HomeMy WebLinkAboutContract 62635-PM1 (2)CSC No. 62635-PMI
PROJECT MANUAL
FOR
THE CONSTRUCTION OF
WATER, SEWER, PAVING AND DRAINAGE IMPROVEMENTS
FWISD FOREST OAK MIDDLE SCHOOL
ADDITION/RENOVATION
IPRC Record No. IPRC24-0158
City Project No. 105753
FID No.30114-0200431-105753-EO7685
File No. K-3313
X File No. 28320
Mattie Parker David Cooke
Mayor City Manager
Christopher P. Harder, P.E.
Director, Water Department
Lauren Prieur, P.E.
Director, Transportation and Public Works Department
Prepared for
The City of Fort Worth
February 2025
JQ Civil Engineering 7986
...F .. # 1
I
Ai
zV..'..........
UVIDIU N. SIPDS
t'• 111707
r
02/25/2025
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 1 of 5
SECTION 00 00 10
TABLE OF CONTENTS
DEVELOPER AWARDED PROJECTS
Division 00 - General Conditions
Last Revised
1 00 11 13
ir. iia4io *e Bidders
03/20/2020
0021 13
lastFueti ns to Bidde :s
03/20/2020
00 41 00
Bid Fefm
04/02/2014
00 42 43
Proposal Form Unit Price
05/22/2019
0043 13
Bid Ben
04/02/2014
0045 11
Bidders Pf:eq, alifiecaie 's
04/02/2014
0045 12
Prequalification Statement
09/01/2015
0045 13
Bidde . Pfegtta1 i;,,a4ien kWiaz.,ian
03/09/2020
00 45 26
Contractor Compliance with Workers' Compensation Law
04/02/2014
00 45 40
r, mere,*. Business Enterprise Goa
08/21/2018
00 52 43
Agreement
06/16/2016
00 61 25
Certificate of Insurance
07/01/2011
00 62 13
Performance Bond
01/31/2012
00 62 14
Payment Bond
01/31/2012
00 62 19
Maintenance Bond
01/31/2012
00 72 00
General Conditions
11/15/2017
00 73 00
r"„„leme tary Conditions
07/01/2011
0073 10
Standard City Conditions of the Construction Contract for Developer
01/10/2013
Awarded Projects
Division 01- General Requirements
Last Revised
01 1100
Summary of Work
12/20/2012
012500
Substitution Procedures
08/30/2013
01 31 19
Preconstruction Meeting
08/30/2013
01 31 20
Pr-egeet Nlee ng-
07/01/2011
01 3233
Preconstruction Video
08/30/2013
01 33 00
Submittals
08/30/2013
01 35 13
Special Project Procedures
08/30/2013
01 45 23
Testing and Inspection Services
03/20/2020
01 5000
Temporary Facilities and Controls
07/01/2011
01 5526
Street Use Permit and Modifications to Traffic Control
07/01/2011
0157 13
Storm Water Pollution Prevention Plan
07/01/2011
01 60 00
Product Requirements
03/20/2020
01 66 00
Product Storage and Handling Requirements
04/07/2014
01 70 00
04/07/2014
01 71 23
Construction Staking
04/07/2014
01 74 23
Cleaning
04/07/2014
01 77 19
Closeout Requirements
04/07/2014
01 78 23
Operation and Maintenance Data
04/07/2014
01 78 39
Project Record Documents
04/07/2014
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 2 of 5
Technical Specifications which have been modified by the Engineer specifically for this
Project; hard copies are included in the Project's Contract Documents
NONE
Technical Specifications listed below are included for this Project by reference and can be
viewed/downloaded from the City's website at:
htti):Hfortworthtexas.aov/tvw/contractors/
or
httvs:Hapes.fortworthtexas.Sov/ProiectResources/
Division 02 - Existing Conditions
Last Revised
0241 13
Selective Site Demolition
12/20/2012
0241 14
Utility Removal/Abandonment
12/20/2012
0241 15
Paving Removal
02/02/2016
Division 03
- Concrete
03 30 00
Cast -In -Place Concrete
12/20/2012
03 34 13
Gen4r-elled Lew Strength Ma4efia (C S n
12/20/2012
0334 16
Concrete Base Material for Trench Repair
12/20/2012
03 80 00
ra, di fieeAions +o Etmctur-es
12/20/2012
Division 26
- Electrical
26 05 00
Commen We v Results f " E eetr4e^i
11/22/2013
2605 10
for- Elee f ieal Systems
12/20/2012
26 05 33
Raee a-ys a -a Be*es for- Eleetia^^i Syst
12/20/2012
26 05 43
Underground Dua:o and Raceways f r Eleet iea Syste ^
07/01/2011
26 05 50
GotmaiurtiaeAie s Mint' Duet Gen " t.
02/26/2016
Division 31-
Earthwork
31 1000
Site Clearing
12/20/2012
3123 16
Unel ssifie Exea- atie
01/28/2013
31 2323
BE)FFE)
01/28/2013
31 24 00
E�ark mis
01/28/2013
31 25 00
Erosion and Sediment Control
12/20/2012
31 36 00
Gabiens
12/20/2012
31 37 00
Ripr-ap
12/20/2012
Division 32 - Exterior Improvements
3201 17
Permanent Asphalt Paving Repair
12/20/2012
3201 18
,oplalt P.r,:r
12/20/2012
32 01 29
Ccr\-��o 1%vimg Repair
12/20/2012
32 11 23
Flexible Base Goufs^^
12/20/2012
32 1129
Lime Tr-ea4ed Base ` etifse^
12/20/2012
32 1133
Gefne + Treat ^^^ `-"^,, ^AR
12/20/2012
32 1137
Liquid Tfea4e coil M lizeaf
08/21/2015
32 1216
Asphalt Paving
12/20/2012
32 1273
A spha * Pa-vi , Cm-cAll Eaalanc is
12/20/2012
32 13 13
Genefete Paving
12/20/2012
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 3 of 5
32 1320
Concrete Sidewalks, Driveways and Barrier Free Ramps
06/05/2018
32 1373
Concrete Paving Joint Sealants
12/20/2012
32 1416
Br ok Urrt Paving
12/20/2012
32 1613
Concrete Curb and Gutters and Valley Gutters
10/05/2016
32 1723
Pavement Markings
11/22/2013
32 1725
Curb Ad �)zz lNvoski rg
11/04/2013
3231 13
Chain Fenees ^~a Ga4es-
12/20/2012
32 31 26
Wire Fences ^ad Ga4es
12/20/2012
32 31 29
Wood Fences a -a rates
12/20/2012
32 32 13
Cast -in -Place Concrete Retaining Walls
06/05/2018
3291 19
Topsoil Placement and Finishing of Parkways
12/20/2012
32 92 13
Hydro -Mulching, Seeding, and Sodding
12/20/2012
32 93 43
Tfees 3 arubc
12/20/2012
Division 33 -
Utilities
33 01 30
Sewer and Manhole Testing
12/20/2012
33 01 31
Closed Circuit Television (CCTV) Inspection
03/03/2016
3303 10
B- -ywo Purr*i-ng ofE*istiag Sewer- Syste
12/20/2012
3304 10
eipA Beading ^^a Qeet lea 1sela4,^^
12/20/2012
3304 11
GE)fFesion CefAfel Test Stations
12/20/2012
33 04 12
r agaesitff Anode r^tt edict Pfeteetie S ysteffl
12/20/2012
33 04 30
Temporary Water Services
07/01/2011
33 04 40
Cleaning and Acceptance Testing of Water Mains
02/06/2013
33 04 50
Cleaning of Sewer Mains
12/20/2012
3305 10
Utility Trench Excavation, Embedment, and Backfill
12/12/2016
3305 12
Water Line Lowering
12/20/2012
3305 13
Frame, Cover and Grade Rings — Cast Iron
01/22/2016
3305 13.10
Frames Coo r and Grade Pigs C—envesrte
01/22/2016
3305 14
Adjusting Manholes, Inlets, Valve Boxes, and Other Structures to
12/20/2012
Grade
3305 16
Genefete W tef Vaults
12/20/2012
3305 17
Concrete Collars
12/20/2012
33 05 20
12/20/2012
33 05 21
Tufmel Liner- or Pi^to
12/20/2012
33 05 22
Steel rasing Pipe
12/20/2012
33 05 23
Hand Tunruiling
12/20/2012
33 05 24
Piro in agar Turffrjl lime
06/19/2013
33 05 26
T rt44-y N4aF Eef:s/T ^^^tar^
12/20/2012
33 05 30
Location of Existing Utilities
12/20/2012
33 1105
Bolts, Nuts, and Gaskets
12/20/2012
33 11 10
Ductile Iron Pipe
12/20/2012
33 11 11
Ductile Iron Fittings
12/20/2012
33 11 12
Polyvinyl Chloride (PVC) Pressure Pipe
11/16/2018
33 11 13
Cenef:etePr-essufe Pipe, Bar W-Fappe , Stool Cylif def: T-jTe
12/20/2012
33 11 14
Died (tool Pir,"z d Fittings
12/20/2012
33 1210
Water Services 1-inch to 2-inch
02/14/2017
33 12 11
Large e Water- Metef:s
12/20/2012
33 1220
Resilient Seated Gate Valve
12/20/2012
33 1221
AWW4 P_ubbor. Feated n„tt^.fl., Valves
12/20/2012
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 4 of 5
33 1225
Connection to Existing Water Mains
02/06/2013
33 1230
Eo:'i' bi.' d r n;,. Va4ye Assemblies lies for- Potable zzl. e - Systems
12/20/2012
33 1240
Fire Hydrants
01/03/2014
33 1250
Wa4ar EamjJ� Fteatians
12/20/2012
33 1260
Standard Blow egNl lve nssom b!)
06/19/2013
3331 12
Cufed ift Piaee Pipe (CIPP)
12/20/2012
33 31 13
F4-b^7,glmr- Rainf reed Pipe for- Or-a-vity S^aitaf . Sow
12/20/2012
3331 15
High Deal t-y P lyet ,ylene Pipe f r S. itaf., S^we
12/20/2012
(HDPE) f
33 31 20
Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe
06/19/2013
333121
P i..yinyi Chle :ide Closed Profile r . Sa*ita Sewer-
12/20/2012
(PVC) a-vit y
33 31 22
S mitaf =Se ar FIiT, Limrn g
12/20/2012
33 31 23
Smit n, S^we f Pipe Hagar-geme
12/20/2012
33 31 50
Sanitary Sewer Service Connections and Service Line
04/26/2013
33 31 70
Combi.-mda^ n;,. Valve anioar; Sowef: Fef:ee Mains
12/20/2012
3339 10
Cast -in -Place Concrete Manholes
12/20/2012
33 39 20
Precast Concrete Manholes
12/20/2012
33 39 30
Fibe glass Manholes
12/20/2012
33 39 40
Wastewater- n eeess rt.^,, bef: (W n C4
12/20/2012
33 39 60
Epex-' T ^ for Fzmitar<' So.:'�^'' ^^
12/20/2012
3341 10
Rein f fee r rer-ete St,.,..,., S^we f Pipe/Ct iyet4s
07/01/2011
3341 11
High Deal t-y Polyethylene (HDPE) Pipe f r St.-,-.w.
12/20/2012
3341 12
Reinf reed Pe1yeth4en, (En.PE) Pire
11/13/2015
33 46 00
Subdrainage
12/20/2012
33 46 01
07/01/2011
33 46 02
Tfomh Dimiomi
07/01/2011
33 49 10
Ccol. r Phc^ Nim- eles and 1 metie~ Bees
12/20/2012
33 49 20
Ct" a -a Dfop inlets
12/20/2012
33 49 40
Stor.� Drd-msa e 14ead ally and Wingwalls
07/01/2011
Division 34 -
Transportation
3441 10
Tfaffi^ Signals
10/12/2015
3441 10.01
At4aehmen4A C-entr-eller C abine
12/18/2015
3441 10.02
At4aehmef4amCwtre lef: Speei Mien
02/2012
3441 10.03
Att-aehment G Software SFee}fetien
01/2012
3441 11
Tempef^M' Ralf e Signals
11/22/2013
3441 13
Removing T -a ffie Signals
12/20/2012
3441 15
Reetangulx iar/. d MwAhi;xg Beacxm
11/22/2013
3441 16
Pedest is 14ybr-;a Sigfta
11/22/2013
34 41 20
Read-w Illumcyatia Assemblies
12/20/2012
34 41 20.01
Amaral LTD Raad-w : amirnroo
06/15/2015
34 41 20.02
Free ay LED Read,,,^•' T11.mi, &� ras
06/15/2015
34 41 20.03
Reside"*..,' LED Read..,^., Tarsi -m -es
06/15/2015
34 41 30
Alurn�ms Fl.gns
11/12/2013
34 41 50
Single rlede Fite- Optie r
02/26/2016
3471 13
Traffic Control
11/22/2013
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
00 00 00
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS
Page 5 of 5
Appendix
GC-4.01
A-N ck Iit-,- a
GC-4.02
Stibstiffaee and PhysiM Conditions
GC-4.04
Undergr-o,,n T7.,eiki;os-
GC-4.06
14az , .dazes Efwifenfnefftal C nditior at 94e
GC-6.06.D
GC-6.07
Wage R—Mes
GC-6.09
no,.mits and r 44ities
GC-6.24
NeadisatirAkyatian
GR-01 60 00
Product Requirements
END OF SECTION
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
00 42 43
DAP - BID PROPOSAL
Page 1 of 5
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
I Description
Specification Section
Unit of
I Bid
Unit Price I
Bid Value
Item No.
No.
