Loading...
HomeMy WebLinkAboutIR 7868 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7868 October 11, 1994 ATw To the Mayor and Members of the City Council A,x /\ titiQp XAS Subject: 1873 THIRD UPDATE ON THE ACTION PLAN TO ADDRESS CHRONIC SANITARY SEWER OVERFLOW AREAS (E.P.A. MANDATES) On March 23, 1993 (M&C G-10099), the City Council approved the supplemental appropriation of $10,000,000.00 from the Water & Sewer Fund reserve into a Sewer Capital Projects Fund, in order to address remediate action required by the Environmental Protection Agency administrative orders. Specifically, the remediate action is focused on recurring overflows and backups from "fully depreciated" facilities. A preliminary list (by Council District) was presented to the City Council on March 8, 1993, in conjunction with Informal Report No. 7698. Informal Reports No. 7758 (September 14, 1993), and No. 7807 (March 22, 1994), provided an update on the status of this action plan. Since March 1, 1993, 27 projects have been added to the original 109, for a total of 136 projects, all of which have been acted upon: 32-Completed 6-Under Construction by City forces 2-Design completed for construction by City forces 19-To be included in the next Trenchless technologies contract 54-Awarded to engineering consultants 13-Deleted following detailed evaluation and maintenance 10-Deleted following-inclusion-in-SSES/Contract work funded-by other sources The 54 projects awarded to-consultants were combined into 16 consultant contracts: Contract Preliminary Review Final Review Waiting Easements Contract 20A 8-18-94 0 of 80 acquired Contract 20B Complete Complete 30 of 59 acquired Contract 20C Complete Complete 20 of 60 acquired Contract 20D Complete Complete. 20 of 78 acquired Contract 20E Complete Complete RR permit in M&C process Contract 20F Complete Complete 6 of 14 acquired Contract 21A Complete Complete 0 of 1 acquired Contract 21B Complete Complete All acquired- advertised 9-8-94 Contract 21C Complete Complete 20 of 80 acquired Contract 21D Complete 10-04-94 25 of 60 acquired Contract 21E 10-04-94 0 of 6 acquired Contract 21F Unknown ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7868 GORTER To the Mayor and Members of the City Council October 11, 1994 tiqR �; 1= Page 2 Subject: 's" THIRD UPDATE ON THE ACTION PLAN TO ADDRESS CHRONIC SANITARY SEWER OVERFLOW AREAS (E.P.A. MANDATES) XXI (L-1881) Complete Complete 0 of 7 acquired XXII (Dist. 7&8) Complete Complete 30 of 107 acquired XXIV (M-205m M-235) Complete Complete 0 of 100 acquired XLHI (L-1857) Not awarded In summary, of the 16 contracts involving one or more of the $10 million fund projects: 11-Design complete and waiting for easement acquisition 4-Final design review should be scheduled before Nov. 15, 1994. 