Loading...
HomeMy WebLinkAboutContract 60374-FP3-FP3 City Secretary 60374 Contract No. FORT WORTH. Date Received 3/20/2025 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Rock Creek Phase 1 City Project No.: 103931 Improvement Type(s): x❑ Paving ❑ Drainage ❑ Street Lights ❑ Traffic Signals Original Contract Price: $3,716,952.20 Amount of Approved Change Order(s): $44,335.50 Revised Contract Amount: $3,761,287.70 Total Cost of Work Complete: $3,761,287.70 atj a`r� Mar 18, 2025 Contractor Date Vice President Title Glenn Thurman, Inc. Company Name Mar 18, 2025 Richard Walden (Mar 18, 202515:25 CDT) Project Inspector Date ft A" Mar 20, 2025 Project Manager Date KandicMar20, 202513:29 CDT) Mar 20, 2025 CFAanarr Date ^^- Mar 20, 2025 Lauren Prieur (Mar 20, 2025 13:38 CDT) TPW Director Date C>�� Mar 20, 2025 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Rock Creek Phase 1 City Project No.: 103931 City's Attachments Final Pay Estimate x❑ Change Order(s): ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 285 WD Days Charged: 241 WD Work Start Date: 11/27/2023 Work Complete Date: 1/8/2025 Completed number of Soil Lab Test: 675 Completed number of Water Test: 72 Page 2of2 FoRTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name ROCK CREEK PHASE 1 Contract Limits Project Type PAVING City Project Numbers 103931 DOE Number 3931 Estimate Number 1 Payment Number 1 For Period Ending City Secretary Contract Number Contract Date Project Manager NA Contractor GLEN THURMAN, INC 3212 PIONEER RD BALCH SPRINGS, TX 75180 Inspectors G. DEYON / R. WALDEN Contract Time Days Charged to Date Contract is 100.00 1/8/2025 WD 28WD 241 Complete Tuesday, January 28, 2025 Page 1 of 5 City Project Numbers 103931 DOE Number 3931 Contract Name ROCK CREEK PHASE 1 Estimate Number I Contract Limits Payment Number 1 Project Type PAVING For Period Ending 1/8/2025 Project Funding UNIT IV: PAVING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 6" CONC PVMT 34377 SY $52.50 804,792.50 34377 1,804,792.50 2 7.5" CONC PVMT (CO #1) (CO#2B) 9154 SY $57.75 $528,643.50 9154 $528,643.50 3 10" CONC PVMT 5153 SY $75.00 $386,475.00 5153 $386,475.00 4 4" CONC SIDEWALK (CO#2B) 9140 SF $7.60 $69,464.00 9140 $69,464.00 5 4" CONC SIDEWALK (6' WIDE) (CO #1) (CO#2B) 30110 SF $7.60 $228,836.00 30110 $228,836.00 6 4" CONC SIDEWALK (10' WIDE) 10426 SF $7.60 $79,237.60 10426 $79,237.60 7 6" LIME TREATMENT 36748 SY $3.90 $143,317.20 36748 $143,317.20 8 8" LIME TREATMENT 9962 SY $4.15 $41,342.30 9962 $41,342.30 9 6" LIME TREATMENT (MAJOR) 5594 SY $4.15 $23,215.10 5594 $23,215.10 10 6" FLEXIBLE BASE TYPE "A" 1282 SY $21.00 $26,922.00 1282 $26,922.00 11 HYDRATED LIME 832 TN $321.00 $267,072.00 832 $267,072.00 12 BARRIER FREE RAMP, TYPE R-1 (CO#2B) 13 EA $3,250.00 $42,250.00 13 $42,250.00 13 BARRIER FREE RAMP, TYPE P-1 (CO#2B) 19 EA $2,200.00 $41,800.00 19 $41,800.00 14 BARRIER FREE RAMP, TYPE P-1 (10' WIDE) 4 EA $3,000.00 $12,000.00 4 $12,000.00 15 END -OF-ROAD BARRIER 6 EA $1,200.00 $7,200.00 6 $7,200.00 16 REMOVE END- OF -ROAD BARRICADE 1 EA $400.00 $400.00 1 $400.00 17 6" SLD PVMT MARKING PAINT (W) 95 LF $2.20 $209.00 95 $209.00 18 6" SLD PVMT MARKING PAINT (Y) 3900 LF $2.20 $8,580.00 3900 $8,580.00 19 6" BRK PVMT MARKING PAINT (W) 110 LF $2.20 $242.00 110 $242.00 20 18" SLD PVMT MARKING PAINT (Y) 166 LF $12.50 $2,075.00 166 $2,075.00 21 18" SLD PVMT MARKING PAINT (W) 22 LF $12.50 $275.00 22 $275.00 22 LANE LEGEND ARROW 2 EA $375.00 $750.00 2 $750.00 23 LANE LEGEND DBL ARROW 2 EA $500.00 $1,000.00 2 $1,000.00 24 LANE LEGEND YIELD 2 EA $600.00 $1,200.00 2 $1,200.00 25 REFL RAISED MARKER TY II -A -A 28 EA $5.25 $147.00 28 $147.00 26 TRAFFIC CONTROL 1 MO $2,000.00 $2,000.00 1 $2,000.00 27 BARRIER FREE RAMP, TYPE M-1 (CO #1) 1 EA $2,850.00 $2,850.00 1 $2,850.00 28 4" SLD PVMT MARKETING PAINT (W) (CO #1) 150 LF $1.85 $277.50 150 $277.50 29 HANDICAP SIGN ON POST (CO #1) (CO#2B) 0 EA $600.00 $0.00 0 $0.00 30 6" 3600 PSI CONCRETE DRIVEWAY ON 200 SF $9.00 $1,800.00 200 $1,800.00 BROOKITE ST (CO#2B) Tuesday, January 28, 2025 Page 2 of 5 City Project Numbers 103931 DOE Number 3931 Contract Name ROCK CREEK PHASE 1 Estimate Number I Contract Limits Payment Number 1 Project Type PAVING For Period Ending 1/8/2025 Project Funding 31 VALVE BOX ADJUSTMENT (CO#2B) 1 EA $250.00 $250.00 1 $250.00 32 STAMPED CONCRETE CROSSWALK (CO#2B) 910 SF $36.50 $33,215.00 910 $33,215.00 33 24" SOLID PAVEMENT MARKING PAINT (W) 50 LF $15.00 $750.00 50 $750.00 (CO#2B) 34 PEDESTRIAN CROSSWALK W/AHEAD SIGN ON 2 EA $675.00 $1,350.00 2 $1,350.00 POST (CO#2B) 35 PEDESTRIAN CROSSWALK W/DOWNWARD 2 EA $675.00 $1,350.00 2 $1,350.00 DIAGINAL ARROW SIGN (CO#2B) Sub -Total of Previous Unit $3,761,287.70 $3,761,287.70 Tuesday, January 28, 2025 Page 3 of 5 City Project Numbers 103931 Contract Name ROCK CREEK PHASE 1 Contract Limits Project Type PAVING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 1 Change Order Number 213 DOE Number 3931 Estimate Number 1 Payment Number 1 For Period Ending 1/8/2025 $3,716,952.20 $4,852.15 $39,483.35 Total Contract Price $3,761,287.70 Total Cost of Work Completed $3,761,287.70 Less % Retained $0.00 Net Earned $3,761,287.70 Earned This Period $3,761,287.70 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $3,761,287.70 Tuesday, January 28, 2025 Page 4 of 5 City Project Numbers 103931 Contract Name ROCK CREEK PHASE 1 Contract Limits Project Type PAVING Project Funding Project Manager NA Inspectors G. DEYON / R. WALDEN Contractor GLEN THURMAN, INC 3212 PIONEER RD BALCH SPRINGS, TX 75180 DOE Number 3931 Estimate Number 1 Payment Number 1 For Period Ending 1/8/2025 City Secretary Contract Number Contract Date Contract Time 285 WD Days Charged to Date 241 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $3,761,287.70 Less % Retained $0.00 Net Earned $3,761,287.70 Earned This Period $3,761,287.70 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $3,761,287.70 Tuesday, January 28, 2025 Page 5 of 5 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Rock Creek Phase 1 CHANGE 1 CONTRACT: Water, Sewer, Drainage, Pavinq, and Street Lights ORDER No: CFA # CFA23-0085 I CITY PARTICIPATION:) NO ICITYPROJECT# 103931 DOE # X-27242 CO-1 WATER PROJECT 