Measure
Quantity
UNIT I: WATER IMPROVEMENTS
1
0241.1514 Salvage 2" Water Meter
0241 14
EA
1
$800.00
$800.00
2
3201.0113 6' Wide Asphalt Pvmt Repair, Residential
3201 17
LF
252
$15.00
$3,780.00
3
3201.0151 Asphalt Pvmt Repair, Water Service
3201 17
SF
2784
$5.00
$13,920.00
4
3292.0101 Utility Service Surface Restoration Sodding
32 92 13
SY
6
$150.00
$900.00
5
3305.0109 Trench Safety
32 05 10
LF
50
$30.00
$1,500.00
6
3305.2001 6" Water Carrier Pipe
33 05 24
LF
25
$60.00
$1,500.00
7
3311.0001 Ductile Iron Water Fittings w/ Restraint
3311 11
EA
5
$800.00
$4,000.00
8
3311.0261 8" PVC Water Pipe
3311 12
LF
212
$80.00
$16,960.00
9
3311.0461 12" PVC Water Pipe
3311 12
LF
15
$68.00
$1,020.00
10
3312.0117 Connection to Existing 4"-12" Water Main
33 12 25
EA
7
$1,800.00
$12,600.00
11
3312.2003 1" Water Service
34 12 10
EA
1
$2,500.00
$2,500.00
12
3312.2203 2" Water Service
33 12 10
EA
2
$3,200.00
$6,400.00
13
3312.3002 6" Gate Valve
33 12 20
EA
1
$1,800.00
$1,800.00
14
3312.3003 8" Gate Valve
33 12 20
EA
2
$2,800.00
$5,600.00
15
3312.3005 12" Gate Valve
33 12 20
EA
1
$4,200.00
$4,200.00
16
3471.0001 Traffic Control
3471 13
MO
3
$1,200.00
$3,600.00
TOTAL UNIT I: WATER IMPROVEMENTS $81,080.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015 00 42 43_Bid Proposal_DAP.xls
UNIT PRICE BID
Bidlist
Item No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Description
Project Item Information
00 42 43
DAP - BID PROPOSAL
Page 2 of 5
Bidder's Application
Bidder's Proposal
Specification Section Unit of Bid
No. Measure Quantity Unit Price Bid Value
UNIT II: SANITARY SEWER IMPROVEMENTS
1 0241.2013 Remove 8" Sewer Line
0241 14
LF
78
$20.00
$1,560.00
2 0241.2201 Remove 4' Sewer Manhole
0241 14
EA
1
$850.00
$850.00
3 3201.0113 6' Wide Asphalt Pvmt Repair, Residential
3201 17
LF
99
$15.00
$1,485.00
4 3292.0101 Utility Service Surface Restoration Sodding
32 92 13
SY
8
$150.00
$1,200.00
5 3301.0002 Post -CCTV Inspection
3301 31
LF
136
$5.00
$680.00
6 3301.0101 Manhole Vacuum Testing
7 3305.0109 Trench Safety
8 3305.0112 Concrete Collar for Manhole
9 3305.0113 Trench Water Stops
10 3305.0116 Concrete Encasement for Utility Pipes
11 3305.0203 Imported Embedment/Backfill, CLSM
12 3331.4119 8" DIP Sewer Pipe
3301 30
EA
3
$800.00
$2,400.00
32 05 10
LF
105
$30.00
$3,150.00
33 05 17
EA
2
$800.00
$1,600.00
33 05 15
EA
1
$450.00
$450.00
33 05 10
CY
18
$130.00
$2,340.00
33 05 10
CY
15
$38.00
$570.00
331110
LF
136
$80.00
$10,880.00
13
3339.0001 Epoxy Manhole Liner
33 39 60
VF
3
$250.00
$750.00
14
3339.1001 4' Manhole
33 39 10, 33 39
EA
1
$4,800.00
$4,800.00
15
3339.1002 4' Drop Manhole
34 39 10, 33 39
EA
2
$5,200.00
$10,400.00
16
3339.1003 4' Extra Depth Manhole
33 39 10, 33 39
VF
2
$300.00
$600.00
17
3471.0001 Traffic Control
3471 13
MO
3
$1,200.00
$3,600.00
TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS $47,315.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015 00 42 43_Bid Proposal_DAP.xls
UNIT PRICE BID
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
Project Item Information
00 42 43
DAP - BID PROPOSAL
Page 3 of 5
Bidder's Application
Bidder's Proposal
Bidlist
I Description
Specification Section Unit of
I Bid
Unit Price I
Bid Value
Item No.
No. Measure
Quantity
UNIT III: DRAINAGE IMPROVEMENTS
1
3341.0103 18" RCP, Class III
3341 10 LF
14
$38.00
$532.00
2
3349.5001 10' Curb Inlet
33 49 20 EA
1
$2,500.00
$2,500.00
3
3471.0001 Traffic Control
3471 13 MO
3
$1,200.00
$3,600.00
4
9999.0001 Concrete Sidewalk flume with steel plate 31 37 00 EA
1
$1,800.00
$1,800.00
TOTAL UNIT III: DRAINAGE IMPROVEMENTS
$8,432.00
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015
00 42 43_Bid Proposal_DAP.xls
00 42 43
DAP - BID PROPOSAL
Page 4 of 5
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlist
I Description
Specification Section
Unit of
I Bid
Unit Price I
Bid Value
Item No.
No.
Measure
Quantity
UNIT IV: PAVING IMPROVEME JTS
1
0241.0100 Remove Sidewalk
0241 13
SF
3728
$0.65
$2,423.20
2
0241.0300 Remove ADA Ramp
0241 13
EA
6
$275.00
$1,650.00
3
0241.0401 Remove Concrete Drive
0241 13
SF
850
$1.25
$1,062.50
4
0241.0550 Remove Guardrail
0241 13
LF
15
$35.00
$525.00
5
0241.1300 Remove Conc Curb&Gutter
0241 15
LF
1065
$6.00
$6,390.00
6
3211.0112 6" Flexible Base, Type A, GR-I
3211 23
SF
9834
$2.10
$20,651.40
7
3212.0301 2" Asphalt Pvmt Type D (DG-D)
32 12 16
SF
1350
$4.00
$5,400.00
8
3212.0401 HMAC Transition
32 12 16
SF
821
$12.00
$9,852.00
9
3212.0503 4" Asphalt Base Pvmt Type B (DG-B)
32 12 16
SF
1350
$6.00
$8,100.00
10
3213.0101 6" Cone Pvmt
32 13 13
SF
8716
$10.00
$87,160.00
11
3213.0301 4" Cone Sidewalk
32 13 20
SF
15307
$8.00
$122,456.00
12
3213.0401 6" Concrete Driveway
32 13 20
SF
1118
$10.00
$11,180.00
13
3213.0501 Barrier Free Ramp, Type R-1
32 13 20
EA
1
$800.00
$800.00
14
3213.0503 Barrier Free Ramp, Type M-1
32 13 20
EA
1
$800.00
$800.00
15
3213.0504 Barrier Free Ramp, Type M-2
33 13 20
EA
4
$800.00
$3,200.00
16
3213.0506 Barrier Free Ramp, Type P-1
33 13 20
EA
4
$800.00
$3,200.00
17
3216.0101 6" Cone Curb and Gutter
32 16 13
LF
1038
$40.00
$41,520.00
18
3216.0301 7" Cone Valley Gutter, Residential
32 16 13
SF
30
$10.00
$300.00
19
3217.0502 Preformed Thermoplastic Contrast Markings -
24" Crosswalk
32 17 23
LF
210
$11.57
$2,429.70
20
3217.0504 Preformed Thermoplastic Contrast Markings
- 24" Stop Bars
32 17 23
LF
32
$11.57
$370.24
21
3291.0100 Topsoil
3291 19
CY
46
$65.00
$2,990.00
22
3292.0100 Block Sod Placement
32 92 13
SY
278
$7.00
$1,946.00
23
3441.4003 Furnish/Install Alum Sign Ground Mount City
34 41 30
EA
2
$1,500.00
$3,000.00
24
3441.4110 Remove and Reinstall Sign Panel and Post
3441 30
EA
6
$1,500.00
$9,000.00
25
3471.0001 Traffic Control
3471 13
MO
3
$8,000.00
$24,000.00
TOTAL UNIT IV: PAVING IMPROVEMENTS $370,406.04
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015 00 42 43_Bid Proposal_DAP.xls
UNIT PRICE BID
Bidlist
Item No.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
00 42 43
DAP - BID PROPOSAL
Page 5 of 5
Bidder's Application
Project Item Information Bidder's Proposal
Description Specification Section Unit of Bid Unit Price Bid Value
No. Measure Quantity
Bid Summary
UNIT I: WATER IMPROVEMENTS $81,080.00
UNIT II: SANITARY SEWER IMPROVEMENTS $47,315.00
UNIT III: DRAINAGE IMPROVEMENTS $8,432.00
UNIT IV: PAVING IMPROVEMENTS $370,406.04
Total Construction Bid $507,233.04
This Bid is submitted by the entity named below:
BIDDER: BY C D MAR
SEDALCO Construction Services
4100 Fossil Creek Blvd. TITLE: Project Manager
Ft Worth, TX 76136 DATE: 8/13/2024
Contractor agrees to complete WORK for FINAL ACCEPTANCE within 75 working days after the date when the
CONTRACT commences to run as provided in the General Conditions.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS
Form Version September 1, 2015 00 42 43_Bid Proposal_DAP.xls
0045 12
DAP PREQUALIFICATION STATEMENT
Page 1 of 1
SECTION 00 45 12
DAP — PREQUALIFICATION STATEMENT
Each Bidder is required to complete the information below by identifying the prequalified contractors
and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work
Tvne" bax provide the complete major work tune and actual descrin_ tion as provided by the Water
Denartment for water and sewer and TPW for navina.
Major Work Type
Sanitary Sewer Development 8"
and under;
Concrete Paving Including
approaches, bus lanes and parent
drop off Less than 18,000 SF
Storm Drain Collection system,
Development, 18" diameter and
smaller
Storm Drain Man Hole
Development smaller than 4'
Water Distribution Development
8" and under
Warren Environmental Systems
Contractor/Subcontractor Company Name Prequalification
Expiration Date
Atlantic Construction May 30, 2026
Sizelove Construction May 30, 2026
Atlantic Construction May 30, 2026
Atlantic Construction May 30, 2026
Atlantic Construction May 30, 2026
ACE May 30, 2026
The undersigned hereby certifies that the contractors and/or subcontractors described in the table above
are currently prequalified for the work types listed.
BIDDER:
SEDALCO-POST L, A Joint Venture
4100 Fossil Creek Blvd.
Fort Worth, Texas
76137
BY- Muss Garris n
I�L
(Signa }
TITLE: Project Director
DATE: 01 /29/2025
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT— DEVELOPER AWARDED PROJECTS 00 45 12_Prequalification Statement 2015_DAP
Form Version September 1, 2015
004526-1
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
Page 1 of I
1 SECTION 00 45 26
2 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
3 Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it
4 provides worker's compensation insurance coverage for all of its employees employed on City
5 Project No. 105753—IPRC24-0158. Contractor further certifies that, pursuant to Texas Labor
6 Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of
7 compliance with worker's compensation coverage.
8
9 CONTRACTOR:
10
11 SEDALCO-POST L, A Joint Venture By: _Russ Garrison
12 Company (Please P 'nt)
13
14 _4100 Fossil Creek Blvd. Signature:
15 Address
16
17 Fort Worth, TX 76137 Title: Project Director
18 City/State/Zip (Please Print)
19
20
21 THE STATE OF TEXAS §
22
23 COUNTY OF TARRANT §
24
25 BV�qRE ME,a undersigned authority, on this day personally appeared
26 It(ILLS5 ( O.krI' S o ri known to me to be the person whose name is
27 subscribed to the foreypting instrument, and acknowledged to me that he/she executed the same as
28 the act and deed of ^ V ro3p c4- 1')t ' re C6,r for the purposes and
29 consideration therein expressed and in the capacity therein stated.
30
31 GIVEN UNDER MY HAND AND SEAL OF OFFICE this �� day of
32 (YlA1rCh _2o;6.
33
34
35
36 Notary Public in and for +thtate of Texas
37
38 END OF SECTION
39
r°i�0.J Ape KIM VAUGHAN
:• e� Notay Public
* • •" STATH OF TEXAS
Notary 1001324DW42
+av Myo m &P W27.202E
CITY OF FORT WORTH FWfSD Forest Oak Middle Schaal AdditionlRenowtion
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Project Number
Revised April 2, 2014
Docusign Envelope ID 5F3EOFFD-4032-4F7B-995F-ACFE8BA1 EBD9
1.1, aura PROCEDEO
Construction Manager -at -Risk Contract
PUBLIC WORK AMENDMENT FORM
DEVELOPER AGREEMENT
This Public Work Amendment ("Amendment" or "Developer Agreement"), effective as of the date of full
execution below, amends the Contract between the Fort Worth Independent School District, a political
subdivision of the state of Texas, and a legally constituted independent school district located in Tarrant
County, Texas ("FWISD," "District" or "Owner" or "Developer") and Sedalco-Post L JV a contractor
authorized to do business in Texas, acting by and through its duly authorized representative ("Construction
Manager") for the Forest Oak MS FWISD Project No. 045-101, City of Fort Worth Project No. 105753,
IPRC No. 24-0158 CFA No. 24-0179 (the "Project").
This Amendment serves as the Developer Agreement covering the scope of public work outlined in the
executed Community Facilities Agreement (CFA) between the City of Fort Worth ("City) and the Fort Worth
Independent School District for the construction of a community facility. ("Public Work")
Developer and Contractor, in consideration of mutual covenants hereinafter set forth, agree to amend the
Contract by incorporating the following Developer Agreement language of the as part of the Contract
between the parties:
Article 1. PUBLIC WORK: As per the executed Community Facilities Agreement (CFA), hereby attached
and incorporated as Exhibit 1, the Contractor shall complete all work as specified or indicated in the Standard
City Conditions of the Construction Contract for Developer Awarded Projects, hereby attached and
incorporated as Exhibit 2, for the Project identified herein.
