FORT WORTH City of Fort Worth
Change Order Request
Project Name: Thomas PI at Calmont SDR 1 City Sec No.: 1 61454
Project No.(s):1 103057 DOE No, I N/A I CityProj. No.: I 103057 I
Project Description: Reroute existing storm drain pipe that runs under private property, outside of City easements, so the pipe is within City Right i
of Way on Thomas PI.. 1
Contractor:I Woody Contractors, Inc. Change Order # 1 2 1 Date: 311212025
City Project Mgr.1 Mike Bennett, PE, PMP I City Inspector: 1 Troy Gardner
Phone Number:1 817-392-7891 Phone Numbed 817-392-8306
Dept. STORMWATER WATER STREETS Totals Contract Time
(Calendar days)
Original Contract Amount $2,179,010.0 $0.00 $0.0a $2,179,010,00 180
Extras to Date $99,624.00 $0,001 $0.0d $99,624.00 40
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $2,278,634.00 $0,00, $0.00 $2,278,634.00 220
Amount of Proposed Change Order $36,759.65 $362,495.001 $45,725.01 $444,979.65 20
Revised Contract Amount $2,315,393.65 $362,495.00 $45,725.0T $2,723,613.65, 240
Original Funds Available for Change Orders $109,000.00 $0.00 $0.04 $109,000.00
Remaining Funds Available for this CO 1
Additional funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 24.99%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACTCOST+ 25%) $2,723,762.501
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 2 provides for paving improvements on Purshing Avenue to be extended to Tremont Avenue as requested by Transportation
and Public Works (TPW) Street Division and the Water Department. As part of the change order, the contractor will conduct additional water
relocations and paving improvements to facilitate the storm drain installation.
Staff recommends the approval of 20 additional calendar days for the change order.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order,
Contractor's Company Name
I
Contractor Name
ractor Signature
Date
Woody Contractors, Inc.
Trent Woody
I
Inspector
Y 7
-p t ,
3�2/1Z0Z�S
Project Manager
T.S. for Mike Bennett....
Dated
c� . c��
03/24/2025
Director (Water Dept)
Date
Construction Supervisor TPW Dept)
Qata
c&�s ��
103/25/202
Syr �
3-24-25
Se'r r sfstant City Attorney
1 Date
Assistant City Manager
Date
J _
103/31 /2025
,_.
04/06/2025
Council Action (If Required)
M&C Number 25-0195
M&C Date Approved
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Thomas PI at Caimont SDR f City Sec No.: 61454
Project No.(s): 103057 _ DOE No.1 N/A I City Proj. No.:
Project Reroute existing storm drain pipe that runs under private property, outside of City easements, so the pipe is within City
Description Right of Way on Thomas PI. .
Contractor Woody Contractors f Change Order: Date: 1 3/12/2025
City Project Mgr. I Mike Bennett, PE, PMP ` City Inspector I Troy Gardner
ITEM
3
4
5
6
34
36
37
65
66
67
69
70
71
72
73
1
2
3
4
5
6
7
B
9
10
11
12
13
14
15
16
17
18
19
20
21
TEMP ASPHALT
1 i° PAV. PULVERIZATION
CEMLI ME (40 LBISY)
3" ASP. PAV-TYPE D
8" GATE VALVE
FITTINGS
TRENCH SAFETY (WATER)
8" DI WATER
4-12" CONNECTS
STUMP GRINDING
6" PVC WATER
FIRE HYDRANT
REM FH
6" GATE VALVE
8" DIP WATER WI CLSM
DESCRIPTION
STORMWATER
WATER
ADDITIONS
IDEPT � CKy
8" PVC WATER PIPE
8" GATE VALVE
1" WATER SERVICE
1" WATER SERVICE, METER RECONNECTION
TEMPORARY WATER SERVICES
8" LOWERING INCLUDING 20 TEMPORARY WATER SERVICES CASTIN(
CONNECTION TO EXISTING 4"-12" WATER MAIN
FITTINGS
TRENCH SAFETY
CONCRETE COLLAR FOR VALVE
4"-12" ABANDON PLUG
GROUT WATER LINE
GSP SURVEY WATER
5' WIDE HMAC PEV REP RESIDENTIAL
EXTRA WIDTH RESIDENTIAL HMAC
MOBILIZATION
TRAFFIC CONTROL
II" PAV. PULVERIZATION
CEMLINE (40LBISY)
3" ASP, PAV.. TYPE D
