Loading...
HomeMy WebLinkAboutContract 62423-FP1-FP1 City Secretary 62423 Contract No. FORT WORTH. Date Received 3/18/2025 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Cold Springs Road City Project No.: 105448 Improvement Type(s): Water ❑x Sewer ❑ Original Contract Price: $122,299.00 Amount of Approved Change Order(s): $0.00 Revised Contract Amount: $0.00 Total Cost of Work Complete: $122,299.00 ndn4a &Wtw Mar 17 2025 Donald Burns (Mar 17, 2025 15:2 CD 1) Contractor Date President Title R & D Burns Bros. Inc. Company Name Mar 17, 2025 Pr ect Inspector Date Mar 18, 2025 Project Manager Date Kandice Merrick (Mar 18, 202511:45 CDT) M a r 18, 2025 CFA Mang er Manger Date Lauren Pn2025 eur (Mar 18, 12:57 CDT) M a r 18, 2025 TPW Director Date M a r 20, 2025 Asst. City Manager Date OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Cold Springs Road City Project No.: 105448 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes ❑ N/A Pipe Report: ❑x Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid — Consent of Surety Statement of Contract Time Contract Time: 26 WD Days Charged: 19 WD Work Start Date: 2/3/2025 Work Complete Date: 3/7/2025 Completed number of Soil Lab Test: 15 Completed number of Water Test: 2 Page 2of2 FORT WORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name 1901 COLD SPRINGS ROAD Contract Limits Project Type WATER City Project Numbers 105448 DOE Number 5448 Estimate Number 0 Payment Number 1 City Secretary Contract Number Contract Date Project Manager NA Contractor R&D BURNS BROS. INC. PO BOX 786 Inspectors For Period Ending BURLESON, TX 76097 T. GARDNER / T. BARKER Contract Time Days Charged to Date Contract is 100.00 3/7/2025 WD 2WD 19 Complete Wednesday, March 12, 2025 Page 1 of 4 City Project Numbers 105448 DOE Number 5448 Contract Name 1901 COLD SPRINGS ROAD Estimate Number 0 Contract Limits Payment Number I Project Type WATER For Period Ending 3/7/2025 Project Funding UNIT L• WATER IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 REMOVE 8" WATER LINE 112 LF $50.00 $5,600.00 112 $5,600.00 2 4"-12" PRSSUR PLUG 1 EA $500.00 $500.00 1 $500.00 3 4"-12" WATER ABANDOMENT PLUG 2 EA $500.00 $1,000.00 2 $1,000.00 4 SALVAGE FIRE HYDRANT 2 EA $1,000.00 $2,000.00 2 $2,000.00 5 WATER LINE GROUTING 27 CY $750.00 $20,250.00 27 $20,250.00 6 SALVAGE 5/8" WATER METER 3 EA $500.00 $1,500.00 3 $1,500.00 7 10' WIDE ASPHALT REPAIR, INDUSTRIAL 100 LF $48.00 $4,800.00 100 $4,800.00 8 8" CONCRETE DRIVEWAY REPLACEMENT (CO 0 SF $21.00 $0.00 0 $0.00 2) 9 UTILITY SERVICE SURFACE RESTORATION 34 SY $45.00 $1,530.00 34 $1,530.00 HYDROMULCH 10 EXPLORATION EXCAVATION OF EXISTING 1 EA $3,500.00 $3,500.00 1 $3,500.00 UTILITIES 11 TRENCH SAFETY 138 LF $1.00 $138.00 138 $138.00 12 DUCTILE IRON WATER FITINGS W/ RESTRAINT 1 TN $12,500.00 $12,500.00 1 $12,500.00 13 6" PVC WATER PIPE 23 LF $165.00 $3,795.00 23 $3,795.00 14 8" PVC WATER PIPE 115 LF $175.00 $20,125.00 115 $20,125.00 15 FIRE HYDRANT 1 EA $8,500.00 $8,500.00 1 $8,500.00 16 5/8" WATER SERVICE (CO#1) 0 EA $3,000.00 $0.00 0 $0.00 17 2" WATER SERVICE I EA $8,500.00 $8,500.00 1 $8,500.00 18 6" GATE VALVE 2 EA $3,000.00 $6,000.00 2 $6,000.00 19 8" GATE VALVE I EA $4,000.00 $4,000.00 1 $4,000.00 20 CONNECTION TO EXISTING 4"-12" WATER MAIN I EA $5,000.00 $5,000.00 1 $5,000.00 21 TRAFFIC CONTROL 1 MO $800.00 $800.00 1 $800.00 22 1" WATER SERVICE (CO#1) 1 EA $3,000.00 $3,000.00 1 $3,000.00 23 9" CONCRETE DRIVEWAY REPLACEMENT (CO 710.7444 SF $13.03 $9,261.00 710.7444 $9,261.00 #2) Sub -Total of Previous Unit $122,299.00 $122,299.00 Wednesday, March 12, 2025 Page 2 of 4 City Project Numbers 105448 Contract Name 1901 COLD SPRINGS ROAD Contract Limits Project Type WATER Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 1 Change Order Number 2 Total Contract Price DOE Number 5448 Estimate Number 0 Payment Number 1 For Period Ending 3/7/2025 $122,299.00 $0.00 $0.00 $122,299.00 Total Cost of Work Completed $122,299.00 Less % Retained $0.00 Net Earned $122,299.00 Earned This Period $122,299.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $122,299.00 Wednesday, March 12, 2025 Page 3 of 4 City Project Numbers 105448 DOE Number 5448 Contract Name 1901 COLD SPRINGS ROAD Estimate Number 0 Contract Limits Payment Number 1 Project Type WATER For Period Ending 3/7/2025 Project Funding Project Manager NA City Secretary Contract Number Inspectors T. GARDNER / T. BARKER Contract Date Contractor R&D BURNS BROS. INC. Contract Time 21 WD PO BOX 786 Days Charged to Date 19 WD BURLESON, TX 76097 Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $122,299.00 Less % Retained $0.00 Net Earned $122,299.00 Earned This Period $122,299.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $122,299.00 Wednesday, March 12, 2025 Page 4 of 4 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: 1901 COLD SPRINGS ROAD CONTRACT: ,C, Water CHANGE ORDER No: ICFA # 24.0100 CITY PARTICIPATION:( NO CITY PROJECT # 105448 ICFFY SECRETARY CONTRACT # 62423 IFID # 30114-0200431-105448-E07685 1 1X # IX-28099 FILE # !NIA INSPECTOR: Ty Barker Phone No: 817-992-3991 � REVIEWED PROJECT MANAGER: Debbie Willhelm Phone No: 817-392-2481 By Debbie J. Willhelm at 11:43 am, Jan 29, 2025 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREETLIGHTS CONTRACT ` Develul;er Cost City Cost Developer Cost City Cosy Developer Cost City Cost .:, vc.:.per Cost City Cost Dove *per Cost City Cost DAYS `(ORIGINAL CONTRACT $122,299.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 21 1EXTRAS TO DATE $0.00 1CREDITs TO DATE $0.00 CONTRACT TO DATE $122,299,011 (AMOUNT OF PROP. CHANGE ORDER $0.00 IREV{SED CONTRAQT AMOUNT $122,299.00 TOTAL REVISED CaNTRACT AMOUNT PERT $0.00 $0.00 $0.00 $0.00 i0.00 S0.o0 $0.00 $0.00 $0,00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 -GO $0.00 $0.00 S0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 21 0 21 ( UNIT $122.299,00 $0.00 $Goo $0.00 50.00 REVISED COST SHARE Dev. Cost: $122,299.00 City Cosy $0.00 I! TOTAL REVISED CONTRACT $122,299.00 Revised: 12-17-201a Page 1 You are directed to make the following changes in the contract documents: PAY ITEM # 16 NEW* Asterisk (^) Indicates New Pay Item CITY BID ITEM QUANTITY 13312.2003 3312.2003 1 UNIT I: WATER IMPROVEMENTS UNIT ITEM DESCRIPTION CFW Unit Prim EA 518" WATER SRVICE $0.00 7 EA I ' WATER SERVICE I $0.00 TOTAL UNIT I: WATER IMPROVEMENTS UNIT PRICE I Devev ' I City Cost I TOTAL 000 F t3..001 $ 15 ;s..xxl x, $3000.001 $ 3.000.00 $ - $ 3,000.00 $ f i Revised: 12-17-2018 Page 2 REASONS FOR CHANGE ORDER Domestic water service revised from 6/8' to 1'. Changes correspond to Plan Revision I as shown on sheet C-D6 of the construction plans RECOMMENDED: APPROVED: APPROVED: HDR Engineering Texas Materials GroupJ R8 \Bur �a'_ Name: Conor Stuart, P-E. Name: Web McConnell Name: Donnie Burns Title: Project Enqineer Title: Owner Title: r•.,...