HomeMy WebLinkAboutContract 60150-A1Amendment Purpose Statement:
The purpose of this engineering amendment is to provide additional construction services for the
Risinger Rd & Garden Springs Dr traffic signal project. Construction for this new traffic signal began in
June 2024. TxDOT is managing the bidding and construction of the project.
The agreement for construction phase services, including quality control and quality assurance (QC/QA),
has reached capacity. Additional funding is needed to support the remaining efforts required, to finalize
construction, and close out the project.
The funding appropriated through this amendment will allow the consultant to complete the required
construction phase services and project closeout activities.
CSC No. 60150-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 60150
WHEREAS, the City of Fort Worth (CITY) and Dunaway Associates, LLC,
(ENGINEER) made and entered into City Secretary Contract No. 60150, (the
CONTRACT) which was administratively authorized on the 21 day of September,
2023 in the amount of $ 6,498.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
W. Risinger Rd and Garden Springs Drive HSIP Project, CPN 103636;
and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $15,185.00. (See Attached Funding Breakdown Sheet, Page
-4-)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $21,683.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
Prof Services Agreement Amendment Template CPN 103636
Revision Date: 03/08/2024
Page 1 of 3
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
cv�
Jesica McEachern
Assistant City Manager
DATE: Mar 17, 2025
ATTEST:
b -&mom
Jannette Goodall
City Secretary
APPROVED AS TO FORM AND LEGALITY:
fj�
Do", M a r 12, 202518:00 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 03/08/2024
Page 2 of 3
of the date subscribed by the City's
ENGINEER
DUNAWAY ASSOCIATES, LLC
J s Wri E
Sr. Discipline Lead
DATE: 01 / 16/2025
M&C No.#: N/A
M&C Date: N/A
W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
CPN 103636
FUNDING BREAKDOWN SHEET
City Secretary No. 60150
Amendment No. 1
Project CF1- CF2 -
Fund Dept ID Account Bond Amount
ID Activity
Reference
34014 0200431 5330500 103636 007130 14010199 $15,185.00
Total: $15,185.00
City of Fort Worth, Texas W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Prof Services Agreement Amendment Template CPN 103636
Revision Date: 03/08/2024
Page 3 of 3
FORT WORTH®
ATTACHMENT "A"
Scope for Engineering Design Related Services for Arterial Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of the W. Risinger Road and Garden Springs Drive Signal and Turn Lane
Improvements (CPN 103636) project is to improve performance of the intersection by
constructing a traffic signal along with eastbound and westbound left turn lanes at the
intersection. Amendment 1 scope covers final efforts required for project construction
administration and final project closeout.
WORK TO BE PERFORMED
Task 1. Design Management
Task `'. GOR6optur-1 D96in %)
Task 3. Pri0irvminary Design (600/
T
Took 'I. Final �,SGigR (9005 and 100
T-a-6k 5. @id Phase SeFViGes
Task 6. Construction Phase Services
IS+ . f . E - I. R. —... - 57,rr0;.07—Tl
Task 9. Permitting
Task 10. Quality Control/ Quality Assurance
City of Fort Worth, Texas Page 1 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 1 of 30
FORT WORTH®
TASK 1. DESIGN MANAGEMENT.
ENGINEER will manage the work outlined in this scope to ensure efficient and effective use
of ENGINEER's and CITY's time and resources. ENGINEER will manage change,
communicate effectively, coordinate internally and externally as needed, and proactively
address issues with the CITY's Project Manager and others as necessary to make progress
on the work.
1.1. Managing the Team:
• Lead, manage and direct design team activities
• Ensure Quality Control / Quality Assurance (QC/QA) is practiced in performance
of the work. Refer to Task 10 for further details.
• Communicate internally among team members
• Task and allocate team resources
1.2. Communications and Reporting:
• Conduct and document monthly project update meetings with CITY Project
Manager
• Conduct QC/QA reviews and document those activities. Refer to Task 10 for
further details
• Prepare invoices, in accordance with Attachment B to this Standard Agreement
and submit monthly in the format requested by the CITY. Multi -month billing is
not allowed. Months in which no work is being invoiced shall require submission
of a $0.00 invoice. Prepare and submit monthly Project Status Reports in the
format provided by the Transportation and Public Works Department.
• Prepare and submit baseline Project Schedule initially, and Project Schedule
updates with a schedule narrative monthly, as required in Attachment D to this
Standard Agreement in compliance with the City's Specification 00 31 15 entitled
Engineer Project Schedule. This PROJECT requires a Tier 3 schedule as
defined in the City's Specification 00 31 15 entitled Engineer Project Schedule.
• Complete Monthly M/WBE Report Form and Final Summary Payment Report
Form at the end of the project.
• Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare
the design.
• With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements
are appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to obtain approval of the designs, and make changes necessary to
meet their requirements, as part of the design scope.
• Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub -consultants shall carry readily visible
information identifying the name of the company and the company
representative.
City of Fort Worth, Texas Page 2 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 2 of 30
FORT WORTH®
ASSUMPTIONS
• Six (6) monthly project update meetings during design phase
• All submittals to the City shall be Quality checked prior to submission.
• Project construction phase is anticipated to take an additional six (6) months.
• Six (6) monthly updates of Project Status Reports, DVIN forms, Opinion of
Probable Construction Cost (OPCC), , and project Schedule.
DELIVERABLES
A. Meeting summaries with action items
B. QC/QA documentation
C. Baseline design schedule
D. Preliminary Project Risk Register,
E. Monthly Schedule updates with schedule narrative describing any current or
anticipated schedule changes
F. Monthly Project Status Reports
G. Monthly invoices
H. Monthly DVIN Report Form and Final Summary Payment Report Form
City of Fort Worth, Texas Page 3 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 3 of 30
FORT WORTH
Ir-
TASK 2. CONCEPTUAL DESIGN (30 PERCENT).
The G9Rtioptu2.1 D9SigR shall bo sLbmittad to CITY r the nnnrn"ed DrejenGSheduIe.
The purpese of the seRGept ual desigp is for the ENCINEER tq idep#if" de"elep
si iccessf uII„ addresses the design problem and to obtain the f ITV's enderservmeRt of #his
cep
ENGICED Will develop the copsept gal desigp of the infras+ri Intl ire as follows
7 r-r cc rn ..,t5' Gellecrtiven
rr
•T�Count r\,.t&N Misreseft EVicel spreadsheet of Darn, 24 heur and Turning
Movement Geun+ data gatherer! at 15 minute in�aaia at a m?nimum on all lave
data GGIllected. Provide nail" ✓jmmaries by Approach and Peak_Deried
F/jmma�r-i oh. Spreadshe" J1,0 he uploaded to the
-� ,.CITY''s
dsEumint m�nc e�en# systern (eB�ilder�derTP\/ Traffic�cunt rUt&'.
• In addition to data obtained from the CITY, EN'INEED \",ill researnh and make
efforts to ehtain pertinent ipferma#ien #e aid in nnerdinatinn of the prepesed
imnrn"nments with any, planned fi its ire tha; may influence the
nrniec# ENG ICED kill also identify and seek to obtain data fee evistipg
Eend*t+ona thst miy 'mpant the present innli iding• utilities,
agencies (TxDQT and
City ar Plana, sn J�i orp cc cvailabl,�T Tax
Assesser''s office
•Th�GINEER will eensi ilt w4h +he JTY'o Tronoper+a+ien and Di iblie Werks
Department, Water Department and other CITY departmonto, pu iutilities, s
private utilitiesprivate utilities and government agencies to determine the
e
a pprnv. hate location of above and underground Ind utilitiesand other facilities
e
(current and fi t Ira) that haws wi imp&s+ or influence on the project
• The data cellectien efforts will alse include cnndi acting special ceerdina#inn
meetings with affeGted property owners and businesses as neGessary to develop
sewer re_re„#ing plcno where ner+essary.
2.2. Subourfase Utility Engineering
P rov'do Cabourface Utility Engineering la�(SUE) per Task 8.