301'14-0200431-103931-EO7685 SEWER PROJECT # 30114-0200431-103931-EO7686 FILE # W-2819 INSPECTOR: Richard Walden Phone No: (682) 249-3078 PROJECT MANAGER: Khal Jaafari Phone No: (817) 392-7872 CONTRACT UNIT WATER SEWER PAVING DRAINAGE STREET LIGHTS I CONTRACT Dovolopor DAYS Dovolopor Costf City Cust Develonor Cost City Cost Devolohor Cost CBv Cost Dovalopor Cost City Coat Cost City Cost ORIGINAL CONTRACT S2,021.407.00 51,357,711,S0 $3.757,952.20 53,364,319.00 S490.562.20 EXTRAS TO DATE I _ 1I CREDITS TO DATE CONTRACT TO DATE $2,021.467.00 II 59.00 S1.357,711.50 soon S3.757,952.20 50.00 _S3.364.319X(l soon S490.562,20 $n.00 285 AMOUNT OO:F❑PROP. CHANGE ORDER r t3.071.001f S 4.852.15 !I! f TACTAMOUNT $2.018.39C.00 II so.00 SI.357.711,50 $0.00 S3,762.604.35I S0.00 $3,304,319.00 $DAO 5496,562.20 so.ce 285 j TOTAL 1iEVISEO PER UNIT S&p19..396.00 $1.357.711.50 S3.702.004.35 S3,364.319.00 S498,562.20 I REVISED COST SHARE Dov. Cost: $11,001,793.05 City cost- 50.96 TOTAL REVISED CONTRACT S11,001,793.05 You are directed to make the lolloWlna changes In the ;,ontract docut lents PAY ITEM # CITY BID ITEM # QUANTITY UNIT REM DESCMP 10N UNIT PRICE TOTAL �i e 27 3213.0503 1 EA Barden Free Rartlpp, ype M-1 S 2.850.00J S 265000 A.)etV r. . - 1 28 .- 1 29 3217.0009 150 LF 9999.0024 1 EA 15 ''Wiw— 4" SLD Pvmt Markfna Paint (W) Handles {{]j SIQQn an Post 7.5"ConePvmt $ 1.81 $ 277.50 S 600.00 S 600.00 S 57.75 S 866.25 p� y fc4 j 2 9999.0003 I7.A hPp / I 5 9999.0004 34 SF 4" Con¢ Sidewalk ((G' Wide) $ 7.60 $ 268.40 AID \� 12 3312.2003 15 EA 1" Water Sarvlcc S 2.129.00 S 31r935.001 I' 14 :'1122101s 3 EA 0312.2203 2 E1l 11!.' kNvic: n•;r.,: ?" Walnr _;crvirc r.'.2;O 5 C.Jc.•s0;)1HI 2.rir1 tiG 5 �\ TOTAL I $ 1.781.15 REASONS FOR CHANGE ORDER All 1.5" and 2" water services have been changed to 1"water services. aS-' Cao Waterline W-11 alignment revlsad. Annotation clean up for tegibilily (n sanitary sewer and storm plan and profile sheets. �\ 1 Revised parallel parking for handicap accessibility. Revised parallel parking striping. �X� Additional concrete for sidewalk due to parking revisions. Additional pavement due to parking ravislons. Additional signage parking revisions. NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: APPROVED: APPROVED: APPROVED: Pelolon Land Solutions/ Westwood D.R. Harlon Wright Construction Glenn By. Eric Day' Bv: By; Name: RavrnonGemes Nam¢y�✓��� Title: Prole Prefect n i Title: %J�A1sf1�"'�...-. VP of Project Management Title: Titlo; Ye � RECEIVED By Khal Jaafari at 2:37 pm, Oct 07, 2024 You are directed to make the following changes in the contract documents: PAVEMENTIMPROVEMENTS CITY BID ITEM Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Cost City Cost TOTAL 4 3213.0301 1740 SF 4" Concrete Sidewalk $7.60 $13,224.00 $13,224.00 12 3213.0501 1 EA Barrier Free Ramp Type R-1 $3250.00 $3,250.00 $3,250.00 30 3213.0401 200 SF 6" 3600 PSI Concrete Driveway on Brookite St. $9.00 $1,800.00 $1,800.00 31 3305.0111 1 EA Valve Box Adjustment $250.00 $250.00 $250.00 32 9999.0025 910 SF Stamped Concrete Crosswalk $36.50 $33,215.00 $33,215.00 33 3217.0503 50 LF 