HomeMy WebLinkAboutContract 61144-A1CO1PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT#
CITY SECRETARY CONTRACT #
FID #
X#
FILE #
CSC No. 61144-AlC01
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Water, Sanitary Sewer, and Drainage Improvements for JPS Parking Garage
Water, Sanitary Sewer, and Drainage
CFA23-0175 I CITY PARTICIPATION:
105038
61144-A1
30114-0200431-105038-EO7685
X-27913
W-2954
YES
INSPECTOR: Sergio Garcia Phone No: 817-392-8306
PROJECT MANAGER: Khal Jaafari, PE Phone No: 817-392-7872
CONTRACT UNIT
WATER I SEWER I DRAINAGE
Developer Developer C
Cost Ci Cost Developer Cost Ci Cost Cost City Cost C
ORIGINAL CONTRACT $174,133.00 $0.00 I $45,453.00 $0.00 $269,906.00 $200,000.00
EXTRAS TO DATE $0.00 $0.00 I $0.00 $0.00 I $0.00 $0.00
CREDITS TO DATE $0.00 $0.00 I $0.00 $0.00 I $0.00 $0.00
CONTRACT TO DATE $174,133.00 $0.00 I $45,453.00 $0.00 I $269,906.00 $200,000.00
AMOUNT OF PROP. CHANGE ORDER - $0.00 I $0.00 $0.00 $0.00 $0.00
REVISED CONTRACT AMOUNT $173,386.00 $0.00 $46,453.00 $0.00 $269,906.00 $200,000.00
TOTAL REVISED CONTRACT AMOUNT PERT
UNIT $173,396.00 $45,453.00 $469,906.00
REVISED COST SHARE Dev. Cost: $488,745.00 City Cost:
TOTAL REVISED CONTRACT $688,745.00
CHANGE
ORDER No:
1
PAVING
STREET LIGHTS
CONTRACT
DAYS
95
I 95
I 0
I 95
eloper
t
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
$0.00
City Cost
Developer
Cost City Cost
I $0.00 $0.00
I $0.00 $0.00
I $0.00 $0.00
I $0.00 $0.00
$0.00 I $0.00
$0.00 1 $0.00
$0.00
$0.00
I $0.00
$0.00
$0.00
$0.00
$0.00
$200,000.00
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Revised: 12-17-2018 Page 1
You are directed to make the following changes in the contract documents:
CITY BID ITEM
PAY ITEM #
#
QUANTITY
UNIT
1
241.1013
(46.00)
L
2
241.1015
(65.00)
L
4
241.1302
(1)
E
5
241.1303
(1)
E
7
241.1510
(2)
E
8
3201.0121
(151)
L
9
3305.0109
(151.0)
L
10
3311.0163
(40)
L
11
3311.0253
(46)
L
12
3311.0453
(215)
L
13
3311.0001
(0.33)
TO
14
3312.2003
(1)
E
15
3312.0001
(2)
E
16
3312.3002
(1)
E
17
3312.3003
(1)
E
19
3312.4106
(1)
E
20
3312.0117
(2)
E
UNIT I: WATER IMPROVEMENTS
ITEM DESCRIPTION
F Remove 8" Water Line
F Remove 12" Water Line
A Remove 6" Water Valve
A Remove 8" Water Valve
A Salvage Fire Hydrant
F Asphalt Pvmt Repair, Arterial
F Trench Safety
F 6" PVC Water, Select Backfill
F 8" DIP Water, Select Backfill
F 12" DIP Water, Select Back -fill
N Ductile Iron Water Fittings w/ Restraint
A 1" Water Service
A Fire Hydrant Assembly
A 6" Gate Valve
A 8" Gate Valve
A 12" x 6" Tapping Sleeve & Valve
A Connection to Existing 4"-12" Water Main
21 * 3311.0263 40 LF
22* 3311.0457 163 LF
23* 3312.2103 1.00 EA
24* 3312.4107 1 EA
Asterisk (*) indicates New Pay Item
CFW Unit
Price
8" PVC Water Pipe, Select Backfill I
