Loading...
HomeMy WebLinkAboutContract 61144-A1CO1PROJECT NAME: CONTRACT: CFA # CITY PROJECT# CITY SECRETARY CONTRACT # FID # X# FILE # CSC No. 61144-AlC01 DEVELOPER -AWARDED -PROJECT CHANGE ORDER Water, Sanitary Sewer, and Drainage Improvements for JPS Parking Garage Water, Sanitary Sewer, and Drainage CFA23-0175 I CITY PARTICIPATION: 105038 61144-A1 30114-0200431-105038-EO7685 X-27913 W-2954 YES INSPECTOR: Sergio Garcia Phone No: 817-392-8306 PROJECT MANAGER: Khal Jaafari, PE Phone No: 817-392-7872 CONTRACT UNIT WATER I SEWER I DRAINAGE Developer Developer C Cost Ci Cost Developer Cost Ci Cost Cost City Cost C ORIGINAL CONTRACT $174,133.00 $0.00 I $45,453.00 $0.00 $269,906.00 $200,000.00 EXTRAS TO DATE $0.00 $0.00 I $0.00 $0.00 I $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 I $0.00 $0.00 I $0.00 $0.00 CONTRACT TO DATE $174,133.00 $0.00 I $45,453.00 $0.00 I $269,906.00 $200,000.00 AMOUNT OF PROP. CHANGE ORDER - $0.00 I $0.00 $0.00 $0.00 $0.00 REVISED CONTRACT AMOUNT $173,386.00 $0.00 $46,453.00 $0.00 $269,906.00 $200,000.00 TOTAL REVISED CONTRACT AMOUNT PERT UNIT $173,396.00 $45,453.00 $469,906.00 REVISED COST SHARE Dev. Cost: $488,745.00 City Cost: TOTAL REVISED CONTRACT $688,745.00 CHANGE ORDER No: 1 PAVING STREET LIGHTS CONTRACT DAYS 95 I 95 I 0 I 95 eloper t $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 City Cost Developer Cost City Cost I $0.00 $0.00 I $0.00 $0.00 I $0.00 $0.00 I $0.00 $0.00 $0.00 I $0.00 $0.00 1 $0.00 $0.00 $0.00 I $0.00 $0.00 $0.00 $0.00 $0.00 $200,000.00 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: CITY BID ITEM PAY ITEM # # QUANTITY UNIT 1 241.1013 (46.00) L 2 241.1015 (65.00) L 4 241.1302 (1) E 5 241.1303 (1) E 7 241.1510 (2) E 8 3201.0121 (151) L 9 3305.0109 (151.0) L 10 3311.0163 (40) L 11 3311.0253 (46) L 12 3311.0453 (215) L 13 3311.0001 (0.33) TO 14 3312.2003 (1) E 15 3312.0001 (2) E 16 3312.3002 (1) E 17 3312.3003 (1) E 19 3312.4106 (1) E 20 3312.0117 (2) E UNIT I: WATER IMPROVEMENTS ITEM DESCRIPTION F Remove 8" Water Line F Remove 12" Water Line A Remove 6" Water Valve A Remove 8" Water Valve A Salvage Fire Hydrant F Asphalt Pvmt Repair, Arterial F Trench Safety F 6" PVC Water, Select Backfill F 8" DIP Water, Select Backfill F 12" DIP Water, Select Back -fill N Ductile Iron Water Fittings w/ Restraint A 1" Water Service A Fire Hydrant Assembly A 6" Gate Valve A 8" Gate Valve A 12" x 6" Tapping Sleeve & Valve A Connection to Existing 4"-12" Water Main 21 * 3311.0263 40 LF 22* 3311.0457 163 LF 23* 3312.2103 1.00 EA 24* 3312.4107 1 EA Asterisk (*) indicates New Pay Item CFW Unit Price 8" PVC Water Pipe, Select Backfill I 12" DIP Water, CLSM Backfill 1 1 /2" Water Service 12" x 8" Tapping Sleeve & Valve TOTAL UNIT I: WATER IMPROVEMENTS_ Developer UNIT PRICE Cost $25.00 ($1,150.00) $25.00 (S1,625.00) $1500.00 (S1,500.00) $1500.00 ($1,500.00) $1750.00 ($3,500.00) $24.00 ($3,624.00) $1.00 ($151.00) $137.00 ($5,480.00) $213.00 ($9,798.00) $224.00 (S48,160.00) $15000.00 (S4,950.00) $4800.00 ($4,800.00) $12500.00 (S25,000.00) $4000.00 ($4,000.00) I $4700.00 ($4,700.00) I $14500.00 ($14,500.00 I $749.50 ($1,499.00) I $200.00 $8,000.00 $680.00 $104,040.00 $5650.00 $5,650.00 $17,500.00 $17,500.00 $7( 47.00) City Cost TOTAL (S1,150.00) (S1,625.00) ($1,500.00) ($1,500.00) ($3,500.00) (S3.624.00) (S151.00) ($5, 480.00 ) ($9,798.00) ($48,160.00) ($4,950.00) ($4,800.00) (S25,000 00) ($4,000.00) (S4,700.00) (S14,500.00) ($1,499.00) $8,000.00 I $104.040.00 $5,650.00 $17,500.00 $0.00 ($747.00) Revised: 12-17-2018 Page 2 Docusign Envelope ID: 586C5C2A-691C-4DD7-AEF2-ODFF17B69B8E a REASONS FOR CHANGE ORDER Wator Une loworings 8 & C and FH lateral lowering at STA 6+14.48 SD-1 wore deleted from the scope based on existing condition uncovered during construction and able to maintain the 2 ft. seperation.Domestic water service upgraded to 1.5" & the water fireiine service upgraded from 6" to 8" RECOMMENDED: Teague Nall & Perkins, Inc. By: Name: Scott A. Gibson, P.E. Title: Team Leader APPROVED: Tarrant County Hospital District By: 5y, X' ana `-4A048FERABA42a... Name: Jill Farrell Title: Sr. EVR COO APPROVED: Beck-Potere Joint Venture By,�'— Name: Scot Bennett Title: Regional Director APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY: CFW - Storm Water/ TPW CFW- Assistant City Manager CFW - City Attorney 5q.,6�o- / off Mar31,2025 �L� �Ass7istant Apr6,2025 A �a«e mar3i,mzsio3scor Mar31,2025 Rrnaamc By: By: By: Name: Stephen Nichols, P.E. Name: Jes+ca McEachern Name: Richard McCracken Titto• Storm Water Proaram Manager Title: Assistant City Manager Title: Sr Asst City Attorney Sect Chief ,FOpro °a RECOMMENDED: a 01 op�A pVo Sp CFW - *Contract Compliance Manager ATTEST °oaaa neznsa44 p * Contract Compliance Manager (Project Manager): KlucG 9a P.E. Mar 21, 2025 By signing I acknowledge that I am the person responsible ` A� BY: 12-' ""'°data" `E `Ma"'"''°'S Apr 7, 2025 for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Name: khal Jaafari RE, Jannette S. Goodall City Secretary 13 There are NO City Funds associated with this Contract Title: Professional Engineer ® There are City Funds associated with this Contract Revised: 12-17-2018 M&C Number: 24-0482 M&C Date Approved: 6/11/2024 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 3