HomeMy WebLinkAboutContract 59821-CO4CSC No. 59851-CO4
FORT WORTH, City of Fort Worth
Change Order Request
Project Name 102927 - 2022 Bond Year 1 Contract 2 City Sec # l 59851
Client Project #(s)�
Project Description Combined Street Paving Improvements, Stormwater Improvements, and Water and Sanitary Sewer Main Replacements for 2022 Bond Year 1 - Contract 2
Contractor McClendon Construction Company Change Order #I 4 I Datel 3/7/2025
City Project Mgr. I Greg Robbins City Inspector) Ignacio Andrade
Dept.
Unit 1: Water
Unit 2: Sewer
Unit 3: Storm
Unit 4: Paving
Totals
Contract Time
(CD)
Original Contract Amount
$2,801,412.50
$281,755.00
$1,081,300.00
$3,510,195.00
$7,674,662.50
400
Extras to Date
$65,550.00
$65,550.00
45
Credits to Date
$600.00
$600.00
Pending Change Orders (in M&C Process)
Contract Cost to Date
$2,866,362.50
$281,755.00
$1,081,300.00
$3,510,195.00
$7,739,612.50
445
1#REFI
$0.00
$0.00
$0.00
$0.00
30
Revised Contract Amount
$2,866,362.50
$281,755.00
$1,081,300.00
$3,510,195.00
$7,739,612.50
475
Original Funds Available for Change Orders
$140,071.00
$28,176.00
$175,510.00
$54,065.00
$397,822.00
Remaining Funds Available for this CO
$75,121.00
$28,176.00
$175,510.00
$54,065.00
$332,872.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.85%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $9,593,328.13
JUSTIFICATION (REASONS) FOR CHANGE ORDER
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and material as per the proposed Change Order Request #4. This
change order is required to add new bid items for a 10" gate valve and a specialized remobilization cost to construct a 10" water line in the intersection of Avenue G and Vaughn
Boulevard. Prior to paving operations in Avenue G, it was determined that it would be in the best interest of the City to also replace the existing 10" water line crossing Avenue G
in Vaughn Boulevard. The utility contractor was recalled to the site to complete the work.
Cost - The City of Fort Worth has compared the unit price that the contractor is proposing to similar items in recently bid construction contracts. All other items associated with the
water line construction are already included in the project's existing bid items.
Time - This change order will add 30 calendar days to the project contract time. This is broken down as 15 days to excavate, install, test and backfill the 10" water line (07/24124 -
08/08/24) and 15 days for remobilization of the utility contractor, the delay to paving operations in the intersection and the negotiation and approval of this change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature Date T
McClendon Construction Company Justin Blair a Mar 18, 2025
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
Rrui.
Mar 19, 2025
�Rg—
Mar 19, 2025
Program Manager
Date
Senior Capital Project Officer
Date
Mar 19, 2025
Mar 19, 2025
Assistant Director (Dept)
Date
Director, Contracting Department (Dept) amok
Date
Mar 20, 2025---'
Mar 20, 2025
Date
A� i'a"t' a1 Manager
Date
�CiBL
Mar 20, 2025
r
� -
Mar 21, 2025
Council Action (if required)
M&C Number
ATTEST:
4........ A .Aa
Jannette Goodall, City Secretary
M&C Date Approved
FORT WORTH City of Fort Worth
Change Order Additions
Project Name 102927 - 2022 Bond Year 1 Contract 2 City Sec # 59851
Client Project# I
Contractorl McClendon Construction Company IPMI Greg Robbins I Inspectorl Ignacio Andrade
Change Order Submittal # ® Date I 3/7/2025 I
ADDITIONS
I I EM UESCKIP I ION DEP I Oty Unit Unit Cost I otal
68 3312.3004 10" Gate Valve Unit 1: Water 1.00000000 EA $4,500.00 $4,500.001
69 9999.0001 Specified Remobilization Unit 1: Water 1.00000000 LS $8,000.00 $8,000.001
Unit 1:Water $12,500.001
Unit 2: Sewer $0.001
Unit 3: Storm $0.001
Unit 4: Paving $0.001
Sub Total Additions $12,500.001
Change Order Additions Page 2 of 4
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name I 102927 - 2022 Bond Year 1 Contract 2 City Sec # I 59851
Client Project # I I
Contractorl McClendon Construction Company I PMI Greg Robbins I Inspectorl Ignacio Andrade I
Change Order Submittal # ® Date I 3/7/2025 I
DELETIONS
ITEM DESCRIPTION DEPT
6 "11.U451 12" UIP Water Pipe Unit 1: Water
61 9999.000U Water Construction Allowance Unit 1: Water
Oty Unit Unit Cost
Total I
/0.00000000 Lh $1/U.UU
$11,900.001
0.00750000 LS $80,000.00
$600.001
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
Unit 1: Water
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
$12,500.001
Unit 2: Sewer
$0.001
Unit 3: Storm
$0.001
Unit 4: Paving
$0.001
Sub Total Deletions
$12,500.001
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Not Applicable Not Applicable $0.00
Total $0.00
Previous Change Orders
CO # DATE AMOUNT
1 1 /4/2024 $0.00
2/15/2024-$600.00
4/16/2024 $65,550.00
Total I $64,950.00 1
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE• 2022 Bond Year 1 Contract 2 — Change Order #4
M&C: CPN: 102927 CSO: 59851 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Filogonio Munoz
TPW - initial
M a r 17, 2025
2.
Justin Blair
Contractor - signature
9,
M a r 18 2025
3.
Ignacio Andrade
TPW - signature
�c
Mar 19, 2025
4.
Daniel Roy
TPW - Signature
Mar 19, 2025
ODA Ro
5.
Greg Robbins
TPW - signature
GR 6R
Mar 19, 2025
6.
Mary Hanna
TPW - signature
N�
Mar 19, 2025
7
Patricia Wadsack
TPW - signature
PLW
Mar 20, 2025
8
Lauren Prieur
TPW - signature
-acP
Lauren PH-
Mar 20 2025
9
Doug Black
Legal - signature
DoW k
Mar 20, 2025
10.
Jesica McEachern
CMO - signature
o' Ea he
M a r 21, 2025
11.
Jannette Goodall
CSO - signature
A 76
Mar 21, 2025
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received
from any and all
City Departments
requesting City Manager's
signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval
first. Once the ACM has signed the routing slip,
David will review
and take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH:DYES ®No SAME DAY: DYES ®No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(cr�,FortWorthTexas.cov at ext. 7233 for pick up when completed.
Thank you!