Article 2. PROJECT: The Public Work for which the Work under the Contract Document may be the whole
or only a part is generally described as follows: Forest Oak Middle School Addition/Renovation, City of
Fort Worth Project No. 105753. FWISD Project No. 045-101
Article 3. CONTRACT TIME: For Public Work only as per CFA.
3.1 The Construction Manager shall achieve Substantial Completion of the Public Work not later than 75
working days from the Public Work NTP (Also refer to the Construction Notice to Proceed for the overall
project duration and Substantial Completion Date. The Public Work project duration is included within the
overall project timeline and is not in addition to it.)
Construction Duration per working days for Public Work only: 75 working days included in the overall
project duration of 867 Calendar days.
3.2 Final Acceptance: The Public Work will be complete for Final Acceptance within 75 working days
(ensure the days shown match the days shown in the Proposal Form) after the date when the Contract Time
commences to run as provided in Paragraph 12.04 of the Standard City Conditions of the Construction
Contract for Developer Awarded Projects.
3.3 Liquidated Damaizes: As applicable in the Contract between the Owner and the Construction Manager.
Article 4. CONTRACT PRICE: For Public Work portion of the Project only as per CFA. Developer agrees
Page 1 of 4
Docusign Envelope ID: 5F3EOFFD-4032-4F7B-995F-ACFE8BA1EBD9
lit �'"i 19611''l III PROCEDEO
Construction Manager -at -Risk Contract
to pay Contractor for the performance of the Public Work portion of the Project, and only in accordance with
the related Contract Documents, an amount in current funds of $507,233.04 Dollars. Payment terms are
governed by the terms of the Contract.
Article 5. CONTRACT DOCUMENTS: For public work only as per CFA.
5.1 CONTENTS:
A.The Contract Documents which comprise the entire agreement between Developer and Contractor
concerning the Public Work portion of the Project consist of the following:
1. This Amendment or Developer Agreement.
2. Attachments to this Amendment or Developer Agreement:
a. Bid Form (As provided by Developer)
1) Proposal Form (DAP Version)
2) Prequalification Statement
b. Insurance ACORD Fonn(s)
c. Payment Bond (DAP Version)
d. Performance Bond (DAP Version)
e. Maintenance Bond (DAP Version)
f. Power of Attorney for the Bonds
g. Worker's Compensation Affidavit
3. Standard City General Conditions of the Construction Contract for Developer Awarded
Projects. (See Exhibit 2)
4. Specifications specifically made a part of the Contract Documents as per CFA attached as
Exhibit 1, as incorporated by reference and described in the Table of Contents of the Project's
Contract Documents.
5. Drawings as per the CFA (Exhibit 1)
6. CFA or ILA (Exhibit 1)
7. The following may be delivered or issued after the Effective Date of the Agreement and, if
issued, become an incorporated part of the Contract Documents:
a. Notice to Proceed.
b. Field Orders.
c. Change Orders.
d. Letter of Final Acceptance.
Article 6. INDEMNIFICATION PROVISION FOR THE CITY RELATED TO THE PUBLIC
WORK PORTION OF THE PROJECT
6.1 CONTRACTOR COVENANTS AND AGREES TO INDEMNIFY, HOLD HARMLESS, AND
DEFEND, AT ITS OWN EXPENSE, THE CITY OF FORT WORTH (CITY), ITS OFFICERS,
SERVANTS, AND EMPLOYEES, FROM AND AGAINST ANY AND ALL CLAIMS ARISING
OUT OF, OR ALLEGED TO ARISE OUT OF, THE WORK AND SERVICES TO BE
PERFORMED BY THE CONTRACTOR, ITS OFFICERS, AGENTS, EMPLOYEES,
SUBCONTRACTORS, LICENSES OR INVITEES UNDER THIS CONTRACT. THIS
INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE
EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE
DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART. BY ANY ACT,
OMISSION, OR NEGLIGENCE OF THE CITY. THIS INDEMNITY PROVISION IS
INTENDED TO INCLUDE, WITHOUT LIMITATION, INDEMNITY FOR COSTS,
Page 2 of 4
Docusign Envelope ID: 5F3EOFFD-4032-4F7B-995F-ACFE8BA1EBD9
1�"°. sil PROCEDEO
Construction Manager -at -Risk Contract
EXPENSES, AND LEGAL FEES INCURRED BY THE CITY IN DEFENDING AGAINST
SUCH CLAIMS AND CAUSES OF ACTIONS.
6.2 CONTRACTOR COVENANTS AND AGREES TO INDEMNIFY AND HOLD HARMLESS,
AT ITS OWN EXPENSE, THE CITY, ITS OFFICERS, SERVANTS, AND EMPLOYEES,
FROM AND AGAINST ANY AND ALL LOSS, DAMAGE, OR DESTRUCTION OF
PROPERTY OF THE CITY, ARISING OUT OF, OR ALLEGED TO ARISE OUT OF, THE
WORK AND SERVICES TO BE PERFORMED BY THE CONTRACTOR, ITS OFFICERS,
AGENTS, EMPLOYEES, SUBCONTRACTORS, LICENSEES OR INVITEES UNDER THIS
CONTRACT. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO.
OPERATE AND BE EFFECTIVE EVEN IF IT 1S ALLEGED OR PROVEN THAT ALL OR
SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED. IN WHOLE OR IN PART,
BY ANY ACT, OMISSION. OR NEGLIGENCE OF THE CITY.,
Article 7. MISCELLANEOUS TERMS CONCERNING ONLY THE PUBLIC WORK PORTION
OF THE PROJECT
7.1 Terms.
Terms used in this Developer Agreement are defined in Article 1 of the Standard City Conditions of
the Construction Contract for Developer Awarded Projects. In the event of a conflict, Standard City
Conditions shall take precedence over the Public Work related scope of the Project.
7.2 Assignment of Contract.
This Agreement, including all of the Standard Construction Specification Documents for Developer
Awarded projects, may not be assigned by the Contractor without the advanced express written
consent of the Developer.
7.3 Successors and Assigns.
Developer and Contractor each binds itself, its partners, successors, assigns, and legal representatives
to the other parry hereto, in respect to all covenants, agreements, and obligations contained in the
Standard Construction Specification Documents for Developer Awarded projects.
7.4 Severability.
Any provision or part of the Standard Construction Specification Documents for Developer Awarded
projects held to be unconstitutional, void, or unenforceable by a court of competent jurisdiction shall
be deemed stricken, and all remaining provisions shall continue to be valid and binding upon
Developer and Contractor.
7.5 Governing Law and Venue.
This Agreement, including all of the Standard Construction Specification Documents for Developer
Awarded projects, is performable in the State of Texas. Venue shall be Tarrant County, Texas, or the
United States District Court for the Northern District of Texas, Fort Worth Division.
7.6 Authority to Sign.
Contractor shall attach evidence of authority to sign Agreement, if other than duly authorized signatory
of the Contractor.
[Signature Page Follows]
IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple
Page 3 of 4
Docusign Envelope ID: 5F3EOFFD-4032-4F7B-995F-ACFE8BA1 EBD9
INDEPENDENT 11 DISTRICT
Construction Manager -at -Risk Contract
counterparts.
This Amendment or Developer Agreement is effective as of the last date signed by the Parties ("Effective
Date").
Contractor: Developer:
Sedalco - Post L JV Fort Worth Independent School District
Signed by:
B I�°uss aoyisbvu J
4CMA63E0919"ignature)
Russ Garrison Kellie Spencer
(Printed Name) (Printed Name)
Title: Project Director Title: DeoutvSuperintendent ofDistrict Operations
3/6/2025 3/14/2025
Date Date
Page 4 of 4
COMMENTS/REMARKS
The General and Auto Liability policies include a Blanket Additional Insured endorsement
that provides Additional Insured status to any person or organization as required by
written contract or agreement.
The General Liability Additional Insured endorsement provides Ongoing and Completed
Operations coverage to any person or organization when there is a written contract or
agreement requiring such status.
The General Liability policy includes Primary and Non -Contributory wording in favor of any
person or organization as required by written contract or agreement.
The General & Auto Liability and Workers Compensation policies include a Blanket Waiver
of Subrogation endorsement in favor of any person or organization as required by written
contract or agreement.
The Umbrella policy follows form of the underlying General Liability, Auto Liability and
Employers Liability.
30 Days Notice of Cancellation will be provided if required by written contract, except 10
days for non-payment.
OFREMARK COPYRIGHT 2000, AMS SERVICES INC.
006213-1
PERFORMANCE BOND
Pagel of 3
1 SECTION 00 62 13 Bond No. 30236440
2 PERFORMANCE BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, SEDALCO-POST L, A Joint Venture ,
8 known as "Principal" herein and National Fire Insurance Company of Hartford , a
9 corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas,
10 known as "Surety" herein (whether one or more), are held and firmly bound unto the Developer,
11 (Fort Worth Independent School District), authorized to do business in Texas ("Developer") and
12 the City of Fort Worth, a Texas municipal corporation ("City"), in the penal sum of, FIVE
13 HUNDRED AND SEVEN THOUSAND TWO HUNDRED AND THIRTY-THREE DOLLARS
14 AND FOUR CENTS ($ 507,233.04 ) lawful money of the United States, to
15 be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be
16 made jointly unto the Developer and the City as dual obliges, we bind ourselves, our heirs,
17 executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth by and through a Community Facilities
20 Agreement, CFA Number CFA24-0179
21 WHEREAS, the Principal has entered into a certain written contract with the Developer awarded
22 the 16 day of January , 2025 which Contract is hereby referred to and made a
23 part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor
24 and other accessories defined by law, in the prosecution of the Work, including any Change
25 Orders, as provided for in said Contract designated as Forest Oak Middle School Renovations &
26 Addition.
27 NOW, THEREFORE, the condition of this obligation is such that if the said Principal
28 shall faithfully perform it obligations under the Contract and shall in all respects duly and
29 faithfully perform the Work, including Change Orders, under the Contract, according to the plans,
30 specifications, and contract documents therein referred to, and as well during any period of
31 extension of the Contract that may be granted on the part of the Developer and/or City, then this
32 obligation shall be and become null and void, otherwise to remain in full force and effect.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 105753
Revised January 31, 2012
006213-2
PERFORMANCE BOND
Page 2 of 3
1 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
2 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
3 Worth Division.
4 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
5 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
6 accordance with the provisions of said statue.
7 IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED
8 this instrument by duly authorized agents and officers on this the 15 day of March
9 .20 25.
10
11
12
13
14
15
30
31
32
33
34
35
36
37
38 X4U4;
39_
40 Witness as to Surety
41
42
43
44 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
45 from the by-laws showing that this person has authority to sign such obligation. If
46 Surety's physical address is different from its mailing address, both must be provided.
47
PRINCIPAL:
SEDALCO-POST L. A Joint Venture
BY.
Signature
Russ Garrison. Project Director
Name and Title
Address: 4100 Fossil Creek Blvd
Fort Worth, TX 76137
SURETY:
National Fire Insurance Company of Hartford
BY: rk
Signature
Amber Jones, Attorney -in -Fact
Name and Title
Address: 151 N. Franklin Street
Chicaoo. IL 60606
Telephone Number: (312) 822-5000
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 105753
Revised January 31, 2012
006213-3
PERFORMANCE BOND
Page 3 of 3
The date of the bond shall not be prior to the date the Contract is awarded.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 105753
Revised January 31, 2012
006214-1
PAYMENT BOND
Page 1 of
I SECTION 00 62 14 Bond No. 30236440
2 PAYMENT BOND
3
4 THE STATE OF TEXAS §
5 § KNOW ALL BY THESE PRESENTS:
6 COUNTY OF TARRANT §
7 That we, SEDALCO-POST L, A Joint Venture , known as
8 "Principal" herein, and National Fire Insurance Company of Hartford , a
9 corporate surety ( or sureties if more than one), duly authorized to do business in the State of
10 Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the
11 Developer, Fort Worth Independent School District, authorized to do business in Texas
12 "(Developer"), and the City of Fort Worth, a Texas municipal corporation ("City"), in the penal
13 sum Fine Hundred and Seven Thousand Two Hundred and Thirty -Three Dollars and Four,
14 Cents (S 507,233.04 ).lawful money of the United States, to be paid in Fort
15 Worth, Tarrant County, Texas, for the payment of which sum well and truly be made jointly unto
16 the Developer and the City as dual obliges, we bind ourselves, our heirs, executors,
17 administrators, successors and assigns, jointly and severally, firmly by these presents:
18 WHEREAS, Developer and City have entered into an Agreement for the construction of
19 community facilities in the City of Fort Worth, by and through a Community Facilities
20 Agreement, CFA Number CFA24-0179
21 WHEREAS, Principal has entered into a certain written Contract with Developer,
22 awarded the _ 16 _day of January , 20 25 , which Contract is hereby
23 referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all
24 materials, equipment, labor and other accessories as defined by law, in the prosecution of the
25 Work as provided for in said Contract and designated as Forest Oak Middle School Renovations
26 & Addition.
27 NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if
28 Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in
29 Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work under
30 the Contract, then this obligation shall be and become null and void; otherwise to remain in full
31 force and effect.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 105753
Revised January 31, 2012
006214-2
PAYMENT BOND
Page 2 of2
1 This bond is made and executed in compliance with the provisions of Chapter 2253 of the
2 Texas Government Code, as amended, and all liabilities on this bond shall be determined in
3 accordance with the provisions of said statute.
