HomeMy WebLinkAboutContract 61071-FP1FORT WORTH,
TRANSPORTATION AND PUBLIC WORKS
NOTICE OF PROJECT COMPLETION
-FP1
City Secretary No. CS61071
Date Received: 3/28/2025
City Project N!?: 104937
Regarding contract CS61071 2024 Asphalt Resurfacing Contract 5 for as required by the
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT as approved by City Council on 2/27/2024 through
M&C 24-0032 the director of the TRANSPORTATION AND PUBLIC WORKS DEPARTMENT upon the
recommendation of the Assistant Director of the Transportation & Public Works Department has accepted the project as
complete.
Original Contract Amount:
Amount of Approved Change Orders:
Revised Contract Amount:
Total Cost Work Completed:
Less Deductions:
Liquidated Damages:
Pavement Deficiencies:
Total Deduction Amount:
Total Cost Work Completed:
Less Previous Payments:
Final Payment Due
��t2ac 2- ull as
Patricia L. Wadsack (Mar 27, 202511:12 CDT)
Recommended for Acceptance
Asst. Director, TPW - Capital Delivery
X.71a-1
Lauren Prieur (Mar 27, 2025 11:13 CDT)
$ 2,741,253.55 Days 210
$ 258,323.58 Ns 2 Days Added by CO 60
$ 2,999,577.13 Total Days 270
$ 1,881,512.56 Days Charged 212
Days @ $ / Day
$ 1,881,512.56
$ 1,787,436.94
$ 94,075.62
M a r 27, 2025
Date
Accepted
Director, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT
v- - -- -- --- -- - -
Asst. City Manager
Comments:
Mar 27, 2025
Date
M a r 28, 2025
Date
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City Secretary Contract Number:
CS61071
Project:
104937-104937 - 2024 Asphalt F
Contract Name:
2024 Asphalt Resurface Contr 5
To:
PEACHTREE CONSTRUCTION LTD
5801 PARK VISTA CIR
KELLER, TX 76248
Supplier ID:
0000007231
Contract Summary:
Contract 5
Purchase Order:
NA
Invoice Number:
CS61071-08-FINAL+PAYAP-11
Invoicing Period (From — To):
02.01.2025 to 02.28.2025
FORT WORTH,:,
TPW Construction Invoice
1.
Original Contract Amount
$2,741,253.55
2.
Net Change by Change Orders
$ 258,323.58
3.
Current Contract Amount (Line 1 +/- Line 2)
$2,999,577.13
4.
Total Completed and Stored to Date
$1,881,512.56
(Progress Estimate, Construction Allowance, and
Change Orders)
5.
Amount Retained (5.00%)
$ .00
6.
Amount Eligible to Date (Line 4 — Line 5)
$1,881,512.56
7.
Less Previous Payments (Line 6 from prior Invoice)
$1,787,436.94
8.
Amount Due this Application
$ 94,075.62
9.
Balance to Finish, Plus Retainage
$1,118,064.57
(Line 3 — Line 6)
10.
Contract Time
a. Days Awarded
210
b. Days Added by Change Order
60
c. Total Contract Days Awarded
270
d. Days Charged this Invoice
0
e. Days Charged from Previous Invoice(s)
212
f. Contract Days Remaining
58
Payment Application Date:
03.06.2025
Estimate Number:
8
Project Manager:
Hafez, Marwan
Payment Approvals
Roles
Date:
Inspector:
6vd- 57- c
03.06.2025
Sr. Inspector:
Pm
03.07.2025
Project Manager:
03.10.2025
Contractors Certification:
The Contractor certifies with the submittal of this document and associated Payment Request
Submittal on the City of Fort Worth eBuilder system that to the best of their knowledge:
(1) all previous progress payments received from Owner on account of Work done under the Contract have been applied on
account to discharge Contractor's legitimate obligations incurred in connection with Work covered by prior Applications for
Payment;
(2) title of all Work, materials and equipment incorporated in said Work or otherwise listed in or covered by this Application for
Payment will pass to Owner at time of payment free and clear of all Liens, security interests and encumbrances (except such as are
covered by a Bond acceptable to Owner indemnifying Owner against any such Liens, security interest or encumbrances); and
(3) all Work covered by this Application for Payment is in accordance with the Contract Documents and is not defective
Liquidated Damages @ $ 650.00 x day
_a/-
BTaylor (e 26, 20250929 CDT)
Consent of Surety
Affidavit of Bills Paid
Page 1 of 6
FORT WORTH.
TPW Construction Invoice
Funding Distribution:
Released Retainage
Funding Identification (FIDs) Amount Earned Retainage (FIDs) Retainage Amount to Pay
30100-0200431-5740010-104937-006280-9999 $ .00 30100-2060000-104937-RETAIN $ 0.00 $ 87,711.16
33002-0800450-5740010-100335-003780-9999 L $ .00 33002-2060000-100335-RETAIN $ 0.00 $ 6,364.46
$ 94,075.62
Contract Bid Items:
A
Bid Item
Description
Spec.
UoM
Bid
Unit Price
Bid Value
Est
No.
Section
Quantity
QL
No.
Insta
CY
1
$ 1,000.00
$ 1,000.00
P
Unit 0135.0201 Remobilization
1.001
Unit
0241.1300 Remove Conc Curb
LF
751
$
2.35
$ 3,174.85
1.002
& Gutter
Unit
3216.0102 7" Conc Curb and
LF
751
$
70.35
$ 95,042.85
1.003
Gutter
Unit
024 1. 0401 Remove Concrete
SF
1,500
$
2.25
$ 4,680.00
1.004
Driveway _
L
SF
Unit 3213.0401 6" Conc Driveway
1,500
$
18.10
$ 37,648.00
1.005
Unit
0241.0100 Remove Sidewalk
SF
685
$
2.25
$ 1,541.25
1.006
Unit
3213.03014"Conc Sidewalk
SF
685
$
11.10
$ 7,603.50
1.007
Unit
3213.0322 Conc Curb at Back
LF
100
$
44.80
$ 4,480.00
1.008
of Sidewalk (6 To 12 Inch Max)
Unit
3232.0100 Conc Ret Wall
SF
100
$
27.75
$ 2,775.00
1.009
Adjacent to Sidewalk (2 Ft To 4
Ft)
Unit
0241.1400 Remove Conc Valley
SY
30
$
20.05
$ 601.50
1.010
Gutter
L
Unit
3216.0301 7" Conc Valley
SY
30
182.40L
$ 5,472.00
1.011
Gutter
L$
Unit
0241.0300 Remove ADA Ramp
SF
805
$
2.25
_
$ 1,811.25
1.012
mated
antity
led this
:riod
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
0.000
D
E
F
Value this
Previously
Previously
Period
Installed
Installed
Quantity
Value
0.0000
$ .00
0 $ .00
0 $ .00
2,375.0100
$ 5,581.28
0 $ .00
2,375.0100
$ 167,081.96
0 $ .00
2,662.0100
$ 5,989.52
0 $ .00
2,662.0100
$ 48,182.38
0 $ .00
268.9100
$ 605.05
0 $ .00
268.9100
$ 2,984.90
0 $ .00
0.0000
$ .00
0 $ .00
0.0000
$ .00
G H I J K
Materials
Total Completed Retainage %
Balance to
Presently
and Stored to
this Period
(H/B)
Finish
Stored
Date(D+F+G)
(B-H)
(not in F)
$
.Do 1
$ .00
$
.00
0.00%
$ 1,000.00
$
.00
$ 5,581.28
$
.00
175.80%
$- 2,406.43
$
.00
$ 167,081.96
$
.00
175.80%
$- 72,039.11
$
.00
$ 5,989.52
$
.00
127.98%
$- 1,309.52
$
.00
$ 48,182.38
$
.00
127.98%
$- 10,534.38
$
.00
$ 605.05
$
.00
39.26%
$ 936.20
$
.00
$ 2,984.90
$
.00
39.26%
$ 4,618.60
$
.00
$ .00
$
.00
0.00%
$ 4,480.00
$
.00
$ .00
$
.00
0.00%
$ 2,775.00
0.0000
$
.00
7.3500
$ 147.37 1
$
.00
$ 147.37
$
.00
24.50%
$ 454.13
0.0000
$
.00
7.3500
$ 1,340.64
$
.00
$ 1,340.64
$
.00
24.50%
$ 4,131.36
0.0000
$
.00
196.5000
$ 442.13
$
.00
$ 442.13
$
.00
24.41%
$ 1,369.12
Page 2 of 6
FORT WORTH,:,
TPW Construction Invoice
A
B
C
D
E
F
G
H
I
J
K
Bid Item
Description
Spec.