24" Solid Pavement Marking Paint (W) $15.00 $750.00 $750.00 34 9999.0026 2 EA Pedestrian Crosswalkw/AHEAD Sign on Post $675.00 $1,350.00 $1,350.00 35 9999.0027 2 EA Pedstrian Crosswalk w/Downward Diaginal Arrow Sign $675.001 $1,350.00 1 $1.350.00 2 9999.0003 219 SY 7.5" Concrete Pvmt ($57.75)1 ($12,647.25) 1 ($12,647.25) 5 9999.0004 1 34 SF 4" Concrete Sidewalk ( 6' wide) ($7.60)1 ($258.40) 1 ($258.40) 13 3213.0506 1 1 EA Barrier Free Ramp Type P-1 ($2,200.00)1 ($2,200.00) 1 ($2,200.00) 29 9999.0024 1 1 EA Handicap Sign on Post 1 ($600.00) 1 ($600.00) 1 ($600.00) PAVEMENT IMPROVEMENTS 1 $39,483.35 $0.00 1 $39,483.35 Asterisk (*) indicates New Pay Item REASONS FOR CHANGE ORDER Addition of 6" Commercial 3600 psi Concrete Driveway Addition of 4" Conc. Sidewalk Addition of Stamped Conc. Crosswalk Addition of Pavement Marking Addition of Signage Removal of Parallel parking Removal of Handicap Sign Removal of 4" Conc. Sidewalk (6' Wide) Removal of P-1 Ramp Addition of R-1 Ramp Revised: 12-17-2018 Page 2 RECOMMENDED: Peloton Land Solutions/ Westwood By: 9/13/24 Name: Raymon Gerges Title: Project Engineer APPROVAL RECOMMENDED: RECEIVED By Khal Jaafari at 2:37 pm, Oct 07, 2024 D.R. Horton - Texas, LTD. —� G By:1 -: / Name: VufT ,." 13cKe . -V7-14 Tale: -0rd_ o..-- Leo ,- APPROVED: APPROVED: Glenn Th By: ;�W Name: och( rd Tr' eff Title: CONTRACT MANAGER APPROVED AS TO FORM AND LEGALITY: By: By: By: Name: N/A Name: N/A Name: N/A Title: Title, Title: RECOMMENDED: ATTEST ' Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible By: for the monitoring and administration of this contract, include N/A ensuring all performance and reporting requirements. Name: Jannette S. Goodall City Secretary f7l There are NO City Funds associated with this Contract Title: ❑ There are City Funds associated with this Contract M&C Number: NIA M&C Date Approved: N/A Revised: 12-17-2018 Page 3 PROJECT NAME: CONTRACT: CFA # CITY PROJECT # CITY SECRETARY CONTRACT # FID # X# FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Rock Creek Phase 1 Water, Sewer, and Drainage CFA23-0085 103931 30114-0200431-103931-EO7685 X-27242 W-2819 Richard Walden Khal Jaafari CITY PARTICIPATION] NO CHANGE ORDER No: 2A Phone No: (682) 249-3078 RECEIVED Phone No: (817) 392-7872 By Khal Jaafari at 2:24 pm, Oct 07, 2024 WATER SEWER CONTRACT UNIT DRAINAGE PAVING STREET LIGHTS CONTRACT Developer Developer DAYS Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Cost City Cost ORIGINAL CONTRACT $2,021,467.00 $0.00 I $1,357,711.50 $0.00 I $3,364,319.00 $0.00 $0.00 $0.00 $0.00 $0.00 I 150 EXTRAS TO DATE $0.00 $0.00 I $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I 0 CREDITS TO DATE $3,071.00 $0.00 I $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACT TO DATE $2,018,396.00 $0.00 I $1,357,711.50 $0.00 I $3,364,319.00 $0.00 $0.00 $0.00 $0.00 $0.00 I 150 AMOUNT OF PROP. CHANGE ORDER ($19,394.00) $0.00 I ($13,576.00) $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 I 0 REVISED CONTRACT AMOUNT $1,999,002.00 $0.00 I $1,344,135.50 $0.00 I $3,364,319.00 $0.00 $0.00 $0.00 $0.00 $0.00 I 150 