4 IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED
5 this instrument by duly authorized agents and officers on this the 15 day of
6 March , 20 25 .
7
8
9
10
11
12
13
14
ATTEST:
ATTEST:
(Surety) Secretary
Witness as to Surety
PRINCIPAL:
SEDALCO-POST L, A Taint Venture
BY: � -
Signature
Russ Garrison, Proiect Director
Name and Title
Address: 4100 Fossil Creek Blvd.
Fort Worth, TX 76137
SURETY:
National Fire Insurance Company of Hartford
BY: I►� �'
Si store
Amber Jones, Attorney -in -Fact
Name and Title
Address: 151 N. Franklin Street
hicago IL ROR R
Telephone Number: (312) 822-5000
Note: If signed by an officer of the Surety, there must be on file a certified extract from the
bylaws showing that this person has authority to sign such obligation. If Surety's physical
address is different from its mailing address, both must be provided.
The date of the bond shall not be prior to the date the Contract is awarded.
END OF SECTION
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 105753
Revised January 31, 2012
1
2
3
4
5
6
7
SECTION 00 62 19
MAINTENANCE BOND
006219-1
MAINTENANCE BOND
Pagel of 3
Bond No. 30236440
THE STATE OF TEXAS §
§ KNOW ALL BY THESE PRESENTS:
COUNTY OF TARRANT §
That we SEDALCO-POST L, A Joint Venture known as "Principal" herein and
8 National Fire Insurance Comoanv of Hartford , a corporate surety (sureties, if more than
9 one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one
10 or more), are held and firmly bound unto the Developer, Fort Worth Independent School District,
11 authorized to do business in Texas ("Developer") and the City of Fort Worth, a Texas municipal
12 corporation ("City"), in the sum of Five Hundred and Seven Thousand Two Hundred and,
13 Thirty Three Dollars and Four Cents ($ 507233.04 ), lawful money of
14 the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which sum
15 well and truly be made jointly unto the Developer and the City as dual obliges and their
16 successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly
17 and severally, firmly by these presents.
18
19 WHEREAS, Developer and City have entered into an Agreement for the construction of
20 community facilities in the City of Fort Worth by and through a Community Facilities
21 Agreement, CFA Number CFA24-0179
22 WHEREAS, the Principal has entered into a certain written contract with the Developer
23 awarded the 16 day of January , 20 25 , which Contract is
24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all
25 materials, equipment labor and other accessories as defined by law, in the prosecution of the
26 Work, including any Work resulting from a duly authorized Change Order (collectively herein,
27 the "Work") as provided for in said Contract and designated as Forest Oak Middle School
28 Renovations & Addition, and
29
30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in
31 accordance with the plans, specifications and Contract Documents that the Work is and will
32 remain free from defects in materials or workmanship for and during the period of two (2) years
33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and
34
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 105753
Revised January 31, 2012
006219-2
MAINTENANCE BOND
Page 2 of 3
1 WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part
2 upon receiving notice from the Developer and/or City of the need thereof at any time within the
3 Maintenance Period.
4
5 NOW THEREFORE, the condition of this obligation is such that if Principal shall
6 remedy any defective Work, for which timely notice was provided by Developer or City, to a
7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to
8 remain in full force and effect.
9
10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely
11 noticed defective Work, it is agreed that the Developer or City may cause any and all such
12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne
13 by the Principal and the Surety under this Maintenance Bond; and
14
15 PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in
16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort
17 Worth Division; and
18
19 PROVIDED FURTHER, that this obligation shall be continuous in nature and
20 successive recoveries may be had hereon for successive breaches.
21
22
23
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 105753
Revised January 31, 2012
006219-3
MAINTENANCE BOND
Page 3 of 3
1 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this
2 instrument by duly authorized agents and officers on this the 15 day of March
3 , 20 25.
4
5 PRINCIPAL:
6 SEDALCO-POST L. A Joint Venture
7 p_
8
9 BY:
10 Signature
Russ Garrison, Proiect Director
Name and Title
Address: 4100 Fossil Creek Blvd.
Fort Worth, TX 76137
SURETY:
National Fire Insurance Company of Hartford
25
26
27
28
29 ATTEST:
3
31 32 (Surety) Secretary
33 �
34 �(�/
35 Witness as to Surety
36
37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract
38 from the by-laws showing that this person has authority to sign such obligation. If
39 Surety's physical address is different from its mailing address, both must be provided.
40
41 The date of the bond shall not be prior to the date the Contract is awarded.
42
BY: A
ignature
Amber Jones, Attorney -in -Fact
Name and Title
Address: 151 N. Franklin Street
Chicago. IL 60606
Telephone Number: (312) 822-5000
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Project Number 105753
Revised January 31, 2012
POWER OF ATTORNEY APPOINTING INDIVIDUAL ATTORNEY -IN -FACT
Know Ala Alien By These Presents, That Continental Casualty Company, an 111inois insurance company, National Fire Insurance Company of Hartford, an
111inois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company (herein ca4led "the CNA Companies"), are
duly organized and existing insurance companies haying their principal offices in the City of Chicago, and State of Illinois, and that they do by virtue of the signatures
and seals herein affixed hereby make, constitute and appoint
Darrin Weber, April Penny, Amber Jones, Julie Baumberger, Individually
of Dallas, TX, their true and lawful Attomey(s)-in-Fact with full power and authority hereby conferred to sign, seal and execute for and on their behalf bonds,
undertakings and other obligatory instruments of similar nature
- In Unlimited Amounts -
and to bind them thereby as €ally and to the same extent as if such instruments were signed by a duly authorized officer of their insurance companies and all the acts of
said Attorney, pursuant to the authority hereby given is hereby ratified and confirmed.
This Power of Attorney is made and executed pursuant to and by authority of the By -Laws and Resolutions, printed below, duly adopted, as indicated, by the
Boards of Directors of the insurance companies.
In Witness Whereof, the CNA Companies have caused these presents to be signed by their Vice President and their corporate seals to be hereto affixed on this
1 lth day of December, 2023,
ticAstkA tµsuy� (OZ�
Continental Casualty Company
�', �k National Fire Insurance Company of Hartford
6ORPOAArE ; American Casualty Company ❑FReadin� Pennsylvania
/ ASEAL c f t /
7897 Larry Kasten Vice President
State of South Dakota, County of Minnehaha, ss:
On this 1 lth day of December, 2023, before me personally came Larry Kasten to me known, who, being by me duly sworn, did depose and say: that he resides in
the City of Sioux Falls, State of South Dakota; that he is a Vice President of Continental Casualty Company, an Illinois insurance company, National Fire Insurance
Company of Hartford, an Illinois insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company described in and
which executed the above instrument; that he knows the seals of said insurance companies; that the seals affixed to the said instrument are such corporate seals; that
they were so affixed pursuant to authority given by the Boards of Directors of said insurance companies and that he signed his name thereto pursuant to like authority,
and acknowledges same to be the act and deed of said insurance companies.
r,.,,.,,-,µme,..,•..,.,,,, s
My commission expires , M. RENT
r�Hvraar vueLIe
r -GUTH OAKOTA �
March 2, 2026 f,meme,a„me„me, meme,,,,♦ M. Bent Notary Public
CERTIFICATE
I, D. Johnson, Assistant Secretary of Continental Casualty Company, an Illinois insurance company, National Fire Insurance Company of Hartford, an Illinois
insurance company, and American Casualty Company of Reading, Pennsylvania, a Pennsylvania insurance company do hereby certify that the Power of Attorney
herein above set forth is still in force, and further certify that the By -Laws and Resolutions of the Board of Directors of the insurance companies printed below are still
in force. In testimony whereof I have hereunto subscribed my name and affixed the seal of the said insurance companies this day of
Gm 1TLSUq Continental Casualty Company
�+5 National Fire Insurance Company of Hartford
�oraPenarE ; .aQrccarrn - American Casualty Company of Reading, Pennsylvania
,ciyi 1'
V SFJ1L �r
1991 +rARTF • --
D. Johnson Assistant Secretary
Authorizing By -Laws and Resolutions
ADOPTED BY THE BOARD OF DIRECTORS OF EACH OF CONTINENTAL CASUALTY COMPANY, NATIONAL FIRE INSURANCE COMPANY OF
HARTFORD, and AMERICAN CASUALTY COMPANY OF READING, PENNSYLVANIA (as defined above, the "CNA Companies"):
This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of each of the above CNA
Companies at a meeting held on May 12, 1995:
"RESOLVED: That any Senior or Group Vice President may authorize an officer to sign specific doctnnents, agreements and instruments on behalf of the
Company provided that the name of such authorized officer and a description of the documents, agreements or instruments that such officer may sign will be
provided in writing by the Senior or Group Vice President to the Secretary of the Company prior to such execution becoming effective."
This Power of Attorney is signed by Larry Kasten, Vice President, who has been authorized pursuant to the above resolution to execute power of attorneys on
behalf of each of the CNA Companies.
This Power of Attorney is signed and sealed by facsimile under and by the authority of the following Resolution adopted by the Board of Directors of each of the above
Companies by unanimous written consent dated the 25" day of April, 2012:
"Whereas, the bylaws of the Company or specific resolution of the Board of Directors has authorized various officers (the "Authorized Officers") to execute
various policies, bonds, undertakings and other obligatory instruments of like nature; and
Whereas, from time to time, the signature of the Authorized Officers, in addition to being provided in original, hard copy format, may be provided via facsimile or
otherwise in an electronic format (collectively, "Electronic Signatures"); Now therefore be it resolved: that the Electronic Signature of any Authorized Officer
shall be valid and binding on the Company."
This Power of Attorney may be signed by digital signature and sealed by a digital or otherwise electronic -formatted corporate seal under and by the authority of the
following Resolution adopted by the Board of Directors of each of the above CNA Companies by unanimous written consent dated the 27th day of April, 2022:
"RESOLVED: That it is in the best interest of the Company to periodically ratify and confirm any corporate documents signed by digital signatures and to ratify
and confirm the use of a digital or otherwise electronic -formatted corporate seal, each to be considered the act and deed of the Company."
Go to www.cnasuretv.com > Owner / Obligee Services > Validate Bond Coverage, if you want to verify bond authenticity.
Form F6853-612023
Figure: 28 TAC §1.601(a)(3)
1 IMPORTANT NOTICE
To obtain information or make a complaint:
2 You may contact Continental Casualty Company,
National Fire Insurance Company of Hartford,
American Casualty Company of Reading, PA and
Continental Insurance Company at 312-822-5000.
3 You may call Continental Casualty Company,
National Fire Insurance Company of Hartford,
American Casualty Company of Reading, PA and
Continental Insurance Company's toll -free telephone
number for information or to make a complaint at:
1-877-672-6115
4 You may also write to Continental Casualty
Company, Nationai Fire insurance Company of
Hartford, American Casualty Company of Reading,
PA and Continental Insurance Company at:
CNA Surety
151 North Franklin, 17th Floor
Chicago, IL 60606
5 You may contact the Texas Department of
Insurance to obtain information on companies,
coverages, rights or complaints at:
1-800-252-3439
6 You may write the Texas Department of
Insurance:
P.O. Box 149104
Austin, TX 78714-9104
Fax: (512) 490-1007
Web: www.tdi.texas.gov
E-Mail: ConsumerProtection@tdi.texas.gov
7 PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your
premium or about a claim you should contact
Continental Casualty Company, National Fire
Insurance Company of Hartford, American Casualty
Company of Reading, PA and Continental Insurance
Company first. If the dispute is not resolved, you
may contact the Texas Department of Insurance.
8 ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not
become a part or condition of the attached
document.
Form F8277-6-2018
AVISO IMPORTANTE
Para obtener informacion o para someter una queja:
Puede comunicarse con Continental Casualty
Company, National Fire Insurance Company de
Hartford, American Casualty Company de Reading, PA
y Continental Insurance Company al 312-822-5000.
Usted puede Ilamar al numero de telefono gratis de
Continental Casualty Company, National Fire
Insurance Company de Hartford, American Casualty
Company de Reading, PA y Continental Insurance
Company's para information o para someter una
queja al:
1-877-672-6115
Usted tambien puede escribir a Continental Casualty
Company, National Fire Insurance Company de
Hartford, American Casualty Company de Reading,
PA y Continental Insurance Company:
CNA Surety
151 North Franklin, 17th Floor
Chicago, IL 60606
Puede comunicarse con el Departamento de Seguros
de Texas para obtener information acerca de
companias, coberturas, derechos o quejas al:
1-800-252-3439
Puede escribir al Departamento de Seguros de
Texas:
P.O. Box 149104
Austin, TX 78714-9104
Fax: (512) 490-1007
Web: www.tdi.texas.gov
E-Mail: ConsumerProtection@tdi.texas.gov
DISPUTAS SOBRE PRIMAS O RECLAMOS:
Si tiene una disputa concerniente a su prima o a
un reclamo, debe comunicarse con el Continental
Casualty Company, National Fire Insurance
Company de Hartford, American Casualty Company
de Reading, PA y Continental Insurance Company
primero. Si no se resuelve la disputa, puede
entonces comunicarse con el departamento (TDI).
UNA ESTE AVISO A SU POLIZA: Este aviso es
solo para proposito de information y no se
convierte en parte o condition del documento
adjunto.