UoM
Bid
Unit Price
Bid Value
Estimated
Value this
Previously
Previously
Materials
Total Completed
Retainage
%
Balance to
No.
Section
Quantity
Quantity
Period
Installed
Installed
Presently
and Stored to
this
Period
(H/B)
Finish
No.
Installed this
Quantity
Value
Stored
Date (D+F+G)
(B-H)
SF
230
$
52.25
$ 12,017.50
Period
0.0000
$
.00
0.0000
$ .00
(not in F)
$
.00
$ .00
$
.00
0.00%
Unit 3213.0501 Barrier Free Ramp,
$ 12,017.50
1.013
Type R-1
Unit
3213.0503 Barrier Free Ramp,
SF
115
$
52.25
_
$ 6,008.75
0.0000
$
.00
0.0000
$ .00
$
.00
$ .00
$
.00
0.00%
$ 6,008.75
1.014
Type M-1
Unit
504 Barrier Free Ramp,
240
$ 12,540.00
0.0000
$
.00
0.0000
$ .00
.00
$ .00
$
.00
0.00%
$ 12,540.0�
SF
$ 52.25
1.015
Type M-2
Type
$ 5,747.50
0.0000
$
.00
$
.00
$ 10,267.13
$
.00
178.64%
$- 4,519.63
Unit 3213.0506 Barrier Free Ramp,
SF
110
$ 52.25
196.5000 $ 10,267.13
1.016
Type P-1
$ 5,747.50
0.0000
$
.00
$
.00
$ .00
$
.00
0.00%
Unit 3213.0506 Barrier Free Ramp,
SF
110
$ 52.2S
0.0000 $ .00
$ 5,747.50
1.017
Type P-2
Unit
3212.0600 Asphalt Pavement
TN
70
$
162.00
$ 11,340.00
0.0000
$
.00
45.6600
$ 7,396.92
$
.00
$ 7,396.92
$
.00
65.23%
$ 3,943.08
1.018
Level - Up
Unit
3124.0101 Asphalt Pavement
CY
1,715
$
345.00
$ 591,675.00
0.0000
$
.00
0.0000
$ .00
$
.00
$ .00
$
.00
0.00%
$ 591,675.00
1.019
Base Repair
GA
Unit 3212.0900 Crack Sealing of
200
$
47.50
$ 9,500.00
0.0000
$
.00
0.0000
$ .00
$
.00
$ .00
$
.00
0.00%
$ 9,500.00
1.020
Existing Pavement
Unit
0241.1506 2" Surface Milling
SY
77,200
$
3.95
$ 304,940.00
0.0000
$
.00
64,178.690
$ 253,505.83
$
.00
$ 253,505.83
$
.00
83.13%
$ 51,434.17
1.021
$1,377,248.00
0.0000
$
.00
0
$ 232,299.99
Unit 3212.0302 2" Asphalt Pvmt
SY
77,200
$ 17.84
64,178.700 $1,144,948.01 $ .00 $1,144,948.01 $ .00
83.13%
1.022
Type D
$ 4,440.00
0.0000
$
.00
0
0.0000
$ .00
$
.00
$ .00
$
.00
0.00%
$ 4,440.00
Unit 9999 7" Remove Concrete
SY
100
$ 44.40
1.023
Pavement
L
Unit
3211.0122 Flex Base, Type A,
CY
100
$
83.25
$ 8,325.00
0.0000
$
.00
0.0000
$ .00
$
.00
$ .00
$
.00
0.00%
$ 8,325.00
1.024
GR-2
Unit
3110.0102 24-Inch and Larger,
EA
1
$ 3,607.50
$ 3,607.50
0.0000
$
.00
0.0000
$ .00
$
.00
$ .00
$
.00
0.00%
$ 3,607.50
1.025
Tree Removal
Unit
3110.0102 6"-12"Tree Removal
2
$ 1,054.50
$ 2,109.00
0.0000
$
.00
0.0000
$ .00
_
$
.00
$ .00
$
.00
0.00%
$ 2,109.00
EA
1.026
Unit
3123.0101 Unclassified
80
$
83.25
$ 6,660.00
0.0000
$
.00
0.0000
$ .00
$
.00
$ .00
$
.00
0.00%
$ 6,660.00
CY
1.027
Excavation
$ 16,745.00
0.0000
$
.00
201.5000
$ 3,969.55
$
.00
$ 3,969.55
$
.00
23.71%
$ 12,775.45
Unit 3292.0100 Block Sod
SY
850
$ 19.70
1.028
Replacement
$ 900.00
0.0000
$
.00
4.0000
$ 300.00
$
.00
$ 300.00
$
.00
33.33%
$ 600.00
Unit 3217.5001 Curb Address
EA
12
$ 75.00
1.029
Painting
Unit
3291.0100 Topsoil
CY
100
$
83.25
$ 8,325.00
0.0000
$
.00
L0.0000
$ .00
$
.00
$ .00
$
.00
0.00%
$ 8,325.00
Page 3 of 6
A
Bid Item Description Spec.
No. Section
No.
1.030
Unit
3217.0101 6" Sid Pvmt Marking
1.031
HAS (W)
Unit
3217.0102 6" Sid Pvmt Marking
1.032
HAS (Y)
Unit
3217.0103 6" Brk Pvmt
1.033
Marking HAS (W)
Unit
3217.0107 6" Brk Pvmt
1.034
Marking HAS (Y)
Unit
3217.0201 8" Sid Pvmt Marking
1.035
HAS (W)
Unit
3217.030112" Sid Pvmt
1.036
Marking HAE (W)
Unit
3217.0403 18" Sid Pvmt
1.037
Marking HAE (Y)
Unit
3217.0501 24" Sid Pvmt
1.038
Marking HAE (W)
Unit
3217.1002 Lane Legend Arrow
1.039
Unit
3217.1004 Lane Legend Only
1.040
Unit
3217.1009 Lane Legend Bike
1.041
Arrow
Unit
3217.1006 Lane Legend Bike
1.042
Unit
3217.1007 Lane Legend
1.043
Sharrow
Unit
3217.1010 Lane Legend 18"
1.044
Yield Triangle (W)
Unit
3217.2001 Raised Marker TY W
1.045
Unit
3217.2103 Refl Raised Marker
1.046
TY I I -A -A
Unit
3217.2104 Refl Raised Marker
1.047
TY II-C-R
FORT WORTH.
