HomeMy WebLinkAboutContract 61087-A1CSC No. 61087-A1 AMENDMENT No. 01 TO CITY SECRETARY CONTRACT No. 61087 WHEREAS, the City of Fort Worth (CITY) and AECOM Technical Services, (CONSULTANT) made and entered into City Secretary Contract No. 61087, (the CONTRACT) which was authorized by M&C 23-0975 on the 141h day of November 2023 in the amount of $2,200,000.00; and WHEREAS, the CONTRACT involves professional services for the following project: Transportation Master Plan, CPN 104860; and WHEREAS, it has become necessary to execute Amendment No. 01 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and CONSULTANT, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: RE Article I of the CONTRACT is amended to include the additional professional services specified in the proposal attached hereto and incorporated herein. The cost to City for the additional professional services to be performed by Consultant totals $1,200,000.00. (See Attached Funding Breakdown Sheet, Page -3-) 0 Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Consultant for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $3,400,000.00. OFFICIAL RECORD 3. CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Transportation Master Plan Prof Services Agreement Amendment Template 104860 Revision Date: 03/08/2024 Page 3 of 11 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth cv� Jesica McEachern Assistant City Manager DATE: Apr 1, 2025 A.00vovp�� F FART Ca ATTEST: Ovo o=d Is �dC 5 ap Jannette Goodall City Secretary APPROVED AS TO FORM AND LEGALITY: Douglas Black (Mar 24, 202515:02 CDT) Douglas W. Black Sr. Assistant City Attorney of the date subscribed by the City's CONSULTANT AECOM Technical Services Laura Weis Vice President DATE: Mar 20, 2025 M&C No.#: 25-0215 M&C Date: 03/11/2025 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 03/08/2024 Page 3 of 11 Transportation Master Plan 104860 FUNDING BREAKDOWN SHEET City Secretary No. 61087 Amendment No. 01 Project CF1- CF2 - Fund Dept ID Account Bond Amount ID Activity Reference 30102 0200431 5330201 105759 002310 $1,200,000.00 Total: $1,200,000.00 City of Fort Worth, Texas Transportation Master Plan Prof Services Agreement Amendment Template 104860 Revision Date: 03/08/2024 Page 3 of 11 ATTACHMENT "A" Scope for Professional Services for the Transportation Investment Program Transportation Investment Program (FY 2026 - 2029) Background and Purpose The City of Fort Worth, with the support of AECOM, is developing the City's first -ever Transportation Investment Program (TIP) to prioritize a four-year suite of transportation improvements, project -based risk assessments, cost estimates, and schedules. This initiative focuses on aligning projects with current funding opportunities and developing strategic approaches to maximize impact, while also identifying and leveraging new sources of funding. A key component of the program is addressing immediate congestion challenges through short-term projects designed to provide operational relief while longer -term solutions are developed. This program would be updated and reevaluated at least once every four -years to sync with the City's bond program and NCTCOG's Metropolitan Transportation Plan. By integrating financial planning with the prioritization of short-term congestion relief projects, the program ensures efficient resource allocation to meet immediate needs while laying the foundation for transportation capital investments over the first four vears of the Moving a Million (M1M) Master Transportation Plan. This approach targets highest -priority transportation needs, integrates public and private funding sources, and aligns project development with funding programs. Key Objectives 1. Align TIP projects with local, regional, state, and federal funding opportunities. 2. Ensure integration of partner- and developer -built facilities to maximize network benefits. 3. Ensure high -return investments that align with the goals of the M1 M Master Transportation Plan. 4. Optimize resource allocation to address both immediate and long-term transportation needs. 5. Amend the current Master Thoroughfare Network (MTP) to incorporate TIP projects. 