1-Project reassigned to contract; not awarded to date The goal of establishing this $10 million fund was to respond quickly (within three years) to severe backups experienced by customers. Half the time period has passed and 25% of the projects are actually completed. Slightly over 50% have'been awafded to consultants for design and the design phase is on schedule. However, some delays may occur due to the problems of obtaining easements. The Real Property Management Division is in the process of obtaining outside contracts for easement acquisition services. A brief financial review reveals a balance of$6,342,963 in the fund: Initial appropriation $10,000,000.00 Expenditures 2,418,639.00 Encumbrances (design cost) 1,238,398.00 Balance $ 6,342,963.00 Estimated construction costs for the remaining trenches projects and City constructed projects are $1,832,650, leaving an estimated balance of $4,510,313. It is estimated that construction costs for the consultant-designed projects will be over $5,000,000. A more detailed status report is attached. The staff 11 continue to provide periodic reports to the City Council on this project fund. Bob Terre 1 City Manager ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS- ATTACHMENT A COUNCIL DISTRICT 2 STATUS LATERAL MAIN ADDRESS ACTIVITY METHOD LINEAR ESTIMATED ESTIMATED ESTIMATED REQUIRED FEET DOLLARS BEGIN COMPLETE CONSTRUCTION CONSTRUCTION •C L-2354 2000 Bluebird Ave. Ex. 6"-replace 8" Pipe 2,436 240,706 2-14-94 3-94 Bursting "•C L-1825 700 N. Chandler Ex. 8"-replace Pipe 1,593 126,772 @ Race Street w/8" Bursting .*C M-181$ 2000 N. Chandler Ex. 10"-repl. Open Cut 3,858 379,264 @ Springdale w/12" `"C L-4690 4800Jacksboro Ex. 6"-repl. w/8" Open Cut 3,067 205,912 Hwy. ""C L-1627 Macie Ave. Ex. 8"-repl. w/8" Open Cut 491 @ NW 30th ••C M-221 Rock Island Ex. 6"-repl. w/8" Open Cut 420 @ Sansom Park "C L-2741 3300 Hampton Ex. 6"-repl. w/8" Open Cut 700 126,000 11-94 1-95 @ Long Ave. "'C M-8 1713 Lagonda Ex. 6"-repl. w/8" Open Cut 0 L-694 1713Lagonda Ex. 6"-repl. w/8" Open Cut 1,050 "C L-681 1713 Lagonda Ex. 6"-repl. w/8" Open Cut 770 71,800 •'C L-1954 3412 N. Terry Ex. 6"-repl. w/8" Open Cut 1-,058- •'C L-1955 3412 N. Terry Ex. 6"-repl. w/8" Open Cut 162 "C L-3959 3206 Schwartz Ex. 6"-repl. w/8" Open Cut 886 87,728 } f 1±♦l��� 0't���ar��np Cam;��'����` ��f,, �� Zjt fi,fl"�'1 "C M-127 12530 Honeysuckle Ex. 8"-repl. Pipe 2,863 170,042 W/10" Bursting •"C L-1713 2530 Honeysuckle Ex. 6"-repl. w/8" Pipe 1,306 134,458 Bursting •'C M-6/M-8 1709 Homan Ex. 6"-repl. w/8" Open Cut 3,000 543,000 "A M-145 2000 Adams Replace 8" Open Cut 1,867 79,240 "A L-1792 2324 Aster Repl. 6" w/8' Pipe 636 54,060 10-94 2-95 Bursting '" r r « t�64 � l$1taJ t't Fiep1 6"wx/8 F'�Pp 6$ 70 687 6 94 6 94 A. .. ..: M 313t�d:N�W� t t� iepl ttt IrlstuFdtt>rt By City Forces •" Referred to DOE C = Current A ded elated 151 Completed Projects ATTACHMENT A COUNCIL DISTRICT 3 STATUS LATERAL MAIN ADDRESS ACTIVITY METHOD LINEAR ESTIMATED ESTIMATED ESTIMATED REQUIRED FEET DOLLARS BEGIN COMPLETE CONSTRUCTION CONSTRUCTION •`C M-205 3400 Slade Ex. 6"&8"-repl. Open Cut 2,442 @ Hwy 80 W w/8" ••C M-235 3400 Slade Ex. 8"-repl. w/8" Insituform 1,116 @ Hwy 280 W w,C ��5�� 31�2�Shit ��y�"*-t•�ptif yx��t� 1���a �$S . �1 x,384 ,i1959Of Pplitamits�ydx 8°'rpMn,>;u ,47 •C L-3253 4100 Trail Lake Ex..B"-re I. w/ Open Cut .818 67,810 6-94 8-13-94 •C M-303 9100 Chamita Ex. 10"-repl. . Open Cut 3,994 181,000 9-94 12-94 w/12" •C L-5715 4753 W. Selkirk Ex. 6"-repl. w/8" Pipe 2,041 173,485 10-94 2-95 Bursting •C L-5039 3400 Westfield Ex. 6"-repl. w/8" Pipe 1,590 135,150 10-94 2-95 Bursting `• 48lVeatil! ..,. .....,., tePl . '... ,...,.. tnfisrrn .;:,.?L1 .r. 93.T ... 