HomeMy WebLinkAboutContract 57661-CO1 (2)CSC No. 57661-COl
FORT WORTH, City of Fort Worth
14� Change Order Request
Project Name Citywide Storm Drain Rehabilitation Open -Cut City Sec # l 57661
Client Project #(s)l 102527
Project Description Replacement and/or Improvement of Existing City Drainage Infrastructure
Contractor Woody Contractors,lnc Change Order #1 1 1 Datel 12/23/2024
City Project Mgr. I Bert Guidry City Inspector) Ignacio Andrade l
Dept.
TPW
Contract Time
Totals
(CD)
Original Contract Amount
$2,000,000.00
$2,000,000.00
1,304
Extras to Date
$0.00
Credits to Date
Pending Change Orders (in M&C Process)
$0.00
Contract Cost to Date
$2,000,000.00
$2,000,000.00
1,304
Amount of Proposed Change Order
$0.00
Revised Contract Amount
$2,000,000.00
2,000,000.00
1,304
Original Funds Available for Change Orders
$0.00
$0.00
Remaining Funds Available for this CO
$0.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
0.00% I
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%)
$2,500,000.00 1j
JUSTIFICATION (REASONS) FOR CHANGE ORDER
The contract for these services included an option to renew up to 2 times; however, due to inflation, the unit prices for many of the bid items were not profitable and the
contractor did not want to renew the contract with the unit prices that were bid. The contractor did agree to renew the contract one time if some of the unit prices were to be
adjusted.
This change order would revise the unit prices for specific bid items needed for projects with safety risks, that would be able to begin construction within three months. Along
with the contract renewal, this would allow continued ability to perform repair work needed for projects with safety risks, until the contract for this work can be rebid. The
contract for these services will be re -advertising within the next several months.
This change order also includes quantity deductions for these bid items, plus quantity deductions for other bid items to offset the increased cost. The revised unit prices were
checked versus other project bids and were found to be reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature Date
Woody Contractors, Inc Troy Woody 01/30/2025
Inspector/Inspection Supervi or
Date
Project and Contract Compliance Manager
Date
I od�Jan30, 20251039 CST)
01/30/2025;G
Program Manager
Date
Senior Capital Project Officer
Date
d
01 /30/2025
I, f
01 /31 /2025
Assistant Director (Dqjot
Date
Director, Contracting Department (Dept)
Date
a ncla T NN(facP02/05/2025
- +
Assistant City Attorney
Date
Assistant Wnager _ All
\n.i C�i n
Date
02/10/2025
Council Action (if required)
,p M&C Number I N/A M&C Date Approved �N/A
ATTEST: Q A ,zmmxu
Jannette Goodall, City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
` 1 Change Order Additions
Project Name Citywide Storm Drain Rehabilitation Open -Cut I City Sec # 57661
Client Project# 102527 1
Contractorl Woody Contractors,lnc I PMI Bert Guidry Inspectorl Ignacio Andrade I
Change Order Submittal # Date 1 12/23/2024 1
ITEM
290
291
292
293
294
295
296
297
298
299
300
301
302
303
DESCRIPTION
CONIC PVMT REPAIR, RES - Renewal 1
CONIC PVMT REPAIR, ART/IND - Renewal 1
6" CONC. ALLEY W/ ROLLOVER CURB - Renewal 1
6" CONC DRIVEWAY - Renewal 1
6" CONC CURB & GUTTER - Renewal 1
COLLAR FOR RING & COVER - Renewal 1
COLLAR FOR VALVE BOX - Renewal 1
4' JUNCTION BOX - Renewal 1
CUT IN 4' JUNCTION BOX - Renewal 1
