Loading...
HomeMy WebLinkAboutIR 7805 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7805 �bESOr�r�o To the Mayor and Members of the City Council March$' 1984 u � x Subject: COMO AND HILLSIDE SWE%UMNG POOLS BATHHOUSE PROJECTS On February 1, 1994, the City Council approved a contract with T.W. Foster, Inc., in the amount of$407,142.00 for the renovation of the Como and Hillside swimming pools. In conjunction with this bid award, the Council approved the transfer of$184,000.00 from the Capital Projects Reserve Fund and accepted private contributions totaling$13,000.00 to underwrite the full project cost (including construction, contingencies, testing, permitting and inspection services) of$481,903.00. The above action will address the renovation of the swimming pools only. At this point, there are no funds available to address the renovation of the existing bathhouse at Como and new construction of the bathhouse at Hillside which was previously demolished. During review of the swimming pool renovation project bids,staff provided an explanation of the overrun from estimates to actual construction costs. At that time, the City Council directed that staff conduct design revisions to the building plans to reduce the bathhouses construction cost estimate of$240,800.00, and explore alternative funding sources to possibly underwrite the project. The Council also requested that staff review options for delayed construction and opening of the bathhouses. In response, staff from the Departments of Transportation and Public Works, Development, Engineering, Water Utilities and Park and Recreation, in conjunction with the project consultant architect reviewed the proposed building plans. It was determined that economies could be achieved in an amount of up to 20% if the proposed roofing structures for both bathhouses were redesigned. This redesign was incorporated into the project construction bid as an alternate bid item in addition to alternate bid items expanding the project time limit from 60 to 90 days. In regards to alternative funding sources, it was determined that Community Development Block Grant (CDBG) funds from Years XV and XVI were available. In response, staff presented a recommendation to the Community Development Council (CDC) on February 21, 1994 proposing the reprogramming of $225,000.00 from the CDBG program to fund the bathhouses project. The CDC unanimously endorsed this recommendation. Alternatives for delaying or deleting the bathhouses work were considered. However, due to operational, security and health reasons, it was determined that any delay or deletion would be inadvisable. Further, completion of the bathhouses would enable the City to operate these facilities at service levels consistent with all other swimming pool facilities in the city. Bids were received on February 23, 1994 reflecting a low base bid, including the redesigned roofing alternate of$173,502.00 ($82,622.00 for Como and $90,880.00 for Hillside). With the addition of contingency, inspection, permitting, utilities and testing funding, the total project cost amounts to $209,527.00. �-ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 7805 TF 4D To the Mayor and Members of the City Council March S. 1004 Page 2 of 2 TEXAS Subject: COMO AND HILLSIDE SWEMUNG POOLS BATHHOUSE PROJECTS 1873 Attached for the City Council's information is a project financial summary including approved and proposed funding sources and project costs. Based upon the above, staff recommends that contract awards be made for the renovation and construction of the Como and Hillside Swimming Pool bathhouses, respectively and that CDBG funds from Years XV and XVI be reprogrammed to underwrite these improvements. If the City Council desires additional information on this matter, please let me know. 0 �rACity Manag ro ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS ?01111 Como and Hillside Swimming Pools and Bathhouse Projects Summary of Finances Funding Sources Transfer from Unspecified M&C G-9903 $ 20, 000.00 Park Bonds 1978 C.I.P. 10/27/92 Transfer from FY 1992-93 M&C G-10148 $ 75,330200 Operating budget to 05/04/93 Capital Projects Fund CDBG Como M&C C-13953 $ 50,000 .00 08/10/93 CDBG Hillside M&C G-10436 $ 50,000.00 11/23/93 Foundations & Community M&C G-10500 $114, 594.00 Contributions 01/04/94 M&C C-14172 $ 13, 000 .00 02/01/94 Capital Projects Reserve Fund M&C C-14172 $184,000 .00 02/01/94 CDBG Year XV for Como M&C Proposed $100, 015 .00 CDBG Year XVI for Hillside M&C Proposed $109,512 .00 $716,451.00 Summary of Funding sources: Bond Funds & Capital Projects Reserve $204, 000.00 28.5% City Operating Budget 75,330.00 10.5%, Community Development Block Grants 309, 527.00 43 .21 Foundations & Community Contributions 127, 594 .00 17.8%; $716,451 100%; Costs Pool Design, Printing & Bidding $ 9,221.00 Bathhouse Design, Printing & Bidding 15,800 .00 Pool Construction Contract 407,142.00 Contingency, Inspection, Utilities & Testing 74, 761.00 Bathhouse Renovation & Construction 173,502 .00 (proposed) Contingency, Inspection, Utilities & Testing 36,025 .00 (proposed) $716,451.00 Summary of Costs Design, Printing & Bidding $ 25, 021.00 3 .5% Construction Contracts 580,644 .00 81.01 Contingency, Inspection, Utilities & Testing $ 110,786 .00 15.51 $716,45.7..U0 loot