2.3. Utility r�ear- ice It
--voIl\EED will develep the design of CITY facilities to aveid or minimize
avoided,GenfliGts with existing utilities, and where known and possible Gensider potential
future utilities On designs. Where GenfliGtS Gannet be
tility Genflists will begin a+ the Consoptusl Design phi&
Utility
In the case of a pi iblis Utility conflict the ENGINEER will design CITY facilities to
utilities, consider petential future ire utilities in designs
In the case of a private Utility GORflis# the Enl `1 hIIt I♦��
R ido s RaF cJet-e#
plans with the Utility conflicts highlighted and a Utility re,,n,,f.,lio.�to.,,Table efi.vr�vec
conflicts to he incl� �ded in a Utilrlit��earraarnGe LetterfeeF GCGYtlin atin`�Te
City of Fort Worth, Texas Page 4 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 4 of 30
FORT WORTH®
ENGINEER , need #o soerdina#e dire Gtly with the private utility nre"ider if that
PI��. , may
presider Reeds to i Rdertake design +e adii s +hoir utility'" InTrvcaii .
Th�vINGGR ch2-upleafi s PDF file G #h;cCITY sppreve d ^nn^ AtUQI plan
set +e the designated preies+ folder in the Gity's des Fn gemen+ s, I
�]n ant m�nu�_..._..- =� =
limits of the nrpieGt�o PQ►F filg should be Gpeaterd idirnn+ly frnm the (SAID files.
2.'1. Engineering design Reper+
T3 vn%lrre-Pdhe1eRGe te prejeGt SGE)pe,thatdesigR ennreenh is in Iine with pro ec4
objectives and #e obtain nnnni irren% on de"elepment of the snnG-Wtwo! layer
E-IQINEER ohsll prepare y oubmit s des+gR report in the format provided by the
.CITY prier +e develeping sensaptual plcno. Th9-CITY ahsn review aR d provide
feedback on the r oparICC�
t priAIar #e Cg the senseptual design
�G ,N��.. otartin
'k The GenEoptual Pas+g„ Package shall innl. ide the fell in_
•—Qusntity iammsry- pane anrd eanh design sheet shall innli irde a quantity take off
table.
Traffic Engineering study snrrirder &Nncs`,sis study or alignment/feasibility stud +o
suppp ert-theFee'nmmeided `design alteMaatiye In#ercec#Inn GORtrel Cali iatien
vmrrT cr zrc �r rrc�rrncr..rcccivrrvvrrcrvr� vuruunvrr
Repert (ICE) msy he required if applicable
•--Seaeaptaal V9Sign Repent (Aoriala) in the -format prqvided by the CITY
GOR+ 1 Q M (�henk ' ssordapce with the ci irre n+ C C
��wr1 i� ��. jot in s.. .. i..
Manud far Cite IDe"elepmen# and Genstr..stien
* SWE Plan oheets sealed by a linens ed prefessienal engineer registered in the
• R F retof plans with the Utility nnnflints highlighted and a Utility Goriflioto Tsble
T�G Count Cats; eB iilderCee Data Gnllestinn above.
C)(loting typical snntinns of the readway #e be nnnstr..nted along with pr+epese,, �d,,
typical sestinas � � which outline the prnpesed irnpm ,emonto. Ty pip.�;-�eet;vnc :".l.A
incli ide evicting and proposed ROW, evicting and proposed lane widths and
directing arrn�e,s existing and prepeed ourbo oidewalks and retaining walls
•--GOR Ww&� ►van rnd profile sheets chOWing evicting and proposed hnriZontal
readway alignments, g pph7existingand reesed OW existing and proposed
e
sidewalks and driveways, npreesed lane dimensions and lane arrows existing
e
draiRage
0
"er+isal alignments (profiles)
j Cotimates of nrebable sans+n is+ion nest
City of Fort Worth, Texas Page 5 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 5 of 30
FORT WORTH
T�n�`7\ cots of 11 "xi 7" so pI--ina will be delivered fer the 301 docigR.
+ DE.\C files nreated from design CAD drawings will he uploaded to the designated
nreieGt folder in the f ity's i-lor•i Irnent management system (eB gilder\
ENGINEER woll not pmceed with Preliminary Design aGt vities without written
approval by the CITY of the f ORGOptUCI Design Danhage.
DELIVERABLES
A. GO FOOPWRI I)esign Revert
B. TraffiG D.1
G. T�GEngineering Study
n. rennenti gal Drainage GheGklist
€
Cam. Con cptal Dasign I7aGkage
F. ROW and Casement needs (M&E3)
G. Utility C of Plsn PC\F snd Utility Gonfkt Table
City of Fort Worth, Texas Page 6 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 6 of 30
FORT WORTH®
'ASK3. PRELIMINARY DESIGN (60 DCERPCAT).
Dreli arg piano and snenifina+ic`io `She"o Submitted to GITV per the anpreyed PFejen+
S n hvcrtcd w-k-.
ENC-INEER will develep the preliminaFy design Of the infrastri Gt„re as f011OwS
1-1. The Preli
minary Design Drawings and Spesif*Ga#iono ohsll insl„de the folloWing•
and beginning and end station limits
+ SUE Plan 3hee#s sealed by a licensed professional epgineer registered in the
State of Texas
• Utility GE)Rflist Matrix
• Preliminwy iSVVM GhesLlist in aseerdanre with the e„rrent .TY iSWM Criteria
..
• Traffin GeRtr31 Plan innl,,ding all noes FUntion signage and pavement rn % S
whiGh will be iR aGGOrdaRGe with the latest editiGR of the Texas MaR61al OR IJRffifE)FM
Traffin GOntrOl DeViner
�A Prejest�T re�Teet shewing all Centre! peintQ 6%ed er set while gathering
data. Generally OR a shale Of no+ I3,ac thun 4 A00 The follE)Wing information shall
he indina+ed for eanh Gen+rel Peint• Identified (existing Git y Men„ment #9901, PK
Nam!, d); `C, Y and Z Geerd+Ratas, in an ideRtwed G99rdiRA a�T
d a referred h ring base 7 Ordinate On i`i4�i Onhr desnrip#ive Inca#inn
,i�icr-er�e� Eernvmuc�vn—vrcy �,t m ,
(i.e. set OR the GeRterl!Re of the iRlet OR the Seuth GUrb IiRe ef Nerth Side Drove at the
Cast end of raid• iuo at the Southeast nOrner of North Side Drove and North �Aain
Strom
Updated readwa plan and profile sheets displaying sta#inn and snerdinate data fer
all herl7ontal alignment C.r.'o, P.T.'o, PJA; L\St
yertinal profile D 'o, P.T.°o, P.I.°o, le"ointo, and high pnin#s' Inpg#hs of �iertinal
r+UNes nr K vales d rtiGall nlearannes here rnn„irnd
zn-vcv , �������ver�Tc�arcr �rarrcc�=wi�cr �cclzrtrca .
•Ne 1 than twe oh marko per nlan/prefile sheet.
• Bearings given on all pr9pesed nentedines, or baselines.
• Station equations relating utilities to paving when apprepria#e
• Overall preieet easement laye„t sheets)
Intersnntien layout sheets innl„ding ROW lines herizental alignmonto, util
owbo, oidewalks driveways lape dimensions and arrews and evicting and
prepesed sOn4o„rs /075° ipteryalrl
DreliminaFy readway details +e insl„de oNrbs, oNrb V(-,NMj.9R joints driveways
sidewalks, pave rgee+ s#ee#iS-hto, trsffiGs+c neI3 vnd all Sppkable utility details
City of Fort Worth, Texas Page 7 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 7 of 30
FORT WORTH
Ir-
- - - - - - - -
..
labeled. O9and year will be previded by the CITY. GaIGUlatiens regard'Rg street and right ef
way GapaGities and design d'SGharges (5 year and UrGe .
1 11
1
I 1 /Qr4ter4aManua
for Site Development All leGationo in the projeGt area where
100 year runoff eXGeeds available steFm drain and right Of Way GaPaGities shall
� � f
with-UTY otandards.
and proposed flew lines, flows, IeRgths and slopes of pope, tep of groun
ever pope and GenReGtieRS te existing er prepesed sterm sewer syste
+ C tes of probable t /r1DCC\ This. estimateall use
�oti me c��t�Et+e�eee �-sl�}��
mC, 3C iGable.
MEN MEMMUSUMUME—M.P...