7 1C#�J .. ..,. ... ..,.23A •A L-3133 4367 Marks Place Repl. Existing 6" Pipe 5,423 W/8" Bursting A L-3358 4900 Fairfax Repl. Existing 6" Pipe 2,100 342,250 w/8" Bursting ^:r`:^+%•; r M4C141 V ats�.R14i� a� i ,.tom fi ..' iuca�'A41 ..f.,. , 4r�vwaf. ., &" 00,. •A L-4888 4600 Inwood Repl. 6" w/8" Pipe 1,265 107,525 10-94 2-95 Bursting ;374 �?crxh �11s,..: Re{51:, cisf�n ,... :... lnscttfarrn 688 ]42;1x4 4 94 94 •C L-5715 4753 W. Selkirk Ex. 6" repl. w/8" Open Cut see portion of 10-94 2-95 above above project • By City Forces Referred to DOE C = Current A = Added = Deleted 0 = Completed Projects ATTACHMENT A COUNCIL DISTRICT 4 STATUS LATERAL MAIN ADDRESS ACTIVITY METHOD LINEAR ESTIMATED ESTIMATED ESTIMATED REQUIRED FEET DOLLARS BEGIN COMPLETE CONSTRUCTION CONSTRUCTION 41 **C L-1667 4000 Medford Ct. Ex. 6"-repl. w/8" Pipe 1,461 Stratford Park Bursting ••C M-126 2200 Watson Rd. Ex. 8"-repl. w/ Open Cut 8501 @ Meadowbrook •*C L-4592 1704 Menser Ct. Ex. 6"-repl. w/8" Open Cut 1,409 OA M-226 5200 Brentwood Stair Rapt. Exist. Insituform 368 31,280 10-94 11-94 7' .......... By City Forces Referred to DOE C = Current A = Added = Deleted Completed Projects ATTACHMENT A COUNCIL DISTRICT 5 STATUS LATERAL MAIN ADDRESS ACTIVITY METHOD LINEARJ ESTIMATED ESTIMATED ESTIMATED REQUIRED FEET DOLLARS BEGIN COMPLETE CONSTRUCTION CONSTRUCTION -.0-1-4 . ..... .... 10 f, NW: ...... ,.,0 .. 6,14. '0 ....... ..... .. ... WC M-126 SE of S Edgewood Terr. Ex. 1 0"-repl. Open Cut 1,380 81,000 9-94 10-94 @ 4700 Panola w/12" ••C L-2989 3120 Milam @ Church Ex. 6"-repl, w/8" Pipe 2,553 230,076 11-94 1-95 Bursting/ Open Cut -,w :X `x . .......... p ., 6 •C L-1595 4000 Hawlet Ex. 6"-repl. w/8" Pipe 919 78,115 10-94 2-95 Bursting •C L-1618 4000 Hawlet Ex. 6"-repl. w/8" Pipe 172 14,620 10-94 2-95 Bursting "—S L-1556 2.917 Bideker Ex. 6"-repl. w/8" Pipe 1,814 116,668 Bursting .0 L-3034 2813 Hunter Ex. 6"-repl. w/8" Pipe 1,146 97,410 10-94 2-95 Bursting 777 Ph `A M-126 4600 Pencils Ex. 10"rep I. Pipe Burst 274 26,77'0 9-94 9-94 w/1 2" By City Forces Referred to DOE C = Current A = Added = Deleted Completed Projects ATTACHMENT A COUNCIL DISTRICT 6 STATUS LATERAL MAIN ADDRESS ACTIVITY METHOD LINEAR ESTIMATED ESTIMATED ESTIMATED REQUIRED FEET DOLLARS BEGIN COMPLETE CONSTRUCTION CONSTRUCTION **C L-5461 6212/5216 Morley Ex. 6"-repl. w/8" Pipe Burst 593 126,195 *•C L4428 5212/5216 Morley Ex. 6"-repl. w/8" Pipe Burst 909 148,715 .0 L-6996 2808 Ladona Ex. 6"-repl. w/8" Pipe 1,000 85,000 10-94 2-95 @ McCart Bursting wrC L-5992 3416 Wharton Ex. 6"-repl. w/8" Pipe 2,919 Bursting By City Forces Referred to DOE C = Current A = Added = Deleted Completed Projects ATTACHMENT A COUNCIL DISTRICT 7 STATUS LATERAL MAIN ADDRESS ACTIVITY METHOD LINEAR ESTIMATED ESTIMATED ESTIMATED REQUIRED FEET DOLLARS BEGIN COMPLETE CONSTRUCTION CONSTRUCTION *.0 M-156 3400 Wellesley Ex. 10"/1 2"-repl. Open Cut/ 3,589 @ 3400 Ashland w/ Pipe Bursting F PIP .0 T 46 ..0 L-4397 1600 Green Oaks Ex. 8"-repl. w/10" Pipe 753 64,005 10-94 2-95 (Ridgmar Mall) Bursting .......... ........... Open Cut 389 **C L-1881 3325 W. 6th St. Ex.