�.. APPROVAL RECOMMENDED. APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Funding Dapartrrrent CFW - Assistant City Manager CFW - Assistant City Attorney By: N/A By. WA By. ___NIA Name: Name: Name: Title: Title: Title: RECOMMENDED: CFW- 'Contract Compliance Manager ATTEST ' Contract Compliance Manager {Project Managery By signing I acknowledge that I am the person responsible By: N/A WA for the monitoring and administration of this Contract, include ensuring all performance and reporting requirements. Name: Debbie Willhelm, P.E. Jannehe S. Goodall City Secretary 0 There are NO City Funds associated with this Contract Title: Senior Professional Engineer There are City Funds associated with this Conbact M&C Number: WA M&C Date Approved: WA Revised: 12.17-2018 Page 3 1 7 �RE-- �-�-R OLR.�TR�Y. D 010 . '. 11"P11=1 M- I. L R-T- O 000 �E ='TF T1 T� N 'El-E ASH-CIL -BNT ADDIT111 I IT, 11 l__NT MT. L r T .NET.-EIINT .-K..- FITI 7 oz ----- ---------- -------- — ------------------------ c TBR- -TA R T Q :' A Q f . A Q f . A Q :'�TR Q f _ A Q :'�TR Q f . A Q :.'�TR Q f . A Q :.'�TR 'E A Q f . " " "D'S�L'E�� _AL A p L Q :T T Q :.�TR TR TR Q :.�TR PER MH M_ �:.�TR A N�M' xE ti BLOCK 1 -ND < AD11OOILN "-E-E-E RE.E- .-L- TEE L K__T I'N.-L'6 TEV. 11AL LVE 'E .L. EI LEGEND I llUl AZENTC = . A ff, ZA 11 A-11E BE.�'- BY M A ZE_R.TT�=REU ZL PI Tl"NE ". � !j-R IH�l ANI - Al I III IRI HIRAN' III IN A-IANIE I -T I lW=%R.MZNM.%E­.E AEEPU -N 'IT T:7=" -11-1 j� MM=Z -DE I-. E �.Ull ­ mEe '�X.M.E ro P� �-T -EK sro,x 'E_ IIN'T"Y A '-ATN 2L U..ER IALRIIME, =EO ­-E pTM no-wg IR -11R -NIR-RT 11 F-T WORTH TEXBS ....EoxA . Y P.T.ENT -ER �E $ @1 1901 COLD SPRINGS ROAD WATERLINE PLAN --D "Ll- � -I P- .AL: C-06 c", REASION I a R�.R "=25 T., N .. N .. 11 -11 1- N. FORT WORTH TRANSPORTATION AND PUBLIC WORKS PIPE REPORT FOR: PROJECT NAME: 1901 Cold Springs Road CITY PROJECT NUMBER: 105448 WATER PIPE LAID SIZE TYPE OF PIPE 8" PVC 6" PVC LF 115 LF 23 LF FIRE HYDRANTS: 1 VALVES (16" OR LARGER) N/A PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: 1" COPPER 1 EA 2" COPPER 1 EA SEWER PIPE LAID SIZE TYPE OF PIPE LF PIPE ABANDONED SIZE TYPE OF PIPE LF DENSITIES: NEW SERVICES: TRANSPORTATION AND PUBLIC WORKS The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311 (817) 392 - 7941 • Fax: (817) 392 - 7845 FORTWORTH. TRANSPORTATION AND PUBLIC WORKS March 11, 2025 R & D Burns Bros. P. O. Box 786 Burleson, TX. 76097 RE: Acceptance Letter Project Name: 1901 Cold Springs Road Project Type: Water Project No.: 105448 To Whom It May Concern: On March 10, 2025 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 10, 2025 , which is the date of the final inspection and will extend of five (5) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817392- 2481. Sincerely, fwx � Andrew Goodman, Project Manager Cc: Ty Barker, Inspector Troy Gardner, Inspection Supervisor Ariel Duarte, Senior Inspector Andrew Goodman, Program Manager HDR Engineering, Consultant R & D Burns