HomeMy WebLinkAboutContract 60044-FP2City Secretary
-FP2
Contract No. 60044
FORT WORTH,
Date Received 3/10/2025
AT
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Trinity Lake North Phase 1
City Project No.: 104888
Improvement Type(s): ❑ Paving ❑x Drainage ❑ Street Lights ❑ Traffic Signals
Original Contract Price: $700,855.00
Amount of Approved Change Order(s): $36,651.00
Revised Contract Amount: $737,506.00
Total Cost of Work Complete: $737,506.00
8rmdolltl W Mar 7 2025
Brandon Walker (Mar7, 202512:15 CST) 7
Contractor Date
Vice President
Title
Walker Utilities
Company Name
'fZ-T
Mar 7, 2025
Project Inspector
Date
Andrew Goodman gar11002025 CDT)
M a r 10, 2025
Project Manager
Date
M a r 10, 2025
Kandice Merrick 10, 202510:42 CDT)
CFA Mager
Date
Lauren Prieur(Mar 10, 202511:05 CDT)
Mar 10, 2025
TPW Director Date
op� Mar 12, 2025
Asst. City Manager Date
Page 1 of 2
Notice of Project Completion
Project Name: Trinity Lake North Phase 1
City Project No.: 104888
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time 120 WD Days Charged: 223 WD
Work Start Date: 9/26/2023 Work Complete Date: 9/19/2024
Completed number of Soil Lab Test: 235
Completed number of Water Test: 0
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name TRINITY LAKES NORTH PHASE 1
Contract Limits
Project Type DRAINAGE
City Project Numbers 104888
DOE Number 4888
Estimate Number 1 Payment Number 1
City Secretary Contract Number
Contract Date
Project Manager NA
Contractor WALKER UTILITIES, INC.
P.O. BOX 54122
Inspectors
For Period Ending 9/19/2024
WD
Contract Time 12WD
Days Charged to Date 223
Contract is 100.00 Complete
HURST , TX 76054
T. GARDNER / E. LOZA
Monday, March 3, 2025 Page 1 of 4
City Project Numbers 104888 DOE Number 4888
Contract Name TRINITY LAKES NORTH PHASE 1 Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE For Period Ending 9/19/2024
Project Funding
UNIT M. DRAINAGE IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
10' CURB INLET (CO#1)
20 EA
$9,850.00
�197,000.00
20
$197,000.00
2
48" HP STORM PIPE
440 LF
$226.00
$99,440.00
440
$99,440.00
3
42" HP STORM PIPE
281 LF
$176.00
$49,456.00
281
$49,456.00
4
36" HP STORM PIPE (CO#1)
1238 LF
$142.00
S175,796.00
1238
$175,796.00
5
30" HP STORM PIPE
152 LF
$109.00
$16,568.00
152
$16,568.00
6
24" HP STORM PIPE
824 LF
$92.50
$76,220.00
824
$76,220.00
7
18" HP STORM PIPE
90 LF
$68.00
$6,120.00
90
$6,120.00
8
4' STORM JUNCTION BOX
7 EA
$7,125.00
$49,875.00
7
$49,875.00
9
6' STORM JUNCTION BOX
I EA
$16,500.00
$16,500.00
1
$16,500.00
10
48" FLARED HEADWALL, 1 PIPE
0 EA
$4,800.00
$0.00
0
$0.00
11
MEDIUM STONE RIPRAP, DRY (CO#1)
100 SY
$90.00
$9,000.00
100
$9,000.00
12
TRENCH SAFETY
3062 LF
$3.00
$9,186.00
3062
$9,186.00
13
36" LONG SLOPING HDWL (CO#1)
2 EA
$7,950.00
$15,900.00
2
$15,900.00
14
CONCRETE PAVEMENT (CO#1)
16 SY
$375.00
$6,000.00
16
$6,000.00
15
8" SLEEVES (CO#1)
170 LF
$17.50
$2,975.00
170
$2,975.00
16
4" SLEEVES (CO#1)
640 LF
$10.50
$6,720.00
640
$6,720.00
17
TRAFFIC CONTROL (CO#1)
0.25 MO
$3,000.00
$750.00
0.25
$750.00
Sub -Total of
Previous Unit
$737,506.00
$737,506.00
Monday, March 3, 2025 Page 2 of 4
City Project Numbers 104888
Contract Name TRMTY LAKES NORTH PHASE 1
Contract Limits
Project Type DRAINAGE
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 1
Total Contract Price
DOE Number 4888
Estimate Number 1
Payment Number I
For Period Ending 9/19/2024
$700,855.00
$36,651.00
$737,506.00
Total Cost of Work Completed $737,506.00
Less % Retained $0.00
Net Earned $737,506.00
Earned This Period $737,506.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$737,506.00
Monday, March 3, 2025 Page 3 of 4
City Project Numbers 104888
Contract Name TRINITY LAKES NORTH PHASE 1
Contract Limits
Project Type DRAINAGE
Project Funding
Project Manager NA
Inspectors T. GARDNER / E. LOZA
Contractor WALKER UTILITIES, INC.