-repl. w/8" iN 12-94 2-95 *.0 L-3302 5600 Chariot Ex. 6"-repl. w/8" Open Cut 2,299 @ Bourine •.c L-1129 3720 Crestline Rd. Ex. 6"-repl. w/8" Pipe 1,4871 177,300 Bursting .0 L-2260 5843 Merrymount Ex. 6"-repl. w/8" Pipe 1,072 91,120 10-94 2-95 Bursting .. .... . ........ W J If "g, xx: X 'A L-2716 100 Hazelwood Repl. 6*w/8"' Pipe 821 69,785 10-94 2-95 Bursting By City Forces Referred to DOE C = Current A = Added )q = Deleted El = Completed Projects ATTACHMENT A COUNCIL DISTRICT 8 STATUS LATERAL MAIN ADDRESS ACTIVITY METHOD LINEAR ESTIMATED ESTIMATED ESTIMATED REQUIRED FEET DOLLARS BEGIN COMPLETE CONSTRUCTION CONSTRUCTION ••C M-34 E. of IH 35 & S of Ex. 18"-repl. Open Cut 1,215 E 4th St. w/24" 0 Heath-Cote G3 MY1Qy 0 .............. . 6 4A*' .......... 'XI 7. P ••c L-796 1269 E. Maddox Ex. 6"-repl, w/8" Open Cut 1,990 (main & stub-outs 88' & 125) 1 1 •.0 L-1197 2201 S. Riverside Dr. Ex. 6%repl. w/8" Open Cut 1,570 122,791 ••C L-1206 703 Sargent Ex. 6"-repl. w/8," Pipe 795 Bursting •*C L-1272 703 Sargent Ex. 6%repl. w/8" Pipe 480 Bursting •*c L-1273 703 Sargent Ex. 6%repl. w18" Pipe 600 Bursting C L-1561 703 Sargent Ex. 6"-repl. w/8" Pipe 207 Bursting •C L-3545 2313 Wyatt Ct. Ex. 6%repl. w/8" Pipe 566 48,110 10-94 2-96 Bursting •C L-4362B 909 Parkdale Ex. 6"-repl. w/8" Pipe 1,100 93,500 10-94 2-95 Bursting/ Open Cut ••C L-8752 4431 Foard Ex. 6"-repl. w/8" Open Cut 875 66,626 ..0 M-167 4431 Foard Ex. 8"/10" Open Cut 1,357 119,615 ..0 L-3475 4431 Foard Ex. 6"--repl. w/8" Open Cut 1,542 94,402 ..0 L-2254 4431 Foard Ex. 6"-repl. w/8" Open Cut 1,985 89,809 ••c M-8 126 S. Main Insituform 2,095 326,300 •.0 L-225 126 S. Main Ex. 6%repl. w/8" Open Cut 400 101,000 6: "AL "4: 4.1 M.- By City Forces Referred to DOE C = Current -A = Added = Deleted Completed Projects Ab ATTACHMENT A COUNCIL DISTRICT 9 STATUS LATERAL MAIN ADDRESS ACTIVITY METHOD LINEAR ESTIMATED ESTIMATED ESTIMATED REQUIRED FEET DOLLARS BEGIN COMPLETE CONSTRUCTION CONSTRUCTION •.0 M-44 1200 W. Arlington St. Repl. 2/12" Open Cut 1,362 @ 5th Ave. .*C L-1194 2217/2215 Ex. 6"-repl. w/8" Pipe 737 94,189 Huntington Bursting •*C L-1142 Huntington Ex. 6"-repl. w/8" Pipe 908 94,189 @ Forest Park Blvd. Bursting ••C L-1192 2021 Hawthorne Ex. 6"-repl. w/8" Pipe 245 Bursting •*C L-384 2306/2342 Harrison Ex. 6"-repl, w/8" Pipe 200 52,250 Bursting ..0 L-384 2306/2342 Harrison Ex. V-repl. w/8" Pipe 1,008 234,300 Bursting I ••C M-24 2306/2342 Harrison Ex. 6"-repl. w/8" Pipe 451 62,380 Bursting ................. •C L-1254 2317 Winton Terr. Ex. 6"-repl. w/8" Pipe 496 42,160 10-94 2-95 Bursting I •C L-520.7 2523 S. University Ex. 6"-repl. w/8" Insituform 475 40,600 10-94 11-94 L 5 '2, ......... *A L-1108 2560 Cockrell Ex. 6"-repl. w18" Pipe Burst 1237 105,145 10-94 2-95 kC�' 'i........ , ....... W U 0(m... ... ... . . .. Repl. Exist. 206 19,000 1239 2200 W. Gambrel 10-94 10-94 'A In.au rm By City Forces Referred to DOE Current ik = Added Deleted Completed Projects