6. Identify and prioritize up to three (3) short-term congestion relief projects that provide immediate operational benefits. 7. Engage the public and stakeholders, with a focus on Title VI and Justice40 populations, to validate critical congestion areas, gather feedback on proposed solutions, and MTP amendments. Detailed Tasks TASK 1: STAKEHOLDER COORDINATION Objective: Foster collaboration and alignment between TxDOT, the City, developers, county officials, and other stakeholders to optimize project outcomes. Activities: • Conduct two virtual stakeholder meetings to: o First Meeting: By Month 2 to provide program updates, gather input on priorities, funding alignment, integration of partner- and developer -built facilities, and address cross - jurisdictional challenges. o Second Meeting: By Month 5 to refine recommendations and incorporate feedback. City of Fort Worth, Texas Transportation Master Plan Attachment A 104860 Revision Date: 05/23/2024 • Summarize key findings from stakeholder discussions and integrate them into program components. • Develop a communication plan to maintain ongoing collaboration throughout the program lifecycle, and target vulnerable populations Deliverables: Stakeholder Coordination Plan and virtual meeting agendas. Summary reports from virtual meetings. Recommendations and adjustments based on stakeholder input. Timeline: First meeting by Month 2; second meeting by Month 5. TASK 2: PUBLIC ENGAGEMENT AND OUTREACH Objectives: Collect public input to refine and prioritize short- and near -term and congestion relief projects; develop a comprehensive, public -facing interagency mapping application for transportation projects; with special consideration given to Title VI, Justice40, and other vulnerable populations. Activities: • Host two rounds of public outreach (20 in -person open houses), one in each council district for each round, to share progress on the plan, validate identified transportation issues, and gather input on potential solutions. • Conduct 1 virtual open house for accessibility and broader participation. • Highlight developer- and partner -built facilities in the discussion and gather feedback on their integration. • Summarize and analyze public input to inform project priorities. Deliverables: • Public Engagement Plan and materials (e.g., FAQs, maps, presentations). • Summary reports for each round of outreach. • Comprehensive Public Engagement Summary. • Interagency Transportation Projects Mapping Application using ESRI software. Timeline: First meeting by Month 5; second meeting by Month 8. TASK 3: INTERIM PROJECT STRATEGY FOR CONGESTION RELIEF Objective: Identify and prioritize up to three (3) high -impact, temporary projects to alleviate congestion. Activities: Analyze congestion hotspots using traffic data, NCTCOG's Travel Demand Model, and stakeholder input. Identify potential projects such as, but not limited to: o Intersection upgrades o Turn lane additions and other intersection geometry related improvements o Signal timing optimization (retiming) City of Fort Worth, Texas Transportation Master Plan Attachment A 104860 Revision Date: 05/23/2024 o Temporary gap closures and operational improvements • Iteratively analyze project benefits through Synchro modeling: o Analyze level of service (LOS), delay results, and other performance metrics for: ■ baseline and ■ interim improvement scenarios o Refine project priorities based on the modeling insights. • Develop planning -level designs for each interim project to illustrate concepts. Deliverables: • Preliminary Engineering for Interim Projects, including visualizations, preliminary cross -sections, and layout plans to guide short-term improvements. • Synchro Modeling Scenarios and Results Report. • Recommendations for ordinance update, if needed. Timeline: Months 2-6. TASK 4: SHORT- AND NEAR -TERM PROJECT MODELING Objective: Develop and analyze short-term congestion relief scenarios for 2030 by integrating planned transportation projects, evaluating key performance indicators, and generating congestion relief maps to inform decision -making. Activities 1. Scenario Development a. Define four short-term scenarios: i. Existing conditions ii. Existing + Committed (COG TIP) iii. Existing + Committed (COG TIP + 2026 Bond Tier 1) iv. Existing + Committed (COG TIP + 2026 Bond Tier 1 and Tier 2) b. Confirm project lists and coding structure for TIP 2036 projects to be included in the 2030 scenario. 