P.O. BOX 54122
HURST, TX 76054
DOE Number 4888
Estimate Number 1
Payment Number I
For Period Ending 9/19/2024
City Secretary Contract Number
Contract Date
Contract Time 120 WD
Days Charged to Date 223 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $737,506.00
Less % Retained
$0.00
Net Earned
$737,506.00
Earned This Period $737,506.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$737,506.00
Monday, March 3, 2025 Page 4 of 4
PROJECT NAME:
CONTRACT:
ICFA #
CITY PROJECT #
DOE #
WATER PROJECT #
ISEWER PROJECT#
FILE #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
(AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Trinity Lakes Mixed Use North Phase 1 - Paving, Storm Drainage and Lighting
23-0100 CITY PARTICIPATION: No
104888
K-3111
Phone No:
Andrew Goodman Phone No: 817-392-6251
WATER
Developer
Cost
City Cost
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
Dev. Cost:
REVIEWED
By Andrew Goodman at 4:22 pm, Feb 18, 2025
CHANGE
ORDER No:
1
CONTRACT
UNIT
SEWER
PAVING
DRAINAGE
Developer
Developer Cost City Cost
Developer Cost
City Cost
Cost
City Cost
$0.00 $0.00
$0.00
$0.00
$700,855.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
$0.00 $0.00
$0.00
$0.00
$700,855.00
$0.00
$0.00 $0.00
$0.00
$0.00
$ 36,651.00
$0.00
$0.00 $0.00
$0.00
$0.00
$737,506.00
$0.00
$0.00
$0.00
$737,506.00
STREET LIGHTS
Developer
Cost
City Cost
$798,861.68
$0.00
$0.00
$0.00
$0.00
$0.00
$798,861.68
$0.00
$
$0.00
$798,861.68
$0.00
$798,861.68
$1,536,367.68 City Cost: $0.00
$1,536,367.68
CONTRACT DAYS
0
0
Revised: 10-12-2011 Page 1
You are directed to make the following changes in the contract documents:
REVIEWED
By Andrew Goodman at 4:22 pm, Feb 18, 2025
CITY BID ITEM
PAY ITEM # #
QUANTITY
UNIT
I Init IV: Drainaoe Item Description
UNIT PRICE
TOTAL
I 1
1
EA
10' Cur6 Inlet
$
9,850.00 $
9,850.00
I 4
-42
LF
36" HP Storm
$
142.00 $
((5,964.00
I 10
-1
EA
48" Flared Headwall
$
4,800.00 $
(4,800.00�
I 11
58
SY
Medium Stone Riprag, DJY
$
90.00 $
5,220.0
I 13
2
EA
36" Long Sloping F{DWL
$
7,950.00 $
15,900.00
I *14
16
SY
Concrete Pavement
$
375.00 $
6,000.00
I 15
170
LF
8" Sleeves
$
17.50 $
2,975.00
I 16
640
LF
4" Sleeves
$
10.50 $
6,720.00
I *17
0.25
MON
Traffic Control
$
3,000.00 $
750.00
I New Pay Item
$
36,651.00
REASONS FOR CHANGE ORDER Change Order Required to reconcile Project Item Information used by contractor versus what is approved and on city's record
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
W&A Engineering, LLC
By y sdc
Name Morgan Murdock, PE
Title: Senior Proiect Manaqer
APPROVED:
Trinity Lakes n LC
By.