Bros. INC, Contractor Texas Materials , Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Signature:5�` Email: allison.tidwell@fortworthtexas.gov ►� 9 • 1111 STATE OF TEXAS Before me, the undersigned authority, a Notary Public in the state and county aforesaid, on this day personally appeared (Name) (Title) r—T �4 '6 iA.,-o , (un+L4-5 JJ-pt L , known to me to be a credible person, who being by me duly sworn, upon his oath deposed and said; That all persons, firms, associations, corporations or other organizations furnishing labor an or materials have een ,par in ; That the wage scale established by the City Council in the City of Fart Worth has been paid; and That there are no claims pending for personal injury and/or property damages; On Contract described as; Cold Subscribed and sworn before me on this 14)a r,-c� KA13EN BURNS LANE State of Texas Noiaty Public. �N;•'Y� Comm. Expires 11-22 2028 Notary 4D 125125363 BY t I day of 20 Z S- Notary Public in Tarrant County, Texas CONSENT OF SURETY COMPANY TO FINAL PAYMENT RJR DOCUMENT G707 PROJECT: TO (Contractor) F OWNER ARCHITECT L CONTRACTOR X SURETY H OTHER L l 1901 Cold Springs Road, CPMN: 105448 R&D Burns Brothers, Inc. P.O. Box 786 Burleson, TX 76097 J OBLIGEE: City of Fort Worth Bond #101299123 PROJECT NO: 105448 CONTRACT AMOUNT: $122,299.00 CONTRACT DATE: 12-19-2024 In accordance with the provisions of the Contract between the Contractor and the Obligee as indicated above (here insert name and address of Surety Company) Merchants Bonding Company (Mutual) P.O. Box 14498 Des Moines, IA 50306 ;SURETY COMPANY, on bond of {here insert name and address of Obligee} City of Fort Worth 200 Texas Street Fart Worth, TX 76102 OBLIGEE, hereby approves of the final payment to the Obligee and agrees that final payment to the Contractor shall not relieve the Surety Company of any of Its obligations to (here insert name and address of Contractor) R&D Burns Brothers, Inc. P.O. Box 786 Burleson, TX 76097 CONTRACTOR, as set forth in the said Surety Company's bond. IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this 11 ah day of March, 2025. Attest: ft Zaal.', , Merchants Bondina Comnanv (Mutual? Surety Company Sigr9ture of Authorized Representative (Seal): Pavton Blanchard.Attornev-in-Fact Title NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS. Current Edition AIA DOCUMENT G707 • CONSENT OF SURETY COMPANY TO FINAL PAYMENT • APRIL 1970 EDITION • AIAO ONE PAGE 01970 • THE AMERICAN INSTITUTE OF ARCHITECTS. 1735 NEW YORK AVE., NW, WASHINGTON, D.C. 20006 ER C H[A..NTS BONDING COMPANY„ POWER OF ATTORNEY Know All Persons By These Presents, that MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., both being corporations of the State of Iowa, d/b/a Merchants National Indemnity Company (in Califomia only) (herein collectively called the "Companies") do hereby make, constitute and appoint, individually, Allison C Lueck; Bryan Simpson; Cadda E Eery; Caitlin Kelley; Donna Martinez; H E Wilkins; Haley Crocker; James R Reid; Jessica Turner; Julie Lindsey; Kay Blair; Lindsay Senior; Malachi Smith; Marie Reyna; Markham Paukune; Michelle Blizzard; Payton Blanchard; Ralph E French; Sandra Fuller; Shane Smith; Shawn Blacklock; Teresa C Smith; Tina LaValley; William Blanchard; William Mitchell