HomeMy WebLinkAboutContract 60593-CO3CSC No. 60593-CO3
FOR_ _ T WORTH, City of Fort Worth
Change Order Request
Project Namel East 4th Street and East 1st Street Federally Funded On -Street Bike Lane
City Sec # I 60593
Client Project #(s)l 102601
Project Description
On -Street Bike Lane Project
Contractorl Fain Group, Inc I Change Order#1 3 l
Datel 2/25/2025
City Project Mgr.l Iskal Shrestha P.E. City Inspectorl
Edward Davila
Dept. TPW
Contract Time
Totals (CD)
Original Contract Amount $2,916,021.70
$2,916,021.70 192
Extras to Date $230,967.56
$230,967.56
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $3,146,989.26
$3,146,989.26 192
JGo to ADD & DEL Tabs to Enter CO Backup-$52,895.99
-$52,895.99 10
Revised Contract Amount $3,094,093.27
$3,094,093.27 202
Original Funds Available for Change Orders
ti
$0.00
Remaining Funds Available for this CO $0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
6.11 %
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%)
$3,645,027.13
The construction is complete. The final construction invoice has been submitted and paid. Change Order (CO)#3 has been issued to reconcile the bid quantities. The
number of days added to this change order is for the work related to change order number 1. The exact date of when CO#1 would be fully executed was unknown at the
time of CO#1 negotiation because it needed a council action and duration for routing it to get fully executed. Therefore, the time impact analysis was also unknown. This
project has federal funding for construction. Thus, we consulted TxDOT Construction PM about this issue. He recommended adding an extra day to perform the work related
to change order #1 when reconciling the project (CO#3). The email correspondence with TxDOT related to time impact analysis is attached to this change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting reauirements.
Contractor's Company Namell Contractor (Name Contract Signature
Date
The Fain Group, Inc Larry Fraziero� s
Mar 6, 2025
Inspector/In
Date
Mar5, 2025
Project and Contract Compliance Manager
Date
Mar5, 2025
Date
Senior Capital Project Officer
Date
Mar 7, 2025
Mar 7, 2025
ssistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Pat✓icra L. waAsack
Mar 10, 2025
Mar 11, 2025
Assistant City Attorney
Date
lAssistant City Manager
Date
Mar 11, 2025
_W
Mar 16, 2025
Council Action (if required)
M&C Number I N/A M&C Date Approved INIA
ATTEST:
Om,,..u.. A A_�
Jannette Goodall, City Secretary
FORT WORTH
City of Fort Worth
Change Order Additions
Project Name I East 4th Street and East 1st Street Federally Funded On -Street Bike Lane City Sec #
Client Project # 1 102601
Contractorl Fain Group, Inc I PMI Iskal Shrestha P.E. I Inspectorl