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,999,002.00 $1,344,135.50 $3,364,319.00 $0.00 $0.00 REVISED COST SHARE Dev. Cost: $6,707,456.50 City Cost: $0.00 TOTAL REVISED CONTRACT $6,707,456.50 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: CITY BID ITEM PAY ITEM # # QUANTITY UNIT 14 3312.2203 3 EA 12 3312.2203 13 EA PAY ITEM # 4 Asterisk (*) indicates New Pay Item REASONS FOR CHANGE ORDER CITY BID ITEM # QUANTITY UNIT 3331.3101 8 EA Removal of (10) 1" Domestic Water Services Removal of (3) 1" Irrigation Water Services Addition of (2) 2" Domestic Water Services Addition of (1) 2" Irrigation Water Service Removal of (8) 4" Sewer Services WATERIMPROVEMENTS Developer ITEM DESCRIPTION CFW Unit Price UNIT PRICE Cost City Cost TOTAL 2" Water Service $2761.00 $8,283.00 $8,283.00 1" Water Service ($2,129.00) ($27,677.00) ($27,677.00) WATER IMPROVEMENTS ($19,394.00) $0.00 ($19,394.00) SEWER IMPROVEMENTS Developer ITEM DESCRIPTION CFW Unit Price UNIT PRICE Cost City Cost TOTAL 4" Sewer Service -$1697.00 ($13,576.00) ($13,576.00) SEWER IMPROVEMENTS ($13,576.00) $0.00 ($13,576.00) RECEIVED By Khal Jaafari at 2:24 pm, Oct 07, 2024 Revised: 12-17-2018 Page 2 RECOMMENDED: Peelllooton Land Solutions/ Westwood By: /13/2024 Name.��/ lRaymon Gerges Title: project Engineer APPROVAL RECOMMENDED: APPROVED: D.R. Horton - Texas, LIP_ ELy Name: trrr l�ao—,o.,--ry Title: 0,'- La.•o . APPROVED: RECEIVED By Khal Jaafari at 2:24 pm, Oct 07, 2024 APPROVED: Wright Construction Chad San Juan By. Name: Eric Day Title: VP of Project Management APPROVED A5 TO FORM AND LEGALITY: By: By: By: Name: N/A Name: N/A Name: N/A Title: Title: Title: RECOMMENDED: ATTEST ` Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible By: for the monitoring and administration of this contract, include N/A ensuring all performance and reporting requirements. Name: Jannette S. Goodall City Secretary [ J There are NO City Funds associated with this Contract Title: There are City Funds associated with this Contract M&C Number: N/A M&C Date Approved: N/A Revised: 12-17-2018 Page 3 PROJECT NAME: CONTRACT: CFA # CITY PROJECT # CITY SECRETARY CONTRACT # FID # X# FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Rock Creek Phase 1 Paving CFA23-0085 103931 30114-0200431-103931-EO7685 X-27242 W-2819 Richard Walden Khal Jaafari CITY PARTICIPATION:I NO CHANGE ORDER No: 2B Phone No: (682) 249-3078 RECEIVED Phone No: (817) 392-7872 By Khal Jaafari at 2:37 pm, Oct 07, 2024 WATER SEWER Developer Cost City Cost Developer Cost ORIGINAL CONTRACT $0.00 $0.00 I $0.00 EXTRAS TO DATE $0.00 $0.00 I $0.00 CREDITS TO DATE $0.00 $0.00 I $0.00 CONTRACT TO DATE $0.00 $0.00 I $0.00 AMOUNT OF PROP. CHANGE ORDER $0.00 $0.00 I $0.00 REVISED CONTRACT AMOUNT $0.00 $0.00 I $0.00 TOTAL REVISED CONTRACT AMOUNT PER CONTRACT UNIT DRAINAGE ty Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Developer Cost I $0.00 I $0.00 I $0.00 I $0.00 I $0.00 I $0.00 City Cost $0.00 $0.00 $0.00 UNIT $0.00 $0.00 REVISED COST SHARE Dev. Cost: $3,761,287.70 TOTAL REVISED CONTRACT $0.00 City Cost: $3,761,287.70 PAVING STREET LIGHTS CONTRACT Developer