TEMPORARY ASPHALT PAVING REPAIR
STREETS
4 11" PAV. PULVERIZATION
5 CEMLIME (40 LBISY)
6 3" ASP. PAV..TYPE D
Page 1 of 3
STORMWATER 90
STORMWATER 1,269
STORMWATER 25.46
STORMWATER 1,269
STORMWATER 2
STORMWATER 0.2
STORMWATER 35
STORMWATER 80
STORMWATER 3
STORMWATER 4
STORMWATER 18
STORMWATER 1
STORMWATER 1
STORMWATER 1
STORMWATER 219
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
WATER
476
15
15
1.0
1
2
0.25
476
6
4
6
1
30
24
2
772
15.4
772
1,108
Unit Unit Cost I Total
LF
$48
$4,320.00
SY
$18,20
$23,095.80
TN
$400,00
$10,184.06
SY
$33.05
$41,940.45
EA
$2,000
$4,000.00
TN
$15,000
$3,000.00
LF
$1.00
$35.00
LF
$243.08
$19,446.40
EA
$6,300
$18,900.00
EA
$400.00'
$1,600.00
LF
$226.00
$4,068,00
EA
$6,250.00
$6,250,00
EA
$400.00
$400,00
EA
$1,800.00
$1,800.00
LF
$395,00
$86,505.00
LF
EA
EA
EA
LS
EA
EA
TON
LF
EA
EA
CY
LS
LF
SY
LS
MO
SY
TON
SY
LF
STREETS
772
SY
STREETS
15.4
TN
STREETS
I
I
772
SY
$%0.06
$2,000,06
$3,400.06
$940.00
$25,000.00
$40,000.00
$6,300.00
$15,000.00
$1.00
$1, 200.00
$480,00
$500,00,
$2,000, 00
$150,00
$120.00
$9,000.00
$4,000.00
$18.20
$400.00
$33.05
$48.00
$18.20
$400.00
$33.05
$76,16020
$2,000.00
$51,000.66
$14,100.00
$25,000.00
$40,000.00
$12.600,00
$3,750.00
$476,00
$7,200,00
$1,920.00
$3,000.00
$2, 000.00
$4, 500.00
$2,880.00
$9,000.00
$8,000.00
$14,050.40
$6,160.00
$25,514.60
$53,184.00
$14,050.40
$6,160.00
$25,514.60
JSTORMV4'ATER $225,544.65
WATER $362,495.00
STREETS $45, 725.00
Additions Sub Total 1 $633,764.65
FORT NORTH City of Fort Worth
Change Order Deletions
Project Name I Thomas PI at Calmont SDR City Sec No.: 61454
Project No.(s): I 103057 DOE No. I N/A City Proj. No.: 103057
Project I Reroute existing storm drain pipe that runs under private property, outside of City easements, so the pipe is within City
Description Right of Way on Thomas PI. .
Contractor Woody Contractors I Change Order; 2 I Date 3/12/2025 1
City Project Mgr. I Mike Bennett, PE, PMP
City Inspector:
Troy Gardner
DELETIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
Total
15
4" M.H., Riser
STORMWATER
3.0
EA
$6,500.00
$19,500.00
31
8" DR 14 PVC WATER
STORMWATER
192.0
LF
$236.00
$45,312.00
45
12" PVC SEWER
STORMWATER
50.0
LF
$227.00
$11,350.00
48
4' M.H. RISER
STORMWATER
5.0
EA
$9,627.00
$48,135.00
49
4' EXTRA DEPTH
STORMWATER
17.0
VF
$164,00
$2,788.00
55
TEMP. WATER
STORMWATER
1.0
LS
$8,900.00
$8,900.00
64
IMPORTED BACKFILL, SELECT FILL
STORMWATER
1,200.00
CY
$44.00
$52,800.00
STORMWATER
$188,785.00
,WATER
(STREETS
,Deletions Sub
Total
$188,785.00
Page 2 of 3
MIWBE Breakdown for this Change Order
AF'
Ip
Total
Previous Change Orders
U "j
Total
Page 3 of 3
3/12/2025
CPN 103057
Thomas PI at Calmont SDR
Chanize Order 2 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
City of Fort Worth, Texas
Mayor and council Communication
DATE: Tuesday, March 11, 2025 REFERENCE NO.: **M&C 25-0195
LOG NAME: 60THOMASPL AT CALMONT SD REHABO02-WOODY
SUBJECT -
(CD 7) Authorize Execution of Change Order No. 2 with a Net Total Amount of $444,979.65 after Deducts
and an Additional 20 Calendar Days to a Contract with Woody Contractors, Inc, for the Thomas Place
at Calmont Storm Drain Rehabilitation Project, Adopt Appropriation Ordinances to Effect a Portion of
Water's Contribution to the Fiscal Years 2025-2029 Capital Improvement Program and Amend
Transportation & Public Works Department's Fiscal Year 2025-2029 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Change Order No. 2 with a net total amount of $444,979.65 after deducts and
an additional 20 calendar days to City Secretary No. 61454, a contract with Woody Contractors, Inc.