Change Order Submittal # 0 Date
ADDITIONS
60593
Edward Davila
2/25/2025
IIEM
JESCKIPI IUN
DEPI
Uty
Unit
Unit Cost
total
UNIT I: CSJ 0902-90-196
UNIT I: CSJ 0902-90-196
2
REMOVING CONC (PAV;
TPW
101.70
SY
$29.00
$2,949.30
3
REMOVING CONC (DRIVEWAYS;
TPW
95.74
SY
$29.0
$2,776.46
4
REMOVING CONC (CURB)
TPW
28.61
LF
$14.0 J
$400.54
5
REMOVING CONC (CURB AND GUTTER;
TPW
64.00
LF
$14.0
$896.00
6
REMOVING CONC (SIDEWALK OR RAMP;
TPW
187.41
SY
$30.0 J
$5,622.30
7
REMOV STAB BASE AND ASPH PAV (0"-12"
TPW
1.30
SY
$71.06J
$92.30
10
FL BS (CMP IN PLC)(TYA GRl-2) (6")
TPW
245.23
SY
$18.06
$4,414.14
11
CONC PVMT CONT REINF - CRCP) (7)
TPW
89.12
SY
$121.00
$10,783.52
22
COLORED TEXTURED CONC (6")
TPW
46.37
SY
$140.00
$6,491.80
24
CONC CURB & GUTTER (TY II)
TPW
124.62
LF
$46.00
$5,732.52
32
CONDT (PVC) (SCH 80) (3")
TPW
25.00
LF
$39.00
$975.00
33
CONDT (PVC) (SCH 80) (3") (BORE)
TPW
90.00
LF
$47.00
$4,230.00
55
REFL PAV MRK TY II (W) 6" (DOT)
TPW
6.00
LF
$0.10
$0.60
69
REFL PAV MRKR TY II -A -A
TPW
21.00
EA
$6.00
$126.00
70
TRAFFIC BUTTON TY W TURTLE DOMES)
TPW
33.00
EA
$250.00
$8,250.00
73
ELIM EXT PAV MRK & V S (24"^
TPW
394.00
LF
$5.00
$1,970.00
75
ELIM EXT PAV MRK & MRKS (WORD)
TPW
1.00
EA
$100.00
$100.00
109
REMOVAL OF GROUND BOXES
TPW
2.00
EA
$400.00
$800.00
I-3
0104 6017 REMOVING CONC DRIVEWAY)
TPW
395.00
SY
$29.00
$11,455.00
I-26
0530 6004 DRIVEWAY (CONC�
TPW
395.00
SY
$20.00
$7,900.00
I-36
0620 6010 ELEC CONDR (NO. 6) INSULATED
TPW
210.00
LF
$3.00
$630.00
I-54
0666 6171 PREFL PAV MRK{ TY II (W) 6" (BRK)
TPW
95.00
LF
$2.50
$237.50
I-56
0666 6174 REFL PAV MARK TY II (W) 6" (SLD)
TPW
20325.00
LF
$2.50
$50,812.50
I-67
0666 6210 REFL PAV MRK TY II (Y) 6" SLD
TPW
14490.00
LF
$2.50
$36,225.00
I-98
0684 6029 TRF SIG CBL (TY A) (14 AWG)(3 CONDR)
TPW
320.00
LF
$2.50
$800.00
UNIT II: CSJ 0902-90-195
UNIT IL CSJ 0902-90-195
2
REMOVING CONC (PAV;
TPW
1.33
SY
$28.00
$37.24
4
REMOVING CONC (CURB AND GUTTER'
TPW
95.20
LF
$13.00
$1,237.60
5
REMOVING CONC (SIDEWALK OR RAMP;
TPW
60.55
SY
$28.00
$1,695.26
8
FL BS CMP IN PLC r\TYA GRl-2) (6")
TPW
167.29
SY
$17.00
$2,843.93
18
COLON TEXTURED CONC (6")
TPW
7.24
SY
$150.00
$1,086.00
19
COLORED TEXTURED CONC (7)
TPW
22.21
SY
$158.00
$3,509.18
21
CONC CURB (MOUNTABLE)
TPW
63.85
LF
$65.00
$4,150.25
22
CONC SIDEWALKS (4")
TPW
10.38
SY
$95.00
$986.10
27
CONDT (PVC) (SCH 80) (2")
TPW
100.00
LF
$32.00
$3,200.00
31
ELEC CONDR (NO.8) BARE
TPW
420.00
LF
$2.50
$1,050.00
37
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
TPW
527.00
LF
$3.00
$1,581.00
43
REFL PAV MRK TY I (W)(BIKE ARW)(100MIL)
TPW
1.00
EA
$160.00
$160.00
44
REFL PAV MRK TY I;)f BIKE SYML)(100MIL)
TPW
1.00
EA
$350.00
$350.00
48