Name: Trevor Oaks
Title: Development Representative
APPROVED:
Walker Utilities
By:
Name: Brandon Walker 9
Title: \) I CC 1 ��S/oGGI
Revised: 10-12-2011 Page 2
m:.:f✓ o' (REVIEWED",, ,a.-,,.�d. "I L6GBNB a
WARNING m.. �.w, o� :s ..«� • i
�---_______
oa
s�o II ar
,z
'
.. of37r y1_nE�a_. .i'_ _ 'a
�� -caysL Trams eoT — sw� � �-.�w� _ _ — _ _ _ — — — — �—_,.�•1,,. e +-^^ - — _ _ _ �'' ~ a4=soaah— 80 � g `r '�
s fi�Eg s�
stain'
R,1am. v
\� \�"\\ � PRcw rs ss 1 ossipc 1 \ / PRaP. rs ss cRomNe � — � �' � PxoP a ss rnnsvNc i eu R" -A sasro' � � w
i
NOTES mAraett oAws Roan ¢ J N
ALL CURB INLETS SHALL BE
F!&/ NWIIH Wn iN��VAlf1xT--441 CAST -IN -PLACE Z O O
PUBUC wORxSLEe - -
GMT„ gam
I.
TMTATT, a- , STORML/NE 'A" ct M LU
w
sosfsos
cr
Qc
��--� o
4&) II _ _ __ _ _ _ 490
7 7
_L`
--
485 J 1 II . __— — _ .}Ire _ _ 4H5
j}480
y
475 wl 475
ET .J.
✓/ I .I� :'ry �� i1 �� E �.,� w�- SHE.
fly ���r� — 5� I rrfn :1rn �1��n t+d /��o i+ab �1�n �_•�m. l.l
vetl by Me antler sigr�ee, aM Ma
e �bi�mw� .n.ieneiri..ruw.repgkmti�Wron�am
micen ]//�``�}\�� nanp�as so��ficalty ran
sprrea/' _ ,oe
--------------
srn— B � A
a�
i cv=�s4t�
� cays/
� � i i s/ axr x,n-crawl eoz � i
Lu II
AMWII
---- gaa -
i
STORM LINE "A"
6471
soo a,
495
----- _
�- ---�7—
If
,� �- . .
eJd dr
i
475
?rljl Iµ�MI 1.F�M f'/a
REVIExWEDm.,,"nla.m,x.nm. zbss � t
L6GBN0
oaW ss .ate � 0
4—:ngs< _
A — --- ��
a4 m n- eo C a s s
W ea
eu = slam' U m d
eu R - sasro'
m A— o.�"s noao goE of Q J N
ALL BE »oa atle�c garrK -7 I'l Ill� � N
17M=MITIMICI
AI;= s �roW
o�W
3 J
x
�u I Ill—
JC)_ Q�
i
l
SHEET
C2.2
ren;rr�m.e s,�����s%�/A��('a». Tn+,m�re IFEVIEWED�nMrr rs�.>eea, gl e�:susmn 0
•
�un,'a
8
rpi
j awsi so wr[ r °-r vxov 1Y ss crs°ssrv° i 4i I NOTES ppy� y� ,�'p/ry/� raett ow urs ao"o goE o<¢
_A—
"m J
ALL
CURB lN[ETS $NACL BE rypl �p yv EH U�ypN'y�r° Q
CAST. -PLACE PUBLIC xtlBA - -
J 4
oNcae (c"s a c,ccmcJ eo°-err-sttz
g STORM LINE „Brrsos
sBum»Es,EBN BEu �ErE�,�NE nr"-�,-szoe
495
490
= Z
�r
4_ ,
485
480
I _
a -- SHEET s
f
-----------------
IIIII I�
°..°�o.�EAd
WARN/NG �
504
500.,Tr L
496 u —�
492
ro.