TPW Construction Invoice
B C D E F G H I J K
UoM
Bid
Unit Price
Bid Value
Estimated
Value this
Previously
Previously
Materials
Total Completed
Retainage
%
Balance to
Quantity
Quantity
Period
Installed
Installed
Presently
and Stored to
this
Period
(H/B)
Finish
Installed this
Quantity
Value
Stored
Date (D+F+G)
(B-H)
Period
(not in F)
$ 925.65
LF 7,600
$ .85
$ 6,460.00 0.0000 $ .00
6,511.0000 $ 5,534.35 $ .00 $ 5,534.35 $ .00
95.67%
LF
8,640
$
.85
$ 7,344.00
0.0000
$ .00
6,302.0000
$ 5,356.70
$
.00 $ 5,356.70
$
.00
72.94%
$ 1,987.30
LF
10,634
$
1.05
$ 11,165.70
$ 105.00
0.0000
0.0000
$ .00
$ .00
2,392.0000
3,534.0000
$ 2,511.60
$ 3,710.70
$
$
.00 $ 2,511.60
.00 $ 3,710.70
$
$
.00
.00
22.49%
3534.00
F $ 8,654.10
$- 3,605.70
LF
100
$ 1.05
$ 1,972.00
$ 1,125.00
0.0000
0.0000
$ .00
$ .00
1,310.0000
235.0000
$ 2,227.00
$ 1,057.50
$
$
.00 $ 2,227.00
.00 $ 1,057.50
$
$
.00
.00
112.93%
94.00%
$- 255.00
LF
1,160
$ 1.70
LF
250
$ 4.50
$ 67.50
LF
100
$
6.40
$ 640.00
0.0000
$ .00
345.0000
$ 2,208.00
$
.00 $ 2,208.00
$
.00
345.00%
$- 1,568.00
LF
1,252
$
8.70
$ 10,892.40
0.0000
$ .00
1,727.0000
$ 15,024.90
$
.00 $ 15,024.90
$
.00
137.94%
$- 4,132.50
EA
20
$
225.00
$ 4,500.00
0.0000
$ .00
18.0000
$ 4,050.00
$
.00 $ 4,050.00
$
.00
90.00%
$ 450.00
$ 1,710.00
$ 1,332.00
$ 852.00
0.0000
0.0000
0.0000
$ .00
$ .00
$ .00
11.0000
12.0000
12.0000
$ 3,135.00 $
$ 1,332.00 $
$ 1,704.00 $
.00 $ 3,135.00
.00 $ 1,332.00
.00 $ 1,704.00
$
$
$
.00
.00
.00
183.33%
100.00%
200.00%
EA
6
$ 285.00
$- 1,425.00
EA
12
6
$ 111.00
$ 142.00
$ .00
$- 852.00
EA
EA
12
$
83.25
$ 999.00
0.0000
$ .00
1.0000
$ 83.25
$
.00 $ 83.25
$
.00
8.33%
$ 915.75
EA
13
$
55.50
$ 721.50
0.0000
$ .00
6.0000
$ 333.00
$
.00 $ 333.00
$
.00
46.15%
$ 388.50
EA
150
$
$
4.50
6.70
$ 675.00
$ 670.00
0.0000
0.0000
$ .00
$ .00
0.0000
135.0000
$ .00
$ 904.50
$
$
.00 $ .00
.00 $ 904.50
$
$
.00
.00
0.00%
135.00%
$ 675.00
EA
100
$- 234.50
EA 100 $ 6.70 $ 670.00 0.0000 $ .00 156.0000 $ 1,045.20 $ .00 $ 1,045.20 $ .00 156.009/
L Page 4 of 6
FORT WORTH,:,
TPW Construction Invoice
A
8
C
D
E
F
G
H
I
J
K
Bid Item
Description
Spec.
UoM
Bid
Unit Price
Bid Value
Estimated
Value this
Previously
Previously Materials
Total Completed
Retainage
%
Balance to
No.
Section
Quantity
Quantity
Period
Installed
Installed Presently
and Stored to
this Period
(H/B)
Finish
No.
Installed this
Quantity
Value Stored
Date (D+F+G)
(B-H)
Period
0.0000
(not in F)
$ .00 $
.00
$ .00
$
.00
0.00%
Unit 3305.0108 Miscellaneous
LS
1
$ 25,000.00
$ 25,000.00 0.0000 $ .00
$ 25,000.00
1.048
Adjustment (Utilities)
Unit
3305.0111 Water Valve Box
$ 750.00
_
$ 1,500.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
$ 1,500.00
EA
2
1.049
Adjustment (With Steel Riser)
Unit
3305.0112 Water Valve Box
$ 8,100.00
0.0000
$ .00
28.0000
$ 25,200.00 $
.00
$ 25,200.00
$
.00
311.11%
$- 17,100.00
EA
9
$ 900.00
1.050
Adjustment (With Concrete
Riser)
$ 222.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
Unit 3312.2003 1-Inch Standard
EA
1
$ 222.00
$ 222.00
1.051
Plastic Meter Box
$ 440.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
$ 440.00
Unit 3312.2003 1-Inch Standard
EA
1
$ 440.00
1.052
Concrete Meter Box
$ 2,300.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
$ 2,300.00
Unit 3349.0107 Manhole
EA
2
$ 1,150.00
1.053
Adjustment (With Steel Riser)
L
Unit
3305.0112 Manhole
EA
5
$ 1,150.00
$ 5,750.00
0.0000
$ .00
11.0000
$ 12,650.00 $
.00
$ 12,110,00
$
.00
220.00%
$- 6,900.00
1.054
Adjustment (With Concrete
Collar)
Unit
3305.0108 Miscellaneous
EA
1
$ 5,550.00
$ 5,550.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
$ 5,550.00
1.055
Structure Adjustment (5' Storm
Drain Inlet Top)
Unit
3305.0108 Miscellaneous
EA
1
$ 8,325.00
$ 8,325.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
$ 8,325.00
1.056
Structure Adjustment (10'
Storm Drain Inlet Top)
Unit
3346.0101 6" Perforated
LF
100
$ 32.50
$ 3,250.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
$ 3,250.00
1.057
Subdrain Pipe
Unit
3471.0002 Portable Message
30
$ 875.00
$ 26,250.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
$ 26,250.00
WK
1.058
Sign
SY
100
$ 44.50
$ 4,450.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
Unit 9999.0000 Site Clearing
$ 4,450.00
1.059
$ 81,690.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
Unit 9999.0096 Paving Construction
0
$ 81,690.00
1.060
Allowance
$ 12,100.00
0.0000
$ .00
1.0000
$ 12,100.00 $
.00
$ 12,100.00
$
.00
100.00%
Unit Tree Protection and Repair
LS
0
$ 12,100.00
$ .Do
1.061
Unit
Remove and Repair Brick
SY
0
$ 31.05
$ 6,210.00
0.0000
$ .00
42.2900
$ 1,313.10 $
.00
$ 1,313.10
$
.00
21.14%
$ 4,896.90
1.062
Sidewalk (City Supplied Brick)
Unit
0241.1300 Remove Conc Curb
LF
0
$ 2.35
$ 235.00
0.0000
$ .00
0.0000
$ .00 $
.00
$ .00
$
.00
0.00%
$ 235.00
Page 5 of 6
FORT WORTH.
TPW Construction Invoice
A
B
C
D
E
F
G
H
I
J
K
Bid Item
Description
Spec.
UoM
Bid
Unit Price
Bid Value
Estimated
Value this
Previously
Previously
Materials
Total Completed
Retainage
%
Balance to
No.
Section
Quantity
Quantity
Period
Installed
Installed
Presently
and Stored to
this Period
(H/B)
Finish
No.
Installed this
Quantity
Value
Stored
Date (D+F+G)
(B-H)
Period
(not in F)
11.001 & Gutter
Unit
3216.0102 7" Conc Curb and
$ 7,035.00
0.0000
$ .00
0.0000
$ .00
$ .00
$ .00
$ .00
0.00%
$ 7,035.00
LF
0
$ 70.35
11.002
Gutter
Unit
0241.1506 2" Surface Milling
SY
0
$ 3.95
$ 30,817.90
0.0000
$ .00
5,524.9700
$ 21,823.63
$ .00
$ 21,823.63
$ .00
70.81%
$ 8,994.27
11.003
Unit
3212.0302 2" Asphalt PVmt
$ 139,187.68
0.0000
$ .00
5,524.9700
$ 98,565.46
$ .00
$ 98,565.46
$ .00
70.81%
$ 40,622.22
SY
0
$ 17.84
11.004
Type D
$ 2,300.00
0.0000
$ .00
6.0000
$ 6,900.00
$ .00
$ 6,900.00
$ .00
300.00%
Unit 3305.0112 Manhole
SY
0
$ 1,150.00
$- 4,600.00
11.005
Adjustment (With Concrete
Collar)
0.0000
$ .00
$ .00
$ .00
$ .00
0.00%
Unit 3305.0108 Miscellaneous
EA
0
$ 8,325.00
$ 8,325.00 0.0000 $ .00
$ 8,325.00
11.006
Structure Adjustment (10'
Storm Drain Inlet Top)
$ 15,000.00
0.0000
$ .00
$ 15,000.00
Unit PARD Construction Allowance
LS
0
$ 15,000.00
0.0000
$ .00
$ .00
$ .00 $ .00 0.00%
11.007
1
$2,999,577.13
1
$ 0.00
T
$1,881,512.56
$ 0.00
$1,881,512.56
$- 94,075.62
1 62.73%
$1,118,064.57
Page 6 of 6
FORT WORTH,,,
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2024 Asphalt Resurfacing Contract 5
M&C: 24-0032 CPN: 104937
CSO:
61071
DOC#: C01
Date: 6/11/2024
To:
Name
Department
Initials
Date Out
1
Sophia Flores (BSP)
TPW
74—
Jun 21, 2024
2
J Barry Clark/Peachtree Construc.
