Loading...
HomeMy WebLinkAboutContract 44281-A1 ,ffy SWRETARY AMENDMENT No. 1 6ONTRACT K0- TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Brown & Gay Engineers, Inc. , (ENGINEER) made and entered into City Secretary Contract No. 44281 , (the CONTRACT) which was authorized by M&C C-26438 on the 5th day of March, 2013 in the amount of $1,158, 764 .00; and "WHEREAS, the CONTRACT involves engineering services for the following project: Northside II 48-inch Water Main, Phase 1, from Heritage Trace Parkway to Alta Vista Road. WHERE ►S, it has become necessary to execute Amendment No . I to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1 . Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated July 24, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $175, 805 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $1, 354 ,569 . 00 . LO � (C I A SE III IMF 11L qi'rn Page 3. All other provisions of the Contract, which are not expressly attended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Brown & Gay Engineers, Inc. M Fernando Costa William D . Dillon, P.E. Assistant City Manager Executive Vice President DATE: zazl DATE: /7- ..,m„ APP REC ED: s � 1 7 vv 7 S. Frank Crumb, P.E. Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C : C-26438 Date: September 17, 2013 Douglas W. Black Assistant City Attorney ATTEST: 0 a Mary J. d ser City Secretary OFFICIAL RECORD CITY f 85CRITARY Page -2- WORTH,1V '( ourwow„„+.:wmmwimmmmmmmimrwm0000ioiwimumowoammoaumaw,uwww.iomraumumiom BROWN GAY Ally 24, 2013 Mr. Roberto Sauceda, PE Project Manager City of Fort Worth 1000 Throckmorton Street Fort Worth, TX 76102 Re: Amendment No. I — Timberland/Alta Vista Conti ection/Caylor Tank Transmission Main Interconnect Additional Design Services, Keller [licks Sanitary Sewer Additional Design Services and Bid / Construction Phase Services Additional Services Design Services for Northside 11 48-inch Water Main, Phase I from 1 1critage Trace Parkway to Alta Vista Road City Project No, 2082 City Secretary 'No. 44281 Dear Mr. SaUceda: As we have worked together to develop the construction documents for the referenced project, we have identified additional items for the scope of the project. These additional services include: • Timberland/Alta Vista Coruiection /Caylor"FankTransinission Main Interconnect • Keller Hicks Sanitary Sewer Additional Services • Bid/ Construction Phase Services for Multiple Construction Packages Timberland/Alta Vista Connection /Caylor Tank'rransniission Main Intel-connect The proposed connection point far the Northside 1148-inch Watcr Main, Phase I to the existing Q-inch v"'fler in d,w it "� Is k11CQ1TUflc,ndt.-(l to c,'q,�edke m kklv Phe connedi,qA1 10 01C "O'"Icm by to fhc e",c� V t 41 t1; MVIMCUOL,d fi) HhC CHd "d HI C c"'w"tilig hne. Prlm� to connection, 'Ind 41-Ink 11 tuaaira 1'eedkig ('ayloi tear �ind die uxi,,ding 42 Inch uiaiu to KcIler zirc tcqtiired to Isolate the ,:,nd oftho existing 42-Inch main. Additional design sc,�rvlccs for this interconricction include: • approximately 500 linear (i.'Ct Of t0p0glEJ)IJC SUrNcy • Level "A" Subsurface Utility Fnginecriut,,) ("w( T) at the connection to the ,.,xishog 12-Inch Main q 10'al e,6t 7th 3ifvnA , Swta"tm)0-Tuil,Nurth,Toxas 761uz 1 IE L:817 W-Allf)-FAX: 41! 