2. Data Preparation a. Interpolate demographic projections for 2030. b. Integrate network assumptions, including speed limits, lane configurations, and signal timings. c. Ensure network consistency with regional TIP and planned investments. 3. Model Implementation a. Code -in 2026 Tier 1 projects. b. Code -in 2026 Tier 1 + Tier 2 projects. c. Implement post -processing steps to clean and validate data outputs. 4. Congestion Relief Analysis a. Compute congestion relief indicators: i. Daily and peak -hour Vehicle Miles Traveled (VMT) ii. Daily and peak -hour Vehicle Hours Traveled (VHT) iii. Speed metrics (VMT/VHT) iv. Daily/peak delay (free -flow vs. congested time, weighted by VMT) v. Travel Time Index (TTI) for peak periods. b. Generate congestion relief maps: City of Fort Worth, Texas Transportation Master Plan Attachment A 104860 Revision Date: 05/23/2024 i. Speed maps ii. Volume -to -Capacity (V/C) ratio maps iii. Level of Service (LOS) maps iv. Volume distribution maps v. Travel Time Index (TTI) maps vi. Throughput analysis 5. Stakeholder Coordination a. Align modeling assumptions with regional agencies (e.g., NCTCOG). b. Validate demographic interpolation with NCTCOG before proceeding. c. Conduct internal reviews to ensure scenario realism and applicability. Deliverables • Scenario Definition Document - Summary of scenario inputs, assumptions, and project inclusions. • Demographic Interpolation Summary - Documentation of 2030 demographic forecasts and their integration into the model. • Congestion Relief Indicators Report - City-wide and district -level analysis of VMT, VHT, speeds, delays, and TTI. • Congestion Relief Maps - GIS-based visualization of network performance for each scenario. • Final Model Outputs - Processed and validated data ready for integration into decision -making workflows. Timeline: Months 2-6. TASK 5: FUNDING STRATEGY FOR THE 2026 BOND/FIRST FOUR YEARS OF M1 M Objective: Develop a comprehensive funding program to support transportation investments outlined in the 2026 Bond, focusing on leveraging public and private resources to maximize impact. Activities: 1. Project Funding Program: a. Assess potential funding opportunities, including: i. Local Funds: Impact fees, bond allocations, and developer contributions. ii. State and Federal Grants: Competitive grants, matching funds, and formula programs. iii. Private and Partner Contributions: Partnerships with private stakeholders and neighboring counties/municipalities. b. Identify innovative funding mechanisms, such as public -private partnerships (P3s), value capture, or community reinvestment funds. 2. Project Alignment: a. Prioritize projects based on funding eligibility, scalability, and alignment with M1 M goals and other city plans. b. Coordinate with regional agencies, developers, and other partners to pool resources effectively. 3. Funding Scenario Matrix: a. Develop funding scenarios to evaluate the impact of various resource allocation strategies. b. Adjust project timelines and priorities based on funding availability and expected returns. 4. Long -Term Readiness: City of Fort Worth, Texas Transportation Master Plan Attachment A 104860 Revision Date: 05/23/2024 a. Establish frameworks to position projects for future funding opportunities, including federal discretionary grant programs. Deliverables: • Comprehensive Funding Strategy Report for the first four years of M1 M with plan adoption. • Analysis of available funding sources and alignment opportunities. • Prioritized project list based on funding potential and strategic importance. • Recommendations for innovative funding mechanisms and next steps for securing resources. • Conceptual Design Preliminary Engineering (schematic) for Interim Projects, including visualizations, preliminary cross -sections, and layout plans. Timeline: Months 1-7. TASK 