Vendor
,BC7C
Jun 21, 2024
3
Carlos Garcia (Inspector)
TPW
7 �
Jun 21, 2024
4
Marwan Hafez (PM)
TPW
M1f
J u n 21, 2024
5
Zelalem Arega (PGM)
TPW
ZA
Jun 21, 2024
6
Mary Hanna (SCPO)
TPW
Jun 21, 2024
7
Patricia Wadsack (AD)
TPW
pL.
Jun 24, 2024
8
Lauren Prieur (Director)
TPW
Jun 25, 2024
9
Doug Black (ACA)
Legal
Jun 27, 2024
10
Jesica McEachern (ACM)
CMO
a`
Jun 27, 2024
11
Jannette Goodall (CS)
CSO
,�
Jun 28, 2024
12
TPW Contracts
TPW
CC:
Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records
Room, TPW Contracts
ALSO
List: - Bus Sppt: Sovhia Flores: Prg Mgr:
Zelalem AreQa: Sr CPO: Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and
take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: DYES ®No SAME DAY: DYES ❑No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContractsnu,fortworthtexas.2ov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!
CSC No. 61071-COI
FORTWORTH ..,
City of Fort Worth
Change Order Request
Project Name 2024 Asphalt Resurfacing Contract 5 I City Sec # l 61071
Client Project #(s)� 104937
Project Description Milling 2 inches of existing pavement and applying a 2-inch HMA overlay in addition to replacing damaged curb and gutter, driveways, and non -compliant
ADA ramps.
Contractor Peachtree Construction, Ltd. Change Order#1 1 Datel 6/11/2024
City Project Mgr.1 Marwan Hafez City Inspectorl Carlos Gracia
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW
$2,741,253.55
$2,741,253.55
$0.00
$2,741,253.55
$137,063.00
$137,063.00
Contract Time
Totals (CD`
$2,741,253.55 210
$2,741,253.55 210
20
$2,741,253.55 230
$137,063.00
$137,063.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 255/o) $3,426,566.94
JUSTIFICATION (REASONS) FOR CHANGE ORDER i
This Change Order is issued to add new bid items for the contractor to:
1- Remove and repair the existing brick sidewalk adjacent to the curb and gutter at Stadium Drive and N Bellaire Drive.
2- Trim and treat tree roots at Stadium Drive, S Bellaire Drive, and N Bellaire Drive during construction.
The brick sidewalk within a 2-foot width will need to be removed and repaired to allow for the construction forms for the concrete curb and gutter. Some tree roots were also
exposed during construction, necessitating a tree treatment plan carried out by a certified arborist, based on recommendations from the City Forester. The pricing for the brick
bid item has been compared with rates from similar contracts and is considered reasonable. The tree root treatment proposal was reviewed by the City Forester and is also
considered reasonable.
This change order will add 20 calendar days to the contract for the contractor to complete the additional work, which involves removing, preserving, and repairing the brick
sidewalk and the tree root treatment work.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
ontractor's Company Name lContractor (NamE Contract Si nature
Peachtree Construction, Ltd. J. Barry Clark a, ,,. Jun 21, 2024
Inspector/Inspection Su ervisor
Date
Project and Contract Compliance Manager
Date
6PA_0__
Jun 21, 2024
Mo
Jun 21, 2024
Program Manager
Date
Senior Capital Project Officer
Date
MrIh�M- -
Jun 21, 2024
" 7
Jun 21, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
w
Jun 24, 2024
X %L
Jun 25, 2024
Assistant City Attorney
Date
JAssistant City Manager
Date
Jun 27, 2024
lcilk�
Jun 27, 2024
Council Action if re uired
M&C Number
ATTEST:
Jannette Goodall, City Secretary
M&C Date Approved
FORTWORTH
City of Fort Worth
'!"
Change Order Additions
Project Name 2024 Asphalt Resurfacing Contract 5
City Sec # 61071
Client Project # 104937
1
Contractorl Peachtree Construction, Ltd.
PMI Manvan Hafez
Inspectorl Carlos Gracia
Change Order Submittal #
Date 1 6/11/2024
ADDITIONS
ITEM DESCRIPTION
DEPT Q�y,
Unit Unit Cost
Total 1
61 Remove and Repair Brick Sidewalk (City supplied Brick)
TPW 20 . 0000000
SY $31.05'
$6,210.001
62 Tree Protection and Repair
TPW 1.00000000
LS $12,100.00
$12,100.001
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
TPW
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
$18,310.001
1
Sub Total Additions
1
1
$18,310.001
Change Order Additions Page 2 of 4
Fox_� City of Fort Worth
Change Order Deletions
Project Name 1 2024 Asphalt Resurfacing Contract 5 City Sec # 1 61071
Client Project # 1 104937 1
Contractorl Peachtree Construction, Ltd. I PMI Manvan Hafez I Inspectorl Carlos Gracia I
Change Order Submittal # 0 Date 1 6/11/2024 1
DELETIONS
IILM UtSUKIHI IUN ULF'I Uty unit Unit host total 1
60 9999.0096 Paving Construction Allowance TPW 0.18310000 LS $100,000.00 $18,310.001
TM $18,310.001
1
1
1
Sub Total Deletions $18,310.001
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service T Amount for this CO
$0.00
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
Total I $0.00 1
104937-CNCO-2024 Asphalt Resurfacing
Contract 5
Final Audit Report 2024-06-28
Created: 2024-06-21
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAAPxmnOVi2cEuyPuKLBFiZiWQ5FL8Uezg5
"104937-CNCO-2024 Asphalt Resurfacing Contract 5" History
'5 Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-06-21 - 1:52:10 PM GMT- IP address: 204.10.90.100
P4 Document emailed to sophia.flores2@fortworthtexas.gov for filling
2024-06-21 - 2:12:54 PM GMT
Cry Document emailed to jbclark@peachtreecon.com for signature
2024-06-21 - 2:12:55 PM GMT
P'+ Document emailed to Carlos Garcia(carlos.garcia3@fortworthtexas.gov) for signature
2024-06-21 - 2:12:55 PM GMT
P+ Document emailed to Marwan Mohamed Saad Hafez (marwan.hafez@fortworthtexas.gov) for signature
2024-06-21 - 2:12:55 PM GMT
Email viewed by sophia.flores2@fortworthtexas.gov
2024-06-21 - 2:13:25 PM GMT- IP address: 204.10.90.100
Email viewed by Marwan Mohamed Saad Hafez (marwan.hafez@fortworthtexas.gov)
2024-06-21 - 2:14:01 PM GMT- IP address: 204.10.90.100
0& Signer sophia.flores2@fortworthtexas.gov entered name at signing as Sophia Flores
2024-06-21 - 2:14:48 PM GMT- IP address: 204.10.90.100
A, Form filled by Sophia Flores(sophia.flores2@fortworthtexas.gov)
Form filling Date: 2024-06-21 - 2:14:50 PM GMT - Time Source: server- IP address: 204.10.90.100
F�� Document e-signed by Marwan Mohamed Saad Hafez (marwan.hafez@fortworthtexas.gov)
Signature Date: 2024-06-21 - 2:16:08 PM GMT - Time Source: server- IP address: 204.10.90.100
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
Email viewed by jbclark@peachtreecon.com
2024-06-21 - 2:32:27 PM GMT- IP address: 66.182.214.203
Signer jbclark@peachtreecon.com entered name at signing as J. Barry Clark
2024-06-21 - 2:41:01 PM GMT- IP address: 66.182.214.203
Document e-signed by J. Barry Clark (jbclark@peachtreecon.com)
Signature Date: 2024-06-21 - 2:41:03 PM GMT - Time Source: server- IP address: 66.182.214.203
Email viewed by Carlos Garcia (carlos.garcia3@fortworthtexas.gov)
2024-06-21 - 5:48:04 PM GMT- IP address: 166.205.58.15
d, Document e-signed by Carlos Garcia(carlos.garcia3@fortworthtexas.gov)
Signature Date: 2024-06-21 - 8:10:03 PM GMT - Time Source: server- IP address: 204.10.90.100
P�- Document emailed to Zelalem Arega (Zelalem.Arega@fortworthtexas.gov) for signature
2024-06-21 - 8:10:06 PM GMT
5. Email viewed by Zelalem Arega (Zelalem.Arega@fortworthtexas.gov)
2024-06-21 - 8:16:21 PM GMT- IP address: 204.10.91.100
40 Document e-signed by Zelalem Arega (Zelalem.Arega@fortworthtexas.gov)
Signature Date: 2024-06-21 - 8:17:52 PM GMT - Time Source: server- IP address: 204.10.90.100
1� Document emailed to Mary Hanna (Mary.Hanna@fortworthtexas.gov) for signature
2024-06-21 - 8:17:55 PM GMT
Email viewed by Mary Hanna (Mary.Hanna@fortworthtexas.gov)
2024-06-21 - 8:20:41 PM GMT- IP address: 204.10.90.100
4& Document e-signed by Mary Hanna (Mary.Hanna@fortworthtexas.gov)
Signature Date: 2024-06-21 - 8:42:51 PM GMT - Time Source: server- IP address: 204.10.90.100
1-1 Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature
2024-06-21 - 8:42:53 PM GMT
tk Signer Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) entered name at signing as Patricia L.