12" DIP Water, CLSM Backfill
1 1 /2" Water Service
12" x 8" Tapping Sleeve & Valve
TOTAL UNIT I: WATER IMPROVEMENTS_
Developer
UNIT PRICE Cost
$25.00 ($1,150.00)
$25.00 (S1,625.00)
$1500.00 (S1,500.00)
$1500.00 ($1,500.00)
$1750.00 ($3,500.00)
$24.00 ($3,624.00)
$1.00 ($151.00)
$137.00 ($5,480.00)
$213.00 ($9,798.00)
$224.00 (S48,160.00)
$15000.00 (S4,950.00)
$4800.00 ($4,800.00)
$12500.00 (S25,000.00)
$4000.00 ($4,000.00) I
$4700.00 ($4,700.00) I
$14500.00 ($14,500.00 I
$749.50 ($1,499.00)
I
$200.00 $8,000.00
$680.00 $104,040.00
$5650.00 $5,650.00
$17,500.00 $17,500.00
$7( 47.00)
City Cost
TOTAL
(S1,150.00)
(S1,625.00)
($1,500.00)
($1,500.00)
($3,500.00)
(S3.624.00)
(S151.00)
($5, 480.00 )
($9,798.00)
($48,160.00)
($4,950.00)
($4,800.00)
(S25,000 00)
($4,000.00)
(S4,700.00)
(S14,500.00)
($1,499.00)
$8,000.00 I
$104.040.00
$5,650.00
$17,500.00
$0.00 ($747.00)
Revised: 12-17-2018 Page 2
Docusign Envelope ID: 586C5C2A-691C-4DD7-AEF2-ODFF17B69B8E
a
REASONS FOR CHANGE ORDER Wator Une loworings 8 & C and FH lateral lowering at STA 6+14.48 SD-1 wore deleted from the scope based on existing condition uncovered during
construction and able to maintain the 2 ft. seperation.Domestic water service upgraded to 1.5" & the water fireiine service upgraded from 6" to 8"
RECOMMENDED:
Teague Nall & Perkins, Inc.
By:
Name: Scott A. Gibson, P.E.
Title: Team Leader
APPROVED:
Tarrant County Hospital District
By: 5y, X' ana
`-4A048FERABA42a...
Name: Jill Farrell
Title: Sr. EVR COO
APPROVED:
Beck-Potere Joint Venture
By,�'—
Name: Scot Bennett
Title: Regional Director
APPROVAL RECOMMENDED:
APPROVED:
APPROVED AS TO FORM AND LEGALITY:
CFW - Storm Water/ TPW
CFW- Assistant City Manager CFW - City Attorney
5q.,6�o- / off Mar31,2025
�L�
�Ass7istant
Apr6,2025 A �a«e mar3i,mzsio3scor Mar31,2025
Rrnaamc
By:
By:
By:
Name:
Stephen Nichols, P.E.
Name:
Jes+ca McEachern Name: Richard McCracken
Titto•
Storm Water Proaram Manager
Title:
Assistant City Manager Title: Sr Asst City Attorney Sect Chief
,FOpro °a
RECOMMENDED:
a 01 op�A
pVo Sp
CFW - *Contract Compliance Manager
ATTEST
°oaaa neznsa44 p * Contract Compliance Manager (Project Manager):
KlucG 9a P.E. Mar 21, 2025
By signing I acknowledge that I am the person responsible
` A�
BY:
12-'
""'°data" `E `Ma"'"''°'S
Apr 7, 2025 for the monitoring and administration of this contract, include
ensuring all performance and reporting requirements.
Name:
khal Jaafari RE,
Jannette S. Goodall
City Secretary
13 There are NO City Funds associated with this Contract
Title:
Professional Engineer
® There are City Funds associated with this Contract
Revised: 12-17-2018
M&C Number: 24-0482
M&C Date Approved: 6/11/2024
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Page 3