■-
rdw��r � I■:rs�:�rr_�rr_sanr_r.�:r_�sr_r�:r�� .�:r.
ltw,V
Drier er pesterier to the 60 pernent review meeting with the -CITY, th&-E-NCINNER
shall snherdi le and attend a proient site visit with the CITY 1 roeGt Manager and
GenstraEtien persennel to walk the projeGt. The €NGlrlGER ch; II cumm--rize4he
CITY's Gomments from the field visit and oubmit this information to the CITY in
Writs Rg.
3.' . Semmunity Meet@
After the nreliminar., plsno hs\,e been reviewed and appre"erd by the CITY, the
€ GINNER will prepare present cmhikitc, the prejeot manager in preparing a
presentation of the most appropriate format (mkt L\s:. ll" in Power Point) and
attend ene (l ) GeMmunity meeting te help explain the propesed projeGt tO residents.
City of Fort Worth, Texas Page 8 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 8 of 30
FORT WORTH®
T-he-CITY ohall oeleot a ouitable IGGatmen, time and date The Engineer needs +e
GGordjpate with the City's project manager to format the mailing list Gf all affe Gted
3.5. Utlllty rl�rea a Ge
■ Th�GINEER will consult with the CITY'o Tranop
Department Water Department and ether CITY departmonto, publiutilities, G
of abeve and undergreuRd utilities, and ether faGilities (GUrrent and future) that
have an impaGreF i fflueeGeeRthepre}eGt. E-ICI sINEER w II , CITY faems
to aysld-or minimize cenfljct6 with existing utilities, and, where known aprd
pvv
pessible, future GGnsider petential ft, ,re ,utilities On designs
■ Where GenfliGts Gannet be a"eided Geerdjnatien of Utility ��, Genflicts ill he
,
odeRtified at the WwGI 1►ha Begin st the Preliminary Design phase:
In the Gase of a private Utility i`enfliGf the ENGINEER hall apl^ad set p
ENGINEER �,-a-�o la�{ps
jp Dr1C fermat with the Utility GGnfliGts highlighted and a Utility GgRfli3t3 Table -of
thos�o n�onf40to in the City's rdoG„mvrit mLiwgement system (e R„jlider) The PIDF
Gity DMA will iss„o a Utility GlearanGe Letter to he nnnemnanind by said piano and
table e all Utility GE)Mpapjes WhiGh have facilities Within the Ijmjts Of the project for
e-€PdG VEER mad, peed to GeGrdjpate dire G+ly with the private
utility presider if that presider Reeds to undertake design to adjust their Utility's
IGGatvcariven
rrrr.
■ ENGINEER te-obtsin Ntilit As b6i It plans and/or do field Visits to confirm
relecatien is Gemplete and the the utility has been relecated in aGGerdanGe with
the plans and the prejeG+ needs, reportan" es disGrepanGifn ed and pre"i -!e
,
•--€N INEER t s built plans in the rity'G ,deG„r..ent monot
system (e Q„ilder)
ASSUMPTIONS
■ Twe /7\ sets of 1 9"v97" size s will he delivered for the 601 design for review
��� �. inn.. �
fer the 60 design
• The fGIIE)Wipg shall he „pleaded to the designated prejeGt folder OR the Git y's
doG„ment management system (eB gilder)•
• ^�i or oNbmitt
City of Fort Worth, Texas Page 9 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 9 of 30
FORT WORTH®
• �The vrTV—'s freert-eFto nri CaI vpe nati6nrS will be used. The ENGINEER
shall supplement the tenhninal snenifinatiens if neertert
• QRe /9 \ P iblin Meetin.s io WOtwm94,
---E-NCINEER ohs!' net nroneeith Canal nesirvn an+iVitiec without written appmyal
by the CITY of the DYeIImiRary liosign plano.
G.GeeteGhR+eal Report
D. nninien of probable nepstrUntiep nest (QPGG)
E ernmunity Meetipn exhibits
City of Fort Worth, Texas Page 10 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 10 of 30
FORT WORTH®
Upon appraval of the ❑rellmlrtap/ piano, ENGINEER will prepare sops+r„otion piano Co
follows:
Final graft nuns+n GUen plane 1901 \ and ❑FejeGt N mnwO O61ll a cu mitted to CITY nor
the approver! DrEion+ SGhed le
• The-E-s1NEER \vM-pF93A4o s PDF oet-of plsno with the Utility nonflin+s highlighted anr+
k�til+ty�Sep#l+oto Table of those oopflists to he ipsli ded in the Utility y GlearanGe Letter to be
isswor+ by the City DMA
• The
�p(('�`(('�`��a INGGP, chcll oubmit an estimate er epinien of pFebahle GeRMr��n+ieR Ges
T�G7
CollGWing a 90' nonstrUGtow plan review mooting with the CITY, the EN INEER shall
oubmit Final Plane (1000 ) to the CITY per the appreyed ProieGt s edu do Cash plan
shoat shall be stQmp9rd dater! and signod by the E CINEER rggjp d in Ctsta-ef
Texas. v
•— A Quantity-&urnrnary- page will be iRGIuded in beth the 0% and 1 nn% d"3n Oc-na:
Cash desigp shoot of the, plem shall etic^ ipnli de a q iaptit y take off table.
�i�T7d\�r71\I��.T:L11�te..• _ ��:E7:� _ !•17�Ti11
ASSUMPTIONS
MaRwal will be
deloveFed for the • • ■
9 At PIDF Greated from desigR CAD draWiRgs and CAD DesigR and will be
• 1 -
• .
for the ■0% Design
1 ■ ■ 1 ■ and 1 ■ files will be upleaded te
DELIVERABLES
A. • _ 1
City of Fort Worth, Texas Page 11 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 11 of 30
FORT WORTH®
G. o onotruotion plano cn^' P Alcnual inGluding QG/QA deGurnentatien.
U. -Detailed es+im7+es of probable neris+ri Gti()R nests ORGI irliRS OUMM&rioo of hid items and
G�. Crl.CglTrigT.TC1TTTGfCG .TCTQ ri C1VT6Q�TC�TITTGTQQI'IZD
q aRtities i isiRg the GITV's or Tvn(JT'3 Stan. add hid items a44c crMSl, SC S'ppliGable
City of Fort Worth, Texas Page 12 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 12 of 30
FORT WORTH®
The GITV resewes the right to deliver the nroient by bidding it ioouing a we Fk ender A, it of an
ex+st+ng a unit prise GE)RtFaGt er by alteMative rrelivery. ENGINEER will suppe, t thent Rhace of the preient as felloWs
The ENGINEER oha9-wplea� all piano and nontrgnt doni imentc onto the (wit.
dGGWnwnt management system /eB gilder\ fer ronorrds
Prolent Manwal shWl be uplead in a oingle PDF file in eB uilyder as well as
i nrdoy0 di gal files as regi iirerd to be innL ii-lei-1 in the Git y's promUrement portal,
Qe
Bid Proposal lionUment of the Gentrant rdenU MV-ItS shall he uploaded in a file
format of filename extension ".xlo".
l!nit Prise Proposal rdeG invents are to he nreaterd utilizing he-GFt§,�3 unit price
OP9GOfffied spreadsheet werkbeek, Bid Proposal
VVeF sheet Template that will he peps �laterd anrd nonfigwerd s p gas
�-avrrc Template, ��-a„�� Tom, �a that all s`J' ""
are nomplete anrd tho Summary Worksheet/s\ in the workbeek detail anrd
oummarize the totals from the ipserUnit Pri�oposa�
autematinally te'd se Prl
rdonU ngept warksheets
Plan sets are to he i plearderd to the Gity's rdoni imr,\gt mwicigement system
PDF and CAD files The PDF Will nsist of one file
vrcv�-rrcv�Tc-r-v�--w�rrEArr.�rsc-vrvrrc-rrrc
of the plan ogt-.