DAYS eveloper Cost City Cost Cost City Cost $3,716,952.20 $0.00 I $0.00 $0.00 60 $4,852.15 $0.00 I $0.00 $0.00 3 $0.00 I $0.00 $0.00 $3,721,804.35 $0.00 I $0.00 $0.00 63 $39,483.35 $0.00 I $0.00 $0.00 4 $3,761,287.70 $0.00 I $0.00 $0.00 67 $3,761,287.70 I $0.00 $0.00 Revised: 12-17-2018 Page 1 RECEIVED By Khal Jaafari at 2:37 pm, Oct 07, 2024 You are directed to make the following changes in the contract documents: PAVEMENTIMPROVEMENTS CITY BID ITEM Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Cost City Cost TOTAL 4 3213.0301 1740 SF 4" Concrete Sidewalk $7.60 $13,224.00 $13,224.00 12 3213.0501 1 EA Barrier Free Ramp Type R-1 $3250.00 $3,250.00 $3,250.00 30 3213.0401 200 SF 6" 3600 PSI Concrete Driveway on Brookite St. $9.00 $1,800.00 $1,800.00 31 3305.0111 1 EA Valve Box Adjustment $250.00 $250.00 $250.00 32 9999.0025 910 SF Stamped Concrete Crosswalk $36.50 $33,215.00 $33,215.00 33 3217.0503 50 LF 24" Solid Pavement Marking Paint (W) $15.00 $750.00 $750.00 34 9999.0026 2 EA Pedestrian Crosswalk WAHEAD Sign on Post $675.00 $1,350.00 $1,350.00 35 9999.0027 2 EA Pedstrian Crosswalk w/Downward Diaginal Arrow Sign $675.00 $1,350.00 $1,350.00 2 9999.0003 219 SY 7.5" Concrete Pvmt ($57.75) ($12,647.25) ($12,647.25) 5 9999.0004 34 SF 4" Concrete Sidewalk (6' wide) ($7.60) ($258.40) ($258.40) 13 3213.0506 1 EA Barrier Free Ramp Type P-1 ($2,200.00) ($2,200.00 (2,200.00) 29 9999.0024 1 EA Handicap Sign on Post ($600.00) ($600.00) ($600.00) PAVEMENT IMPROVEMENTS $39,483.35 $0.00 $39,483.35 Asterisk (*) indicates New Pay Item REASONS FOR CHANGE ORDER Addition of 6" Commercial 3600 psi Concrete Driveway Addition of 4" Conc. Sidewalk Addition of Stamped Conc. Crosswalk Addition of Pavement Marking Addition of Signage Removal of Parallel parking Removal of Handicap Sign Removal of 4" Conc. Sidewalk (6' Wide) Removal of P-1 Ramp Addition of R-1 Ramp Revised: 12-17-2018 Page 2 RECOMMENDED: P""ef�oton Land Solutions/ Westwood By: ,fir 9/13/24 Name: Raymon Gerges Title: Project Engineer APPROVAL RECOMMENDED: i RECEIVED By Khal Jaafari at 2:37 pm, Oct 07, 2024 APPROVED: O.R. Horton - Texas, LTD. By:i Name: Vt�ST[.✓«c.e2TlL Title: L91d, APPROVED: APPROVED: Glenn Th By: , / Name: Rlc acor I rip ®II Tide, L;JNTRAGT MANAGER APPROVED AS TO FORM AND LEGALITY: By: _ By By: Name: N/A Name' N/A Name: NIA Title: Title _ Title: RECOMMENDED: ATTEST • Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible By. _ for the monitoring and administration of this contract, include. N/A ensuring all performance and reporting requirements. Name: Jannette S. Goodall City Secretary (] There are NO City Funds associated with this Contract Title: There are City Funds associated with this Contract M&C Number: N/A M&C Date Approved: N/A Revised: 12-17-2018 Page 3 PROJECT NAME: CONTRACT: CFA # CITY PROJECT # CITY SECRETARY CONTRACT # FID # X# FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Rock Creek Phase 1 Water, Sewer, and Drainage CFA23-0085 103931 30114-0200431-103931-E07685 X-27242 W -2819 Richard Walden Khal Jaafari CITY PARTICIPATION:1 Phone No: Phone No: WATER SEWER Developer