472 STORM Z INAIN LINt 0-1 ' -
468
464
460
7+00 6+00 5+00 4+00 J+OO 2,00 1+00 'I+fA�
STORM DRAIN LINE D-2' z
e i
aF
xk
4BB
--
re rorlormu
p,c.]5
ch
wi it a.
�
vy.e r -os
sH=
`B0
C3.4
+� o+6o
Soo „
I
I
4 .
495� If - t2
490 I '^
I
I
I
485 I m !Ci �
L 44
REVIEWED
4 �*
II a
1 510
495
a
airy �1OkM
a eeawhn xd•:.ric.,h
490
e ,ero,azs
l i l l l l l l l l l-
455
I w
SHEET
---
C3.5
FORTWORTH.
M"
TRANSPORTATION AND PUBLIC WORKS
February 17, 2025
Walker Utilities
124 Brown Trail
Hurst, TX 76053
RE: Acceptance Letter
Project Name: Trinity Lake North Phase 1
Project Type: Drainage
City Project No.: 104888
To Whom It May Concern:
On February 4, 2025 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on February 17, 2025. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on February 17, 2025, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-6251.
Sincerely,
Andrew Goodman ar 10, 202510:24 CDT)
Andrew Goodman, Project Manager
Cc: Erik Loza, Inspector
Troy Gardner, Inspection Supervisor
Manny Nieto, Senior Inspector
Andrew Goodman, Program Manager
W&A Engineering LLC, Consultant
Walker Utilities Inc, Contractor
Trinity Lakes Partners, LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
AFFIDAVIT
STATE OF TEXAS
COUNTY OF TARRANT
Before me, the undersigned authority, a Notary Public in the state and
county aforesaid, on this day personally appeared Brandon Walker,
Vice President, of Walker Utilities Inc., known to me to be a credible
person, who being by me duly sworn, upon his oath deposed and said;
That all persons, firms, associations, corporations or other
organizations furnishing labor and/or materials have been paid in full;
That the wage scale established by the City Council in the City of Fort
Worth has been paid in full; and
That there are no claims pending for personal injury and/or property
damages;
On Contract described as;
Trinitv Lakes North Phase 1 Storm Draina-ve CPN # 104888
,,17 rAA1'4 0'-1ktof
BY Presi'G%a �'
Subscribed and sworn before me on this 94 day of
M.,,(,,4 9 OW
.'"""��.� JASON ESCOBEQO
,g`.•, Notary Public, State of Texas
A.
'3�•.,• � Comm. Expires 02.26-2029
Notary ID 126817961
Notary Public in Tarrant
County, Texas
III
SURETEC INSURANCE COMPANY
CONSENT OF SURETY
TO FINAL PAYMENT
BOND NO.: 4462701
TO OBLIGEE:
(Name and Address)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
PROJECT:
(Name and Address)
Trinity Lakes North Phase 1
PRINCIPAL: Walker Utilities, Inc.
OWNER
ARCHITECT
CONTRACTOR
SURETY
OTHER
CONTRACT FOR: Storm Drainage Improvements
City Project No, 104888
CONTRACT DATED: August 21, 2023
At the request of the Obligee and the Principal indicated above, (Insertname andaddress of Surety)
SureTec Insurance Company, 2103 CityWest Blvd, Suite 1300, Houston, TX 77042,
SURETY,
on bond Of (Insert name and address of Contractor)
Walker Utilities, Inc.