Wadsack
2024-06-24 - 10:00:30 PM GMT- IP address: 204.10.90.100
d� Document e-signed by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov)
Signature Date: 2024-06-24 - 10:00:32 PM GMT - Time Source: server- IP address: 204.10.90.100
P,� Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature
2024-06-24 - 10:00:35 PM GMT
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
Email viewed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
2024-06-25 - 2:49:35 PM GMT- IP address: 166.205.54.32
Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
Signature Date: 2024-06-25 - 2:50:24 PM GMT - Time Source: server- IP address: 166.205.54.32
Document emailed to Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov) for approval
2024-06-25 - 2:50:26 PM GMT
Email viewed by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov)
2024-06-25 - 3:17:44 PM GMT- IP address: 204.10.91.100
de& Document approved by Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov)
Approval Date: 2024-06-25 - 3:17:59 PM GMT - Time Source: server- IP address: 204.10.91.100
P�- Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature
2024-06-25 - 3:18:01 PM GMT
dQ Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov)
Signature Date: 2024-06-27 - 5:24:54 PM GMT - Time Source: server- IP address: 204.10.90.100
C-4. Document emailed to Jesica McEachern (jesica.mceachern@fortworthtexas.gov) for signature
2024-06-27 - 5:24:57 PM GMT
&0 Document e-signed by Jesica McEachern(jesica.mceachern@fortworthtexas.gov)
Signature Date: 2024-06-27 - 10:57:24 PM GMT - Time Source: server- IP address: 204.10.91.100
r;2 Document approval automatically delegated to Katherine Cenicola (Katherine.Cenicola@fortworthtexas.gov) by
Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov)
2024-06-27 - 10:57:26 PM GMT
C'► Document emailed to Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov) for approval
2024-06-27 - 10:57:27 PM GMT
C� Document emailed to Katherine Cenicola (Katherine.Cenicola@fortworthtexas.gov) for approval
2024-06-27 - 10:57:27 PM GMT
Document approved by Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov)
Approval Date: 2024-06-28 - 12:46:53 PM GMT - Time Source: server- IP address: 204.10.91.100
C� Document emailed to Jannette Goodall Qannette.goodall@fortworthtexas.gov) for signature
2024-06-28 - 12:46:55 PM GMT
Email viewed by Jannette Goodall (jannette.goodall@fortworthtexas.gov)
2024-06-28 - 12:47:31 PM GMT- IP address: 204.10.91.100
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
Document e-signed by Jannette Goodall Qannette.goodall@fortworthtexas.gov)
Signature Date: 2024-06-28 - 12:47:43 PM GMT - Time Source: server- IP address: 204.10.91.100
Form filling automatically delegated to Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) by Allison
Tidwell (allison.tidwell@fortworthtexas.gov)
2024-06-28 - 12:47:45 PM GMT
Document emailed to Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) for filling
2024-06-28 - 12:47:46 PM GMT
Document emailed to Allison Tidwell (allison.tidwell@fortworthtexas.gov) for filling
2024-06-28 - 12:47:46 PM GMT
U Form filled by Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov)
Form filling Date: 2024-06-28 - 2:50:47 PM GMT - Time Source: server- IP address: 204.10.91.100
Agreement completed.
2024-06-28 - 2:50:47 PM GMT
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2024 Asphalt Resurfacing Contract 5 — CO2
M&C: 24-0986 CPN: 104937
CSO:
61071
DOC#: 1
Date: 11/13/2024
To:
Name
Department
Initials
Date Out
1
Sophia Flores (BSP)
TPW
Nov 14, 2024
2
J Barry Clark/Peachtree Construc.
Vendor
,B
Nov 14, 2024
3
Carlos Garcia (Inspector)
TPW
'
Nov 14, 2024
4
Marwan Hafez (PM)
TPW
Mff
Nov 14, 2024
5
Zelalem Arega (PGM)
TPW
°
Nov 14, 2024
6
Mary Hanna (SCPO)
TPW
Nov 14, 2024
7
Patricia Wadsack (AD)
TPW
PLW
Nov 15, 2024
8
Lauren Prieur (Director)
TPW
LL�
Nov 17, 2024
9
Doug Black (ACA)
Legal
DBD2
Nov 18, 2024
10
Jesica McEachern (ACM)
CMO
,a`
Nov 20, 2024
11
Jannette Goodall (CS)
CSO
JG
Nov 21, 2024
12
TPW Contracts
TPW
CC:
Program Manager, Sr. CPO, TPW BSPAP
Recon Team, TPW Records
Room, TPW Contracts
ALSO
List: - Bus Sppt: Sovhia Flores: Prg Mgr:
Zelalem Areea: Sr CPO: Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review and
take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: DYES ®No SAME DAY: DYES ❑No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContracts(a fortworthtexas.cov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!
CSC No. 61071-CO2
FORTWORTH ..,
City of Fort Worth
Change Order Request
Project Name 2024 Asphalt Resurfacing Contract 5 I City Sec # l 61071
Client Project #(s)� 104937
Project Description Milling 2 inches of existing pavement and applying a 2-inch HMA overlay in addition to replacing damaged curb and gutter, driveways, and non -compliant
ADA ramps.
Contractor Peachtree Construction, Ltd. Change Order#1 2 Datel 11/13/2024
City Project Mgr.1 Marwan Hafez City Inspectorl Carlos Garcia
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
TPW PARD
$2,741,253.55 $0.00
$0.00
Contract Time
Totals (CD`
$2,741,253.55 210
20
$2,741,253.55 230
$258,323.58 40
$2,999,577.13 270
$137,063.00
$137,063.00
$202,900.58
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 9.42%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $3,426,566.94
$2,741,253.55
$0.00
$55,423.00
$202,900.58
$2,796,676.55
$202,900.58
$137,063.00
$137,063.00
$0.00
$202,900.58
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This Change Order No. 2 will remove the scope of work on Colonial Parkway from South University Drive to the pavement change on the east and replace it with Park Place
Avenue from Forest Park Boulevard at the north end to the park boundary south. This change will increase the quantities for concrete replacement on curb and gutters as well
as driveways to be paid by TPW but no additional asphalt bid items.