387 6115 Mr. Roberto Saticeda, PF July 2 4, 2013 Page 2 • Level "B" SUE to Identify the location of the existing 42-Inch main and 30-inch mains that are to be interconnected • construction plans, details and specifications required for the construction. The proposed fee for this work is $25,215 and is summarized in the following table. Additional Services-Work T e 1-48-inch Lare Diameter Water (P265 5231200 6021402082) Description of Services Phase Amount Consultinp, Firm Civil Engineering;/Project Management 32 $14,640 Brown & Gay Engineers Level=W & Level "A" SUE 32 $7,075 The Rios Group J7opqgaphic'Sure 51 $3,500 Gorrondona & Associates Keifer Hicks Sanitary Server Additional Services At the conceptual milestone meeting for Phase 1, 1-.)art 1, BGE was asked to determine the feasibility of providing sanitary sewer service to the properties on the south side of Keller Hicks from Old Denton Road to the 15-inch interceptor approximately 2,200 east of Old Denton Road/Keller Hicks intersection. Additional design services for the additional sanitary sewer include: • approximately 2,200 linear feet of topographic survey on private property parallel and south of Keller Hicks • design of approximately 2,200 linear of 8-inch sanitary sewer line • easement documents for utility improvements along, Keller Flicks The proposed fee for this work is $88,470 and is summarized in the following table. Additional Services-Work Tvne 2-Sanitary Sewer Improvements (P265 5231200 702 1402082) D"c�tion of Services Phase Amount Consultine Firm Civil En ineeri g�. j ne n /Project M e 32 $42,980 Brown & Gay Engineers __ .Pr� - ,ana q L � lntl Easement DoCLIMents 32 $31,550 Gorrondona & Associates 'Topographic Survey 51 S 13,940 1 Gorrondona & Associates Hid / Construction Phase Services For Multiple ('onsti-tiction Packages & Additional Scope I he k.ontract docunivrits t'01, 06S p'r()jcvf im,8uded thk,, ofcon,m uo.ion plans pt)r �q) to protecr,4 Hased on manr dist"H'dwi'Wns° I thu'd J, "'VIchlion"A HK IN. hid ,urpmf, 'u-1("i a.,soclatcd Nt,'Oh ;id&6onal c;,�rvitrucflair pac iepn,­s. I he proposed fce for this ��,nrk Is S62,120 and Is sutnim6z,I,d in di o lollovving (,thle, Mr. l0berto Sauceda, PF, July 24, 2013 Page 3 Additional Services-Work Tvoe I Sinitar w Scwcr Impro74cmcrrts (P265 5231200 702 1402082) T Description of Services PfTase Amount Consulting Firm _st _.... . _. .i.ce`. _ ._ __. .__ --- _ _ _ . ._ Bid Phase/ C'—onstr-r.rc�trran Phase `�ervaces 33 $58,620 _ Brown �°� Gay Engineers . Corrosion Enginecrin _. .— --- _ _ $3,500 V&A Consulting Engineers, Inc, In accordance with Out* contract, Article V, Section K of the STANDARD AGREEMENT FOR ENGINEERING RELAITI`) DEISIGN SERVICES, Brown & Gay Engineers, Inc., requests an cquitable adjustment to our contract to account fOr the additional cost required to perform the City's requested additional services. The proposed man hour breakdown for the additional services is attached. 