for the Thomas Place at Calmont Storm Drain Rehabilitation project for a revised contract amount of
$2, 723,613.65;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of $362,495.00, transferred from
available PayGo funds within the Water and Sewer Fund, for the purpose of funding the Thomas
Place at Calmont Storm Drain Rehabilitation project (City Project No. 103057) and to effect a portion
of Water's Contribution to the Fiscal Years 2025-2029 Capital Improvement Program;
3. Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the
General Capital Projects Fund by increasing estimated receipts and appropriations in the Thomas
Place at Calmont Storm Drain Rehabilitation project (City Project No. 103057) in the amount of
$45,725.00 and decreasing estimated receipts and appropriations in the Contract Street Maintenance
Programmable project (City Project No. P00020) by the same amount; and
4. Amend Transportation and Public Works Contribution to Fiscal Years 2025-2029 Capital Improvement
Program.
DISCUSSION:
On April 23, 2024, by Mayor and Council Communication (M&C 24-0337), the City Council authorized a
contract with Woody Contractors, Inc, in the amount of $2,179,010.00 for the construction of the Thomas
Place at Calmont Storm Drain Rehabilitation project. The contract was subsequently revised by Change
Order No. 1 in the amount of $99,624.00 administratively authorized September 3, 2024, that primarily
provided for the replacement of a severely deteriorated storm drain pipe that was identified during
construction. The project is a part of the Stormwater Program's Storm Drain Rehabilitation Program which
assesses the condition of existing drainage pipe systems to identify and prioritize pipes for rehabilitation
before potential collapse and/or sinkholes form. This M&C will authorize the execution of Change Order No.
2 and appropriate funding.
Change Order No. 2 provides for paving improvements on Pershing Avenue to be extended
to Tremont Avenue as requested by Transportation and Public Works (TPW) Street Division and the
replacement of the shallow water mains in Thomas Place and Pershing Avenue as requested by the Water
Department. As part of the change order, the contractor will conduct additional water relocations and paving
improvements to facilitate the storm drain installation. The change order will delete pay items that are no
longer needed on the project. Staff recommends that the contract time be extended by 20 calendar days
due to the changes in scope discussed above. The cost for the change order will be shared between the
Transportation and Public Works Department Stormwater Division and Streets Division and the Water
Department as follows: Stormwater: $36,759.65, Water Department: $362,495.00 and TPW
Street: $45,725.00.
The action in this M&C will amend TPW's contribution to the Fiscal Years (FY) 2025-2029 Capital
Improvement Program as follows:
Capital project FY2025 CIP Additional
Fund Name �A Authority Project Total
Name _f ppropriations Appropriations
30100 P00020 —
General
Contract
Capital Street
M&C 24-
$38,798,204.00 1093
($205,288.00).$38,592,916.00
Projects Maintenance
(Fund �((
30100 P0002a- _
General
y
Contract
Capital Street
M&C 25-
0026
($961,859.00) $37,631,057.00
Projects Maintenance
Fund
,30100 P00020 —
General
Contract
Capital (Street
M&C 25-
0030
($561,870.00)'$37,069,187.00
Projects Maintenance
Fund
30100 P00020 —
General
M&C
Contract
Capital Street
Agenda
($653,547.00) $36,415,640.00
iMaintenancei
2l11/25
Fund
30100 P00020 —
General
Contract
Capital Street
This M&C
($45,725.00) $36,369,915.00
Projects Maintenance
;Fund I
I
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY),
instead of within the annual budget ordinance, as projects commence, additional funding needs are
identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of
the Water's portion of the City of Fort Worth's Fiscal Years 2025-2029 Capital Improvement Program, as
follows:
60THOMASPL AT CALMONT SD REHABCO2-WOODY
Capital FY2025 CIP Budget Change Revised
Fund Project Name Appropriations Authority (Increase/Decrease) FY2025
Name Budget
W&S
Capital 103057 Thomas
Projects -- PI $0.00 This M&C $362,495.00 $362,495.00
Fund at Calmont SDR
56002--- - — —�
Funding is available in Stormwater Capital Projects Fund, the General Capital Projects Fund and the
Transfer to Water/Sewer account of the Water and Sewer Fund for the purpose of funding the Thomas
Place at Calmont SDR project within the Stormwater Capital Projects Fund.