s The ENGINEER will noorrdinate with the PM to resnonrd to Vendor Iiisr`i fissions
PC and 's add rda\ h p ry OR Qopfire The
.. cn�� �c—Pdet+E-�era�,Ten�eEe-s ,a
ENGINEER will provide tenhninal interpretation of the nontrant hied rdoni invents
ooto in the
f rda a C`1 ICCP still noorrdinate Isiith the Oita PM to i iploard all
rerr� o addenda. � � �.. \
/Attend the pre_bid Genferenno in ouppaFt of the (`I TV
---\c�ci/x* the -CITY in determining the qualifinations anld anneptahility of prospentiVe
G9ntFaGCoro, qub-sentrantoro anrd si ippliers
•Whon 3ub3titNti9R prier te award Of GGRtFaOt3 io all9we,d in the nontrant
rdoni invents f ` the ENC_II�CCP will advise the JTY w to the anneptability of
alternate mate `rials Qnd equipment prepesed by bidders
• PeyDew all materials reneiyerd from bid ers/proposV, G 37 0t t e CITY -irnrr
deGu4;lsnt mans
After the bird opening CAIC_IAICCP will preyirde a minima im of 5 fi ill sets of piano, 5
City of Fort Worth, Texas Page 13 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 13 of 30
FORT WORTH®
half rin sets and 7 Genies of the nnnfnrmed Drninnt Man6d Set innnrnnrn+inn all
• The proiont will be hid eRly onno anrt awarded to ono nontraptnr.
platform Qnnfirn
e
• Gnnc•tri intinp rinni imnptc will not be printed b y thn JTY and made available fe
p• irnhase by plan hnldelrS and/nr onion to plainn rnnmo
• All prom iromopt materials will be i ipinaded to the Cit. is prom iremeRt platfnm
Rnpfirn as well as eB raider
DELIVERABLES
A. AddeRda
D.RGyG9FnneRltatieR of award as rpdiire�pn�rejent
G. "rr veacr'cr'Et18rni-dOGLIF•ients (�`"'``''11e4)
City of Fort Worth, Texas Page 14 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 14 of 30
FORT WORTH®
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGINEER will support the construction phase of the project as follows.
6.1. Construction Support
• The ENGINEER shall attend the pre -construction conference.
• After the pre -construction conference, the ENGINEER shall provide project
exhibits and attend one (1) public meeting to help explain the proposed project to
residents. The CITY shall select a suitable location or media and mail notices to
the nearby residents and other stakeholders.
• The ENGINEER shall conduct periodic site visits as needed during the duration of
construction. The ENGINEER will prepare or collaborate with the CITY PM on a
Construction Progress Report using the CITY's standard format and upload in the
City's document management system (eBuilder).
• The ENGINEER shall review shop drawings, samples and other submittals
submitted by the contractor for general conformance with the design concepts and
general compliance with the requirements of the contract for construction. Such
review shall not relieve the Contractor from its responsibility for performance in
accordance with the contract for construction, nor is such review a guarantee that
the work covered by the shop drawings, samples and submittals is free of errors,
inconsistencies or omissions. The ENGINEER shall log and track all shop
drawings, samples and other submittals in the City's document management
system (eBuilder).
• ENGINEER shall review material substitution requests, issue a recommendation
and incorporate approved substitutions into the Record Drawings.
• As requested by the CITY, the ENGINEER shall provide necessary interpretations
and clarifications of contract documents, respond to Request for Information (RFI)
from the contractor, review change orders, and make recommendations as to the
acceptability of the work. The ENGINEER will meet with the Project Delivery
Team and Contractor on -site to review any field changes.
• The ENGINEER shall attend the "Final" project walk through and assist with
preparation of final punch list.
6.2 Record Drawings
• The ENGINEER shall prepare record drawings from information provided by the
CITY depicting any changes made to the Final Drawings during construction.
Information provided by the CITY may include, but is not limited to the following:
o As -Built Survey provided by the contractor, which includes vertical and
horizontal coordinates of all water, sewer and storm drain assets, and in
accordance with the Construction (As -Built) Survey Specification.
ENGINEER shall verify accuracy of the data provided by contractor and
conformance with requirements.
o Red -Line Markups from the Contractor
City of Fort Worth, Texas Page 15 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 15 of 30
FORT WORTH®
o Red -Line Markups from City Inspector
o Approved Substitutions
The ENGINEER shall modify the Final Drawings electronically and shall place a
stamp on the plans indicating that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate all changes which apply to that sheet by
clouding and numbering, or other suitable means.
• The following disclaimer shall be included with the Record Drawing stamp:
These Record Drawings were prepared using information
provided by others and represent the as constructed
conditions to the extent that documented changes were
provided for recording. The ENGINEER assumes no liability
for undocumented changes and certifies only that the
documented changes are accurately depicted on these
drawings.
The ENGINEER shall submit a set of sealed Final Drawings, modified and
stamped as Record Drawings, in Adobe Acrobat PDF format (version 6.0 or
higher). The set must include the cover sheet bearing City official signatures.
The ENGINEER may keep copies of the information provided by the CITY for
their files, but all original red -lined drawings shall be returned to the CITY with
the digital files.
• There shall be one (1) PDF file and one (1) CAD file for the TPW plan set and a
separate PDF and CAD file for the Water plan set, if required. Each PDF file
shall contain all associated sheets of the particular plan set. Sinaular PDF files
for each sheet of a plan set will not be accepted. PDF files shall conform to
naming conventions as follows:
I. TPW file name example — "W-1956_org47.pdf" where "W-1956" is the
assigned file number obtained from the CITY, "_org" designating the file is
of an original plan set, "47" shall be the total number of sheets in this file.
Example: W-0053_org3.pdf and K-0320_org5.pdf
II. Water and Sewer file name example — "X-35667_org36.pdf" where "X-
35667" is the assigned file number obtained from the CITY, "_org"
designating the file is of an original plan set, "36" shall be the total number of
sheets in this file.
Example: X-12755_org18.pdf
Both PDF files shall be uploaded to the project's Record Drawing folder in the City's
document management system (eBuilder).
For information on the proper manner to submit Record Drawing files and to obtain
a file number for the project, the ENGINEER should coordinate with the City
project manager. File numbers will not be issued to a project unless the
appropriate project numbers and fund codes have been assigned and are in the
Department of Transportation and Public Works database.
City of Fort Worth, Texas Page 16 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 16 of 30
FORT WORTH®
ASSUMPTIONS
• One (1) Pre -Construction Community Meeting is assumed.
• Three (3) site visits are assumed.
• One (1) submittal reviews are assumed.
• Two (2) RFI's are assumed.
• One (1) Change Orders are assumed.
DELIVERABLES
C. Response to Contractor's Request for Information
D. Review of Change Orders
E. Review of shop drawings
G. Record Drawings in electronic format
City of Fort Worth, Texas Page 17 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 17 of 30
FORT WORTH®
TASK
€ CINEER
per scnning direr#inn and gi iidance from the CITY'a Prgjec# Manager
7�Right_ef Way ResearGh
The ENGINEER ohall determipe rights_of_way apd easement needs fnr
sonotruotien of the prefect Required temperwy and permanent easements Will
fer approval by the CITY.
7 Dinh#_nf_\A/av/Casement Drenara}inn an� &jbm7ttCtr
• Th��GINEER ohall prepare deco invents to he used to ebtain right _of_way and
• Th�GINEER ohall prepare a ROW and Casemont paroel reference map
shE)WORg and designs all land in# sts for preje n ll he revised
v ut+K}�-un-rc�,cr,rrceKl�Tvrprvjc ti mSl: "� an-pc-rccr�ca
as Recess ary throughout it the land acgUisi#ion nrncess
• The deci rnentatien shall he pre"ided in cenfnrmance with the checklists and
templates available on the Git y's dn^i R;V'lt menagemen# system /eB iilder\
Drnje Gt Resewces folder.
• \.Nhep required ENC_INGL'
ER shall provide a chedule B Analysis in cepfermapce
e
I ENste_requirements.
7 2 Dinh#_nf_\A/av/Gassman+ AcgUisi#ion Cer"i^es
• Th�GINEER oha ' r appraisal sen,i^ns by li^nnsed appraisers for all land
4#&r3at3 in thq pre}eEt.
• Th�GINEER ohall loci ie offer letters +e preperty ewners and negetiate land right
GVvtS.
the Qty-L&
Te
Dreyer#„ MaR_gemeRt Department,
arGaRfOrmaGe wit- 4e-T )(S3 r y
Cede
Ch r21EmiReRt Demain guideliRes to allow the City to exercise eminent
domain ohe„ld jt be necessaFy.