'The proposed $175,805 for these services was determined based on the time estimated to complete at the hourly rates established in negotiated total budget outlined in Exhibit E-1 . This includes $56,065 for SBE sub consultants resulting in approximately 31.9% `RE participation for this amendment. The breakdown of the proposed fee for additional services is as follows: $ 48,990 – Gorrondona & Associates Inc. (Surveying & easement documents) $ 7,075 --The Rios Group (Subsurface Utility Exploration) $ 3,500 – V&A Consulting Engineers, Inc. (Cathodic Protection) $116,240– Brown & Cray Engineers (Project Management & Engineering) This proposed amendment increases the total contract amount summarized below: Original contract arnount $1,158,764,00 Amendment No. 1 _._ $ 175 A05.00 Revised Contract Amount $1 ,334,569.00 Please contact nae at your earliest convenience, so we can discuss this matter and move to finalizing the project for construction. Sincerely, Cad Errs,r 'Ns. F" 1 .(_�� � Project N Manager Unclosures i 04 0 U b 6 c . 6 ci C u C) C -S C 6 6 u C: C: w" ui vi -- -S - E ui vi E vi u' (D lu vi T T w c cu &, a) c O .c c 0 0 0 c cr q c a c cr. 2) a -U,) cn c 0 CT LU CP , < C C: I-, C C: - r- Lli W w ui < < w 75 W W W > 0 0 od .6 >, 0 >� >. >1 c m m m c m m m 0 00 r- c c 100 00 () 0 0 0 06 0 0 o6 'o -6 Od '0 .6 o6 Cc: 06 a I c c c a c c 3: 0 W 0 2 t: 121 2 -c -c 2 0 CQ (D 0 0 L�5 m �o > m �o C9 co 101 CD V) CD 0 C� C) LO CD CD a co C) CD C) CD (D 0 C) , " in m q 0 Ln LO u- -C� C� r- 0 to (14 'o 7 C) T� � cc� p co LO :3 LQ ;,! 'C� 'n co - 0 ;;� 0 m clq Ln o CO co 0) �r 00 o t- C-i 04 E CIA N oo w 69 bq M 619 09 < co 6t9 69 65 En (f) U9 :3 cr, a a cn Z c c c c C: c W c .- - c: w 4, a) (D (D d) 4) a) (U Z z 0 d) m a c c c n z c c m -r- w w w w U) (n -r- w U) w w w J;�: z c c c a- CL cr, cn u a) c C: c c: E E E E E E E E E W< wu m m m m s 'S 'C C: Li- U- LI- I.L- CO E 0 a- cL d- a- cL q- �) cl) coic')l 0 u) w E - CV CV C� C� -1 C4 C� -1 -1 04 M: a :3 4; co Cl) Cl) Cl) Cl) to to co cl to 0 ce) (I) co CY) (0 co 0 Q) Q) 04 m Q 0 Q) X It c 0 It Z c al C\j z -1 C: co c o Q.c O 0 MA 0 04 V) C) £ th YU cn LO C: -0 04 c Ln m m a LO tX) w Ry 3 0 cep C a. (o C: C4 Z5 V) 0 to 3: E 7 8 a) -q (n z 97- - E 'o 'E — di c E (D �v U) :3 -�j w '0 -- U) M I- i> E c Q) w CD 0 0 (D C: 6 a) M.(n c 0 U) U) ca w c (n N CL N < C 0 cn Q3 C N :3 C e 0 c .6 0- 0 ;-, o6 0 aj r-- ;> 0 cu c c 0 c: V - - 4) -,, W LLJ W - 10 - 11" .- Q o -5 A c 2 ow o 0 cl- 'p ul �s N, C"') 5z, x: Lc(9 00 W -C 0 M c 81"l i i r- 4�Z E m cn L CN 7. U C: N-S: E. WO U) lu cc m m co CD 'a a 0 W 0 0 N 0 0 0 0 Ic cr c cr 'o a 0 W C: (4 M Ir (a (n ccm < m LU LU W W c w < w C14 73 w Lij 0 >� >, = ,.6 (D (p ,-6 -6 .6 , 0 C a ID c m m m m m 0 m m m m C:) 0 () c c c (D 0 0 c 0 CD o 0 0 0 0 0 C c c a c 0 0 0 0 a 3: 04 O di 3: 3 3: 3: E 3: N A t t t , A c 2 2 2 2 0 2 'n 0 0 0 M F- 03 CO CO > Cn (D CO u-) CO 0 C9 o 83 Ci7 CO C, LO C� CD (D CD C:) 0 C) C� CD (D 'r, CD c:, m 0 Lo r- m �T r- CD �n co kn Cn Cl s C-,�,, C-0, C�,0 Iq "t I O CM ml c-i t-0- N cn r- 0 .0 co M �t co '? N --t 0 CN LO -0 E m E (D co E co E r- cc ;�> < Q E < H9 Cfl/A 49 tH fA 6H 00 LA 60 W 6-4 V) ul (4 U) (A 09 to CA en 2 cl o 0 E cm U) cn cal C C w > qj 4) c v c�_ w w a rz mo FT W m c c c a 0 :3 C: m c :3 m WC WC-' 2 c r- w LU Ui w C: c c c U)(n c6 c W -r- w In In ui U) CL ?, 'T , 2� 9 n- CL o e7 2� N m co N ai 0 4) c c a c 'c C Z c C c c 0 0 0 0 E E CL Em ,E E E E E E CL E C- c c c t m m Q_ 7, z LZ LT 0 0 x Z,cn w E N N 04.04 MIMIM Mp; N M N N C-4 NA =3 a M M 0 M M M M (n 1CY cn M (-7 co M <n c-, o p 02 0 A a C4 0 N d 0 0 c I 0 N oo ai Cc c c 00 O C4 VI Ad c m C: —M Li A u) W) C: w 0 CA E Z "i lu E d) acid .0 w u m u w E �7- c E yam. (n 4) 1 Q cr m cn c 0 CD cr, al c 0 0 (n " U) m 0 m c g W E a c: w C, a) m 13 a Qj < C C: > co- .. I, " :!:� c .6 2 d) :3 0 M Z3 m -;� "u Er a CL CL a, M - E a c C) c a E -- - U 0 2 co-0 0 L-- 4�' cm: c 'D 0 ca '3 a a "lu > eg �A 'J fr 'A A M F- L N Ld LO (D C� (D I.L. C) w C)r- co CL W Co U) (D C) Lo CD Lo LO CY) r- (D C) C) cl, OQ c 0 OD r� M LO I.L. w E 0 76 oi 0 < Z z CO Y C4 LU LA 0 0 -0 C 0 C: . ooY viz E Ix w t Im aia C: o W u) w E JU 0 cn (n (D 7@ M > (n 0 (D < z 0 LLJ cl 06 00 U) U)07 c rqy C:) 0 0 06 4) tll c 4) w 0 E cc w w cn C U7 Sy C U� 0 LL cm to C 2c C: G Ji sod C S") 16 E 1 �i 0 iiS Z > 0- CJ Cn C7 C) It)) LO h w ? m �D �o 8 o t-0 L 0 Lo afro N 4A 0 4f W 64 (A 4A fA IiA L4 u 0 C N 46 N m 0 L) C u al O 9 1 E (A e) 0. CL ce m c o C31 0 0 c o .0 w co w w uj .g 2 v 2 2 CL w u;," CL (L to z z E �u E tCA w 0 O < to Z c NS a> > Lij < m B ce .2 F- (12 d QY o 0 w C: F- 0 ui c Lu o tit a u tip S2 (u .0 > 0 t Z aj 0 13 c c (n 5 tv ur p t0 E 0 li Lo I_- 0 04 04 al r 0 ro In r u P 2 2 A a. ft I, u "J > c: c coati ui ch T . -5 r- Lj -e5o' E E Lu > W 0 U 0 F- 0 c lo Igo 0 Of Q O C? 4 4 N 4 Y Cq C.1 'A rt N t O 1- d0 T h � N ff1 Kl N N N tH N Y N u C p O o v u3 Q N C] O M N co G^IyI. U G C C _ 0 0 G C yy O O O (/) C �! N O co 6 O O ..L o o ' r? ' ' vi a Y Z z uj La L ` 4c = F ui Ova a a z w ° m CD a t � Coln o u = N O = Ji •� > � C' vin � a z $ .V co 61 �' � � C ' O N OD Lo O _ d z " w q C3 r+ o m cy rn N 41 Y Z U7 C C ro •� coo g av r o c� U) t „ U) cn I� cn a E w r cn zAe E ' a� '( u ft SE S w Y O a Q CD 3 r+ � 0 0 0 0 0 0 a It 0 0 17 r- 10 q el 14 19 SO O LO :3 0 cn 0 A (a co 10 (N m 0 +t? 0 0 J= F U F- c cl CL c u (D O C= �D ; 00 64 to cn LO cv co ra 24 Nm U M m uj 69 6 d) z W (D z u 0 M L6 CR �R 17 N — w r_ 0 on I C', , �o a LLJ z CL W c W 0 0 U Z uj 0 0 cn m 0 Ln w �T go C14 z (L <w um j 0 CD a) M 0 U) W (A u 0 C> 0 n 0 C) 0 0 CQ r- C: F- uj <0 cn (L :t 0 z 2 > U) 4) Z m dci .0 E (L 0 CD E cc C o 0 C:, lb O CD CD C 0 LP Ij 10 ac CL jY Ur n &) I I I I- � I I I t I M&(` Review Page | 0f7 Official site ofM)eCity of Fort Worth, Texas CITY COUNCILAGENDA COUNCIL ACTION: Approved mm8/17/2O13 DATE: 9/17/2013 REFERENCE NO.: ^°C'20438 LOG NAME: 60NS1148VVP1/\1-B&G CODE: C TYPE' CONSENT PUBLIC NO HEARING: SUBJECT: Authorize Execution of Amendment No. 1 to City Secretary Contract No. 44281. an Engineering