HomeMy WebLinkAboutContract 61577-AR2foRTWORTH. City of Fort Worth
Construction Allowance Request
Project Namel Park Vista Boulevard - Keller Haslet Road to Timberland Boulevard
ClientProject#(s) 103281
City Sec # 61577
�-------------------------------------�
Des:�;�:� Park Vista Boulevard - Keller Haslet to Timberland -Roadway, Drainage and Illumination Improvements
ContractoriMcClendon Construction Company, Inc.
City Project Mgr.I Mitch Aiton
UNIT or DEPT
Original Contract Amount Extras to Date Credits to Date Current Contract Amount !Amount of Proposed AllocationOriginal Allowance Available to AllocationAllowance Funds Previously Allocated Revised Allowance Balance
Unit 1-Paving
$3,309 611.75
$3 309 611.75 $171 585.00$300,000.00$25,589.27$102 825.73
CA#�l ___ 2 __ � Datel 2/18/2025
Unit 11-Stonn -
$572,305.00
$572 305.00$0.00 $0.00
$0.00 $0.00
City Inspector! Steve Johnson
-Totals
$3 881 916.75
$3 881 916.75$0.00 1171 585.003300 000.00 525 589.27$0.00 3102 825.73
JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL:
The plans and contract for 103281 Park Vista are adding the two Southbound Lanes while preserving the existing NorthBound Lanes. As part of
preserving the existing Northbound lanes, the plans included replacing failing concrete panels in the project limits. Staff met with Inspection Staff,
BGE Engineering and McClendon Construction and selected concrete panels that were sinking due to failing subgrade. The contract included bid
item 22 Cone Pavement Repair, Arterial however the plans indicated an 11" Concrete pavement depth when existing concrete panels were 8"
Concrete. City Pavement Repair team recommended the standard practice of replacing with a miniumum 9" Cone panel for any existing panels
less than 9" of depth. Mcclendon proposed a revised price of $115/SY for 9" Cone repair to replace the existing $140/SY for 11" Cone Repair
which will not be used in the contract. Contract 59301 for Street Paving Improvements included Cone Paving Repair for $129/SY. Staff deems
the proposed price reasonable. This construction allowance will authorize the overrun of existing item 5 -Remove Cone Pvmt and Item 23 -8"
Flexible Base as well.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Com n Name
McClendon Construction Company, Inc.
lnsll8Clornnsll8Clion Supervisor
pwwJo�,-,("-121,20l515.'0SCST)
Program Manager
Ra,dL,l"J ,e,_
Assistant Director (Deotl
&bi<4:t me&eof Pob!dtL-dl(ta•<1,:!025lt:29Q'ry
Assistant Citv Attorney ...... -Jlo•-�,..,.,,,m22:o,=i
ATTEST:
FA�
Jannette Gooda ll, City Secretary
Contractor Name Contractor s· nature
Justin Blair
Date Project and Contract Compliance ManaQer
Feb 21, 2025 Ali/J.. di/�
Date Senior Capital Project Officer
Feb 21, 2025 St, (4. .. ��(Fot:,2,0,2025117'A9CST)
Date Director, Contractill!I Deoartment (Deotl
Mar4,2025 �
Date Assistant Citv Manager
Mar5,2025 �
Construction Allowance SUMMARY
Page 1 of 4
Date
Feb 21, 2025
Date
Feb 21, 2025
Date
Feb 24, 2025
Date
Mar 4, 2025
Date
Mar 10, 2025
61577-AR2
FORT WORTH City of Fort Worth
� Construction Allowance Additions
Project Name Park Vista Boulevard - Keller Haslet Road to Timberland Boulevard ity Sec #�
Client Project # 103281
Contractor McClendon Construction Company, Inc. PM Mitch Aiton Inspector Steve Johnson
Construction Allowance Submittal # 0 ate �
ADDITIONS
Construction Allowance Additions
Page 2 of 4
FORT WORTH:, City of Fort Worth
""'�� Construction Allowance Value
Project Name Park Vista Boulevard - Keller Haslet Road to Timberland Boulevard City Sec #�
Client Project # 103281
Contractor McClendon Construction Company, Inc. PM Mitch Aiton Inspector Steve Johnson
Construction Allowance Submittal # � Date �
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
Unit 1
Item 70 9999.0000 Construction Allowance 0.571950 LS $300,000.00 $171,585.00
Construction Allowance Value
3of4
MISBE for this Construction Allowance Request
M/SBE Sub I Tvae of Service I Amount for this CAR
Total � $0.00
Previous Construction Allowance Requests
CAR # DATE AMOUNT
1 11/6/2024 $25,589.27
Total $25,589.27
Construction Allowance MSBE Data
Page 4 of 4
Park Vista - Keller Haslet to Timberland
BJ Blair Project Manager
Rustic Timbers Irrigation Repair
•• •
NO CHANGE
INCREASE IN COST $ 171,585.00
DECREASE IN COST
2.0 2
� ' '�
61577 McClendon Construction Company
McClendon Const 817-829-0251 O1 /22/25
NO CHANGE
INCREASE IN TIME
DECREASE IN TIME
# of Days =
# of Days =
McClendon would like to meet to confirm panels to repair on Park Vista.