• Should the Git" decide to nrnceed with emine n# d
omaln, t ��..CCD
w
all dnni imepta+inn to si ippert the legal process provide any additional ouppgFt,,-and
may he required to he an expert Wi#nCIC at tha Land G3mmi33iener's Hearing
7.1. Temporary Right of Cntn, Drvpvaretiv,-�d Submittal
Prior to cons#ri ictinn the ENGINEER 3hewId cnnrdinate with the Git y prefect
manager to identify all needed Temperwy Right of Entries from landeoro. It to
assumed that letters will only he required fnr land ewners adjacent to
r.11n Strl ictien er who are djrectly affect
ed by the prefect and Re easement is
required to enter their prnpertyy.
The dnci amenta}inn shall be previded in cenfermance with the checklists and
templates available on the rit y's dnci 1MVIt management system /eB iilder\
Project Desna Mes folder.
City of Fort Worth, Texas Page 18 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 18 of 30
FORT WORTH
Ir—
..
) available a
the start of the premeGt and available en around orenertv information (m.e. oFen
Feds, fenG", stokes, etG.). it does not indude effort for chain of title reseaFGh-,
parent trad< researGh, additional researGh for easements not induded in the ..
way vaGatieRS, and street GleSUre-&-.
• Gentwt name and mailing address fer the lanrdewner
. Title noligY for eaeh permanent easement
•Titlle searGhthreugh aR seaTGh GeMpany (i.e. Hellerhanh or TnI) verifying
ownership for eanh TGE:
• Engagement anrd prevision of Sn apprRisal fer eagh fake from a Texas
wed apArb3ol f
. Signed and notarized easements with exhibits
• Cep�i�fffer letter�di Gatio�ggrreed i iUPOR Gimpen tiOR
Entity researgh innlurding providing signipg ai itherit yyerifigatiop fer a
Gerperate lanrlewner
0 C;entaet log of Gommnioatien with the lanrlewner
Critical for an erninent rlornain proceeding is as follows and shall he the
responsibility of the acquisition anent
a Appraisal of the take low than 1 year old
Title work identifying any other entities on the property that need to be served
L\3 p,rt of emiReRtdomsin proeeerdingc. (Ceherdi Flo Q walys's of Title
Sommitmap't)
Gentaet leg of all Gentant aR d negetiatiens with lanrlewner anrd/er #heir
representative
City of Fort Worth, Texas Page 19 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 19 of 30
FORT WORTH®
A. YYY /Y\ Cac emeRt vithiLib cnd meet's and be R ds ppeyi/de d on CITY fps.
B. W aR d Easementparee' map
G. YY�Temporary Right of Entry Goverletters
B. mYY� ^ep ^ yyRight of Entry /d„GUmeRt
E. If aKlisablc) Emin9^t Domain s ppert .dGG 1meRtS
City of Fort Worth, Texas Page 20 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 20 of 30
FORT WORTH®
TASK 2, SURVEY AND SUBSURFACE RFACE UT ITY ENGINEERING SERVICE
ENGINEER will provide survey suppeFt as fellows.
ENGINEER will perferm field s, p,ievs to eollee+ heri-zantal snd Ver+ieal elevations
and ether inferma+inn needed by ENGINEER in design and prepara+inn
of p ano
data, elevations ef A mnitcry aprd adjasep+ s+erm sewers rim/invert elevations
GaRepy, and have qualified arbeFist ideRtify speGieS of trees), and other features
relevant to tho final plan aheet`+. Existing drainage at intersestieps will he pie rifiei-1
by field supveys. Spot elevatiens will be shown en interseGtOGR layeuts with GFGSS
clone to fit inters ee+ino orarte lipes
e,,rrep+ interne+ hasey Tarrsnt Appra{3d !grist (TAD) ipferma+iep available at
i rnn rolls fennea. otokes,-etGA
The MORI S.'m oun,ey infnrma+ion to he provided on the Nlins. ��wll ORGlude the
fellowinw.
� � �T�:STt1L�TT.S'�7T�tA. }LT.I�\■�■T1:STt1■� .�TlS_S1�.�1'.fl -
The fellowinn 43n-nssion sbeut eaeh i nn+rnl Dnint;
Gar:'1:SSt/TI11�J1!SlLT.'��lYr�I1�►......:T.......!7T:q
b. ,Y snd Z Ged;n-atoo, in sn identified GOn�rdine+e system,
Fefe Fed bearing base % ennrr�linete nn CITY PU. urn gnly-.
GOOF lina+es an all P.C.'o, P.T.',�Q
o,,/'P,...l..''3,,.,Man, hele:, Valves,etG., t
came Geerr+inate systom, s� thr"entrel.
No IOU thCr txu- hnri-7nn+a1 heRGh marks per line nr Ineatinn.
cation en,,atiens relating utilities to paying when apprepriate
,
9.2. Temperary Right of Come Preparation and gubmittal
The rdee, imentatien shall he provided in eopfermapse with the checklists and
templates available en the Gity's dec,,me\nt mLinonement system reseurnes
fel
9.3. &jbourface Utility Cne,neer,pe
City of Fort Worth, Texas Page 21 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 21 of 30
FORT WORTH®
Prevmdu C6b&wrfc''ceUtility Engineering (SUE) Quality Level C1 G Q and /1 nG
,•des bed below. Fho SWE shall be peFfermed in aGGorrdanGe with GI/ASGE 4Q_fl'�
c�.rErlu � ... 1 c� vrrrT �rraccvruaiTcc�cr
Q ial0ty ! eve! D
' personal intep,iews vioual inopeGtienG eta to help identify utility ewners tha+
may have fa Gilities within the pre Got limito or that may be affe Gterd by the preient
• (-nlleet applicable rennrrds /e tt Utility- OWnef—I�O m5'pO, "SO bUilt" nr r�Q
rdrawipgs permit re GGrrds field netes geegraphdata,
iG infermatiep system era!
e e e
histories eta.) Gp the evistepGe apapprevimate Ineatien of eviGtipg iRyelverd
e
• Review re GGrrds fer• e"irdenGe er indinatinn of ardrditienal available re GGrrdG•
• e
rdUpliGate or GGpfliGting ipformatiep• Reed far GlarifiGatiGn
- Develop JJE plsn sheets ap,•d transfer ipfermatien an A in lel„erd i itilitiec tG
apprepriate design plsn oheetsf eleGtrnniG files, rdan/er ethrd er -- imnnts as
i TnferrrrntTiGn c?p};t?d ,iRtlt� Gatn• Q .fil�,p'7TniTalln'fCrd ownership; rate of repTi GTifGr quality level/s\• earpeints of any utility d`�� InC'J.Gtis �/n g a et+yGiabundenev,
Evat
Of SerVOGe\•0 "Re size aped GGnrd 3n•0 nvmher of iGiRtly hi irie,d Gables; anrd
encasement
Quality Level G (ORG161dsc t-ci Jkc cc described for Quality I ey M
• Identify surfa Ge features, frervm preieGt tepegraphiG data anrd frervm field
ebserva#ions, thst aYere src�raco sppNrten p;� f wbosrfaGe utilities.
• IRGlurde su Fye" aTpideerrnelatiGR of aerial er greunrd_MeU Rtca utility fnaGili 1eves
Quality ! ey,el C taJis.
• Survey surface feat Tres of oubour—'ane Utility fanilities nr systems if si iGh features
have not already been sup,eyerd b., n p.prnfossional 3arvey3r. If previously
surveyed, GheGk si Fye" data fer aGGi FaG" anrd GGmpleteness
•�The survey shn.II QI119 innlurde /in ardrditinn to OubourfcGe utility features visible at
the grnY R d surfa Gel• .dete minOlnp of irn,e rt eleyatinps of ap" mapheles aprd
VOLMS; ,%etches GhoWing interior rdimensinns anrd line GnnnAGut ions of si 1 -
mapheles aped vaults; any si Urfa Ge markings rdenGtiRS s i aGe utilities
6 iM`► l:
fWrpisherd by Utility GWRers far design p` -9ses.
f ExeFeise pFefess y."na. j " " y .eRtto-cGrreate data frerm aTiffereRrt vGIr C$S, ancto
resole GonfliGting information
• Update (er prepare) plsn cheets, electrnniG files, rd an/er ether der-,er, imepts to
refle-t the integratiOR Level D and Quality Lev .