REFL PAV MRK TY �I (Wj 8" (DOT)
TPW
630.00
LF
$0.05
$31.50
53
REFL PAV MRK TY II (W) (BIKE ARROW,
TPW
1.00
EA
$12.00
$12.00
54
REFL PAV MRK TY II (W) (BIKE SYMBOL;
TPW
1.00
EA
$12.00
$12.00
66
ELIM EXT PAV MRK & MRKRS(PLOWABLE RPMS;
TPW
1019.00
EA
$2.00
$2,038.00
67
PAV SURF PREP FOR MRK (6"^
TPW
659.00
LF
$0.05
$32.95
82
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
TPW
30.00
LF
$3.00
$90.00
89
PED DETECT PUSH BUTTON (APS)
TPW
1.00
EA
$1,105.00
$1,105.00
II-17
0514 6016 PERM CTB (F-SHAPE) (TY 4)
TPW
1631.00
LF
$165.00
$269,115.00
II-45
0666 6171 PREFL PAV MRK TY II (W) 6" (BRK)
TPW
215.00
LF
$2.50
$537.50
II-47
0666 6174 REFL PAV MARK TY II (W) 6" (SLD)
TPW
17565.00
LF
$2.50
$43,912.50
II-55
0666 6210 REFL PAV MRK TY II (Y) 6" SLD
TPW
10150.00
LF
$2.50
$25,375.00
II-104
0666 6174 REFL PAV MARK TY 1 (W) 6" (SLD)
TPW
643.00
LF
$2.40
$1,543.20
II-105
0666 6174 REFL PAV MARK TY II (W) 6" (SLD)
TPW
643.00
LF
$0.10
$64.30
TPW $530,425.99
Sub Total Additions 1 $530,425.99
Change Order Additions Page 2 of 5
FORT WORTH
City of Fort Worth
Change Order Deletions
Project Name I East 4th Street and East tat Street Federally Funded On -Street Bike Lane I City Sec # 60593
Client Project# 1 102601 1
Contracturl Fain Group, Inc I PMI ISkal Shrestha P E. I Inspeclorl Edward Davila I
Change Order Submittal# 0 Date 2I2512025
DELETIONS
IIEM I UESURIFIION I ULFI I w I Unit I Unit UDSt I total
13
RIPRAP (CONC)(4 IN)
TPW
2.44J
CY
$588.00
$1,434.721
21
PERM CTB (F-SHAPE) (TY 4)
TPW
8.3UUJ
LF
$172.00
$1,427.601
23
COLORED TEXTURED CONC (7")
TPW
14.7-
5Y
$146.00
$2,156.421
25
CONC CURB (MOUNTABLE)
TPW
95.8U
LF
$69.00
$6,610.201
26
DRIVEWAYS (CONIC)
TPW
51.45
5Y
$20.00
$1,029.001
27
CONC SIDEWALKS (4")
TPW
266.84
5Y
$97.00
$25,883.481
31
REMOVE METAL BEAM GUARD FENCE
TPW
35.00
LF
$42.00
$1,470.001
45
REEL PAV MRK TY I(W)8"(SLD)(100MIL)
TPW
58.00
LF
$3.OU
$174,001
46
REEL PAV MRK TY I(W)I2"(SLDR100MIL)
TPW
292.0UJ
LF
$9.00
$2,628.001
47
REEL PAV MRK TY I (W)24"(SLD)(I00MIL)
TPW
1317.0U0/I
LF
$12.00
$15,804.001
48
REEL PAV MRK TY I(W)(ARROWRI OOMIL)
TPW
3.OU
FA
$175.OU
$525,001
49
REEL PAV MRK TY I(W)(WORD)(IOOMIL)
TPW
1.0�1
FA
$175.00
$175,001
54
REFL PAV MRK TY 11(W) 6" (BRK)
TPW
95.001
LF
$2.5U
$237.501
56
REEL PAV MRK TY II (W) 6" (SLD)
TPW
20325.0U
LF
$2.5Ci
$50,812.501
58
REEL PAV MRK TY II (W) 8" (SLD)
TPW
387.001 1
LF
$0.05
$19 351
59
REEL PAV MRK TY II (W) 12" (SLD)
TPW
292.0U0/I
LF
$0.05
$14 601
60
REEL PAV MRK TY II (W) 24" (SLD)
TPW
1677.ODU/I
LF
$0.05
$83 B51
61
REEL PAV MRK TY II(W)(ARROW)
TPW
3.OU1
FA
$12.0C;
$36001
62
REEL PAV MRK TY II(W)(WORD)
TPW
1.0U1
FA
$12.0C;
$12001
67
REEL PAV MRK TY II (Y) 6" (SLD)
TPW
14490.0((
LF
$2.5C-
$36,225.001
68