Met with McClendon and City Inspection Staff 1/23/2025 to select panels.
Mitch Aiton Sr Professional Engineer 682-715-9424 Ol /22/25
Replace panels with 9" Conc Panel Repair on 8" of new Flex Base
Bid Item 22 Conc Pvmt Repair, Arterial was bid for 1 1" Conc
Repair at $140/SY. McClendon proposed to do the 9" Conc
Repair at $1 15/SY. Staff deems the proposed price reasonable.
No Schedule Impact
Ol/31/25
Mitch Aiton, Sr Professional Engineer ��3� `' �_ Ol /31 /25
� �E�e
_ ��
(
� ii
�
r
�4
"�
�
� �,
C
Y U
C �
� O
O �
C
N _
nm
E � a�
m� �
X C (6
W (6 �
1i
J �
I + S �
`� '+
� +� j ��
f�
�
}'t � ..
�
- .-.. �� �
� _" _�
�
� 'i
1'''
N
I � U �
Y �
� O
�U �
o �
� �
O_ @
/��
�
�
6
d -
.. N
..,.. �" ...... p�.. .....
3noa�is3navu
� � N i
(6 -p C .
X � @
w ma
�-, -. ,
� - �, � �
` � � � v � . o r,
:� :d , . �
t �ty l' '
z
A `� � n �
� .
�.-� � i:• �
.. .�, � , . � .
�
- I .. u. . �.i� I .— 1,. 1� � i . PR��n�, _� . . i . . . . ' . � � - OAK IEAF
n.. .
I I I
— . . . . � L/ .___
L:,� ., _... . _
_ 1� �
` � I' �IIII� � t I I I I I_
....- � _1�— L� ....3noa �rvirvanow � Q = _
f � ,
-- � � a
-------
- �� I I'I � � - - °
\__
— -� -
,
�s st -- - � —
a � �� .s .e� o =� �o�
�= a�� ,� �s ��� �� �33 a=� ,o , 33�
J 9Z 1 3H5 92l f0 iZ 133H5 L� JO
j0 9Z 133i� ��
02� i0 52 3N5 8Li 0
�� I I I i I I I I I I e�� i0 02 133H5 I BZl JO 5l I3iM
y> � SW21 itlWOV31 I I
�� _ _ � +
� � o���d, � �— _ �
— � � , ��
' � �� � � ° N3i isaa -� � �I ',, � '
, � Hlvd3Nois � — o � o w � �
�
� � r
....y:-�' �` �_ — I o g
� — — � _ — 3 � �m —
V�NtlO w
�-� - � �� �i� — � �
� '
-'� I� � I I � I� I I I I � � �_ — _ �
�� � �
H�'�pS�� � a �
w
�I �
� N —
�I � I
I �
C C i �_
l
h Y O � �
�� � ' � @ � I` �
`' . T ..... � N
J a
� W � LS7.L
�' � � C Q
`. 'i :—
%� ' - ' � --------- i li �'
r
_I'..-.
�
��,,_�I�'��� 1
�
,
� �W ��_JJ � I_ � I I l�l
° �- � I- -!
II W � i�saoa I I
� � — � � — �— _ ----/ � , — �
�
a
� �� �
� � �- — _ �� � �o�aa��vwaio ���,
_
� � I �� _ � � �
I�
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE:Park Vista CA #2
M&C: N/A CPN: 103281 CSO: 61577 DOC#: N/A
Date: 2/20/2024
To: Name Department Initials Date Out
1. Jessica Rodriguez TPW - Review
2. Mitch Aiton TPW - Signature
3. Justin Blair
McClendon - Signature
4. Steve Johnson (Inspector) TPW – Signature
5. Raul Lopez TPW - Signature
6. Lissette Acevedo TPW – Signature
7. Patricia Wadsack TPW – Signature
8. Lauren Prieur TPW – Signature
9. Doug Black Legal – Signature
10. Jesica McEachern CMO – Signature
11. Jannette Goodall CSO - Signature
12. TPW Contracts
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER’S SIGNATURE: All documents received from any and all
City Departments requesting City Manager’s signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: YES No
RUSH:YES No SAME DAY:YES No NEXT DAY:YES No
ROUTING TO CSO: YES No
Action Required: Attach Signature, Initial and Notary Tabs
As Requested
For Your Information
Signature/Routing and or Recording
Comment
File
Return To: Please notify TPWContracts@fortworthtexas.gov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!