• ReGeMrneRd follow _Up iRvestigatiens (e.g., aonsl obxve eonobltstiae with
utility 9w e s et \) " mejj he neerderd,,.tho further reselye rliGGrepanGies.
• Pre"irde Quality Lev^el-Gte-ideRtify eveFheard utilities en the pFeejeGt and prrca prev=ive
the eyerheard Utility informatinp nn tho .SVE plan oheets.
City of Fort Worth, Texas Page 22 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 22 of 30
FORT WORTH
Ir—
I eyel R (jncli irdes tasks as described for Quality Level G)
deteot oubourfa^e utilities within the preieot limito, snd/er to traGV a portieufa-r
Utility lino or system
• Reused -'.fin sn interpretation of olsta, mark the indications of utilities on the ground
surface for si ibsequont ourve„ Utilize paint er other me#her# acceptable for
marling of lines
• Unless etheRN'se doreGted, MaFk Genterline E)f single GORduit lines, and outside
edges of multi cenrdit ^.,st i iem^
• Resolve OferenGes between designated utilities and utility reGerds and surveyed
appurtenances.
• Recnmmenrd ardrdi#ional measures to resehre differences if they still exist
Re^nmmendationo may in^li de additional er different surface geophysical
methods, exploratory eVcayatlep er upgrade to Quality Level A data.
• As an alternative to the physical marling of lines the EN EER
��" . may,
CITY'o appreval, utilize other means of data eelleGtien, storage, retrieval and
rereclUdion, that enables the cerrela#ion of surface geophysical data to the proiect's
survey y centre)
Level
• Gvpese and lecate i i#iliti Cc nt QPecif�O&stlOno where cenflic#s May ecci it
•T�zontsl and vertical lecatien of utility to survey centrel.
• Provide utility size and cenfigi ira#ion
• Prude PaViRg thri^L�s., and where applicable.
• Provide general semi type and site Ganditions and SUGh other pertinent infE)FMat'E)n
as s reasenabl�eeertainahle from eaGrhtest hole site
Up t��orr^^Y``,Y;; �XQ (X) I eyel A test holes are inclu ded I eyel 0 test hole information #n he
}�d--.
1P-ierte design, to si ipplemeRt the design survey
�'-'APT c-mc-�c�r`3T' r°�Y
2 P-n'vrt9 GenStFuet+en, at GFitic-al, GGat+sas, to confirm franohioe utility ^enfli^# has
been in fact clearer)
A. O,rawing of the project layout with dimensions and cnnrrdinate list
€. JJE plcn drawings sealed by a prefessienal ep gjpoer renistererd On the State of
Tee -Amass
City of Fort Worth, Texas Page 23 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 23 of 30
FORT WORTH®
TASK 9. PERMITTING.
ENGINEER will provide permitting support for the CITY to obtain any and all agreements
and/or permits normally required for a project of this size and type, as follows:
9.1 Texas Depa#n4enf-ef Trsnsp^riaiien (TxDQT) Permit
• Meet, sd negetiate annoorrdiRate to \i 3btsin sppr9val of the agennicci jinn +he
noreernent and/or permits.
• G9Mpletinrr all f(rmo/applinatieno nepe SSa Fy
• S/jbmitt' JTY snd T„DOT re.,ie\e,
• ✓jbmittipn revised forms for agenev reviev.g
• Res pending to agepe\i seFn Fnepts nerd rem pests
7 ilrea d Dermot
�' m-vQa�crrrm
Meet, d pegetiate aR eoerrdiRate to \i 3btain spprgval of the agennissi jinn the
agreement and4)r permits
• Gon•\nletinn all forms/applications necessary.
• Submitting fr)rms/epplonptor)ns for CITY review
• g'Ubr luting revised forms for 7/'YennI re\/le\A/
• Responding to agency nomments aR d req jests
9.3 Texas Department of Licensing and Regulation (TDLR)
• Identify and analyze the requirements of the Texas Architectural Barriers Act,
Chapter 68 Texas Administrative Code, and become familiar with the
governmental authorities having jurisdiction to approve the design of the Project.
• ENGINEER is responsible for providing plans that are in compliance with TDLR
requirements.
• Submit construction documents to the TDLR
• Completing all TDLR forms/applications necessary
• Obtain the Notice of Substantial Compliance from the TDLR
• Request an inspection from TDLR or a TDLR locally approved Registered
Accessibility Specialist no later than 30 calendar days after construction
substantial completion. Advise the CITY in writing of the results of the inspection.
• Responding to agency comments and requests
• All costs associated with TDLR plan review and inspections are to be paid by the
ENGINEER during the course of the project.
City of Fort Worth, Texas Page 24 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 24 of 30
FORT WORTH®
For provjeoto that diaturb an area gFeator than 9n /�-(;-Tacr,+he C;E)RtFaGt^r �^tee
responsible for preparing and oLWmittin^ the Storm Water Pelli tieR PreVen+ien
PlaR /C\A/PPP\ ^iIt Spp rapr,iate r egc�later�agenres. The � e pr epure
the iSWM GenstF Gtion Plan SGnorrding to the ni FFent GITV i WAA GF4erio Manual
fer Site Il nm t and i'on �� will he in e
rc�--vrc�oC.ib �lr-cn-rcr-vvr�r�%-crE �r�rat
SWPPP by the eeptrnster
EGnV'ronmentel SeFVOGes [prod de a deta#ed scope if US nrm„ Gerp of Engineers
Qeotien 404 Nlotie wide Permit or i 3djWd rol perm if is re-quh;er]
. Negetiating enld noorrdoRating to obtain s°pprev-al of the agenny issi jinn the
agreement andl 9r permits
. Gompleting all forms/applinations necessary.
• SubmittiRg ferms/oppkatiens fer CITY review
+ ✓ibmittipg revised forms fer agepsv reviei.v
. Pec.peprllpg to onennY nomments and regi iests
96F�e�plsin genes
• Meet, d negetiate aR neerrliRate k �i obtain sppre„al of the agenoissi jinn the
agreement ander permits
. Gempleting all fnrms/applinatieRs neoesswni
• Submitting forms/ennlinotions for CITY review
• Submitting revised forms fer agenn, re�iie�ni
. Pespenrding to agennY nomments anrd requests
97Tree Removal Pem44
.ENGINEER ohall noerrdinate with the City Forester ip t4o Park and Peereatiep
Department /P/`DQ) oNbmit snd-obtSin sppre„al of a Tree PeMoval Permit when
required.
ASSUMPTIONS
City of Fort Worth, Texas Page 25 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements - Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 25 of 30
FORT WORTH®
• Permit preparation will begin after approval of the Conceptual Design.
One (1) meetings are assumed with RAS for the TDLR permit.
DELIVERABLES
A. Copies of Permit Applications
B. Copies of Approved Permits
City of Fort Worth, Texas Page 26 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. 1
Revision Date: 05.23.2024 CPN 103636
Page 26 of 30
FORT WORTH®
TASK 10. QUALITY CONTROL / QUALITY ASSURANCE
ENGINEER to provide to the City a Quality Control/ Quality Assurance Plan (QC/QA Plan)
outlining the ENGINEER's method of ensuring the highest levels of design and accuracy are
incorporated into the calculations, plans, specifications, and estimates.
ENGINEER is responsible for and shall coordinate all subconsultant activity to include
quality and consistency of plans.
If, at any time, during the course of reviewing a submittal of any item it becomes apparent to
the CITY that the submittal contains errors, omissions, and inconsistencies, the CITY may
cease its review and return the submittal to the ENGINEER immediately for appropriate
action. No additional time will be granted.
10.1. QC/QA of Survey and SUE Data
• The ENGINEER's Surveyor shall perform Quality Control/ Quality Assurance on
all procedures, field surveys, data, and products prior to delivery to the CITY. The
CITY may also require the ENGINEER's Surveyor to perform a Quality
Assurance review of the survey and/or subsurface utility engineering (SUE) work
performed by other surveyors and SUE providers.
• ENGINEER's Surveyor shall certify in writing via a letter that the survey
information provided has undergone a Quality Control/ Quality Assurance
process.