REEL PAV MRKR TY I-C
TPW
34.0 )
FA
$6.0 l
$204.001
71
ELIM EXT PAV MRK & MRKS (4")
TPW
245.0Uf
LF
$1.25,
$305.251
72
ELIM EXT PAV MRK & MRKS (8")
TPW
962.0
LF
$2.0
$1,924.001
76
ELIM EXT PAV MRK & MARKS (BIKE ARROW)
TPW
3.0
FA
$100.0
$300.001
77
ELIM EXT PAV MRK & MARKS (BIKE SYMBOL)
TPW
3.0
FA
$100.0
$300.001
78
ELIM EXT PAV MRK & MRKRS(PLOWABLE RPMS)
TPW
146.0
FA
$2.25
$328.501
79
PAV SURF PREP FOR MRK (6")
TPW
434.0
LF
$0.1
$43.401
80
PAV SURF PREP FOR MRK (8")
TPW
58.0
LF
$0.1
$5 801
81
PAV SURF PREP FOR MRK (12")
TPW
292.0
LF
$0.1
$29 201
82
PAV SURF PREP FOR MRK (24")
TPW
2419.0
LF
$0.1
$241,901
83
PAV SURF PREP FOR MRK (ARROW)
TPW
3.0
FA
$12.0
$36001
84
PAV SURF PREP FOR MRK (WORD)
TPW
1.0
FA
$12.0
$12001
113
PORTABLE CHANGEABLE MESSAGE SIGN
TPW
13.0
DAY
$62.0
$805.001
1-2
01046001 REMOVE CONC (PAV)
TPW
143.0 1
5Y
$29.0
$4,147.001
1-5
0104 6022 REMOVE CONC (CURB AND GUTTER)
TPW
I60.0
LF
$14.00
$2,240.001
1-6
01046036 REMOVIN'CO C(SIDEWALK OR RAMP)
TPW
130.0 1
5Y
$30.00
$3,900.001
1-10
0247 6061 FL BS (CMP IN PLC) (TY A GRI-2) (6")
TPW
410.0
5Y
$18.00
$7,380.001
1-26
05306004 DRIVEWAYS CONC)
TPW
400.0
5Y
$20.00
$8,000.001
1-27
0531 6001 CONC. SIDEWALKS (4")
TPW
I10.0
5Y
$97.00
$10,670,001
-11
03606 CONC PVMT (CONY REINF-CRCP) (7")
TPW
38.1 1
5Y
$121.00
$4,614.941
1-119
0666 6171 PREFL PAV RK TY I (W) 6" (BRK)
TPW
2.0
LF
$2.40
$4 801
1-120
0666 6171 PREFL PAV MRK TY II (W) 6" (BRK)
TPW
2.0
LF
$0.10
$0 201
1-121
0666 6174 REEL PAV MARK TY 1 (W) 6" (SLD)
TPW
234.0
LF
$2.40
$561.601
1-122
0666 6174 REFL PAV MARK TY II (W) 6" (SLD)
TPW
234.0 1
LF
$0.10
$23 401
1-123
0666 6210 REFL PAV MRK TY I (Y) 6" SLD
TPW
617.0f 1f
LF
$2.40
$1,480.801
1-124
0666 6210 REEL PAV MRK TY II (Y) 6" SLD
TPW
617.0
LF
$0.10
$61 701
1-126
668 6128 PREFAB PAV MRK TY C (GRN) (SLD) (BLOCK)
TPW
60.0�l
SF
$22.43
$1,345.801
1-2
01046001 REMOVE CONC PAV)
TPW
28.71
5Y
$28.00
$803.881
1-11
0360-6001 CONC PVMT (C NT REINE - CRCP) (7")
TPW
20.8 1
5Y
$110.00
$2,297.901
6
FURNISHING AND PLACING TOPSOIL
TPW
6.00
CY
$350.0111
$2,100.001
9
CONC PVMT CONT REINF - CRCP) (7)
TPW
42.89
5Y
$110.00
$4,717.901
17
PERM CTB (F- -HAPE) (TY 4)
TPW
1653.00
LF
$165.00
$272,745 001
20
CONC CURB & GUTTER (TY II)
TPW
39.90
LF
$70.00
$2,793.001
39
REEL PAV MRK TY I(W)8"(SLD)T00MIL)
TPW
360.00
LF
$3.OU
$1,080.001
40
REEL PAV MRK TY I(W)24"(SLD)(I00MIL)
TPW
668.00
LF
$13.00
$8,684.001
41
REEL PAV MRK TY I (W)(ARROW)(I OOMIL)
TPW
6.00
FA
$180.00
$1,080.001
42
REEL PAV MRK TY I (W)(WORD)(IOOMIL)
TPW
4.00
FA
$180.00
$720.001
45
REEL PAV MRK TY II (W) 6" (BRK)
TPW
215.00
LF
$2.5U
$537.501
46
REEL PAV MRK TY II (W) 6" (DOT)
TPW
20.OU
LF
$3.5U
$70 001
47
REEL PAV MRK TY II (W) 6" (SLD)
TPW
17565.00
LF
$2.5U