6: MTP AMENDMENTS. RIGHT-OF-WAY NEEDS AND CLASSIFICATIONS Objective: Amend the MTP, update ROW requirements and classifications for TIP projects Activities: • Align current and Future Functional Classification System (FFCS) classifications in an equivalency table • Define ROW needs for amendments • Integrate new point classifications for grade separations and interchanges into ROW updates • Assist CFW staff with the MTP amendment process, including meetings with affected property owners and presentations to MITC and CPC. Deliverables: New MTP linework as shapefiles and cross -sections as needed to determine ROW needs Visualizations and narrative as needed for the MTP amendment process Timeline: Months 2-8. TASK 7: PROJECT SCOPING FOR FEDERAL/BOND READINESS Objective: Prepare three Connecting the Core projects for federal or bond funding readiness. Activities: • Identify suitable projects based on public input, impact, feasibility, alignment with M1 M, Comprehensive Plan, and other city plans. • Prepare conceptual designs, cost estimates, and documentation for funding applications. Deliverables: • Project Scoping Report (3 projects). • Supporting documentation for funding applications Timeline: Months 8-12. City of Fort Worth, Texas Transportation Master Plan Attachment A 104860 Revision Date: 05/23/2024 Final Deliverables 1. Stakeholder Coordination Plan a. Agendas and summaries from stakeholder meetings. b. Recommendations based on feedback. 2. Public Engagement Summary a. Summary reports for in -person and virtual meetings. b. Comprehensive Public Engagement Report. c. Interagency Public -Facing Mapping Application. 3. Interim Project Strategy Document a. Prioritized list of short-term congestion relief projects. b. Synchro modeling scenarios and results. 4. Preliminary Engineering Package for Interim Projects a. Visualizations, preliminary cross -sections, and layout plans. 5. Comprehensive Funding Profiles a. Analysis of funding sources and recommendations for innovative funding mechanisms. b. Scenario -based financial planning and project prioritization. c. Alignment with the 2026 Bond and long-term transportation goals. 6. MTP Amendments Package a. Updated ROW and classification maps. b. New MTP linework, visualizations, and supporting narratives. 7. Project Scoping Report for Federal/Bond Readiness a. Conceptual designs and cost estimates for three key projects. b. Documentation for funding applications. City of Fort Worth, Texas Transportation Master Plan Attachment A 104860 Revision Date: 05/23/2024 Professional Services for Master Transportation Plan City Project No. 104860 Lump Sum Project I. Compensation a) The CONSULTANT shall be compensated a total lump sum fee of $1,200,000.00 as summarized in Exhibit B-1 - Consultant Invoice and Section IV - Summary of Total Project Fees. The total lump sum fee shall be considered full compensation for the services described in Attachment A, including all labor materials, supplies, and equipment necessary to deliver the services. b) The CONSULTANT shall be paid monthly payments as described in Section II - Method of Payment. II. Method of Payment a) Partial payment shall be made to the CONSULTANT monthly upon City's approval of an invoice prepared and submitted by the CONSULTANT in the format and including content as presented in Exhibit B-1, Progress Reports as required in item III. of this Attachment B, and Schedule as required in Attachment D to this Agreement. b) The estimated current physical percent complete as required on the invoice shall be calculated from the progress schedule as required in Attachment D to this Standard Agreement and according to the current version of the City of Fort Worth's Schedule Guidance Document. c) The cumulative sum of such monthly partial fee payments shall not exceed the total current project budget including all approved Amendments. d) Each invoice shall be verified as to its accuracy and compliance with the terms of this Agreement by an officer of the CONSULTANT. III. Progress Reports a) The CONSULTANT shall prepare and submit to the designated representative of the Transportation and Public Works