Change Order Request
CSC No. 57937-0O2
Facility and Project South Patrol Division
City Sec No. �57937
Description:
Funding (FID) No.(s) 34018 0350421 5740010101661 000980 999918060199
City Project No 101661
Contractor:ICORE Construction I Change Order#
0 Date: 1
3/13/2025
City Project Mgr.1Jackson Jones for (retired) Alfonso Meza I City Inspector:
I Lisa Pyper
Phone Number:1(817) 392- 8274 1 Phone Number:
1817-201-0099
Contract Time
(CD)
Original Contract Amount---------------------------------------------------------------------------------------------------------------------------{
514,724,970.00
456 1
Extrasto Date------------------------------------------------------------------------------------------------------------------------------------------- I $225,000.00
0
Creditsto Date-------------------------------------------------------------------------------------------------------------------------------------------I 0.00
0
Pending Change Orders (in M&C Process) ------------------ —---------------------------------------------------------------- —----------------- I pm
0
Contract Cost to Date --------------------------------------------- —------------------ —----------------------- —--------------------------------------- I $14,949,970.00
456
Amount of Proposed Change Order--------------------------------------------------------------------------------------------------------------� ($118,139.48)
336
Revised Contract Amount--------------------------------------------------------------------------------------------------------------------------
$1 ,831,830.52
792
Original Funds Available for Change Orders ------------ --------------------------------------------------------------------------------------- 0.00
Remaining Funds Available for this CO---------------------------------------------------------------------------------------------------------I 0.00
Additional Funding (if necessary)-------------------------------------------------------------------------------------------------------------------{ 0.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
.7 %
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$18,406,212.50
The purpose of Change Order #2 is to credit the City from the construction contract with Core Construction for the cost to repair the south area of the property. Excess spoils were stockpiled
during construction of South Patrol outside of the disturbed project footprint and were not reincorporated onto the project site nor removed from the area. This has caused changes in elevations
and erosion in an area not originally part of the civil work. It is estimated that there is in excess of 430 cu yds of soil that needs to be removed and the area regraded to proper elevations. Soil
will need to be stabilized with hydroseed to prevent further erosion. The City will withhold $97,437.00 from CORE's retainage in order to hire a Job Order Contractor to perform the outstanding
scope of work.
In addition, there is a remaining balance of $20,702.48 in the owner's general contingency allowance to be reincorporated back into the project.
Therefore, a total of $118,139.48 (credit from General Contractor plus remaining General Contingency Allowance) will be moved back to project budget. This will complete the construction with
a total cost overage of 0.7% or $106,860.52. qr" 4&4
Due to delays by Core Construction to complete the punchlist, the CoFwwil4ra0336 additional days to the contract with final completion effective 2/20/2025.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
actors Company Name
Core Construction
ntra Contractor Signature
Matt Letlow Matt,7 Latow Mar17,2025
PMD Inspector DateAL Assistant Director/Property Management uepartn
f- Mar 17, 2025 /' Mar 21, 2025
PMD Superintendent a e Director/Prope ariagement Department ldlrli jj'1Ahl,
Mar 17, 2025 Mar 26, 2025
1 Project Mafia -b�s�s�ls�i`a�ni Uily Attorney
I Mar17,2025 ooQ,a,NrrBarL Mar27,2025
Project Architect �Ij& JIjj rAssistant City Manager ENEWOMM
Mar 17, 2025 --Ad "4--4 Apr 1, 2025
M&C Number I I M&C Date Approved
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible r, 70, 202516:25 CDT)
for the monitoring and administration of this contract, including OFFICIAL RECORD Nikita Watts
ensuring all performance and reporting requirements. CITY SECRETARY Sr. Capital Projects Officer
FT. WORTH, TX
FORT WORTH,
February 19, 2025
RE: Contract Close Out South Patrol
Mr. Letlow,
Discussions concerning the removal of soils and regrading the dirt that was spread across the site in the flood plain area
have been going on since June 27, 2024. The site was evaluated and considered a zero -sum site. Therefore, there
should not have been any excess soil nor was direction provided in the contract documents giving directions to distribute
the soil across the site.
During construction, the spoils from the project were distributed across the southwest corner of the property in the flood
plain area. Core has not been able to produce a Request for Information (RFI), submittal, as -built or any type of
documentation that provided guidance or approval for spoil distribution on the site.
To date we have continued to experience erosion in that area. We were provided an estimate by Core on August 24,
2024, to perform the work. We continued to review and negotiate costs up until February 6, 2025, when we received a
communication stating that the subcontractor had backed out and Core would not be ablet to complete the scope of work.
We understand that things like this can happen after a lengthy exploration period. Additionally, we have since been able
to validate the number provided with one of our Job Order Contractors (JOC). We will be withholding from your contract
$97,437.00 to self -perform the work. This amount will be taken from your retainage balance.
If you agree please sign below, and we will allow you to make your final payment less the amount indicated in this letter
and close out the project. The amount 91011110ebmq0to be paid will be)iiY��
Respectfully Requested,
NikitaFtts
Sr. Capitol Project Officer
Property Management
ACCEPTED By:
"*
3.3.25
Signature
Title
Date
CC: Brian Glass, Assistant Director Property Management
Doug Black, Legal
Jackson Jones, Construction Superintendent
ILThis amount is to be the difference between
our final contract amount less previous paid
to date total.