ADD. DEPTH OVER 6', 4' STD MH - Renewal 1
CUT IN 4' JUNCTION BOX- EXTRA DEPTH - Renewal 1
CUT IN 5' JUNCTION BOX - Renewal 1
CUT IN 5' JUNCTION BOX- EXTRA DEPTH - Renewal 1
4' DROP INLET -Renewal 1
ADDITIONS
DEPT
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
TPW
Qty
100.00000000
100.00000000
170.00000000
1,700.00000000
335.00000000
1.00000000
1.00000000
7.00000000
1.00000000
7.00000000
4.00000000
1.00000000
4.00000000
2.00000000
Unit
SY
SY
SY
SF
LF
EA
EA
EA
EA
VF
VF
EA
VF
EA
Unit Cost
$198.00
$204.00
$170.00
$18.20
$70.00
$2,100.00
$1,850.00
$8,060.00
$16,960.00
$900.00
$1,270.00
$17,620.00
$1,370.00
$12,450.00
Total
$19,800.00
$20,400.00
$28,900.00
$30,940.00
$23,450.00
$2,100.00
$1,850.00
$56,420.00
$16,960.00
$6,300.00
$5,080.00
$17,620.00
$5,480.00
$24,900.00
Change Order Additions
Page 1 of 1
TPW
Sub Total Additions
$260,200.00
$260,200.00
FORT WORTH City of Fort Worth
,I-- Change Order Deletions
Project Name I Citywide Storm Drain Rehabilitation Open -Cut City Sec # 1 57661
Client Project # 1 102527 1
Contractorl Woody Contractors,lnc PMI Bert Guidry I Inspectorl Ignacio Andrade l
Change Order Submittal # 0 Date 1 12/23/2024
DELETIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
57
CONC PVMT REPAIR, RES
TPW
100.00000000
SY
$165.00
$16,500.00
58
CONC PVMT REPAIR, ART/IND
TPW
100.00000000
SY
$170.00
$17,000.00
67
6" CONC. ALLEY W/ ROLLOVER CURB
TPW
170.00000000
SY
$130.00
$22,100.00
70
6" CONC DRIVEWAY
TPW
1,700.00000000
SF
$14.06
$23,800.00
82
6" CONC CURB & GUTTER
TPW
335.00000000
LF
$48.00
$16,080.00
118
COLLAR FOR RING & COVER
TPW
1.00000000
EA
$1,600.00
$1,600.00
119
COLLAR FOR VALVE BOX
TPW
1.00000000
EA
$1,400.00
$1,400.00
247
4' JUNCTION BOX
TPW
7.00000000
EA
$6,650.00
$46,550.00
248
CUT IN 4' JUNCTION BOX
TPW
1.00000000
EA
$13,000.00
$13,000.00
249
ADD. DEPTH OVER 6', 4' STD MH
TPW
7.00000000
VF
$600.06
$4,200.00
250
CUT IN 4' JUNCTION BOX- EXTRA DEPTH
TPW
4.00000000
VF
$970.00
$3,880.00
254
CUT IN 5' JUNCTION BOX
TPW
1.00000000
EA
$14,000.00
$14,000.00
256
CUT IN 5' JUNCTION BOX- EXTRA DEPTH
TPW
4.00000000
VF
$1,070.00
$4,280.00
279
4' DROP INLET
TPW
2.00000000
EA
$10,000.00
$20,000.00
94
Seeding, Hydromulch with Binder Agent
TPW
51.00000000
SF
$1.00
$51.00
219
12x9 Box Culvert
TPW
12.00000000
LF
$1,360.00
$16,320.00
220
12x10 Box Culvert
TPW
12.00000000
LF
$1,417.00
$17,004.00
221
12xl1 Box Culvert
TPW
10.00000000
LF
$1,477.00
$14,770.00
222
12x12 Box Culvert
TPW
5.00000000
LF
$1,533.00
$7,665.00
TPW
Sub Total Deletions
Change Order Deletions Page 1 of 1
$260,200.00
$260,200.00
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
Total I $0.00 I
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE:
Citywide Storm Drain Improvements
M&C: 22-0314 CPN:
102527 CSO: 57661
DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Troy Woody
Contractor
&
01/30/2025
2.
Ignacio Andrade
TPW - Inspector
01/30/2025
3.
Berton Guidry
TPW-Project Manager
01/30/2025
4.
Thanaa Maksimos
TPW — Program Manager
-Al
01/30/2025
5.
Lissette Acevedo
TPW — Sr. CPO
IN
01/31/2025
6.
Patricia Wadsack
TPW A/D
j>LW
02/05/2025
7.
Lauren Prieur
TPW - Director
+=-
02/06/2025
8.
Doug Black
Legal
-QV
02/06/2025
9.
Jesica McEachern
CMO
02/10/2025
10.
Jannette Goodall
CSO
02/11/2025
11.
Allison Tidwell
CSO
AT
04/07/2025
12.
tpw sw_contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: tvw sw contracts(&fortworthtexas.gov Call 817-229-3283 with questions. Thank you!