HomeMy WebLinkAboutContract 61420-CO1CSC No. 61420-COI
FpR->F` WoP,-i->F3 City of Fort Worth
Change Order Request
Project Name: I Trinity Boulevard Phase 2 - Salado Trail to Thames Trail City Sec No.: 61420
Project No.(s):l 103280 1 DOE No. I N/A City Proj. No.: 103280
Project Description:
Trinity Boulevard Phase 2 Salado Trail to Thames Trail - Roadway, Drainage, Waterline, Landscape and Illumination
Improvements
Contractor: Jackson Construction, Ltd.
City Project Mgr. Mitch Aiton/Preeti KC
Phone Number: 682-715-9424
Dept. I Water
Change Order # 1 1 1 Date: 1 3/10/2025
City Inspector: I Stan Sutterfield
Phone Number: (817) 240-4037
Sewer TPW Totals Contract Time
(Calender days)
Original Contract Amount $4,981,705.00 $7,117,637.00
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $4,981,705.00 $7,117,637.00
Amount of Proposed Change Order $37,870.79 $0.00
Revised Contract Amount $5,019,575.79 $7,117,637.00
Original Funds Available for Change Orders $149,451.00 $213,529.00
Remaining Funds Available for this CO $149,451.00 $213,529.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$12,099,342.00
730
$12,099,342.00
730
$37,870.79
$12,137,212.79
730
$362,980.00
$362,980.00
0.31 %
$15,124,177.50
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 1 will provide for the increased quantities of 36-inch water carrier pipe in 54-inch casing BOTC
to avoid disruption to the traffic in Trinity Boulevard.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name Contractor Name 1111IL&ctor Signature I Date
Jackson Construction, Ltd. All Jones AU 7onor Mar 14, 2025
Inspector
Date
Mar 14, 2025
Pro'
/`,< -�`
Date
Mar 17, 2025
Director Water Dept
Date
Construction Supervisor (Water)
Date
Christopher ffa✓Aer
Mar 21, 2025
Mar 15, 2025
Senior Assistant City Attorney
Date
Assistant City Manager
Date
Mar24,2025 (�
Mar28,2025
Council Action (If Required)
M&C Number N/A
M&C Date Approved N/A
ATTEST:
Ate.
F[] i:;,--r Wco P, r m City of Fort Worth
Change Order Additions
Project Name Trinity Boulevard Phase 2 - Salado Trail to Thames Trail City Sec No.: 1 61420
Project No.(s): 103280 1 DOE No.1 N/A City Proj. No.: 1 103280
Project Trinity Boulevard Phase 2 Salado Trail to Thames Trail - Roadway, Drainage, Waterline, Landscape and Illumination
Description Improvements
Contractor Jackson Construction, Ltd. Change Order: 1 Date: 1 3/10/2025
City Project Mgr. Mitch Aiton/Preeti KC City Inspector I Stan Sutterfield
ADDITIONS
DEPT I Qty JUnit I Unit Cost I Total
II-7 36" Water Carrier Pipe Water 2.75 LF $1,700.00 $4,675.00
II-8 54" Casing By Other Than Open Cut Water 2.75 LF $4,600.00 $12,650.00
II-42 36" Water Carrier Pipe (Quantity above 25% of original) Water 21.25 LF $1,380.74 $29,340.73
11-43 54" Casing By Other Than Open Cut(Quantity above 25% of original) Water 21.25 LF $2,409.65 $51,205.06
Page 1 of 1
(Water $97,870.79
(Sewer
ITPW
(Additions Sub Total
F" R > AV" P, H City of Fort Worth
Change Order Deletions
Project Name Trinity Boulevard Phase 2 - Salado Trail to Thames Trail I City Sec No.: 61420
Project No.(s): 103280 1 DOE No. I N/A I City Proj. No.: 103280
Project Description Trinity Boulevard Phase 2 Salado Trail to Thames Trail - Roadway, Drainage, Waterline, Landscape and
Illumination Improvements
Contractor Jackson Construction, Ltd. I Change Order: � Date I 3/10/2025
City Project Mgr. Mitch Aiton/Preeti KC I City Inspector: I Stan Sutterfield
DELETIONS
ITEM IDESCRIPTION I DEPT I Qty JUnit I Unit Cost ITotal
II-41 Water Construction Allowance Water 0.40 LS $150,000.00 $60,000.00
(Water $60,000.00
(Sewer
ITPW
Page 1 of 1 (Deletions Sub Total $60,000.00
MWWBE Breakdown for this Change Order
MWBE Sub I Type of Service I Amount for this CO
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
Total I $0.00 1
Page 1 of 1
FORT WORTH:,:
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Trinity Blvd Ph 2 CO #1
M&C: N/A CPN: 103280 CSO: 61420
Date: 3/11/2025
To:
Name
1.
Jessica Rodriquez
2.
Mitch Aiton
3.
Ali Jones
4.
David Harlin (Inspector)
5.
Emanuel Nieto (Const Super)
6.
Preeti KC (PM Sign)
7.
Tony Sholola
8.
Chris Harder (Director)
9.
Doug Black
10.
Jesica McEachern (ACM)
11.
Jannette Goodall
12.
TPW Contracts
Department
Initials
TPW - Approval
TPW - Approval
R TR
M�
Jackson - Signature
Al
TPW - Signature
TPW - Signature
Water - Signature
Water - Approval
Preeti c
Water — Signature
Legal — Signature
Water — Signature
CSO - Signature
;;H
P/ollw Black
\
�ka MCEachern
,G 7CI
DOC#: N/A
Date Out
Mar 14, 2025
Mar 14, 2025
Mar 14, 2025
Mar 14, 2025
Mar 15, 2025
Mar 17, 2025
Mar 17, 2025
M a r 21, 2025
Mar 24, 2025
Mar 28, 2025
M a r 28, 2025
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: []YES ®No SAME DAY: []YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
® For Your Information
® Signature/Routing and or Recording
® Comment
❑ File
Return To: Please notify TPWContracts(&,fortworthtexas.tiov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!