Loading...
HomeMy WebLinkAboutContract 54767-A2CSC No. 54767-A2 AMENDMENT No . 2 TO CITY SECRETARY CONTRACT No. 54767 WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates, Inc., (ENGINEER) made and entered into City Secretary Contract No. 54767, (the CONTRACT) which was authorized by M&C 20-0773 on the 20th day of October, 2020 in the amount of $1,129,280.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1 in the amount of $303,590.00 which was authorized by M&C 23-0184 on 28th day of February, 2023; and WHEREAS, the CONTRACT involves engineering services for the following project: Westside Treatment Plant III 30" Water Transmission Main, CPN 102688; and WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $54,535.00. 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1,487,405.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas OFFICIAL RECORD Westside Treatment Plant III-30" WTM Prof Services Agreement Amendment Template CITY SECRETARY CPN 102688 Revision Date: 12/08/2023 Page 1 of 2 FT. WORTH, TX EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth Jesica McEachern Assistant City Manager DATE: 03/17/2025 nn QFORT ➢dd eFg 9d ATTEST: pro =d V dIlC naaa5ap Jannette S. Goodall City Secretary APPROVAL RECOMMENDED: chris-fooher Harder Christopher Harder (Mar 10, 2025 06:51 CDT) Christopher Harder, P. E. Director, Water Department Contract Compliance Manager: ENGINEER Kimley-Horn and Associates, Inc. W'0' d. zf 40", r.e- John�Atkins, P.E. Vice President DATE: 03/06/2025 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. l�t/G�, /!/621ifr86� Walter P. Norwood, P. E. Project Manager APPROVED AS TO FORM AND LEGALITY: 4&jg� Douglas Black (Mar 10, 202511:15 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.#: N/A M&C Date: N/A Form 1295: N/A OFFICIAL RECORD Westside Treatment Plant 111-30" WTM CITY SECRETARY cPN 102688 FT. WORTH, TX Kimley>»Horn August 27, 2024 Mr. Walter Norwood Project Manager City of Fort Worth Water Department 200 Texas Street Fort Worth, TX 76102 Re: WESTSIDE III WATER TRANSMISSION MAIN Amendment No. 2 KHA No. 061018380 City Project No. 102688 / City Secretary No. 54767 Dear Walter: The City of Fort Worth (CITY) has requested that Kimley-Horn perform additional services under Amendment Number 2 for the WESTSIDE III TRANSMISSION MAIN project. These additional services are related to various items included in Task 6A — Construction Phase Services for Phase 1 of the 42-inch water transmission main. These improvements are further described as follows: TASK 6.OA —PHASE 1— CONSTRUCTION PHASE SERVICES: ($54,535) ENGINEER will complete the following additional Construction Phase Services in accordance with the Scope of Services set forth in Amendment No. 1 as follows: Progress Meetings and Site Visits ■ ENGINEER will conduct and attend six (6) additional progress meetings. • Clarifications/Interpretations/Requests for Information ■ ENGINEER will respond to eight (8) additional requests for clarifications, interpretations, or information. • Change Orders ■ ENGINEER will assist in evaluating one (1) additional change order. Shop Drawings ■ ENGINEER will review and process an additional 28 shop drawings associated with the construction contract. Substitutions 0 ENGINEER will review and evaluate one (1) additional substitution request. Kimley»>Horn Page 2 We recommend that the CITY increase the budget by $54,535 for these additional services. The following tables summarize our recommended budget revisions, water design fees, and revised contract amount: Description Water Task 6A - Phase 1 - Construction Phase Services $54,535 Total $54,535 The following breakdown for water and sewer services is recommended: Water Fee Sewer Fee Survey Fee Original Contract $1,067,280 $0 $62,000 Amendment No. 1 $293,590 $0 $10,000 Amendment No. 2 $54,535 $0 $0 Total I $1,415,405 $0 I $72,000 Total $54,535 $54,535 Total $1,129,280 $303,590 $54,535 $1,487,405 The following table summarizes our recommended budget revisions and shows the revised contract amount: Task Original Amend Amend Revised Number Contract No.1 No.2 Contract Task 1 $37,230 $6,980 $0 $44,210 Task 1A $73,215 $0 $0 $73,215 Task 2 $57,600 $0 $0 $57,600 Task 3 $289,145 $0 $0 $289,145 Task 4 $206,155 $55,190 $0 $261,345 Task 5A $16,195 $0 $0 $16,195 Task 5B $16,195 $0 $0 $16,195 Task 6A $0 $100,935 $54,535 $155,470 Task 6B $0 $69,170 $0 $69,170 Task 7 $90,825 $11,075 $0 $101,900 Task 8 $186,180 $19,750 $0 $205,930 Task 9 $145,365 $10,860 $0 $156,225 Task 10 $11,175 $29,630 $0 $40,805 Total $1,129,280 $303,590 $54,535 $1,487,405 Project Kimley»>Horn Page 3 We appreciate the opportunity to be of continued service to the CITY. Please contact us if we need to provide any further information. Very truly yours, KIMLEY-HORN AND ASSOCIATES, INC. 4/1.,f, � �. JI.Atkins, P.E. Vice President J RA/j rt Attachments: Level of Effort Summary K:\FTW_Utilities\061018380-Westsidelll-30-IN-WL\PPP\Post_ NTP\Amendment#2\CPN 102688_Amend2_WSIII_Amend Request_R1.doc EXHIBIT B-2 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Design Services for Westside III Transmission Main - Amendment No. 2 City Project No. 102688 Labor(hou-s) Er➢Rnse Task No. Task Description PrinciProject pal Project EIT/SIT RPLS Admin Total Labor Subconsultant Total Expense Percent Task Sub Total Budget Rate Manager $270 $25S Engineer $219 $180 $21S $120 Cos[ Travel MWBE Non-MWBE Reproduction Cost Complete Remaining 1.0 A Alignment Study and Report 0 0 0 0 0 0 $0 $0 $0 $0 $0 $0 $0 2.0 Conceptual Design (30-Percent) 6 0 0 Q 0 0 $- $0 $Q $0 $It $0 $0 3.0 Preliminary Desiqn (60 Percent) 0 0 0 0 0 0 $C• $0 $0 $0 $0 $0 $0 4.0 Final Design 0 0 0 0 0 0 $C• $0 $0 $0 $0 $0 $0 0% $0 5.0 Bid Phase - Bid Unit 1 0 0 0 0 0 0 $r 1 $0 $0 $0 $0 $0 $0 5.0 Bid Phase - Bid Unit 2 6 0 0 Q 0 0 $0 $0 $Q $0 $tt $0 $0 Construction Phase Services - Phase 1 - 6.0 Added to this Contract 5 35 92 126 0 15 $54,53! t $0 $0 $0 $0 $0 $54,535 0% $54,535 6.1 Construction Support 6 $1,531I $0 Prepare/Attend Preconstruction 6.1.1 Conference $r1 $0 $0 6.1.2 Prepare Exhibits for Public Meeting $r 1 $0 $0 Progress Meetings/Site Visit and Notes (6 6.1.3 Additional) 6 12 24 $8,43r 1 $0 $8,430 6.1.3 Materials Testing Coordination and Eval. $') $0 6.1.3 Maintain Report Log $0 $0 6.1.3 Coordination with Testing Lab & City $? $0 6.1.3 Review Reports for Conformance $ $0 $0 6.1.4 Clarifications/Interpretations/RFI (8) L 8 46 40 $18,38 $6 $18,380 6.1.5 Change Orders (1) f 2 4 4 $2,366 $G $2,360 6.1.6 Shop Drawing Review and Log (28) f if 28 56 19 $20,9Y$ $0 $20,975 6.1.7 Substitutions (1) f 2 8 2 $2,860 $0 $2,860 6.1.8 Final Walk Through Visit/Punch List $6 $0 $0 6.2 Record Drawings/As Built (25 Sheets) $6 $0 7.0 ROW/Easement Services 6 0 0 Q 0 0 $0 $0 $Q $0 $tt $0 $0 0/ $0 7.1 ROW Research $0 $0 $0 8.0 Survey 6 0 0 Q 0 0 $0, $0 $Q $0 $Q $0 $0 0/ $0 9.0 Permitting 6 0 0 Q 0 0 $0 $0 $Q $0 $Q $0 $0 0/ $0 $0 $0 $0 $0 $0 $0 10.0 S-015 0 0 0 0 0 0 $(1 $0 $0 0% $0 10.1 IAddlhonal Additional Services $0 $0 $0 Totals S 34 92 126/ Q 16 $54,535 $0 $d $0 $0 $0 $54,535.00 Additional Water Line Footage 20,500 100% Project Summary 1{ Sewer Line Footage 0 0% Total Hours 273 20,500 100% Total Labor $54,535 Total Expense $0 (A) Total Fee $54,535 MBE/SBE Subconsultant $0 (B) Survey Fee $0 Non-MBE/SBE Subconsultant $0 (C) Total Fee (-) survey Fee $54,535 10% Sub Markup $0 I Water Fee (100%of C) Sewer Fee (0% of C) I MBE/SBE Participation 0.0% !4 $54,535.00 $0.00 IV Total Project Cost $54,535.00 I Description WP Water Sewer I Conceptual Design (30%) 31 $16,361.00 $0.00 I Preliminary Design 60°�°) 32 $32,721.00 $0.00 I Final Desiqn (10%) 33 $5,453.00 $0.00 I Survey 51 $0.00 $0.00 I I Subtotal 1 $54,535.00 I $0.00 I Total I $54,535.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FW WTR Official Release Date: 8.09.2012