State of Texas
Claim Notice Endorsement
To be attached to and form a part of Bond No. 30236440
In accordance with Section 2253.021(f) of the Texas Government Code and Section
53.202(6) of the Texas Property Code any notice of claim to the named surety under this
bond(s) should be sent to:
CNA Surety
151 North Franklin, 17th Floor
Chicago, IL 60606
Telephone: 1-877-672-6115
Form F6944-6-2018
I"ll#T►A
STANDARD CITY CONDITIONS
OF THE CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
CITY OF FORT WORTH
STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS
Revised: Jumary 10, 2013
STANDARD CITY CONDITIONS OF THE
CONSTRUCTION CONTRACT
FOR DEVELOPER AWARDED PROJECTS
TABLE OF CONTENTS
Article 1 — Definitions and Terminology..........
1.01 Defined Terms ...............................
1.02 Terminology ..................................
Article 2 —
Preliminary Matters .......................
2.01
Before Starting Construction......
2.02
Preconstruction Conference........
2.03
Public Meeting ............................
Page
.............................................1
.............................................1
............................................. 5
....................................................... 6
....................................................... 6
....................................................... 6
....................................................... 6
Article 3 — Contract Documents and Amending............................................................................................... 6
3.01 Reference Standards..................................................................................................................... 6
3.02 Amending and Supplementing Contract Documents.................................................................. 6
Article 4 — Bonds and Insurance....................................................................................................................... 7
4.01 Licensed Sureties and Insurers..................................................................................................... 7
4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7
4.03 Certificates of Insurance............................................................................................................... 7
4.04 Contractor's Insurance.................................................................................................................. 9
4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12
Article 5 —
Contractor's Responsibilities........................................................................................................12
5.01
Supervision and Superintendent.................................................................................................12
5.02
Labor; Working Hours................................................................................................................13
5.03
Services, Materials, and Equipment...........................................................................................13
5.04
Project Schedule..........................................................................................................................14
5.05
Substitutes and "Or-Equals".......................................................................................................14
5.06
Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16
5.07
Concerning Subcontractors, Suppliers, and Others...................................................................16
5.08
Wage Rates..................................................................................................................................18
5.09
Patent Fees and Royalties...........................................................................................................19
5.10
Laws and Regulations.................................................................................................................19
5.11
Use of Site and Other Areas.......................................................................................................19
5.12
Record Documents......................................................................................................................20
5.13
Safety and Protection..................................................................................................................
21
5.14
Safety Representative.................................................................................................................21
5.15
Hazard Communication Programs.............................................................................................22
5.16
Submittals....................................................................................................................................22
5.17
Contractor's General Warranty and Guarantee..........................................................................23
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
5.18 Indemnification ............................................
5.19 Delegation of Professional Design Services
5.20 Right to Audit: .............................................
5.21 Nondiscrimination ........................................
Article 6 - Other Work at the Site.......
6.01 Related Work at Site .......
Article 7 - City's Responsibilities ............................................
7.01 Inspections, Tests, and Approvals .......................
7.02 Limitations on City's Responsibilities ................
7.03 Compliance with Safety Program ........................
Article 8 - City's Observation Status During Construction.......
8.01 City's Project Representative .................................
8.02 Authorized Variations in Work ..............................
8.03 Rejecting Defective Work ......................................
8.04 Determinations for Work Performed ......................
Article 9 - Changes in the Work ......................
9.01 Authorized Changes in the Work
9.02 Notification to Surety ...................
Article 10 - Change of Contract Price; Change of Contract Time
10.01 Change of Contract Price ...........................................
10.02 Change of Contract Time ...........................................
10.03 Delays.........................................................................
Article 11 - Tests and Inspections; Correction, Removal or Acceptance of Defective Work ............
11.01 Notice of Defects..............................................................................................................
11.02 Access to Work.................................................................................................................
11.03 Tests and Inspections........................................................................................................
11.04 Uncovering Work.............................................................................................................
11.05 City May Stop the Work...................................................................................................
11.06 Correction or Removal of Defective Work......................................................................
11.07 Correction Period..............................................................................................................
11.08 City May Correct Defective Work...................................................................................
Article 12 - Completion ...........................................
12.01 Contractor's Warranty of Title ............
12.02 Partial Utilization .................................
12.03 Final Inspection ....................................
12.04 Final Acceptance ..................................
Article 13 - Suspension of Work .....................................
13.01 City May Suspend Work .............................
Article 14 - Miscellaneous .........................................
14.01 Giving Notice .........................................
CITY OF FORT WORTH
STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
24
24
25
25
26
26
26
26
26
27
a
a
... 29
... 29
... 29
... 29
... 30
... 30
... 30
... 30
... 31
................................. 32
................................. 32
................................. 32
................................. 32
................................. 33
............................................................. 33
............................................................. 33
34
34
14.02 Computation of Times................................................................................................................ 34
14.03 Cumulative Remedies................................................................................................................. 34
14.04 Survival of Obligations...............................................................................................................35
14.05 Headings......................................................................................................................................35
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 1
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 1 of 35
ARTICLE 1— DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Wherever used in these General Conditions or in other Contract Documents, the terms listed
below have the meanings indicated which are applicable to both the singular and plural thereof,
and words denoting gender shall include the masculine, feminine and neuter. Said terms are
generally capitalized or written in italics, but not always. When used in a context consistent with
the definition of a listed -defined term, the term shall have a meaning as defined below whether
capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial
capital letters in the Contract Documents include references to identified articles and paragraphs,
and the titles of other documents or forms.
1. Agreement - The written instrument which is evidence of the agreement between Developer
and Contractor covering the Work
2. Asbestos —Any material that contains more than one percent asbestos and is friable or is
releasing asbestos fibers into the air above current action levels established by the United
States Occupational Safety and Health Administration.
3. Business Day — A business day is defined as a day that the City conducts normal business,
generally Monday through Friday, except for federal or state holidays observed by the City.
4. Buzzsaw — City's on-line, electronic document management and collaboration system.
5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight.
6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by,
its governing body through its City Manager, his designee, or agents authorized pursuant to
its duly authorized charter on his behalf.
7. Community Facilities Agreement (CFA) A Contract between the Developer and the City
for the Construction of one or more following public facilities within the City public right-of-
way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs.
A CFA may include private facilities within the right-of-way dedicated as private right-of-
way or easement on a recorded plat.
8. Contract —The entire and integrated written document incorporating the Contract
Documents between the Developer, Contractor, and/or City concerning the Work. The
Contract supersedes prior negotiations, representations, or agreements, whether written or
oral.
9. Contract Documents —Those items that make up the contract and which must include the
Agreement, and it's attachments such as standard construction specifications, standard City
Conditions, other general conditions of the Developer, including:
a. An Agreement
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10-2
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 2 of 35
b. Attachments to the Agreement
i. Bid Form
ii. Vendor Compliance with State Law Non -Resident Bidder
iii. Prequalification Statement
C. Current Prevailing Wage Rates Table (if required by City)
d. Insurance Accord Form
e. Payment Bond
f. Performance Bond
g. Maintenance Bond
h. Power of Attorney for Bonds
i. Workers Compensation Affidavit
j. MWBE Commitment Form( If required by City)
k. General Conditions
1. Supplementary Conditions
in. The Standard City Conditions
n. Specifications specifically made part of the Contract Documents by attachment, if
not attached, as incorporated by reference and described in the Table of Contents of
the Project's Contract Documents
o. Drawings
P. Documentation submitted by contractor prior to Notice of Award.
q. The following which may be delivered or issued after the effective date if the
Agreement and, if issued become an incorporated part of the Contract Documents
i. Notice to Proceed
ii. Field Orders
iii. Change Orders
iv. Letters of Final Acceptance
r. Approved Submittals, other Contractor submittals, and the reports and drawings of
subsurface and physical conditions are not Contract Documents.
10. Contractor —The individual or entity with whom Developer has entered into the Agreement.
11. Day or day —A day, unless otherwise defined, shall mean a Calendar Day.
12. Developer — An individual or entity that desires to make certain improvements within the
City of Fort Worth
13. Drawings —That part of the Contract Documents prepared or approved by Engineer which
graphically shows the scope, extent, and character of the Work to be performed by
Contractor. Submittals are not Drawings as so defined.
14. Engineer —The licensed professional engineer or engineering firm registered in the State of
Texas performing professional services for the Developer.
15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor
that the Work specified in the Contract Documents has been completed to the satisfaction of
the City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 3
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 3 of 35
16. Final Inspection — Inspection carried out by the City to verify that the Contractor has
completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in
conformance with the Contract Documents.
17. General Requirements —A part of the Contract Documents between the Developer and a
Contractor.
18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes,
and orders of any and all governmental bodies, agencies, authorities, and courts having
jurisdiction.
19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or
personal property.
20. Milestone —A principal event specified in the Contract Documents relating to an
intermediate Contract Time prior to Final Acceptance of the Work.
21. Non -Participating Change Order —A document, which is prepared for and reviewed by the
City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
22. Participating Change Order —A document, which is prepared for and approved by the City,
which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or
revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on
or after the Effective Date of the Agreement.
23. Plans — See definition of Drawings.
24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with
the General Requirements, describing the sequence and duration of the activities comprising
the Contractor's plan to accomplish the Work within the Contract Time.
25. Project —The Work to be performed under the Contract Documents.
26. Project Representative —The authorized representative of the City who will be assigned to
the Site.
27. Public Meeting — An announced meeting conducted by the Developer to facilitate public
participation and to assist the public in gaining an informed view of the Project.
28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday
thru Friday (excluding legal holidays).
29. Samples Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and which establish the standards by which such
portion of the Work will be judged.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 4
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 4 of 35
30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required
submittals and the time requirements to support scheduled performance of related
construction activities.
31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or
Developer upon which the Work is to be performed, including rights -of -way, permits, and
easements for access thereto, and such other lands furnished by City or Developer which are
designated for the use of Contractor.
32. Specifications —That part of the Contract Documents consisting of written requirements for
materials, equipment, systems, standards and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable thereto.
Specifications may be specifically made a part of the Contract Documents by attachment or,
if not attached, may be incorporated by reference as indicated in the Table of Contents
(Division 00 00 00) of each Project.
33. Standard City Conditions — That part of the Contract Documents setting forth requirements
of the City.
34. Subcontractor —An individual or entity having a direct contract with Contractor or with any
other Subcontractor for the performance of apart of the Work at the Site.
35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information
which are specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work.
36. Superintendent — The representative of the Contractor who is available at all times and able
to receive instructions from the City and/or Developer and to act for the Contractor.
37. Supplementary Conditions —That part of the Contract Documents which amends or
supplements the General Conditions.
38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having
a direct contract with Contractor or with any Subcontractor to furnish materials or
equipment to be incorporated in the Work by Contractor or Subcontractor.
39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any
encasements containing such facilities, including but not limited to, those that convey
electricity, gases, steam, liquid petroleum products, telephone or other communications,
cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or
other control systems.
40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday,
Sunday or legal holiday, as approved in advance by the City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 5
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 5 of 35
41. Work —The entire construction or the various separately identifiable parts thereof required
to be provided under the Contract Documents. Work includes and is the result of performing
or providing all labor, services, and documentation necessary to produce such construction
including any Participating Change Order, Non -Participating Change Order, or Field
Order, and furnishing, installing, and incorporating all materials and equipment into such
construction, all as required by the Contract Documents.
42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or
legal holidays authorized by the City for contract purposes, in which weather or other
conditions not under the control of the Contractor will permit the performance of the
principal unit of work underway for a continuous period of not less than 7 hours between 7
a.m. and 6 p. m.
1.02 Terminology
A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in
the Bidding Requirements or Contract Documents, have the indicated meaning.
B. Defective:
1. The word "defective," when modifying the word "Work," refers to Work that is
unsatisfactory, faulty, or deficient in that it:
a. does not conform to the Contract Documents; or
b. does not meet the requirements of any applicable inspection, reference standard, test, or
approval referred to in the Contract Documents; or
c. has been damaged prior to City's written acceptance.
C. Furnish, Install, Perform, Provide:
1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or
the word "Supply," or any combination or similar directive or usage thereof, shall mean
furnishing and incorporating in the Work including all necessary labor, materials, equipment,
and everything necessary to perform the Work indicated, unless specifically limited in the
context used.
D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 6
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 6 of 35
ARTICLE 2 — PRELIMINARY MATTERS
2.01 Before Starting Construction
Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting
the Work. New schedules will be submitted to City when Participating Change Orders or Non -
Participating Change Orders occur.
2.02 Preconstruction Conference
Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as
specified in the Contract Documents.
2.03 Public Meeting
Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor
attending the Public Meeting as scheduled by the City.
ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING
3.01 Reference Standards
A. Standards, Specifications, Codes, Laws, and Regulations
1. Reference to standards, specifications, manuals, or codes of any technical society,
organization, or association, or to Laws or Regulations, whether such reference be specific or
by implication, shall mean the standard, specification, manual, code, or Laws or Regulations
in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there
were no Bids), except as may be otherwise specifically stated in the Contract Documents.
2. No provision or instruction shall be effective to assign to City, or any of its officers,
directors, members, partners, employees, agents, consultants, or subcontractors, any duty or
authority to supervise or direct the performance of the Work or any duty or authority to
undertake responsibility inconsistent with the provisions of the Contract Documents.
3.02 Amending and Supplementing Contract Documents
A. The Contract Documents may be amended to provide for additions, deletions, and revisions in
the Work or to modify the terms and conditions thereof by a Participating Change Order or a
Non -Participating Change Order.
B. The requirements of the Contract Documents may be supplemented, and minor variations and
deviations in the Work not involving a change in Contract Price or Contract Time, may be
authorized, by one or more of the following ways:
1. A Field Order;
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 7
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 7 of 35
1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or
2. City's written interpretation or clarification.
ARTICLE 4 — BONDS AND INSURANCE
4.01 Licensed Sureties and Insurers
All bonds and insurance required by the Contract Documents to be purchased and maintained by
Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized
in the State of Texas to issue bonds or insurance policies for the limits and coverage so required.