P. O.Box 54122
Hurst, TX 76053 , CONTRACTOR,
and conditioned on the representation by Obligee that all Contract provisions relating to the payment
of final payment under the Contract have been satisfied by Principal as of the date of final payment,
and that no claims by Obligee or any third party are known or believed by Obligee or its
representatives to exist as of the date of final payment, representations as to the truth and accuracy
of the foregoing conditions being deemed to have been made by Obligee in connection with this
request for Consent of Surety, hereby approves of the final payment to the Principal, and agrees that
final payment in accordance with the terms hereof shall not relieve the Surety of its obligations to
(Insert name and address of Obligee)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102 OBLIGEE,
as set forth in said Surety's bond.
IN WITNESS WHEREOF, the Surety has hereunto set its hand on this date: February 7, 2025
(Insert in writing the month followed by the numeric date and year.)
SureTec Insurance Company(Surety)
Xa
(Signature of authorized representative)
Kim Bracamonte Attorney-I^-FAct
MIC, SIC COS Final Payment rev 01_2022 Page 1 of 1
POA a: 4221800
SureTec Insurance Company
LIMITED POWER OF ATTORNEY
Know All Men by These Presents, That SURETEC INSURANCE COMPANY (the "Company"), a corporation duly organized and
existing under the laws of the State of Texas, and having its principal office in Houston, Harris County, Texas, does by these presents
make, constitute and appoint
Steven W. Lewis, Paul Fredette, Crystal Langhorn, Adam Syswerda, Andrea Nix, Kim Bracamonte, Brad Johnson
its true and lawful Attorney -in -fact, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge
and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include waivers to the
conditions of contracts and consents of surety for, providing the bond penalty does not exceed
Ten Million and 00/100 Dollars ($10,000,000.00)
and to bind the Company thereby as fully and to the same extent as if such bond were signed by the President, sealed with the corporate
seal of the Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attomey-in-Fact may do in the
premises. Said appointment is made under and by authority of the following resolutions of the Board of Directors of the SureTec
Insurance Company:
Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is
hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on
behalf of the Company subject to the following provisions:
Attorney -in -Fact may be given full power and authority for and in the name of and of behalf of the Company, to execute, acknowledge and
deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings and any and all
notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such
Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary.
Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or
any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid
and binding upon the Company with respect to any bond or undertaking to which it is attached. (Adopted at a meeting held on 20" of April,
1999.)
In Witness Whereof, SURETEC INSURANCE COMPANY has caused these presents to be signed by its President, and its corporate seal
to be hereto affixed this 11th day of July , A.D. 2023 .
:VORAN�F X ...SURETEC INSURANCE COMPANY
�..• Pp
y . g'4 By:
u,: w D= Michael C. �KeimiglPresiden
c k% C,
State of Texas ss: 1
County of Harris �*
On this lim day of July , A.D. 2023 before me personally came Michael C. Keimig, to me known, who, being by me duly swom, did depose
and say, that he resides in Houston, Texas, that he is President of SURETEC INSURANCE COMPANY, the company described in and which executed
the above instrument; that he knows the seal of said Company; that the seal affixed to said instrument is such corporate seal; that it was so affixed by
order of the Board of Directors of said Company; and that he signed his name thereto by like order.
TANYA SNEED
Notary Public State of Texas
Commission # 128571231 Tanya S�Notaublic
s,1 4
••.••••.. Commission Expires 03/30/2027 i My commission expires March 30, 2027
I, M. Brent Beaty, Assistant Secretary of SURETEC INSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy
of a Power of Attorney, executed by said Company, which is still in full force and effect; and furthermore, the resolutions of the Board of Directors, set
out in the Power of Attorney are in full force and effect.
Given under my hand and the seal of said Company at Houston, Texas this 7th 4aX of F rua 7 2025 , A.D.
M. Brien. Beassistsnf 4ecretary
Any instrument issued in excess of the penalty stated above is totally void and without any validity. 4221800
For verification of the authority of this power you may call (713) 812-0800 any business day between-8:30 air► and 5:00 pm CST.