This change order will also add Park Place Avenue from the park boundary to Forest Park Boulevard at the south end to be funded by the Park & Recreation Department
(PARD). It will add all the associated items, including asphalt paving and concrete curb and gutter, under a new unit funded by PARD.
The staff supports the contractor's request for an additional 40 days to complete the expanded scope of work and ensures all necessary approvals are in place for this change
order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
ontractor's Company Name lContractor Nam ontract Si nature
Peachtree Construction, Ltd. J. Barry Clark ',7"t�{� Nov 14, 2024
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
—
Nov 14, 2024
L �
Nov 14, 2024
Program Manager
Date
Senior Capital Project Officer
Date
e (a(QG i A ✓ja
Nov 14, 2024
" 7/'°
Nov 14, 2024
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Nov 15, 2024
_... .. _
Nov 17, 2024
Assistant City Attorney
Date
JAssistant City Manager
Date
uW
Nov 18, 2024
I Nov 20, 2024
Council Actio
M&C Number 1 24-0986
ATTEST:
Jannette Goodall, City Secretary
M&C Date Approved I 11/12/20241
FORTWORTH
City of Fort Worth
'!"
Change Order Additions
Project Name 1 2024 Asphalt Resurfacing Contract 5
City Sec # 1 61071
Client Project # 104937
1
Contractorl Peachtree Construction, Ltd.
PMI Manvan Hafez
Inspectorl Carlos Garcia
Change Order Submittal # F--2
Date 1 11/13/2024
ADDITIONS
ITEM
DESCRIPTION
DEPT
O)y
Unit
Unit Cost
Total I
1-New
0241.1300 Remove Cone Curb & Gutter
PARD
10 . OOOOOOU
LF
$2.3r
$235.001
2-New
3216.0102 7" Cone Curb and Gutter
PARD
100.00000000
LF
$70.35
17,035.001
3-New
0241.1506 2" Surface Milling
PARD
7,802.00000000
SY
$3.95
$50,817.901
4-New
3212.0302 2" Asphalt Pvmt Type D
PARD
7,802.00000000
SY
$17.84
$139,187.681
5-New
3305.0112 Manhole Adjustment (With Concrete Collar)
PARD
2.00000000
EA
$1,150.00
$2,300.001
6-New
3305.0108 Miscellaneous Structure Adjustment (10' Storm
Drain Inlet Top) PARD
1.00000000
EA
$8,325.06
8,325.001
7-New
PARD Construction Allowance
PARD
1.00000000
LS
$15,000.00
$15,000.001
2
0241.1300 Remove Cone Curb & Gutter
TPW
600.00000000
LF
$2.35
$1,410.001
3
3216.0102 7" Cone Curb and Gutter
TPW
600.00000000
LF
$70.35
S42,210.001
4
0241.0401 Remove Concrete Driveway
TPW
580.00000000
SF
$2.25
$1,305.001
5
3213.0401 6" Cone Driveway
TPW
580.00000000
SF
$18.10
$10,498.001
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
TPW
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
$55,423.001
PARD
$202,900.581
1
Sub
Total Additions
1
$258,323.581
Change Order Additions Page 2 of 4
I I tM
FOx_� City of Fort Worth
Change Order Deletions
Project Name 1 2024 Asphalt Resurfacing Contract 5 City Sec # 1 61071
Client Project # 1 104937 1
Contractorl Peachtree Construction, Ltd. PMI Manvan Hafez I Inspectorl Carlos Garcia I
Change Order Submittal # 0 Date 1 11113/2024 1
DELETIONS
Ut5UNIHI IUN ULF'1 Uty unit Unit host total 1
I
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
i
I
TM 0.001
PARD 0.001
Sub Total Deletions $0.001
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Westhill Construction Concrete repairs, curb & gutter, and driveways $26,310.00
Total 1 $26,310.00
Previous Change Orders
CO # DATE I AMOUNT
6/28/2024 $0.00
Total I $0.00 1
M&C Review
Page I of 3
CITY COUNCIL AGENDA
Create New From This M&C
DATE: 11/12/2024 REFERENCE **M&C 24-
NO.: 0986
LOG NAME:
CODE: C TYPE: CONSENT PUBLIC
HEARING:
Official site of the City of Fort Worth, Texas
FoRTIVQRTI1
2024 ASPHALT
RESURFACING
CONTRACT 5 - CO2
NO
SUBJECT: (CD 3 and CD 9) Authorize Execution of Change Order Number 2 in the Amount of
$258,323.58 and the Addition of 40 Calendar Days to the Contract with Peachtree
Construction Ltd., for the 2024 Asphalt Resurfacing Contract 5 Project for a Revised
Contract Amount of $2,999,577.13, Adopt the Appropriation Ordinance and Amend
the Fiscal Years 2025-2029 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
Authorize execution of Change Order Number 2 in the amount of $258,323.58, and the
addition of 40 Calendar Days to City Secretary Contract Number 61071 with Peachtree
Construction Ltd., for the 2024 Asphalt Resurfacing Contract 5 project (City Project No.
104937) and Forest Park Road & Parking project (City Project No. 100335) for a revised
contract amount of $2,999,577.13;
Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations
in the PARD Gas Lease Capital Project Fund by increasing estimated receipts and
appropriations in the Forest Park Road & Parking project (City Project No. 100335) in the
amount of $17,500.00 and decreasing estimated receipts and appropriations in the Park
Improvements programmable project (City Project No. P00059) by the same amount; and
Amend the Fiscal Years 2025-2029 Capital Improvement Program.
DISCUSSION:
On January 23, 2024, Mayor & Council Communication (M&C) 24-0032, awarded City Secretary
Contract No. 61071 in the amount of $2,741,253.55 to Peachtree Construction Ltd. for 2024 Asphalt
Resurfacing Contract 5 (City Project No. 104937) at various locations.
The Contract was subsequently revised by Change Order No.1, which was administratively authorized
on June 28, 2024, at no additional cost, providing for an additional 20 calendar days for the brick work
on Stadium Drive and N Bellaire Drive.
Change Order No. 2 will remove the scope of work on Colonial Parkway, from South University Drive
to the pavement change on the east, since it was found to be located outside the City's right-of-way
and part of Forest Park Property, per the updated Forest Park plat. This change order will add Park
Place Avenue from Forest Park Boulevard at the north end of the park boundary south, to be funded
by the Transportation and Public Works, and the Park Place Avenue from the park boundary to the
Forest Park Boulevard at the south end to be funded by the Park & Recreation Department.
The staff has reviewed and verified the quantities for the additional work under this Change Order No.
2. Additionally, to complete this work, staff recommends extending the contract by 40 calendar days.
The Transportation & Public Works Department's share of this Change Order No. 2 is $55,423.00,
which is available in the Transportation and Public Works (TPW) Department's General Capital
Projects Fund of the project (City Project No. 104937). The Park & Recreation Department's share of
this change order is $202,900.58 and will be available in the PARD Gas Lease Capital Project Fund
for the project (City Project No. 100335).
http://apps.cfwnet.org/council_packet/mc review.asp?ID=32693&councildate=l1/12/2024 11/8/2024
M&C Review
Page 2 of 3
Recommendation 2 will transfer the residual budget in the Park Improvements Programmable project
(City Project No. P00059) to the Forest Park Road & Parking static project (City Project No. 100335).
This administrative action is needed as the Park Improvements project is no longer receiving new
appropriations and the FWLab will be closing this project.
Funding for the Forest Park Road & Parking project (City Project No. 100335) was not included in the
FY2025 Capital Improvement Program. The action in this M&C will amend the FY2025-2029 Capital
Improvement Program as approved and is summarized in the table below:
Capital Fund IlProject Name Existing liFunding
Additional IlProject
Name Funding Total
33002 - PARD Forest Park
Gas Lease Road & $185,501.45 $17,500.00 $203,001.45
Capital Project Parkiing
Business Equity: The Business Equity Division placed a 7.27\% business equity goal on this
solicitation/contract. Peachtree Construction, Ltd., will be exceeding the goal at 10.18\%, meeting the
City's Business Equity Ordinance. Any changes in subcontractors will be reviewed by the Business
Equity Division.