Such surety and insurance companies shall also meet such additional requirements and qualifications
as may be provided Section 4.04.
4.02 Performance, Payment, and Maintenance Bonds
A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in
accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount
equal to the Contract Price as security for the faithful performance and payment of all of
Contractor's obligations under the Contract Documents.
B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount
equal to the Contract Price as security to protect the City against any defects in any portion of the
Work described in the Contract Documents. Maintenance bonds shall remain in effect for two
(2) years after the date of Final Acceptance by the City.
C. All bonds shall be in the form prescribed by the Contract Documents except as provided
otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list
of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and
as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial
Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed
by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney
which shall show that it is effective on the date the agent or attorney -in -fact signed each bond.
D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or
its right to do business is terminated in the State of Texas or it ceases to meet the requirements of
Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event
giving rise to such notification, provide another bond and surety, both of which shall comply
with the requirements of Paragraphs 4.01 and 4.02.C.
4.03 Certificates of Insurance
Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee
identified in these Standard City Conditions certificates of insurance (and other evidence of
insurance requested by City or any other additional insured) which Contractor is required to
purchase and maintain.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10- 8
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 8 of 35
1. The certificate of insurance shall document the City, an as "Additional Insured" on all
liability policies.
2. The Contractor's general liability insurance shall include a, "per project" or "per location",
endorsement, which shall be identified in the certificate of insurance provided to the City.
3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the
insured, be complete in its entirety, and show complete insurance carrier names as listed in
the current A.M. Best Property & Casualty Guide
4. The insurers for all policies must be licensed and/or approved to do business in the State of
Texas. Except for workers' compensation, all insurers must have a minimum rating of A-:
VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial
strength and solvency to the satisfaction of Risk Management. If the rating is below that
required, written approval of City is required.
5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor
of the City. In addition, the Contractor agrees to waive all rights of subrogation against the
Engineer (if applicable), and each additional insured identified in these Standard City
Conditions. Failure of the City to demand such certificates or other evidence of full
compliance with the insurance requirements or failure of the City to identify a deficiency
from evidence that is provided shall not be construed as a waiver of Contractor's obligation
to maintain such lines of insurance coverage.
6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess
Liability insurance for any differences is required. Excess Liability shall follow form of the
primary coverage.
7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If
coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with
or prior to the date of the effective date of the agreement and the certificate of insurance shall
state that the coverage is claims -made and the retroactive date. The insurance coverage shall
be maintained for the duration of the Contract and for three (3) years following Final
Acceptance provided under the Contract Documents or for the warranty period, whichever is
longer. An annual certificate of insurance submitted to the City shall evidence such
insurance coverage.
8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the
required lines of coverage, nor decrease the limits of said coverage unless such endorsements
are approved in writing by the City. In the event a Contract has been bid or executed and the
exclusions are determined to be unacceptable or the City desires additional insurance
coverage, and the City desires the contractor/engineer to obtain such coverage, the contract
price shall be adjusted by the cost of the premium for such additional coverage plus 10%.
9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance
coverage shall be approved by the City in regards to asset value and stockholders' equity. In
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
0073 10-9
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 9 of 35
lieu of traditional insurance, alternative coverage maintained through insurance pools or risk
retention groups, must also be approved by City.
10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a
first -dollar basis, must be acceptable to and approved by the City.
11. City, at its sole discretion, reserves the right to review the insurance requirements and to
make reasonable adjustments to insurance coverage's and their limits when deemed
necessary and prudent by the City based upon changes in statutory law, court decision or the
claims history of the industry as well as of the contracting party to the City. The City shall
be required to provide prior notice of 90 days, and the insurance adjustments shall be
incorporated into the Work by Change Order.
12. City shall be entitled, upon written request and without expense, to receive copies of policies
and endorsements thereto and may make any reasonable requests for deletion or revision or
modifications of particular policy terms, conditions, limitations, or exclusions necessary to
conform the policy and endorsements to the requirements of the Contract. Deletions,
revisions, or modifications shall not be required where policy provisions are established by
law or regulations binding upon either parry or the underwriter on any such policies.
13. City shall not be responsible for the direct payment of insurance premium costs for
Contractor's insurance.
4.04 Contractor's Insurance
A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such
insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers'
Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for
Employers' Liability as is appropriate for the Work being performed and as will provide
protection from claims set forth below which may arise out of or result from Contractor's
performance of the Work and Contractor's other obligations under the Contract Documents,
whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly
or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts
any of them may be liable:
1. claims under workers' compensation, disability benefits, and other similar employee benefit
acts;
2. claims for damages because of bodily injury, occupational sickness or disease, or death of
Contractor's employees.
3. The limits of liability for the insurance shall provide the following coverages for not less
than the following amounts or greater where required by Laws and Regulations
a. Statutory limits
b. Employer's liability
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 10
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 10 of 35
1) $100,000 each accident/occurrence
2) $100,000 Disease - each employee
3) $500,000 Disease - policy limit
B. Commercial General Liability. Coverage shall include but not be limited to covering liability
(bodily injury or property damage) arising from: premises/operations, independent contractors,
products/completed operations, personal injury, and liability under an insured contract. Insurance
shall be provided on an occurrence basis, and as comprehensive as the current Insurance
Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded to the City. The Commercial General
Liability policy, shall have no exclusions by endorsements that would alter of nullify
premises/operations, products/completed operations, contractual, personal injury, or advertising
injury, which are normally contained with the policy, unless the City approves such exclusions
in writing.
1. For construction projects that present a substantial completed operation exposure, the City
may require the contractor to maintain completed operations coverage for a minimum of no
less than three (3) years following the completion of the project
2. Contractor's Liability Insurance under this Section which shall be on a per project basis
covering the Contractor with minimum limits of:
a. $1,000,000 each occurrence
b. $2,000,000 aggregate limit
3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance)
making the General Aggregate Limits apply separately to each job site.
4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U"
coverage's. Verification of such coverage must be shown in the Remarks Article of the
Certificate of Insurance.
C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto",
defined as autos owned, hired and non -owned and provide indemnity for claims for damages
because bodily injury or death of any person and or property damage arising out of the work,
maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by
anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone
for whose acts any of them may be liable.
1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in
an amount not less than the following amounts:
a. Automobile Liability - a commercial business policy shall provide coverage on "Any
Auto", defined as autos owned, hired and non -owned.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 11
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 1 I of 35
1) $1, 000, 000 each accident on a combined single limit basis. Split limits are
acceptable if limits are at least:
2) $250,000 Bodily Injury per person
3) $500,000 Bodily Injury per accident /
4) $100,000 Property Damage
D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of
railroad right-of-way, the Contractor shall comply with the following requirements:
1. The Contractor's construction activities will require its employees, agents, subcontractors,
equipment, and material deliveries to cross railroad properties and tracks owned and
operated by: None
Write the name of the railroad company. (If none, then write none)
2. The Contractor shall conduct its operations on railroad properties in such a manner as not to
interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use
or operation of its/their trains or other property. Such operations on railroad properties may
require that Contractor to execute a "Right of Entry Agreement" with the particular railroad
company or companies involved, and to this end the Contractor should satisfy itself as to the
requirements of each railroad company and be prepared to execute the right -of -entry (if any)
required by a railroad company. The requirements specified herein likewise relate to the
Contractor's use of private and/or construction access roads crossing said railroad company's
properties.
3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions
shall provide coverage for not less than the following amounts, issued by companies
satisfactory to the City and to the Railroad Company for a term that continues for so long as
the Contractor's operations and work cross, occupy, or touch railroad property:
a. General Aggregate: None
Enter limits provided by Railroad Company (If none, write none)
b. Each Occurrence:: None
Enter limits provided by Railroad Company (If none, write none)
4. With respect to the above outlined insurance requirements, the following shall govern:
a. Where a single railroad company is involved, the Contractor shall provide one insurance
policy in the name of the railroad company. However, if more than one grade separation
or at -grade crossing is affected by the Project at entirely separate locations on the line or
lines of the same railroad company, separate coverage may be required, each in the
amount stated above.
b. Where more than one railroad company is operating on the same right-of-way or where
several railroad companies are involved and operated on their own separate rights -of -
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 12
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 12 of 35
way, the Contractor may be required to provide separate insurance policies in the name
of each railroad company.
c. If, in addition to a grade separation or an at -grade crossing, other work or activity is
proposed on a railroad company's right-of-way at a location entirely separate from the
grade separation or at -grade crossing, insurance coverage for this work must be included
in the policy covering the grade separation.
d. If no grade separation is involved but other work is proposed on a railroad company's
right-of-way, all such other work may be covered in a single policy for that railroad, even
though the work may be at two or more separate locations.
5. No work or activities on a railroad company's property to be performed by the Contractor
shall be commenced until the Contractor has furnished the City with an original policy or
policies of the insurance for each railroad company named, as required above. All such
insurance must be approved by the City and each affected Railroad Company prior to the
Contractor's beginning work.
6. The insurance specified above must be carried until all Work to be performed on the railroad
right-of-way has been completed and the grade crossing, if any, is no longer used by the
Contractor. In addition, insurance must be carried during all maintenance and/or repair work
performed in the railroad right-of-way. Such insurance must name the railroad company as
the insured, together with any tenant or lessee of the railroad company operating over tracks
involved in the Project.
E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation
or other loss of insurance coverage. Contractor shall stop work until replacement insurance has
been procured. There shall be no time credit for days not worked pursuant to this section.
4.05 Acceptance of Bonds and Insurance; Option to Replace
If City has any objection to the coverage afforded by or other provisions of the bonds or insurance
required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis
of non-conformance with the Contract Documents, the Developer and City shall so notify the
Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence
requested). Contractor shall provide to the City such additional information in respect of insurance
provided as the Developer or City may reasonably request. If Contractor does not purchase or
maintain all of the bonds and insurance required by the Contract Documents, the Developer or City
shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure
to maintain prior to any change in the required coverage.
ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES
5.01 Supervision and Superintendent
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as may be necessary to perform the
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 13
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 13 of 35
Work in accordance with the Contract Documents. Contractor shall be solely responsible for the
means, methods, techniques, sequences, and procedures of construction.
B. At all times during the progress of the Work, Contractor shall assign a competent, English-
speaking, Superintendent who shall not be replaced without written notice to City. The
Superintendent will be Contractor's representative at the Site and shall have authority to act on
behalf of Contractor. All communication given to or received from the Superintendent shall be
binding on Contractor.
C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of
construction.
5.02 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to perform construction as
required by the Contract Documents. Contractor shall at all times maintain good discipline and
order at the Site.
B. Except as otherwise required for the safety or protection of persons or the Work or property at
the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work
at the Site shall be performed during Regular Working Hours. Contractor will not permit the
performance of Work beyond Regular Working Hours or for Weekend Working Hours without
City's written consent (which will not be unreasonably withheld). Written request (by letter or
electronic communication) to perform Work:
1. for beyond Regular Working Hours request must be made by noon at least two (2) Business
Days prior
2. for Weekend Working Hours request must be made by noon of the preceding Thursday
3. for legal holidays request must be made by noon two Business Days prior to the legal
holiday.
5.03 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full
responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary
facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, Contractor required testing, start-up, and completion of the Work.
B. All materials and equipment incorporated into the Work shall be as specified or, if not specified,
shall be of good quality and new, except as otherwise provided in the Contract Documents. All
special warranties and guarantees required by the Specifications shall expressly run to the benefit
of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of
required tests) as to the source, kind, and quality of materials and equipment.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 14
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 14 of 35
C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed,
connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of
the applicable Supplier, except as otherwise may be provided in the Contract Documents.
5.04 Project Schedule
A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01
and the General Requirements as it may be adjusted from time to time as provided below.
1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and
the General Requirements) proposed adjustments in the Project Schedule.
2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be
submitted in accordance with the requirements of Article 9. Adjustments in Contract Time
for projects with City participation shall be made by participating change orders.
5.05 Substitutes and "Or -Equals "
A. Whenever an item of material or equipment is specified or described in the Contract Documents
by using the name of a proprietary item or the name of a particular Supplier, the specification or
description is intended to establish the type, function, appearance, and quality required. Unless
the specification or description contains or is followed by words reading that no like, equivalent,
or "or -equal" item or no substitution is permitted, other items of material or equipment of other
Suppliers may be submitted to City for review under the circumstances described below.
1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by
Contractor is functionally equal to that named and sufficiently similar so that no change in
related Work will be required, it may be considered by City as an "or -equal" item, in which
case review and approval of the proposed item may, in City's sole discretion, be
accomplished without compliance with some or all of the requirements for approval of
proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of
material or equipment will be considered functionally equal to an item so named if:
a. City determines that:
1) it is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) it will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole; and
3) it has a proven record of performance and availability of responsive service; and
b. Contractor certifies that, if approved and incorporated into the Work:
1) there will be no increase in cost to the City or increase in Contract Time; and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 15
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 15 of 35
2) it will conform substantially to the detailed requirements of the item named in the
Contract Documents.
2. Substitute Items:
a. If in City's sole discretion an item of material or equipment proposed by Contractor does
not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a
proposed substitute item.
b. Contractor shall submit sufficient information as provided below to allow City to
determine if the item of material or equipment proposed is essentially equivalent to that
named and an acceptable substitute therefor. Requests for review of proposed substitute
items of material or equipment will not be accepted by City from anyone other than
Contractor.
c. Contractor shall make written application to City for review of a proposed substitute item
of material or equipment that Contractor seeks to furnish or use. The application shall
comply with Section 0125 00 and:
1) shall certify that the proposed substitute item will:
i. perform adequately the functions and achieve the results called for by the general
design;
ii. be similar in substance to that specified;
iii. be suited to the same use as that specified; and
2) will state:
i. the extent, if any, to which the use of the proposed substitute item will prejudice
Contractor's achievement of final completion on time;
ii. whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with City for other work on the Project) to adapt the design to the proposed
substitute item;
iii. whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty; and
3) will identify:
i. all variations of the proposed substitute item from that specified;
ii. available engineering, sales, maintenance, repair, and replacement services; and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 16
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 16 of 35
4) shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including costs of redesign and Damage
Claims of other contractors affected by any resulting change.