Department monthly progress reports and schedules in the format required by the City. I. Summary of Total Project Fees City of Fort Worth, Texas Transportation Master Plan Attachment A 104860 Revision Date: 05/23/2024 Firm Primary Fee Amount Responsibility Prime Consultant AECOM Prime Consultant $ Proposed MWBE Sub -Consultants Othon Traffic $ Engineering Pavlik and Associates Public Relations $ Livable Plans and Codes Land use and $ zoning assessments Toole Design Complete streets, $ active transportation planning Non-MWBE Consultants TOTAL $ 1000 Amendment Project Numbers & Names Total Fee MWBE Fee MWBE % 105759 26 Bond Project Development �$1,200,C00.00k180,000.00� 150 City MWBE Goal = 150 Consultant Committed Goal = 150 City of Fort Worth, Texas Attachment A Revision Date: 05/23/2024 Page 4 of 11 Transportation Master Plan 104860 3/20/25, 9:20 AM M&C Review CITY COUNCIL AGENDA Create New From This M&C DATE: 3/11/2025 REFERENCE **M&C 25- NO.: 0215 Official site of the City of Fort Worth, Texas FoR H 202026 BOND LOG NAME: TRANSPORTATION PROJECT DEVELOPMENT CODE: C TYPE: CONSENT PUBLIC NO HEARING: SUBJECT: (ALL) Authorize Execution of Amendment No. 1 to the Professional Services Agreement with AECOM Technical Services Inc. in the Amount of $1,200,000.00 for the 2026 Bond Transportation Project Development Scope for a Revised Contract Amount of $3,400,000.00 RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 1, in the amount of $1,200,000.00, to the Professional Services Agreement with AECOM Technical Services, Inc. (City Secretary No. 61087) for a Revised Contract Amount of $3,400,000.00 for the 2026 Bond Transportation Project Development (City Project No. 105759). DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to expand the scope of the existing contract with AECOM Technical Services Inc. (AECOM) to include the 2026 Bond Transportation Project Development support. On March 11, 2024, the City Council authorized a contract with AECOM to administer the City's first overall Master Transportation Plan (City Secretary Number 61087,, M&C 23-0975). The scope includes an analysis of existing conditions, needs assessment, gap analysis, and the update and integration of the City's Master Thoroughfare Plan (MTP), Active Transportation Plan, and other policies. On October 15, 2024, the City Council approved additional funding in the amount of $2,500,000.00 (M&C 24-0917) which will fund this amendment. This contract amendment will align project scopes with funding plans and early design efforts and improve coordination among partners, helping to deliver both short-term congestion relief projects and long-term infrastructure improvements more efficiently. The revised scope includes, but is not limited to, interim MTP amendments, interim project and alternative delivery strategies, 2026 bond transportation financial plan, travel demand modeling, and corridor planning -level schematics. This work will also prepare candidate projects for federal funding competitiveness and other partner funding leverage opportunities. The following table summarizes previous contract actions and amendments: Agreement Amount Justification MI&oC Date Initial M&C23- Contract CSC $2,200,000.00 Initial Agreement 11/14/2023 No. 61087 0975 Amendment 26 Bond This $1,200,000.00 Transportation 03/11/2025 No. 1 Project Support M&C Contract $3,400,000.00 Total apps.cfwnet.org/council_packet/mc_review.asp?ID=33081 &councildate=3/11/2025 1/2 3/20/25, 9:20 AM M&C Review The Funding for the 2026 Bond Transportation Project Development is summarized in the table below: Fund Existing Funding Additional Funding Project Total 30102 - Project Srvc-Capital $2,500,000.00 $0.00 $2,500,000.00 Total $2,500,000.00 $0.00 1$2,500,000.00 Funding is budgeted in the Capital Project Srvc-Capital Fund in the TPW Department for the purpose of funding the 2026 Bond Transportation Project Development, as appropriated. AECOM Technical Services Inc. agrees to maintain its initial M/WBE commitment of 15\% that it made on the original agreement and extend and maintain that same M/WBE commitment of 15\% to this first amendment. Therefore AECOM Technical