $0.00 $147,018
Table 2 below summarizes our revisions to the total contract.
Table 2 — Total Contract:
Description Amount
Original Contract $3,695,990.00
Amendment No. 1 $0.00
Amendment No. 2 $11,149,078.00
Amendment No. 3 $0.00
Modified Contract $14,845,068.00
This change does impact the MWBE percentages for this project.
75 State Street, Suite 701, Boston, Massachusetts 02109 � tel: 617 452-6000
CDM
Smith
Mr. McDonald
December 19, 2024
Page 3
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Sincerely,
�_�� 9�
Sarah A. Stewart, P.E.
Vice President / Project Manager
CDM Smith Inc.
Copy to: Jessi Veach, P.E., CDM Smith
Tony Sholola, P.E. City of Fort Worth
75 State Street, Suite 701, Boston, Massachusetts 02109 � tel: 617 452-6000