B. Substitute Construction Methods or Procedures: If a specific means, method, technique,
sequence, or procedure of construction is expressly required by the Contract Documents,
Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure
of construction approved by City. Contractor shall submit sufficient information to allow City, in
City's sole discretion, to determine that the substitute proposed is equivalent to that expressly
called for by the Contract Documents. Contractor shall make written application to City for
review in the same manner as those provided in Paragraph 5.05.A.2.
C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each
proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require
Contractor to furnish additional data about the proposed substitute. City will be the sole judge of
acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review
is complete, which will be evidenced by a Change Order in the case of a substitute and an
accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination.
D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special
performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall
indemnify and hold harmless City and anyone directly or indirectly employed by them from and
against any and all claims, damages, losses and expenses (including attorneys fees) arising out
of the use of substituted materials or equipment.
E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or
submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City
approves a substitute so proposed or submitted by Contractor, Contractor may be required to
reimburse City for evaluating each such proposed substitute. Contractor may also be required to
reimburse City for the charges for making changes in the Contract Documents.
F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or
"or -equal" at Contractor's expense.
G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute
shall be incorporated to the Contract by Participating Change Order.
5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors)
A. The Contractor and any subcontractors are required to be prequalified for the work types
requiring pre -qualification
5.07 Concerning Subcontractors, Suppliers, and Others
A. Minority and Women Owned Business Enterprise Compliance:
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 17
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 17 of 35
❑ Required for this Contract.
(Check this box if there is any City Participation)
® Not Required for this Contract.
It is City policy to ensure the full and equitable participation by Minority and Women Business
Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the
Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent
of the City's MWBE Ordinance (as amended) by the following:
1. Contractor shall, upon request by City, provide complete and accurate information regarding
actual work performed by a MWBE on the Contract and payment therefor.
2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without
written consent of the City. Any unjustified change or deletion shall be a material breach of
Contract and may result in debarment in accordance with the procedures outlined in the
Ordinance.
3. Contractor shall, upon request by City, allow an audit and/or examination of any books,
records, or files in the possession of the Contractor that will substantiate the actual work
performed by an MWBE. Material misrepresentation of any nature will be grounds for
termination of the Contract. Any such misrepresentation may be grounds for disqualification
of Contractor to bid on future contracts with the City for a period of not less than three years.
B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors,
Suppliers, and other individuals or entities performing or furnishing any of the Work just as
Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract
Documents:
1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity
any contractual relationship between City and any such Subcontractor, Supplier or other
individual or entity; nor
2. shall create any obligation on the part of City to pay or to see to the payment of any moneys
due any such Subcontractor, Supplier, or other individual or entity except as may otherwise
be required by Laws and Regulations.
C. Contractor shall be solely responsible for scheduling and coordinating the Work of
Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the
Work under a direct or indirect contract with Contractor.
D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing
any of the Work shall communicate with City through Contractor.
E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an
appropriate agreement between Contractor and the Subcontractor or Supplier which specifically
binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 18
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 18 of 35
Documents, Contractor shall provide City contract numbers and reference numbers to the
Subcontractors and/or Suppliers.
5.08 Wage Rates
❑ Required for this Contract.
® Not Required for this Contract.
A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of
Chapter 2258, Texas Government Code (as amended), including the payment of not less than the
rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in
accordance with Chapter 2258. Such prevailing wage rates are included in these Contract
Documents.
B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage
shall, upon demand made by the City, pay to the City $60 for each worker employed for each
calendar day or part of the day that the worker is paid less than the prevailing wage rates
stipulated in these contract documents. This penalty shall be retained by the City to offset its
administrative costs, pursuant to Texas Government Code 2258.023.
C. Complaints of Violations and City Determination of Good Cause. On receipt of information,
including a complaint by a worker, concerning an alleged violation of 2258.023, Texas
Government Code, by a Contractor or Subcontractor, the City shall make an initial
determination, before the 31 st day after the date the City receives the information, as to whether
good cause exists to believe that the violation occurred. The City shall notify in writing the
Contractor or Subcontractor and any affected worker of its initial determination. Upon the
City's determination that there is good cause to believe the Contractor or Subcontractor has
violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or
claimants as the difference between wages paid and wages due under the prevailing wage rates,
such amounts being subtracted from successive progress payments pending a final determination
of the violation.
D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of
Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected
worker, shall be submitted to binding arbitration in accordance with the Texas General
Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any
affected worker does not resolve the issue by agreement before the 15th day after the date the
City makes its initial determination pursuant to Paragraph C above. If the persons required to
arbitrate under this section do not agree on an arbitrator before the 1 Ith day after the date that
arbitration is required, a district court shall appoint an arbitrator on the petition of any of the
persons. The City is not a party in the arbitration. The decision and award of the arbitrator is
final and binding on all parties and may be enforced in any court of competent jurisdiction.
E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3)
years following the date of acceptance of the work, maintain records that show (i) the name and
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 19
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 19 of 35
occupation of each worker employed by the Contractor in the construction of the Work provided
for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be
open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right
to Audit, shall pertain to this inspection.
F. Progress Payments. With each progress payment or payroll period, whichever is less, the
Contractor shall submit an affidavit stating that the Contractor has complied with the
requirements of Chapter 2258, Texas Government Code.
G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at
all times.
H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall
otherwise require all of its Subcontractors to comply with Paragraphs A through G above.
5.09 Patent Fees and Royalties
A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold
harmless City, from and against all claims, costs, losses, and damages (including but not limited
to all fees and charges of engineers, architects, attorneys, and other professionals and all court
or arbitration or other dispute resolution costs) arising out of or relating to any infringement of
patent rights or copyrights incident to the use in the performance of the Work or resulting from
the incorporation in the Work of any invention, design, process, product, or device not specified
in the Contract Documents.
5.10 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations
applicable to the performance of the Work. Except where otherwise expressly required by
applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's
compliance with any Laws or Regulations.
B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws
or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such Work.
However, it shall not be Contractor's responsibility to make certain that the Specifications and
Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of
Contractor's obligations under Paragraph 3.01.
5.11 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas:
1. Contractor shall confine construction equipment, the storage of materials and equipment, and
the operations of workers to the Site and other areas permitted by Laws and Regulations, and
shall not unreasonably encumber the Site and other areas with construction equipment or
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 20
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 20 of 35
other materials or equipment. Contractor shall assume full responsibility for any damage to
any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas
resulting from the performance of the Work.
2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is
carrying on operations in a portion of a street, right-of-way, or easement greater than is
necessary for proper execution of the Work, the City may require the Contractor to finish the
section on which operations are in progress before work is commenced on any additional
area of the Site.
3. Should any Damage Claim be made by any such owner or occupant because of the
performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim.
4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and
against all claims, costs, losses, and damages arising out of or relating to any claim or
action, legal or equitable, brought by any such owner or occupant against City.
B. Removal of Debris During Performance of the Work: During the progress of the Work
Contractor shall keep the Site and other areas free from accumulations of waste materials,
rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other
debris shall conform to applicable Laws and Regulations.
C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the
clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the
Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as
the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the
written notice (by letter or electronic communication), and shall be entitled to recover its cost in
doing so. The City may withhold Final Acceptance until clean-up is complete and cost are
recovered.
D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and
the Work and make it ready for utilization by City or adjacent property owner. At the completion
of the Work Contractor shall remove from the Site all tools, appliances, construction equipment
and machinery, and surplus materials and shall restore to original condition or better all property
disturbed by the Work.
E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded
in any manner that will endanger the structure, nor shall Contractor subject any part of the Work
or adjacent property to stresses or pressures that will endanger it.
5.12 Record Documents
A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor
and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change
Orders, Field Orders, and written interpretations and clarifications in good order and annotated
to show changes made during construction. These record documents together with all approved
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 21
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 21 of 35
Samples and a counterpart of all accepted Submittals will be available to City for reference.
Upon completion of the Work, these record documents, any operation and maintenance manuals,
and Submittals will be delivered to City prior to Final Inspection. Contractor shall include
accurate locations for buried and imbedded items.
5.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors of their responsibility for the safety of persons or property in the performance of
their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall
take all necessary precautions for the safety of, and shall provide the necessary protection to
prevent damage, injury or loss to:
1. all persons on the Site or who may be affected by the Work;
2. all the Work and materials and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks,
pavements, roadways, structures, utilities, and Underground Facilities not designated for
removal, relocation, or replacement in the course of construction.
B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss; and
shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall
notify owners of adjacent property and of Underground Facilities and other utility owners when
prosecution of the Work may affect them, and shall cooperate with them in the protection,
removal, relocation, and replacement of their property.
C. Contractor shall comply with the applicable requirements of City's safety programs, if any.
D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any,
with which City's employees and representatives must comply while at the Site.
E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused,
directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any
other individual or entity directly or indirectly employed by any of them to perform any of the
Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor.
F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue
until such time as all the Work is completed and City has accepted the Work.
5.14 Safety Representative
Contractor shall inform City in writing of Contractor's designated safety representative at the Site.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 22
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 22 of 35
5.15 Hazard Communication Programs
Contractor shall be responsible for coordinating any exchange of material safety data sheets or other
hazard communication information required to be made available to or exchanged between or
among employers in accordance with Laws or Regulations.
5.16 Submittals
A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal
will be identified as required by City.
1. Submit number of copies specified in the General Requirements.
2. Data shown on the Submittals will be complete with respect to quantities, dimensions,
specified performance and design criteria, materials, and similar data to show City the
services, materials, and equipment Contractor proposes to provide and to enable City to
review the information for the limited purposes required by Paragraph 5.16.C.
3. Submittals submitted as herein provided by Contractor and reviewed by City for
conformance with the design concept shall be executed in conformity with the Contract
Documents unless otherwise required by City.
4. When Submittals are submitted for the purpose of showing the installation in greater detail,
their review shall not excuse Contractor from requirements shown on the Drawings and
Specifications.
5. For -Information -Only submittals upon which the City is not expected to conduct review or
take responsive action may be so identified in the Contract Documents.
6. Submit required number of Samples specified in the Specifications.
7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers,
the use for which intended and other data as City may require to enable City to review the
submittal for the limited purposes required by Paragraph 5.16.C.
B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any
related Work performed prior to City's review and acceptance of the pertinent submittal will be
at the sole expense and responsibility of Contractor.
C. City's Review:
1. City will provide timely review of required Submittals in accordance with the Schedule of
Submittals acceptable to City. City's review and acceptance will be only to determine if the
items covered by the submittals will, after installation or incorporation in the Work, conform
to the information given in the Contract Documents and be compatible with the design
concept of the completed Project as a functioning whole as indicated by the Contract
Documents.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 23
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 23 of 35
2. City's review and acceptance will not extend to means, methods, techniques, sequences, or
procedures of construction (except where a particular means, method, technique, sequence,
or procedure of construction is specifically and expressly called for by the Contract
Documents) or to safety precautions or programs incident thereto. The review and
acceptance of a separate item as such will not indicate approval of the assembly in which the
item functions.
3. City's review and acceptance shall not relieve Contractor from responsibility for any
variation from the requirements of the Contract Documents unless Contractor has complied
with the requirements of Section 01 33 00 and City has given written acceptance of each
such variation by specific written notation thereof incorporated in or accompanying the
Submittal. City's review and acceptance shall not relieve Contractor from responsibility for
complying with the requirements of the Contract Documents.
5.17 Contractor's General Warranty and Guarantee
A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract
Documents and will not be defective. City and its officers, directors, members, partners,
employees, agents, consultants, and subcontractors shall be entitled to rely on representation of
Contractor's warranty and guarantee.
B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, modification, or improper maintenance or operation by persons other than Contractor,
Subcontractors, Suppliers, or any other individual or entity for whom Contractor is
responsible; or
2. normal wear and tear under normal usage.
C. Contractor's obligation to perform and complete the Work in accordance with the Contract
Documents shall be absolute. None of the following will constitute an acceptance of Work that is
not in accordance with the Contract Documents or a release of Contractor's obligation to
perform the Work in accordance with the Contract Documents:
1. observations by City;
2. recommendation or payment by City or Developer of any progress or final payment;
3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by
City;
4. use or occupancy of the Work or any part thereof by City;
5. any review and acceptance of a Submittal by City;
6. any inspection, test, or approval by others; or
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 24
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 24 of 35
7. any correction of defective Work by City.
D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to
other work or property resulting therefrom which shall appear within a period of two (2) years
from the date of Final Acceptance of the Work unless a longer period is specified and shall
furnish a good and sufficient maintenance bond, complying with the requirements of Article
4.02.13. The City will give notice of observed defects with reasonable promptness.
5.18 Indemnification
A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the
City, its officers, servants and employees, from and against any and all claims arising out of, or
alleged to arise out of, the work and services to be performed by the Contractor, its officers,
agents, employees, subcontractors, licenses or invitees under this Contract. THIS
INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE
AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME
OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY
ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is
intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by
the City in defending against such claims and causes of actions.
B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its
officers, servants and employees, from and against any and all loss, damage or destruction of
property of the City, arising out of, or alleged to arise out of, the work and services to be
performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees
under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY
INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR
PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE
CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF
THE CITY.