Services Inc. remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an authorized representative of its company. The project is located in ALL COUNCIL DISTRICTS FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the Capital Project Srvc-Capital Fund for the 2026 Bond Transportation Project Development to support the approval of the recommendation and execution of the amendment. Prior to an expenditure being incurred, the Transportation and Public Works Department has the responsibility of verifying the availability of funds. TO Fund Department Account Project I Program Activity I Budget I Reference # I Amount ID ID Year (Chartfield 2) FROM Fund Department Account Project ID ID Submitted for City Manager's Office by_ Originating Department Head: Additional Information Contact: ATTACHMENTS Program Activity Budget Reference # I Amount Year (Chartfield 2) Jesica McEachern (5804) Lauren Prieur (6035) Monty Hall (8662) Kelly Porter (7259) 202026 BOND DEVELOPMENT FID.xlsx (CFW Internal) 202026 BOND TRANSPORTATION PROJECT DEVELOPMENT funds availabilitv,pdf (CFW Internal) 25-104860 (CO 1 Citywide Master Plan)APCF-NS.Ddf (CFW Internal) Completed Form.PDF (CFW Internal) M&C Map 2026BondTIRpdf (Public) apps.cfwnet.org/council_packet/mc_review.asp?ID=33081 &councildate=3/11/2025 2/2 104860-EPAM-Professional Services Agreement Amendment # 1 with AECOM Technical Services Final Audit Report 2025-03-20 Created: 2025-03-20 By: Andrea Munoz (Andrea. Mu noz@fortworthtexas.gov) Status: Signed Transaction ID: CBJCHBCAABAADWYoIOgEizsb8fxYoxcKC-cK4eRoCxWg "104860-EPAM-Professional Services Agreement Amendment # 1 with AECOM Technical Services" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-03-20 - 2:40:27 PM GMT- IP address: 204.10.90.100 Document emailed to Laura Weis (laura.weis@aecom.com) for signature 2025-03-20 - 2:42:30 PM GMT IV `5 Email viewed by Laura Weis (laura.weis@aecom.com) 2025-03-20 - 10:42:21 PM GMT- IP address: 130.41.238.24 C�o Document e-signed by Laura Weis (laura.weis@aecom.com) Signature Date: 2025-03-20 - 10:42:46 PM GMT - Time Source: server- IP address: 130.41.238.24 Ci Agreement completed. 2025-03-20 - 10:42:46 PM GMT FORTWORTH, I Pawere"Y Adobe Acrobat Sign 104860-EPAM-Professional Services Agreement Amendment # 1 with AECOM Technical Services Final Audit Report 2025-03-24 Created: 2025-03-21 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Canceled / Declined Transaction ID: CBJCHBCAABAAp3,i5CfcPcVBmNZXh9plvignnF3b4F-6 "104860-EPAM-Professional Services Agreement Amendment # 1 with AECOM Technical Services" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-03-21 - 2:37:05 PM GMT- IP address: 204.10.90.100 Document emailed to Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) for approval 2025-03-21 - 2:41:49 PM GMT Email viewed by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) 2025-03-21 - 3:02:44 PM GMT- IP address: 204.10.90.100 Document approved by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) Approval Date: 2025-03-21 - 3:07:52 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2025-03-21 - 3:07:54 PM GMT Document declined by Douglas Black (Douglas.Black@fortworthtexas.gov) Decline reason: In paragraph I, change "design" to "professional'. Thx. 2025-03-24 - 3:24:24 PM GMT- IP address: 204.10.90.100 FDRTWORTHs I P°`4'y Adobe Acrobat Sign FORT WORTH,,, Routing and Transmittal Slip Transportation & Public Works Department Professional Services Agreement Amendment # 1 with DOCUMENT TITLE• AECOM Technical Services M&C: 25-0215 CPN: 104860 CSO: 61087 DOC#: Date: To: Name Department Initials Date Out 1. Laura Weis Consultant w Mar 20, 2025 2. Kelly Porter TPW AD Arrvd in Ayilnft TT)• 1715 4. Lauren Prieur TPW Director 5. Doug Black Legal M a r 24, 2025 Dougla 6. Jesica McEachern ACM JIca E, „e Apr 1, 2025 7. Jannette Goodall CSO Apr 1, 2025 8. DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: DYES ®No RUSH: DYES ®No SAME DAY: DYES ❑No NEXT DAY: DYES ❑No ROUTING TO CSO: ®YES ❑No Action Renuired: ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts(&FortWorthTexas.�4ov at ext. 7233 or 8363, for pick up when completed. Thank you! Updated 0111212024 mdhm