$43,912.501
49
REEL PAV MRK TY II (W) 8" (SLD)
TPW
360.00
LF
$0.05
$18 001
50
REEL PAV MRK TY II (W) 24" (SLD)
TPW
668.00
LF
$0.05
$33 401
51
REEL PAV MRK TY II(W)(ARROW)
TPW
6.00
FA
$12.00
$72001
52
REEL PAV MRK TY II(W)(WORD)
TPW
8.00
FA
$12.00
$96001
55
REEL PAV MRK TY II (Y) 6" (SLD)
TPW
10150.00
LF
$2.5U
$25,375.001
56
REEL PAV MRKR TY I-C
TPW
39.OU
FA
$6.OU
$234.001
59
ELIM EXT PAV MRK & MRKS (4")
TPW
1694.00
LF
$1.OU
$1,694.001
60
ELIM EXT PAV MRK & MRKS (8")
TPW
771.00
LF
$2.OU
$1,542.001
61
ELIM EXT PAV MRK & MRKS (24")
TPW
458.00
LF
$S.OU
$2,290.001
68
PAV SURF PREP FOR MRK (8")
TPW
360.00
LF
$0.05
$18 001
69
PAV SURF PREP FOR MRK (24")
TPW
1283.00
LF
$0.05
$64 151
91
PORTABLE CHANGEABLE MESSAGE SIGN
TPW
13.00
DAY
$67.00
$871.001
II-99
0528 6002 COLOR TEXTURED CONCRETE (6")
TPW
9.00
5Y
$140.OU
$1,260.001
11-100
0529 6002 CONC CRUB (TY II) (8")
TPW
23.00
LF
$60.00
$1,380.001
11-39
0666 6036 REFL PAV MAR TYP I (W) 8" (SLD) (1 OOMIL)
TPW
2.00
LF
$3.OU
$6 001
11-49
0666 6178 REFL PAV MRK TY II (W) 8" (SLD)
TPW
2.00
LF
$0.05
$0 101
11-68
0678 6004 PAV SURF PREP FOR MRK (8")
TPW
2.00
LF
$0.05
$0 101
11-102
0666 6171 PREFL PAV MRK TY I (W) 5" (BRK)
TPW
8.00
LF
$2.35
$18 801
I I-103
0666 6171 PREFL PAV MRK TY II (W) 6" (BRK)
TPW
8.00
LF
$0.15
$1 201
I I-106
0666 6210 REEL PAV MRK TY I (Y) 6" SLD
TPW
1928.00
LF
$2.40
$4,627.201
11-107
0666 6210 REEL PAV MRK TY II (Y) 6" SLD
TPW
1928.00
LF
$0.10
$192.801
I I-108
668 6128 PREFAB PAV MRK TY C (GRN) (SLD) (BLOCK)
TPW
128.00
5F
$22.43
$2,871.041
TFW $583,321981
1
1
1
Sub Total Deletions $583,321 981
Change Order Deletions Page 3 of 5
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
9/12/2024 $135,439.32
11 /1 /2024 $95,528.24
Total I $230,967.56
Shrestha, Iskal
From: Jay Ripley <Jay.Ripley@txdot.gov>
Sent: Wednesday, July 31, 2024 3:47 PM
To: Shrestha, Iskal
Subject: RE: E. 4th St/1st St Improvements Change Order Impact
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Iskal,
The city can proceed with the expectations of this Time Impact being marked as a participating change order, as long as
proper justification is provided at the time of reconciliation.
Thanks,
JAY RIPLEY
DISTRICT LOCAL GOVERNMENT PROJECT COORDINATOR
TEXAS DEPARTMENT OF TRANSPORTATION
Fort Worth District/District Construction
Jay.Riplev@txdot.gov 1 817-659-0841 1 TxDOT.eov
From: Shrestha, Iskal <Iskal.Shrestha@fortworthtexas.gov>
Sent: Wednesday, July 31, 2024 3:28 PM
To: Jay Ripley <Jay.Ripley@txdot.gov>
Subject: FW: E. 4th St/1st St Improvements Change Order Impact
This email originated from outside of the organization. Do not click links or open attachments unless you recognize the sender and
know the content is safe.
