AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 60791
WHEREAS, the City of Fort Worth (CITY) and Kimley-Horn and Associates,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 60791,
(the CONTRACT) which was authorized by M&C 23-1074 on the 12th day of
December, 2023 in the amount of $1,928,983.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment No. 1
in the amount of $1,274,037.00 which was authorized by M&C 25-0094 on 28th
day of January, 2025; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Northside III 48" Water Transmission Main Alignment Study & Land,
CPN 104940; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $ 93, 825. 00 (Water) . OFFICIAL RECORD
2.
CITY SECRETARY
FT. WORTH, TX
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $3,296,845.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 1 of 2
Northside III-48" WTM Alignment Study & Land
CPN 104940
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: Apr 6, 2025
ATTEST: 9 }Q
Jannette S. Goodall
City Secretary
APPROVAL RECOMMENDED:
�IlIl
�� � FOgT�pdo
d*�Od
nEXns*
aaan b4q
Christopher H r�r(M.r3l,202506:49 CDT)
Christopher Harder, P. E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
Kimley-Horn and Associates,
Inc.
d.4 . . PE.
John�Atkins, P.E.
Vice President
DATE: 03/28/2025
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Preeti KC, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
kl�
Douglas Black (Mar 31, 2025 23:08 CDT)
Douglas W. Black
Sr. Assistant City Attorney
M&C No.#:
M&C Date:
Form 1295:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
N/A
N/A
N/A
City of Fort Worth, Texas Northside III-48" WTM Alignment Study & Land
Prof Services Agreement Amendment Template CPN 104940
Revision Date: 12/08/2023
Page 2 of 2
Kimley>»Horn
February 20, 2025
Ms. Preeti KC
Project Manager
City of Fort Worth Water Department
200 Texas Street
Fort Worth, TX 76102
Re: NORTHSIDE III 48-INCH WATER TRANSMISSION MAIN ALIGNMENT STUDY
Amendment No. 2
KHA No. 061018460
City Project No. 104940 / City Secretary No. 60791
Dear Preeti:
The City of Fort Worth (CITY) has requested that Kimley-Horn perform additional services under
Amendment Number 2 for the NORTHSIDE III 48-INCH WATER TRANSMISSION MAIN
ALIGNMENT STUDY project. These additional services are related to items included in Task 6 —
Construction Phase Services for Phase 2 (Boat Club Road to Bonds Ranch Road) of the 54-inch
water transmission main. These improvements are further described as follows:
TASK 6.OA — PHASE 2 — CONSTRUCTION PHASE SERVICES: ($93,825)
ENGINEER will complete the following additional Construction Phase Services in accordance
with the Scope of Services set forth in the original contract and as follows:
• The original contract did not include Construction Phase Services for Phase 2 and is being
added through this amendment.
• Since the contract time for Phase 2 is 450 calendar days, 15 months of Construction Phase
Services are assumed.
• Progress Meetings and Site Visits
■ ENGINEER will conduct and attend fifteen (15) progress meetings.
• Clarifications/Interpretations/Requests for Information
■ ENGINEER will respond to five (5) requests for clarifications, interpretations, or
information.
• Change Orders
■ ENGINEER will assist in evaluating two (2) change orders.
• Shop Drawings
■ ENGINEER will review and process forty-five (45) shop drawings associated with the
construction contract.
• Substitutions
0 ENGINEER will review and evaluate two (2) substitution request.
Kimley»>Horn
Page 2
We recommend that the CITY increase the budget by $93,825 for these additional services. The
following tables summarize our recommended budget revisions, water design fees, and revised
contract amount:
Description Water
Task 6 - Phase 2 - Construction Phase Services $93,825
Total $93,825
The following breakdown for water and sewer services is recommended:
Water Fee
Original Contract I $1,555,948
Amendment No. 1 I $1,206,007
Amendment No. 2 I $93,825
Total I $2,855,780
Sewer Fee
I Survey
Fee
$0
I $373,035
$0
I $68,030
$0
I $0
$0
I $441,065
Total
$93,825
$93,825
Total
$1,928,983
$1,274,037
$93,825
$3,296,845
The following table summarizes our recommended budget revisions and shows the revised contract
amount:
Task
Original
Amend
Amend
Revised
Number
Contract
No.1
No.2
Contract
Task 1
$39,565
$45,940
$0
$85,505
Task 1A
$127,660
$0
$0
$127,660
Task 2
$151,590
$49,445
$0
$201,035
Task 3
$375,970
$205,222
$0
$581,192
Task 4
$263,008
$770,213
$0
$1,033,221
Task 5
$18,230
$45,739
$0
$63,969
Task 6
$71,250
$0
$93,825
$165,075
Task 7
$184,890
$0
$0
$184,890
Task 8
$532,529
$99,413
$0
$631,942
Task 9
$134,291
$22,665
$0
$156,956
Task 10
$30,000
$35,400
$0
$65,400
Total
$1,928,983
$1,274,037
$93,825
$3,296,845
Project
Kimley»>Horn
Page 3
We appreciate the opportunity to be of continued service to the CITY. Please contact us if we need
to provide any further information.