• ENGINEER's Subsurface Utility Engineering provider shall certify in writing via a
letter that the SUE information provided has undergone a Quality Control/ Quality
Assurance process.
10.2. QC/QA of Design Documentation
• ENGINEER shall perform a QC/QA review of all documents being submitted for
review at all stages of the design including the 30%, 60%, and 90% and Final
Document design review submittals. QA should be performed by an individual
within the firm who is not on the design team.
ENGINEER is to acknowledge that each item on the Detailed Checklist has been
included by checking "done" on the checklist. If a particular checklist item is not
applicable, this should be indicated by checking "N/A". If an entire checklist is
not applicable, this should be indicated by checking every item on the list as
"N/A" and still included with the submittal. The ENGINEER shall use the Detailed
Checklist provided by CITY.
• A Comment Resolution Log must be used to document conflicting comments
between reviewers and to highlight comments made by the CITY that the
ENGINEER is not incorporating into the design documents along with the
associated explanation. The ENGINEER shall use the Comment Resolution Log
provided by CITY.
• The documentation of a QC/QA review includes (1) a copy of the color -coded,
original marked -up document (or "check print") developed during the QA
City of Fort Worth, Texas Page 27 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 27 of 30
FORT WORTH®
checking process and/or review forms which sequentially list documents and
associated comments; and (2) a summary list of the findings of the QC effort.
• Evidence of the QC/QA review will be required to accompany all submittals.
Documentation shall include, but is not limited to, the following items:
- PDF of the completed Detailed Checklists
If any of the above information is missing, is incomplete or if any comments are
not adequately addressed; the CITY may contact the ENGINEER and request
the missing information. If the ENGINEER does not respond to the request
within 24 hours, the CITY shall reject the submittal. No additional time will be
granted to the design schedule for a returned submittal. ENGINEER shall plan to
recover the lost time with future project milestones remaining unchanged.
• If the ENGINEER has not adequately addressed the comments, the submittal
shall be rejected and returned to the ENGINEER immediately to address the
issues.
ASSUMPTIONS
• All submittals to the City will be Quality checked prior to submission.
• A PDF of the QC/QA documentation will be uploaded to the project folder in the
City's document management system (eBuilder).
DELIVERABLES
QC/QA documentation
a. Comment Resolution Log
b. Summary of the QC effort findings
City of Fort Worth, Texas Page 28 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 28 of 30
FORT WORTH®
fete -arid oubmit Plan i;ubmittal G#eGk)ioto in Sid
PLAN i URMITTA�I CHECKLIST REQ1!IREN &
A44nnh "A" Storm Storm dtO^`F^M- $
to `�NatCY
!Sewe
C v7n��v
J dtl'7B
It
e
B �B J'^Z
ItTyp
/C
�v'v7a
F(l o/
�v'vl
Street X X X X
X X
X
StAFni Wate X X
X X
X
tolatpr / spwpr
*If irtnli ded in street project
X
X X
X
City of Fort Worth, Texas Page 29 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 29 of 30
FORT WORTH®
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existinq Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon the
CITY's written request. Any additional amounts paid to the ENGINEER as a result of any
material change to the Scope of the Project shall be agreed upon in writing by both parties
before the services are performed. These additional services include the following:
• Negotiation of easements or property acquisition, unless included as part of Section 7.
• Services related to disputes over pre -qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Administration of the construction contract and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the Contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
City of Fort Worth, Texas Page 30 of 30
Attachment A W. Risinger Road and Garden Springs Dr Intersection Improvements — Amend No. I
Revision Date: 05.23.2024 CPN 103636
Page 30 of 30
ATTACHMENT B
COMPENSATION
Design Services for
W. Risinger Road and Garden Springs Drive Intersection Improvements
City Project No. 103636
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateaory Rate for the ENGINEER's team member performing the work.
Labor Cateaory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
Project Director
Senior Technical Engineer
Project Manager
Project Engineer
EIT
CADD
Administrative
Project Surveyor
Survey Party Chief
Survey Technician
Survey Field Assistant
2025 Rate 2026 Rate
($/hour) ($/hour)
$245
$215
$210
$170
$150
$130
$105
$155
$130
$110
$70
Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
W. Risinger Rd and Garden Springs Dr Intersection Improvements
CPN 103636
AN
ATTACHMENT B
COMPENSATION
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 2 of 4
W. Risinger Rd and Garden Springs Dr Intersection Improvements
CPN 103636
AM
ATTACHMENT B
COMPENSATION
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Dunaway Associates, LLC Civil Engineering
Proposed MWBE Sub -Consultants
Non-MWBE Consultants
Project Number & Name
CPN 103636 Risinger & Garden
Springs Intersection
Improvements
City MWBE Goal = 0%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
TOTAL
Total Fee
$15,185.00
Fee Amount %
$15,185.00 100%
$15,185.00 100%
MWBE Fee MWBE %
$0.00 0.0%
Consultant Committed Goal = 0%
W. Risinger Rd and Garden Springs Dr Intersection Improvements
CPN 103636
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
W. Risinger Rd and Garden Springs Dr Intersection Improvements
CPN 103636
AMA
Level of Effort Spreadsheet
TASKMOUR BREAKDOWN
Design Services for W. Risinger Road at Garden Springs Drive
Risinqer Road & Garden Springs Drive Signal and Turn Lane Improvements - Construction Phase Services - Amendment No. 1
City Project No. 103636
Labor
(hours
Ernse
Task No.
Task Description Engagement
Mena er
Project
Mana er
Project
Engineer
Graduate
Engineer
Civil
Desi ner
Project
Surve or
Survey Parry
Chief
Survey Field
Assistant
Survey
Technician
Administrative
Total Labor
Cost
Subconsubant
j Trevel
I (0.655
Reproduction
Total Expense
Cost
Task Sub Total
Rate $215
$190
$165
$135
$125
$145
$125
$68
$105
$100
MWBE Non-MWBE
cents/mi
16
32
0
0
0
0
0
6
$15,185
$0
$0
$0
$0
$0
$15,185
S.0 Construction Phase Services (3 additional Mo.) 1 39
fi 1
Construction Support
6.1.1
Project Man rment Admin & Status Rgpy s
16
S
6
$4,465
$0
$4,465
$906
50
$900
6 1 2 Amend Virtual Construction Status Virluaf (leetinas (1 Assumed) 3
2
61 3
Project Site Visits (1 Tot.))