Jay,
Please take a look below for contractor concurrence. We're just asking for your approval for the time impact due to the
change order, which will be added during the reconciliation change order at the end of the project.
Thanks,
Iskal Shrestha
From: Steven Aguirre <saguirre(@faingp.com>
Sent: Wednesday, July 31, 2024 3:15 PM
To: Shrestha, Iskal<Iskal.Shrest ha@fortworthtexas.gov>
Subject: RE: E. 4th St/1st St Improvements Change Order Impact
CAUTION: This email originated from outside of the City of Fort Worth email system. Do not click any links or open attachments
unless you recognize the sender and know the content is safe.
Iskal,
We agree to the change order with the understanding that reconciliation of extra days will be addressed at the
completion of the project.
Thankyou,
Steven Aguirre
Project Manager
rm.
FAIN
P.O. Box 164308
Fort Worth, TX 76161
(P) 817-927-4388 (F) 817-927-4389
(M) 817-727-5919
From: Shrestha, Iskal <Iskal.Shrestha@fortworthtexas.gov>
Sent: Wednesday, July 31, 2024 3:10 PM
To: Steven Aguirre <saguirre@faingP.com>
Subject: FW: E. 4th St/1st St Improvements Change Order Impact
Steven,
I discussed the project's time impact due to change order#1 with the TxDOT PM. He has a great idea, and I agree
because we don't know the exact date for CO#1 approval. Therefore, the actual time impact is unknown, and it depends
on the date when the change order is fully executed.
We plan to approve the actual impacted time during the reconciliation change order after the project is complete.
Please let us know if you agree. If you do, please work on change order items that have a time impact immediately after
the change order is fully executed.
Thanks,
Iskal Shrestha
From: Steven Aguirre
Sent: Tuesday, July 30, 2024 12:58 PM
To: Shrestha, Iskal <Iskal.Shrestha@fortworthtexas.gov>
Subject: E. 4th St/1st St Improvements Change Order Impact
Iskal,
Attach is the impact schedule for the E. 4t" St/1 st St project. Fain is requesting 21 working days be added to the
change order due to new items added to project that were not included on baseline schedule. The project
originally proposed installation of permanent CTB on E.1 st St between Beach St & Haltom Rd. Installation of 8"
curb & gutter with median island will replace the CTB which causes more labor and time. If you have any questions
let me know.
Thank you,
Steven Aguirre
Project Manager
rm.
FAIN
P.O. Box 164308
Fort Worth, TX 76161
(P) 817-927-4388 (F) 817-927-4389
(M) 817-727-5919
0
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: E 4th St/E. 1st Street On -Street Bicycle Improvement
Construction Contract — Change Order #3
M&C: N/A CPN: 102601 CSO: 60593 DOC#: 1
Date: 02/25/2025
To: Name
Department
Initials
Date Out
1. Larry Frazier
Fain Group - signature
Mar 6, 2025
2. Alexandra Ripley
TPW - review
Mar 5, 2025
3 Edward Davila
TPW-signature
Mar 5, 2025
4. Iskal Shrestha
TPW - signature
-7
Mar5, 2025
5. Chad Allen
TPW - signatures
Mar 7, 2025
6. Lissette Acevedo
TPW - signature
c�V
Mar 7 2025
7. Patricia Wadsack
TPW - signature
PLW
Mar 10, 2025
8. Lauren Prieur
TPW - signature
�xQ„�,,,
Mar 11, 2025
9. Doug Black
Legal - signature
ok
Mar 11, 2025
10. Jesica McEachern
CMO - signature
� Ea ne,
Mar 16, 2025
11. Jannette Goodall
CSO - signatures
Mar 17, 2025
12. TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE:
All documents
received from any
and all City Departments requesting
City Manager's signature for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
Jay will review and take the next steps.
NEEDS TO BE NOTARIZED: []YES ®No
RUSH: ❑YES ®No
SAME DAY: ❑YES ®No
NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(a)FortWorthTexas.2ov at ext. 7233 for pick up when completed.
Thank you!