Very truly yours,
KIMLEY-HORN AND ASSOCIATES, INC.
/1. , P r.
John R. Atkins, P.E.
Senior Vice President
JRA/sdw
Attachments:
Level of Effort Summary
KAFTW_Utilities\061018460-Northside III Transmission Main\PPP\POST_NTP\Amendment#2\2025-02-20_Amend2_NS3-kha-signed.doc
Task No.
Task Description
1.0 Project Management
1.0A Alignment Study and Report
2.0 Conceptual Design (30-Percent)
3.0 Preliminary Design (60 Percent)
4.0 Final Design
5.0 Bid Phase
6.0 Construction Phase Services (Phase 2)
5.1 Construction Support
611 Prepare/Attend Preconstruction
Conference
6.1.2 Prepare Exhibits for Public Meeting (1)
6.1. mite Visits (Monthly, up to 15)
fi 1 4Vadf1wtions/Intemretations/RFI (5)
Clrarrje
rders
6.1.6'Sinnq DraOw nq Rewew and Lon (451
6 1 �ubslituti.n. (2)
6.1.5=anal Walk Through Vis /Punch List (2)
62 � acord Drewinns/As Built (29 sheets)
7.0 ROW/Easement Services
B.0 Survey
9.0 Permlttinn
110.0 Additional Services
0.1 Additional Services for Amend-mt2
EXHIBIT B-2
Level of Effort Spreadsheet TASKIHOUR BREAKDOWN
Design Services for
Northside III 48-Inch Transmission Main Alignment Study
City Project No. 104940
Amendment #2
Labor
(hours
Total Labor Cost
Expense
ITotal Expense
Principal Project Manager
)T Administrative
Subconsultant
Cost
Rate $316
$299
$249
$145
MWBE Non-MWBE
Travel Reproduction
0
a
6
0 $
$1 sd
$d
$o
0
0
0
0 S - $
- $ - $
- $
-
$-
6
0
0
0 s - $
- $ - $
- $
-
$ -
0
a
6
0 $ -
8- $-
$-
$-
$-
6
o
a
6 $ _
$0 $6
$6
$o
$-
0
6
6
$d
$qqa sd
sd
$
$-
�d
112
1fd
//0
L $93,824
$d $0
$0
$0
3
3
$ 995
2
2
$ 1,080
d
30
36
$ 19,166
4
10
10
$ 6,890
z
a
8
$ 5xif
1d
45
96
24 $ 44,355
z
2
z
$ I,820
d
4
4
$ 3,n6
2
8
24
$ 10,205
0
o
d
0 $0
$d $0
$0
$o
0
o
d
0 $$0/0
$d $0
$0
$o
0
0
d
0 ad
$d $d
$d
$0
0
a
6
0 $d
$6 $d
sd
$J
Towel A
1121
1191
1961 $93.8Sd(
tel di
di
$01 1
Water Line Footage
58,895
100%
SIII Nrough Preliminary DesrgNFasemevt
Acgms�bov (LF)
Proj.ot Summary
Sewer Line Footage
0
0%
NSIII ds..gb Final Dengn(LF)
»�ys p0
Total Hours
58,895
100%
Total Labor
Total Expense
(A) Total Fee $ 93.8250
(B)Survey Fee $ -
(C) Total Fee (-) Survey Fee $ 93,825 00
Water Fee (100% of Contract) I Sewer Fee (0 % of Contract)
$93,825.00 $0.00
MBEISBE Subcensubant
Non-MBEISBE Subconsultant
10% Sub Markup
MBE/SBE Parficipahon
Total Project Cost
11E
Sub Total
93,925
I
19,160
6,880
5,o60
44,355
1,820
3,270
IU205
s93.6Ji $ - $
Description WP
52 Conceptual Design 31
$93.8i 1 Preliminary Design .32
$ Final Design (10°c) 33
$0 Survey 51
$0
$ JJJ Subtotal
0 00000/I Total $93,825
$93,825/If
Water
$28,14T 50
$56,295.00
$9,382 50
$0.00
1$93,825 00
a
Remaining
no
If .
19 160
deed
5,060
44355
1.820
10,205
r