4
$1,230
so
$1,230
6.1.4
6 1 5
west for lrforr lion/C11;1np)3 order Review (1 RFI) 1
nal Walk Thhroug andddd (uno Last
3
5
6
$1,610
$1,380
$0
$0
$1,610
$1,380
6 1 6
TDLR Walk and Coordination
6
$1,000
6.2
Record Drawin sand Project Close Out
10
161
20
32
0 01 01 01
01 6
$4,600
$0 $0 $0
1$25
so
$4,600
Totals 1 391
$15,185
$0
$15,185
Project Summa v
Total Hours
88
Total Labor
$15,185
Total E'xffo��-
$0
MBE/SBE SubconsuHant
$0
Non-MBE/SBE Subconsultanf
$0
10% Sub Markup
$0
MBE/SBE Participation
00%
Total Project Cost,
$15,185
Lissette Acevedo, PE, PTOE, PMP
Sr. Capital Projects Officer
Transportation and Public Works
City of Fort Worth, Texas W. Risinger Road and Garden Springs Dr Intersection Improvements —Amend No. 1
Attachment B - Level of Effort Supplement
CPN 103636
1 of
City of Fort Worth - 2020 HSIP Risinger Rd & Garden Springs Or Intersection Improvements
ID Task Name
Duration
Start
Finish
Predecessors % Complete
Hag 4 2022 Hag 1, 2023 Half 2, 2023 Half 1, 2024 Hag 2
2024 Half 1, 2025
Hag 2, 2025 Half 1
:1 I
0 2020 HSIP Risinger Rd and Garden Springs Dr Intersection
767 days
Mon 4/4/22
Mon 4/14/25
98%
M A M I J A S O N D I F M A M I J A S O N D I F M A
M J I A S O N D F
M A J A S O
2020 HSIP Risinger Rd and
1 1 Design
'232 days
Mon 4/4/22
Fri 3/3/23
100%
__i Design
2 1.1 Notice to Proceed
0 days
Man 4/4/22
Mon 4/4/22
100%
♦ Notice to Proceed
3 1.2 Conceptual Design (30%)
77 days
Mon 4/4/22
Thu 7/21/22
100%
1I Conceptual Design (30%)
14 1.3 Preliminary Design(60%)
SO days
Wed 7/13/22
Wed 9/21/22
100%
1 1 Preliminary Design(60%)
20 1.4 Final Design Contract
60 days
Wed 8/24/22
Wed 11/16/22
ISFF 100%
— Final Design Contract
21 1.5 Final Design
105 days
Thu 9/22/22
Wed 2/22/23
100%
I I Final Design
34 1.6 Environmental
155 days
Fri 7/22/22
Fri 3/3/23
100%
1 Environmental
39 1.7 Permits
20 days
Fri 12/16/22
Wed 1/18/23
100%
1 1 Permits
43 2 ROWS, Easements
130 days
Fri 7/22/22
Fri 1/27/23
100%
I ROW & Easements
51 3 Utility Relocation
`218 days
Fri 7/22/22
Thu 6/1/23
100%
1 A Utility Relocation
55 4Construction
530 days
Mon 3/6/23
Mon 4/7/25
95%
1
�,��
Construction
S6 4.1 Obligation of Federal Funds
50 days
Man 3/6/23
Fri 5/12/23
38,50 100%
�Olitigation of Federal Funds
57 4.2 Receive State Letter of Authority (Letting)
0 days
Fri 5/12/23
Fri 5/12/23
56 100%
♦ Receive State Letter of Authority (Letting)
58 4.3 Advertisement(TxDOT Let)
80 days
Mon 5/15/23
Wed 9/6/23
100%
1 Advertisement(TxDOT Let)
65 4.4 Project Construction
400 days
Thu 9/7/23
Mon 4/7/25
93%
• Project Construction
66 4.4.1 Material Lead Time
191 days
Thu 917/23
Fri 6/7/24
50,54,64 100%
Material Lead Time
67 4.4.2 Project Mobilization
5 days
Mon 6/10/24
Fri 6/14/24
66 100%
M-11,11 flon
68 4.4.3 Signalization Work
130 days
Mon 6/17/24
Thu 12/19/24
67 100%
SIBnalization
Mork
69 4.4.4 Roadway Work
50 days
Tue 8/13/24
Tue 10/22/24
67FS+40 days 100%
Roadway'Jork
70 4.4.5 Signal Power and Commisioning
20 days
Wed 2/19/25
Tue 3/18/25
68FS+40 days 0%
'.Si Inal Power and Commisionir
71 4.4.6 Final TDLR Inspection
1day
Wed 3/19/25
Wed 3/19/25
70 0%
7�Flv l TDLR Inspection
72 4.4.7 Final Walk-through
1 day
Thu 3/27/25
Thu 3/27/25
71FS+5 days,69F:0%
lF inal Walk-through
73 4.4.8 Project Closeout
7 days
Fri 3/28/25
Man 4/7/25
72 0%
ifroject Closeout
74 4.4.9 Construction Completion
10 days
Man 4/7/25
Man 4/7/25
71,73 0%
j Construction Completion
75 5Closeout
Sdays
Tue 4/8/25
Mon 4/14/25
0%
I Closeout
76 5.1 As -Built Plans
5days
Tue 4/8/25
Mon 4/14/25
0%
F As -Built Plans
77 5.1.1 Preparation
`o days
Tue 4/8/25
Mon 4/14/25
74 0%
Y Preparation
78 5.1.2 Submitttal
%days
Mon 4/14/25
Mon 4/14/25
77 0%
♦ Sulunitttal
W. Risinger Road and Garden Springs Dr Intersecuon Improvements —Amend No. 1
CPN 103636
Task Task Completion Critical Task Milestone ♦ Projed Summary Imm-1 Task Summary 11
2020 HSIP Risinger Rd and Garden Springs Dr Intersection Page 1 1
Date:1/15/2025 ATTACHMENT D — DUNAWAAY
103636-EPAM-W Risinger Rd & Garden
Springs Dr Highway Safety Improvements
Project Engineering Contract Amendment #1
Final Audit Report 2025-03-11
Created: 2025-03-04
By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov)
Status: Approved
Transaction ID: CBJCH BCAABAAslsi-nsWicVcU Ham uaDCHtS4x5OVwV-e
"103636-EPAM-W Risinger Rd & Garden Springs Dr Highway S
afety Improvements Project Engineering Contract Amendment #
1" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2025-03-04 - 11:43:50 PM GMT- IP address: 204.10.91.100
Document emailed to Ann Estes (ann.estes@fortworthtexas.gov) for approval
2025-03-04 - 11:47:05 PM GMT
Document emailed to Fanta Kaba (fanta.kaba@fortworthtexas.gov) for filling
2025-03-04 - 11:47:05 PM GMT
Document emailed to Josh Wright Owright@dunawayassociates.com) for filling
2025-03-04 - 11:47:05 PM GMT
Document emailed to Leonel Rios(Leon el. Rios@fortworthtexas.gov) for filling
2025-03-04 - 11:47:06 PM GMT
Email viewed by Ann Estes (ann.estes@fortworthtexas.gov)
2025-03-04 - 11:54:20 PM GMT- IP address: 204.10.91.100
Document approval delegated to Jessica Rodriguez (Jessica.rodriguez@fortworthtexas.gov) by Ann Estes
(ann.estes@fortworthtexas.gov)
2025-03-04 - 11:54:58 PM GMT- IP address: 204.10.91.100
Document emailed to Jessica Rodriguez (Jessica.rodriguez@fortworthtexas.gov) for approval
2025-03-04 - 11:54:58 PM GMT
FORTW❑RTHg I P°He1� Y
Adobe
Acrobat Sign
Email viewed by Josh Wright Owright@dunawayassociates.com)
2025-03-05 - 3:25:26 AM GMT- IP address: 146.75.152.0
Email viewed by Jessica Rodriguez Qessica.rod riguez@fortworthtexas.gov)
2025-03-05 - 2:04:23 PM GMT- IP address: 204.10.90.100
Form filled by Fanta Kaba (fanta.kaba@fortworthtexas.gov)
Form filling Date: 2025-03-05 - 3:49:59 PM GMT - Time Source: server- IP address: 208.184.124.181
Uo Form filled by Leonel Rios(Leone1.Rios@fortworthtexas.gov)
Form filling Date: 2025-03-05 - 5:32:43 PM GMT - Time Source: server- IP address: 204.10.90.100
616 Document approved by Jessica Rodriguez 0essica.rodriguez@fortworthtexas.gov)
Approval Date: 2025-03-05 - 10:21:47 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by Josh Wright Owright@dunawayassociates.com)
2025-03-10 - 7:07:18 AM GMT- IP address: 146.75.164.1
Form filled by Josh Wright awright@dunawayassociates.com)
Form filling Date: 2025-03-11 - 6:59:12 PM GMT - Time Source: server- IP address: 198.35.56.130
Agreement completed.
2025-03-11 - 6:59:12 PM GMT
FORTW❑RTHg I Pawered6v
Adobe
Acrobat Sign
FORT WORTHO
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: W Risinger Rd & Garden Springs Dr Highway Safety
Improvements Project Engineering Contract Amendment #1
M&C:
N/A CPN: 103636
CSO:
60150 DOC#: I
Date:
To:
Name
Department
Initials
Date Out
1.
Fanta Kaba, Project Manager
TPW
FK T-k
Mar 5, 2025
2.
Josh Wright, Consultant
Consultant
Mar 11, 2025
3.
Leonel Rios
TPW
LR /-)?
Mar 5, 2025
4.
Lauren Prieur
TPW
Appvd in Agiloft.
ID: 1722
5.
Doug Black
Legal
Doug
Mar 12, 2025
6.
Jesica McEachern
CMO
� E.6-
Mar 17, 2025
7
Jannette Goodall
CSO
,�
Mar 17, 2025
8
TPW Contracts
TPW
9
10.
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: DYES ®No SAME DAY:DYES ❑No NEXT DAY:DYES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(ufortworthtexas.sov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!