Cost City Cost Developer Cost City Cost ORIGINAL CONTRACT $2,021,467.00 I $0.00 I $1,357,711.50 $0.00 EXTRAS TO DATE $0.00 I $0.00 I $0.00 $0.00 CREDITS TO DATE $22,465.00 I $0.00 I $13,576.00 $0.00 CONTRACT TO DATE $1,999,002.00 I $0.00 I $1,344,135.50 $0.00 AMOUNT OF PROP. CHANGE ORDER $2,761.00 I $0.00 I $0.00 $0.00 REVISED CONTRACT AMOUNT $2,001,763.00 I $0.00 I $1,344,135.50 $0.00 TOTAL REVISED CONTRACT AMOUNT PER UNIT $2,001,763.00 $1,344,135.50 REVISED COST SHARE Dev. Cost: $6,710,217.50 TOTAL REVISED CONTRACT Me CHANGE ORDER No: 3A (682) 249-3078 RECEIVED (817) 392-7872 By Khal Jaafari at 11:45 am, Oct 28, 2024 CONTRACT UNIT DRAINAGE PAVING STREET LIGHTS CONTRACT leveloper Developer DAYS :ost City Cost Developer Cost City Cost Cost City Cost $3,364,319.00 $0.00 I $0.00 $0.00 I $0.00 $0.00 150 $0.00 I $0.00 I $0.00 $0.00 I $0.00 $0.00 0 $0.00 I $0.00 I $0.00 $0.00 I $0.00 $0.00 $3,364,319.00 I $0.00 I $0.00 $0.00 I $0.00 $0.00 150 $0.00 I $0.00 I $0.00 $0.00 I $0.00 $0.00 0 $3,364,319.00 I $0.00 I $0.00 $0.00 I $0.00 $0.00 150 $3,364,319.00 $0.00 $0.00 City Cost: $0.00 $6,710,217.50 Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: CITY BID ITEM PAY ITEM # # QUANTITY 14 3312.2203 1 Asterisk (*) indicates New Pay Item RECEIVED By Khal Jaafari at 11:45 am, Oct 28, 2024 WATERIMPROVEMENTS Developer UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Cast City Cost TOTAL EA 2" Water Service 1 $2761.00 $2,761.00 $2,761.00 WATER IMPROVEMENTS $2-761.00 $D.DD $2,761.00 REASONS FOR CHANGE ORDER Addition of (1) 2" Irrigation Water Service RECOMMENDED: APPROVED: APPROVED: R-eloton Land Solutions/ Westwood D.R. Horton - Texas, LTD. Wright Construction By: 10/7/2024 By: f! / l� % By: � Eric Day Name: Raymon Gerges Name: /USrr �/ /�aLTGAt.w\�(% Name: Title: Project Engineer title: Title:VP of Project Management APPROVAL RECOMMENDED: By: Name: N/A Title: RECOMMENDED: By: Name: Title: M&C Number: N/A M&C Date Approved: N/A APPROVED: APPROVED AS TO FORM AND LEGALITY: By: By Name: N/A Name: N/A Title: Title: ATTEST * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include N/A ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary 0 There are NO City Funds associated with this Contract ❑ There are City Funds associated with this Contract Revised: 12-17-201 S Page 2 FORTWORTH. M, TRANSPORTATION AND PUBLIC WORKS January 27, 2025 Glenn Thurman inc. 3212 Pioneer Rd, Mesquite, Tx 75180 RE: Acceptance Letter Project Name: Rock Creek Phase 1 Project Type: Paving City Project No.: 103931 To Whom It May Concern: On January 8, 2025 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on January 24, 2025. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on January 24, 2025, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at khal.jaafari@FortWorthTexas.Gov. Sincerely, Khal Jaafari, Project Manager Cc: Richard Walden, Inspector Gary Deyon, Inspection Supervisor Edward Davila, Senior Inspector Andrew Goodman, Program Manager Peloton Land Solutions, Consultant Glenn Thurman, Inc., Contractor D.R Horton, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19