This project is located in COUNCIL DISTRICTS 3 and 9.
FISCAL INFORMATION/CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Park Improvements and
Forest Park Road & Parking projects within the PARD Gas Lease Capital Project Fund and in the
2024 Asphalt Resurface Contr 5 project within the General Capital Projects Fund upon approval of
the above recommendations and adoption of the attached appropriation ordinance, funds will be
available in the PARD Gas Lease Capital Project Fund for the Forest Park Road & Parking project to
support the above recommendations and execution of the change order to the contract. Prior to an
expenditure being incurred, the Transportation & Public Works Department has the responsibility of
verifying the availability of funds.
TO
Fund I Department Account Project Program Activity Budget Reference #
ID ID Year (Chartfield 2)
FROM
Fund Department Account Project Program Activity Budget Reference #
ID ID Year (Chartfield 2)
Submitted for Citv Manager's Office bv: Jesica McEachern (5804)
Oriainatina Department Head:
Additional Information Contact:
/_11aL[91:IJ�I=1►kV
100335 PBS.pdf (CFW Internal)
104937 PBS.Ddf (CFW Internal)
Lauren Prieur (6035)
Monty Hall (8662)
104937 FID Table Peachtree Construction CO2 (1).xlsx (CFW Internal)
Amount
Amount
http://apps.cfwnet.org/council_packet/mc review.asp?ID=32693&councildate=l1/12/2024 11/8/2024
M&C Review
Page 3 of 3
2024 ASPHALT RESURFACING CONTRACT 5 - CO2.docx (CFW Internal)
24-104937 CO 5 for ITB 2024 Asphalt Resurfacinq Approved-NS.pdf (CFW Internal)
Form 1295 Certificate 101240269.ndf (CFW Internal)
M&C Map AsphaltResurfacinq Contract5 CPN104937.pdf (Public)
ORD.APP 2024 ASPHALT RESURFACING CONTRACT 5 - CO2 33002 A025(R2) (3).docx
(Public)
SAM Report Peachtree Construction 104937-CO2.ndf (CFW Internal)
Sharing Funds TPW & PARD CO2.pdf (CFW Internal)
http://apps.cfwnet.org/council_packet/mc review.asp?ID=32693&councildate=11/12/2024 11/8/2024
104937-CNCO-2024 Asphalt Resurfacing
Contract 5 — CO2
Final Audit Report 2024-11-21
Created: 2024-11-14
By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAA1QBUYS-TAwtvBmE-GuiXHVazkWZQCNQ4
"104937-CNCO-2024 Asphalt Resurfacing Contract 5 — CO2rr Hi
story
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-11-14 - 4:23:26 PM GMT- IP address: 204.10.90.100
' Document emailed to sophia.flores2@fortworthtexas.gov for filling
2024-11-14 - 4:26:17 PM GMT
P+ Document emailed to J Barry Clark Qbclark@peachtreecon.com) for signature
2024-11-14 - 4:26:18 PM GMT
P4 Document emailed to Carlos Garcia (carlos.garcia3@fortworthtexas.gov) for signature
2024-11-14 - 4:26:18 PM GMT
P+ Document emailed to Marwan Mohamed Saad Hafez(marwan.hafez@fortworthtexas.gov) for signature
2024-11-14 - 4:26:18 PM GMT
Email viewed by J Barry Clark Qbclark@peachtreecon.com)
2024-11-14 - 4:26:49 PM GMT- IP address: 47.190.61.6
Email viewed by Carlos Garcia(carlos.garcia3@fortworthtexas.gov)
2024-11-14 - 4:28:19 PM GMT- IP address: 166.205.58.36
00 Document e-signed by J Barry Clark Qbclark@peachtreecon.com)
Signature Date: 2024-11-14 - 4:35:08 PM GMT - Time Source: server- IP address: 47.190.61.6
Email viewed by sophia.flores2@fortworthtexas.gov
2024-11-14 - 4:48:51 PM GMT- IP address: 204.10.90.100
Ole Signer sophia.flores2@fortworthtexas.gov entered name at signing as Sophia Flores
2024-11-14 - 4:52:30 PM GMT- IP address: 204.10.90.100
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
Form filled by Sophia Flores(sophia.flores2@fortworthtexas.gov)
Form filling Date: 2024-11-14 - 4:52:32 PM GMT - Time Source: server- IP address: 204.10.90.100
Email viewed by Marwan Mohamed Saad Hafez (marwan.hafez@fortworthtexas.gov)
2024-11-14 - 5:36:00 PM GMT- IP address: 166.205.54.44
Document e-signed by Marwan Mohamed Saad Hafez (marwan.hafez@fortworthtexas.gov)
Signature Date: 2024-11-14 - 5:37:01 PM GMT - Time Source: server- IP address: 166.205.54.44
Document e-signed by Carlos Garcia (carlos.garcia3@fortworthtexas.gov)
Signature Date: 2024-11-14 - 6:00:05 PM GMT - Time Source: server- IP address: 166.205.58.36
Document emailed to Zelalem Arega (Zelalem.Arega@fortworthtexas.gov) for signature
2024-11-14 - 6:00:08 PM GMT
Email viewed by Zelalem Arega (Zelalem.Arega@fortworthtexas.gov)
2024-11-14 - 8:45:27 PM GMT- IP address: 204.10.91.100
L Q Document e-signed by Zelalem Arega (Zelalem.Arega@fortworthtexas.gov)
Signature Date: 2024-11-14 - 8:45:42 PM GMT - Time Source: server- IP address: 204.10.91.100
[.. Document emailed to Mary Hanna (Mary.Hanna@fortworthtexas.gov) for signature
2024-11-14 - 8:45:44 PM GMT
ce Email viewed by Mary Hanna (Mary.Hanna@fortworthtexas.gov)
2024-11-14 - 9:06:24 PM GMT- IP address: 204.10.90.100
d, Document e-signed by Mary Hanna (Mary.Hanna@fortworthtexas.gov)
Signature Date: 2024-11-14 - 9:08:01 PM GMT - Time Source: server- IP address: 204.10.90.100
P,� Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for signature
2024-11-14 - 9:08:04 PM GMT
i4 Signer Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) entered name at signing as Patricia L.
Wadsack
2024-11-15 - 7:29:41 PM GMT- IP address: 204.10.90.100
Document e-signed by Patricia L. Wadsack (patricia.wadsack@fortworthtexas.gov)
Signature Date: 2024-11-15 - 7:29:43 PM GMT - Time Source: server- IP address: 204.10.90.100
C� Document emailed to Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) for signature
2024-11-15 - 7:29:45 PM GMT
Email viewed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
2024-11-15 - 7:31:20 PM GMT- IP address: 76.227.105.128
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
Document e-signed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov)
Signature Date: 2024-11-17 - 3:45:40 PM GMT - Time Source: server- IP address: 76.227.105.128
Document emailed to Priscilla Ramirez (Priscilla.Ramirez@fortworthtexas.gov) for approval
2024-11-17 - 3:45:42 PM GMT
Andrea Munoz (Andrea. M u noz@fortworthtexas.gov) added alternate approver Andrea
Munoz (Andrea. M u noz@fortworthtexas. gov). The original approver Priscilla Ramirez
(Priscilla.Ram irez@fortworthtexas.gov) can still approve.