Agreement with BnDvvn & Gay Engineers, Inc., in the Amount Df $175.8D5.O0 for a Total Contract in the Amount of$1.354.56S.0Ofor Northside |l 48-inch Water Main, Phase | from Heritage Trace Parkway to Alta Vista Road (COUNCIL DISTRICT 2) RECOMMENDATION: |t (o recommended that the City Council authorize the execution of Amendment No. 1tuCity Secretary Contract No. 44281, an Engineering Agreement with Brown & Gay Engineers, Inc., in the amount of$175.805.00 for the Nqrth8ide |( 49-inCh water main, Phase i from Heritage Trace Parkway to Alta Vista Road thereby increasing the contract amount to $1,354,569.00. DISCUSSION: On March 5. 2013. (M&C C-26144) the City Council authorized an Engineering Agreement with Brown & Gay Engineers, |nc., iD the amount Uf$1.158'7840O for NOdhSid8 |\ 4O-inCh Water Main Phase | from Heritage Trace Parkway tO Alta Vista Road. The proposed project will provide for the connection of 48-inoh water main off Heritage Trace Parkway west of I.H. 35 to an existing 42-inch water main that <s located ot the Timberland Bou|evard64haVieta intersection. Amendment No. 1 will provide for the following that are necessary on the project: Design fora valve and interconnection between the 30-inch water main feeding [ay|ortank and the existing 42-inch water main to Keller to isolate the end of the existing 43-inch water main, which will allow for expedited construction of the project main at the Timberland Boulevard/Alta Vista intersection. Design to provide sewer service to residents on the south side uf Keller Hicks Road. Construction phase services for two additional construction parts on the project. Additional design survey. Subsurface utility engineering. Additional easement preparation. Brown & Gay Engineers, Inc., proposes to perform the necessary design work for o lump sum fee of $175.805.00. Staff considers this fee tobe fair and reasonable for the scope Vfservices proposed, k0/VVBE [)MiDe - BrOvvD & Gay Engineers, Inc., is in compliance with the City's BDE Ordinance by committing to32 percent 8BE participation on this Amendment No. 1. The City's goal onthis amendment io28percent. |n addition tothe contract amount, $2U.000.O0iS required for project management and real property acquisition. The project iS /Dc8ted in COUNCIL DISTRICT 2, PNAPSCD 21L, 21K8, 21O and 22J. EISCAL . The Financial Management Services Director certifies that funds are available in the current capital budgets, as appropriated, of the Water Capital Projects Fund and the Sewer Capital Projects Fund, M&C Review Page 2 of 2 TO Fund/Account/Centers FROM Fund/Account/Centers P265 531200 602140208232 $21,715. P265 531200 602140208251 $3,500,00 P275 531200 702140208232 $74,530.00 P275 531200 702140208233 $62.120,0 P275 531200 702140208251 $13,940. Submitted for City Manager's Office by. Fernando Costa (6122) Originating Department Head: S. Frank Crumb (8246) Additional Information Contact: Roberto C. Sauceda (2387) ATTACHMENTS 60NS1148WPlAl-BG MAP.pdf httv://ar)r)s.cfwnet.orp,/councit packet/mc review.asp?ID=I 8875&counci Ida... 9/17/2013