Jennings their true and lawful Attorney(s)-in-Fact, to sign its name as surety(ies) and to execute, seal and acknowledge any and all bonds, undertakings, contracts and other wriften instruments in the nature thereof, on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. This Power -of -Attorney is granted and is signed and seated by facsimile under and by authority of the following By -Laws adopted by the Board of Directors of Merchants Bonding Company (Mutual) on April 23, 2011 and amended August 14, 2015 and April 27, 2024 and adopted by the Board of Directors of Merchants National Bonding, Inc., on October 1E. 2015 and amended on April 27. 2024. "The President, Secretary, Treasurer; or any Assistant Treasurer or any Assistant Secretary or any Vice President shall have power and authority to appoint Attorneys -in -Fact, and to authorize them to execute on behalf of the Company, and attach the seal of the Company thereto, bonds and undertakings, recognizances, contracts of indemnity and other writings obligatory in the nature thereof." "The signature of any authorized officer and the seal of the Company may be affixed by facsimile or electronic transmission to any Power of Attorney or Certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or other suretyship obligations of the Company, and such signature and seal when so used shall have the same force and effect as though manual€y fixed," In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and aut hority hereby given to the Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consent{ ng to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner - Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation, In Witness Whereof, the Companies have caused this instrument to be signed and sealed this 29th day of July , 2024 ly �••• '•,�+� • • _ • • • "• MERCHANTS BONDING COMPANY (MUTUAL) �i+•��lP 0 44 `s� •� �Q\GqA •• MERCHANTS NATIONAL BONDING, INC. P r i dlbla MERCHANTS NATIONAL INDEMNITY COMPANY 2003 ram_ 1933 �; By .V• • I. 4, • :••' ..... : ' V1,i..... 'a . President STATE OF IOWA `'' r •.+`•• • .... • "\•-. COUNTY OF DALLAS ss. •"•'•' On this 29th day of July 2024 before me appeared Larry Taylor, to me personally known, who being by me duly sworn did say that he is President of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC.; and that the seals affixed to the foregoing instrument are the Corporate Seals of the Companies; and that the said instrument was signed and sealed in behalf of the Companies by authority of their respective Boards of Directors. Penni Miller rr� - vCommission Number 787952 t • + My Commission Expires j fOW, January 20, 2027 Notary Lp blfc (Expiration of notary's commission does not invalidate this instrument) I, Elisabeth Sandersfeld, Secretary of MERCHANTS BONDING COMPANY (MUTUAL) and MERCHANTS NATIONAL BONDING, INC., do hereby certify that the above and foregoing is a true and correct copy of the POWER -OF -ATTORNEY executed by said Compan ies,which is still in full force and effect and has not been amended or revoked. In Witness Whereof, 1 have hereunto set my hand and affixed the seal of the Companies on this 11th day of March , 2025 . ,••��►o fu,�� •., • o�N� . cad•. %Q • qR Aq ? =2 -C,•w: :x 2003 :yyxj `�'~ 1933 c' Secretary