2024-11-18 - 4:12:30 PM GMT- IP address: 204.10.90.100
+ Document emailed to Andrea Munoz (Andrea. M u noz@fortworthtexas.gov) for approval
2024-11-18 - 4:12:31 PM GMT
Email viewed by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2024-11-18 - 4:15:05 PM GMT- IP address: 204.10.90.100
f3 Document approved by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
Approval Date: 2024-11-18 - 4:15:13 PM GMT - Time Source: server- IP address: 204.10.90.100
C� Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature
2024-11-18 - 4:15:14 PM GMT
&0 Document e-signed by Douglas Black (Douglas.Black@fortworthtexas.gov)
Signature Date: 2024-11-18 - 10:45:14 PM GMT - Time Source: server- IP address: 204.10.90.100
P,� Document emailed to Jesica McEachern (jesica.mceachern@fortworthtexas.gov) for signature
2024-11-18 - 10:45:16 PM GMT
(�+ Document e-signed by Jesica McEachern (jesica.mceachern@fortworthtexas.gov)
Signature Date: 2024-11-21 - 5:16:18 AM GMT - Time Source: server- IP address: 204.10.90.100
13 Document approval automatically delegated to Katherine Cenicola (Katherine.Cenicola@fortworthtexas.gov) by
Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov)
2024-11-21 - 5:16:20 AM GMT
C� Document emailed to Katherine Cenicola (Katherine.Cenicola@fortworthtexas.gov) for approval
2024-11-21 - 5:16:21 AM GMT
Pi. Document emailed to Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov) for approval
2024-11-21 - 5:16:21 AM GMT
�� Document approved by Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov)
Approval Date: 2024-11-21 - 1:18:59 PM GMT - Time Source: server- IP address: 208.184.124.181
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
Document signing automatically delegated to Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov) by
Jannette Goodall Qannette.goodall@fortworthtexas.gov)
2024-11-21 - 1:19:01 PM GMT
Document signing automatically delegated to Katherine Cenicola (Katherine.Cenicola@fortworthtexas.gov) by
Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov)
2024-11-21 - 1:19:01 PM GMT
C� Document emailed to Jannette Goodall (jannette.goodall@fortworthtexas.gov) for signature
2024-11-21 - 1:19:02 PM GMT
P,� Document emailed to Ronald Gonzales (Ronald.Gonzales@fortworthtexas.gov) for signature
2024-11-21 - 1:19:03 PM GMT
1-1 Document emailed to Katherine Cenicola (Katherine.Cenicola@fortworthtexas.gov) for signature
2024-11-21 - 1:19:03 PM GMT
f3 Document e-signed by Jannette Goodall (jannette.goodall@fortworthtexas.gov)
Signature Date: 2024-11-21 - 1:58:12 PM GMT - Time Source: server- IP address: 208.184.124.181
AB Form filling automatically delegated to Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) by Allison
Tidwell (allison.tidwell@fortworthtexas.gov)
2024-11-21 - 1:58:15 PM GMT
E� Document emailed to Allison Tidwell (allison.tidwell@fortworthtexas.gov) for filling
2024-11-21 - 1:58:16 PM GMT
C'► Document emailed to Elisa Winterrowd (Elisa.Winterrowd@fortworthtexas.gov) for filling
2024-11-21 - 1:58:16 PM GMT
i�o Form filled by Allison Tidwell(allison.tidwell@fortworthtexas.gov)
Form filling Date: 2024-11-21 - 7:54:22 PM GMT - Time Source: server- IP address: 208.184.124.181
Q Agreement completed.
2024-11-21 - 7:54:22 PM GMT
FoRTWORTH, I P—e'b'
Adobe
Acrobat Sign
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
January 29, 2025
Peachtree Construction Ltd.
5801 Park Vista Circle
Keller, Texas 76244
RE: Acceptance Letter
Project Name: 2024 Asphalt Resurfacing Contract 5
Project Type: Paving
City Project No.: 104937
To Whom It May Concern:
On January 22, 2025 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on January 29, 2025. The final inspection
and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and
is therefore accepted by the City. The warranty period will start on January 29, 2025, which is the date
of the punch list completion and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
925-4381.
Sincerely,
Mai,, 11W
Marwan hafez, Project Manager
Cc: Carlos Garcia, Inspector
Gary Deyon, Inspection Supervisor
Edward D'Avila, Senior Inspector
Mary Hanna, Program Manager
Omar Elbagalati, Consultant
Peachtree Construction Ltd., Contractor
Click here to enter text., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
Bond #107908205
CONSENT OF
OWNER
SURETY COMPANY
ARCHITECT
❑
TO FINAL PAYMENT
CONTRACTOR ❑
Conforms with the American Institute of
SURETY
Architects, AIA Document G707
OTHER
❑
PROJECT: 2024 Asphalt Resurfacing Contract 5 City Project # 104937
City of Fort Worth
TO (owner) 200 Texas St.
Fort Worth, TX 76102
ARCHITECT'S PROJECT NO.
CONTRACT FOR: Construction
CONTRACT DATE: January 23, 2024
Peachtree Construction, LTD.
CONTRACTOR: 5801 Park Vista Cir., Keller, TX 76248
In accordance with the provisions of the Contract between the Owner and the Contractor as above, the
Travelers Casualty and Surety Company of America
9601 McAllister Freeway, Suite 700, San Antonio, TX 78216 SURETY COMPANY,
on bond of
Peachtree Construction, LTD.
5801 Park Vista Cir., Keller, TX 76248 CONTRACTOR,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to
City of Fort Worth
200 Texas St. OWNER,
Fort Worth, TX 76102
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 25th day of March 2025.
5ur,,ty CompanyTrave s Casualty and Surety Company of America
Witness: Signature of Authorized F#resentative
Tina Payne Teresa Ayala Atty-in-Fact
NOTE: This form is to be used as a companion document to AIA DOCUMENT G766, CONTRACTOR'S AFFIDAVIT OF PAx'N1LiN':
OF DEBTS AND CLAIMS,
Current Edition
00438 12/00 ONE PAGE
AW
TRAVELERS)
Travelers Casualty and Surety Company of America
Travelers Casualty and Surety Company
St. Paul Fire and Marine Insurance Company
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and
St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein
collectively called the "Companies"), and that tho Companies do hereby make, constitute and appoint Teresa Ayala of
FT WORTH , Texas , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and
acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of
the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or
guaranteeing bonds and undertakings required or permitted In any actions or proceedings allowed by law.
IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April,
2021.
iyr+F Jpeir ap,..
COtlir. iFAriiFU9D,
�N• o %Gi
State of Connecticut
City of Hartford ss.
By:
Robert L. Rane enter Vice President
On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior
Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the
purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer.
IN WITNESS WHEREOF, I hereunto set my hand and official seal.
My Commission expires the 30th day of June, 2026
Nowik, Notary Public
This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of
the Companies, which resolutions are now in full force and effect, reading as follows:
RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice
President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint
Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority
may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings
obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may
remove any such appointee and revoke the power given him or her; and it is
FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or
any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided
that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is
FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance,
or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive
Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the
Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary;
or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her
certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is
FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President,
any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to
any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in -
Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of
Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed
and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or
understanding to which it is attached.
1, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a
true and correct copy of the Power of Attorney executed by said Companies,.vfi3ch remains in full force and effect.
Dated this 25th day of March 2025
Y _
iL1RTF4FID, W HPO, '�.. MO
AN,
_
ONNHH.
Is I
• ,6 '�;ar# Kevin Hughes�A, retary
ra verify toe authenticity of this Power of AtWmey, Please call us at 1-800-421-3880.
Please refer to the above-namedAttorney(s)-in-Pact and the details of the bond to which this Power ofAttorney is attached
Affidavit of Compliance with
City of Fort Worth
Prevailing Wages
I, Brendan Tavlor Proiect manager
(Name of person signing affidavit) (Title)
do hereby certify that the wages paid to all employees of Peachtree Construction, Ltd.
(Company Name)
for all hours worked on the
2024 Asphalt Resurfacing Contract 5 104937
(Project name and location)
project, during the period from 6/1/24
to 1/31/25
(Project Dates)
are in compliance with the requirements of Chapter 2258, Texas Government Code related to paying established
City of Fort Worth wage rates per the project bid documents. I further certify that no rebates or deductions have
been or will be made, directly or indirectly, from any wages paid in connection with this project, other than those
provided by law.
Sworn to and subscribed in my presence this
Janet Lynn Reiter
My Commission Expires =�
+ ¢ 8/28/2027
Notary ID130350671 ,
Revised 3/08/2024
(Signature of Officer or Agent)
3''ZA, day of 1 �
U(Notary Public)
20 2'5