FY2025 -Water PAYGO Appropriations per City Ordinance 27107-09-2024
FY2025
FY2025 Amended PayGo (includes YTD PayGo Approved FY2025
Original any council actions for/Moved to Capital This M&C Remaining PayGo Balance
Adopted PayGo subsequent to budget Projects
_ adoption) _
$92,597,771.00 $92,597,771.00 ($39,169,83&00) ($362,495.00) $53,065,440.00
Note: there may be other pending actions or recently approved actions that are not reflected in the table
due to timing.
Appropriations for Thomas Place at Calmont Storm Drain Rehabilitation project are as depicted below:
Fund Existing Additional [Project Total*
Appropriations Appropriations
52002-
Stormwater $600,000.00 $0.00 $600,000.00,
Capital Projects
52007-
Stormwater
Revenue Bonds $2,093,000.00 $0.00 $2,093,000.00
2020
52008- Drainage
Revenue Bonds $350,000.00
Series 2023
'W&S Capital
Projects Fund $0.00
56002
General Capital
$0.00:$350,000.00
$362,495.001 $362,495
Projects Fund $0.00 $45,725.00. $45,725,00'
30100
Project Total $3,043,000.00 $408,220.001$3,451,220.00
*Numbers rounded for presentation purposes.
Business Equity — Woody Contractors, Inc. agrees to maintain its initial MIWBE commitment of 14.36
percent that it made on the original contract and extend and maintain that same MIWBE commitment of 14
percent to all prior change orders up to and inclusive to this Change Order No. 2. Therefore Woody
Contractors, Inc. remains in compliance with the City's MIWBE Ordinance and attests to its commitment by
its signature on the Acceptance of Previous MIWBE Commitment form executed by an authorized
representative of its company.
This project is located in COUNCIL DISTRICT 7.
FISCAL INFORMATION 1 CERTIFICATION:
The Director of Finance certifies that funds are available in the Water & Sewer Fund, Contract Street
Maintenance Programmable project within the General Capital Projects Fund, and in the
Stormwater Capital Projects Fund, and upon approval of the above recommendations and adoption of the
attached appropriation ordinances, funds will be available in the W&S Capital Projects Fund and
the General Capital Projects Fund for the Thomas PI at Calmont SDR project to support the above
recommendations and execution of the change order. Prior to any expenditure being incurred, the Water
and Transportation & Public Works Departments have the responsibility of verifying the availability of funds.
FUND IDENTIFIERS IFIDs):
TO
Fund Department Pro ect Pro raml ctivit Budget Reference # moun
ID II ID IAccoun
g yI Year (Chartfieid 2) 1
FROM
Fundl Department Account; Project iProgramActivity Budget Reference # moun�
I
1D I ID I Year I (Chartfield 2)
CERTIFICATIONS:
Submitted for Citv Manager's Office bv; William Johnson (5806)
Originating Denartment Head:
Additional Information Contact:
Chris Harder (5020)
John Kasavich (8480)
ATTACHMENTS
1. 1295 form wooda,p— f (CFW Internal)
2. 60THOMASPLAT CALM ONT SD REHABCO2-WOODY FID Table (WCF 02.03.25).xlsx (CFW Internal)
3, 60THOMASPLAT CAL MONT SD REHABCO2-WOODY funds avail.docx (CFW Internal)
4. 60THOMASPL AT CALMONT SD REHABCO2-WOODY Ma,r).pdf (Public)
5. MWBE-APCF-Final-CC,p-lf (CFW Internal)
60THOMASPL AT CALMONT SD REHABCO2-WOODY FID Table
2 56002 0600430
103057
3
30100
0200431
4910100 P00020
3
30100
0200431
4910100 103057
3
30100
0220431
P00020
3
30100
0200431
103057
2025
2025
2025
2025
$362,495.00
($45,725.00)
$45,725.00
($45,725.00)
$45,725.00
2 56001 0609020 5956001 $362,495.00
2 56002 0600430 4956001 103057 001780 9999 ($362,495.00)
3 30100 0200431 491010 P00020 9999 $45,725
3 30100 0200431 491010 103057 002880 9999 ($45,725)
1
52002
0200431
5740010
103057
1
30100
0200431
5740010
103057
002880 9999
002480 9999
$36,759.65 Pay to Contractor
$45,725.00 Pay to Contractor
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
12
Signature
John R. Kasavich
Name of Employee
Engineering Manager
Title
ATTEST:
Jannette Goodall
City Secretary