5.19 Delegation of Professional Design Services
A. Contractor will not be required to provide professional design services unless such services are
specifically required by the Contract Documents for a portion of the Work or unless such
services are required to carry out Contractor's responsibilities for construction means, methods,
techniques, sequences and procedures.
B. If professional design services or certifications by a design professional related to systems,
materials or equipment are specifically required of Contractor by the Contract Documents, City
will specify all performance and design criteria that such services must satisfy. Contractor shall
cause such services or certifications to be provided by a properly licensed professional, whose
signature and seal shall appear on all drawings, calculations, specifications, certifications, and
Submittals prepared by such professional. Submittals related to the Work designed or certified
by such professional, if prepared by others, shall bear such professional's written approval when
submitted to City.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 25
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 25 of 35
C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services,
certifications or approvals performed by such design professionals, provided City has specified
to Contractor performance and design criteria that such services must satisfy.
D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design
drawings will be only for the limited purpose of checking for conformance with performance
and design criteria given and the design concept expressed in the Contract Documents. City's
review and acceptance of Submittals (except design calculations and design drawings) will be
only for the purpose stated in Paragraph 5.16.C.
5.20 Right to Audit:
A. The City reserves the right to audit all projects utilizing City funds
B. The Contractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of the Contractor involving transactions relating
to this Contract. Contractor agrees that the City shall have access during Regular Working Hours
to all necessary Contractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this Paragraph. The City shall
give Contractor reasonable advance notice of intended audits.
C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that
the subcontractor agrees that the City shall, until the expiration of three (3) years after final
payment under this Contract, have access to and the right to examine and photocopy any directly
pertinent books, documents, papers, and records of such Subcontractor, involving transactions to
the subcontract, and further, that City shall have access during Regular Working Hours to all
Subcontractor facilities, and shall be provided adequate and appropriate work space in order to
conduct audits in compliance with the provisions of this Paragraph. The City shall give
Subcontractor reasonable advance notice of intended audits.
D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the
City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate
published in the Texas Administrative Code in effect as of the time copying is performed.
5.21 Nondiscrimination
A. The City is responsible for operating Public Transportation Programs and implementing transit -
related projects, which are funded in part with Federal financial assistance awarded by the U.S.
Department of Transportation and the Federal Transit Administration (FTA), without
discriminating against any person in the United States on the basis of race, color, or national
origin.
B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of
the Act and the Regulations as further defined in the Supplementary Conditions for any project
receiving Federal assistance.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 26
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 26 of 35
ARTICLE 6 — OTHER WORK AT THE SITE
6.01 Related Work at Site
A. City may perform other work related to the Project at the Site with City's employees, or other
City contractors, or through other direct contracts therefor, or have other work performed by
utility owners. If such other work is not noted in the Contract Documents, then written notice
thereof will be given to Contractor prior to starting any such other work; and
B. Contractor shall afford each other contractor who is a party to such a direct contract, each utility
owner, and City, if City is performing other work with City's employees or other City
contractors, proper and safe access to the Site, provide a reasonable opportunity for the
introduction and storage of materials and equipment and the execution of such other work, and
properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of
the Work that may be required to properly connect or otherwise make its several parts come
together and properly integrate with such other work. Contractor shall not endanger any work of
others by cutting, excavating, or otherwise altering such work; provided, however, that
Contractor may cut or alter others' work with the written consent of City and the others whose
work will be affected.
C. If the proper execution or results of any part of Contractor's Work depends upon work
performed by others under this Article 7, Contractor shall inspect such other work and promptly
report to City in writing any delays, defects, or deficiencies in such other work that render it
unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's
failure to so report will constitute an acceptance of such other work as fit and proper for
integration with Contractor's Work except for latent defects in the work provided by others.
ARTICLE 7 — CITY'S RESPONSIBILITIES
7.01 Inspections, Tests, and Approvals
City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph
11.03.
7.02 Limitations on City's Responsibilities
A. The City shall not supervise, direct, or have control or authority over, nor be responsible for,
Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety
precautions and programs incident thereto, or for any failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. City will not be responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 27
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 27 of 35
7.03 Compliance with Safety Program
While at the Site, City's employees and representatives shall comply with the specific applicable
requirements of Contractor's safety programs of which City has been informed pursuant to
Paragraph 5.13.
ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION
8.01 City's Project Representative
City will provide one or more Project Representative(s) during the construction period. The duties
and responsibilities and the limitations of authority of City's representative during construction are
set forth in the Contract Documents.
A. City's Project Representative will make visits to the Site at intervals appropriate to the various
stages of construction as City deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor's executed Work. Based on
information obtained during such visits and observations, City's Project Representative will
determine, in general, if the Work is proceeding in accordance with the Contract Documents.
City's Project Representative will not be required to make exhaustive or continuous inspections
on the Site to check the quality or quantity of the Work. City's Project Representative's efforts
will be directed toward providing City a greater degree of confidence that the completed Work
will conform generally to the Contract Documents.
B. City's Project Representative's visits and observations are subject to all the limitations on
authority and responsibility in the Contract Documents.
8.02 Authorized Variations in Work
City's Project Representative may authorize minor variations in the Work from the requirements of
the Contract Documents which do not involve an adjustment in the Contract Price or the Contract
Time and are compatible with the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. These may be accomplished by a Field Order and will be
binding on City Developer, and also on Contractor, who shall perform the Work involved promptly.
8.03 Rejecting Defective Work
City will have authority to reject Work which City's Project Representative believes to be defective,
or will not produce a completed Project that conforms to the Contract Documents or that will
prejudice the integrity of the design concept of the completed Project as a functioning whole as
indicated by the Contract Documents. City will have authority to conduct special inspection or
testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or
completed.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 28
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 28 of 35
8.04 Determinations for Work Performed
Contractor will determine the actual quantities and classifications of Work performed. City's Project
Representative will review with Contractor the preliminary determinations on such matters before
rendering a written recommendation. City's written decision will be final (except as modified to
reflect changed factual conditions or more accurate data).
ARTICLE 9 — CHANGES IN THE WORK
9.01 Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, City may, at any time or
from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall
promptly proceed with the Work involved which will be performed under the applicable
conditions of the Contract Documents (except as otherwise specifically provided). Extra Work
shall be memorialized by a Participating Change Order which may or may not precede an order
of Extra work.
B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a
project with City participation, a Field Order may be issued by the City.
9.02 Notification to Surety
If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including, but not limited
to, Contract Price or Contract Time), the giving of any such notice will be Contractor's
responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the
effect of any such change.
ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME
10.01 Change of Contract Price
A. The Contract Price may only be changed by a Participating Change Order for projects with City
participation.
10.02 Change of Contract Time
A. The Contract Time may only be changed by a Participating Change Order for projects with City
participation.
10.03 Delays
A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or
damages (including but not limited to all fees and charges of engineers, architects, attorneys, and
other professionals and all court or arbitration or other dispute resolution costs) sustained by
Contractor on or in connection with any other project or anticipated project.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 29
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 29 of 35
ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF
DEFECTIVE WORK
11.01 Notice of Defects
Notice of all defective Work of which City has actual knowledge will be given to Contractor.
Defective Work may be rejected, corrected, or accepted as provided in this Article 13.
11.02 Access to Work
City, independent testing laboratories, and governmental agencies with jurisdictional interests will
have access to the Site and the Work at reasonable times for their observation, inspection, and
testing. Contractor shall provide them proper and safe conditions for such access and advise them of
Contractor's safety procedures and programs so that they may comply therewith as applicable.
11.03 Tests and Inspections
A. Contractor shall give City timely notice of readiness of the Work for all required inspections,
tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required
inspections or tests.
B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any
of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full
responsibility for arranging and obtaining such independent inspections, tests, retests or
approvals, pay all costs in connection therewith, and furnish City the required certificates of
inspection or approval; excepting, however, those fees specifically identified in the
Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR)
inspections, which shall be paid as described in the Supplementary Conditions.
C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection
with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or
equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment
submitted for approval prior to Contractor's purchase thereof for incorporation in the Work.
Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by
City.
D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to
perform any inspections or tests ("Testing") for any part of the Work, as determined solely by
City.
1. City will coordinate such Testing to the extent possible, with Contractor;
2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other
similar negative result, the Contractor shall be responsible for paying for any and all retests.
Contractor's cancellation without cause of City initiated Testing shall be deemed a negative
result and require a retest.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 30
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 30 of 35
3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the
Testing Lab by Contractor.
Developer/Contractor.
City will forward all invoices for retests to
4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance
until the Testing Lab is Paid
E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of City, Contractor shall, if requested by City, uncover
such Work for observation.
11.04 Uncovering Work
A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it
must, if requested by City, be uncovered for City's observation and replaced at Contractor's
expense.
11.05 City May Stop the Work
If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials
or equipment, or fails to perform the Work in such a way that the completed Work will conform to
the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until
the cause for such order has been eliminated; however, this right of City to stop the Work shall not
give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any
Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent
of any of them.
11.06 Correction or Removal of Defective Work
A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to
an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has
been rejected by City, remove it from the Project and replace it with Work that is not defective.
Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not
limited to all fees and charges of engineers, architects, attorneys, and other professionals and all
court or arbitration or other dispute resolution costs) arising out of or relating to such correction
or removal (including but not limited to all costs of repair or replacement of work of others).
Failure to require the removal of any defective Work shall not constitute acceptance of such
Work.
B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07,
Contractor shall take no action that would void or otherwise impair City's special warranty and
guarantee, if any, on said Work.
11.07 Correction Period
A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may
be prescribed by the terms of any applicable special guarantee required by the Contract
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 31
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 31 of 35
Documents), any Work is found to be defective, or if the repair of any damages to the land or
areas made available for Contractor's use by City or permitted by Laws and Regulations as
contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without
cost to City and in accordance with City's written instructions:
1. repair such defective land or areas; or
2. correct such defective Work; or
3. if the defective Work has been rejected by City, remove it from the Project and replace it
with Work that is not defective, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work
of others or other land or areas resulting therefrom.
B. If Contractor does not promptly comply with the terms of City's written instructions, or in an
emergency where delay would cause serious risk of loss or damage, City may have the defective
Work corrected or repaired or may have the rejected Work removed and replaced. All claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or other dispute resolution costs)
arising out of or relating to such correction or repair or such removal and replacement (including
but not limited to all costs of repair or replacement of work of others) will be paid by Contractor.
C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or
removed and replaced under this Paragraph 11.07, the correction period hereunder with respect
to such Work may be required to be extended for an additional period of one year after the end
of the initial correction period. City shall provide 30 days written notice to Contractor and
Developer should such additional warranty coverage be required. Contractor's obligations under
this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this
Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any
applicable statute of limitation or repose.
11.08 City May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from City to correct defective
Work, or to remove and replace rejected Work as required by City in accordance with Paragraph
11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents,
or if Contractor fails to comply with any other provision of the Contract Documents, City may,
after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such
deficiency.
B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed
expeditiously. In connection with such corrective or remedial action, City may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor's services related thereto, and incorporate in the Work all materials and equipment
incorporated in the Work, stored at the Site or for which City has paid Contractor but which are
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 32
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 32 of 35
stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants,
employees, and City's other contractors, access to the Site to enable City to exercise the rights
and remedies under this Paragraph.
C. All claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or other dispute resolution
costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph
13.09 will be charged against Contractor, and a Change Order will be issued incorporating the
necessary revisions in the Contract Documents with respect to the Work; and City shall be
entitled to an appropriate decrease in the Contract Price.
D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the
performance of the Work attributable to the exercise of City's rights and remedies under this
Paragraph 11.09.
ARTICLE 12 — COMPLETION
12.01 Contractor's Warranty of Title
Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any
Application for Payment will pass to City no later than the time of Final Acceptance and shall be
free and clear of all Liens.
12.02 Partial Utilization
A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed
part of the Work which has specifically been identified in the Contract Documents, or which
City, determines constitutes a separately functioning and usable part of the Work that can be
used by City for its intended purpose without significant interference with Contractor's
performance of the remainder of the Work. City at any time may notify Contractor in writing to
permit City to use or occupy any such part of the Work which City determines to be ready for its
intended use, subject to the following conditions:
1. Contractor at any time may notify City in writing that Contractor considers any such part of
the Work ready for its intended use.
2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and
Contractor shall make an inspection of that part of the Work to determine its status of
completion. If City does not consider that part of the Work to be substantially complete, City
will notify Contractor in writing giving the reasons therefor.
3. Partial Utilization will not constitute Final Acceptance by City.
12.03 Final Inspection
A. Upon written notice from Contractor that the entire Work is complete in accordance with the
Contract Documents:
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 33
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 33 of 35
1. within 10 days, City will schedule a Final Inspection with Contractor.
2. City will notify Contractor in writing of all particulars in which this inspection reveals that
the Work is incomplete or defective. Contractor shall immediately take such measures as are
necessary to complete such Work or remedy such deficiencies.
12.04 Final Acceptance
A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the
Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction
of the following:
1. All documentation called for in the Contract Documents, including but not limited to the
evidence of insurance required by Paragraph 5.03;
2. consent of the surety, if any, to Final Acceptance;
3. a list of all pending or released Damage Claims against City that Contractor believes are
unsettled; and
4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to
City) of all Lien rights arising out of or Liens filed in connection with the Work.
5. after all Damage Claims have been resolved:
a. directly by the Contractor or;
b. Contractor provides evidence that the Damage Claim has been reported to Contractor's
insurance provider for resolution.
6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
ARTICLE 13 — SUSPENSION OF WORK
13.01 City May Suspend Work
A. At any time and without cause, City may suspend the Work or any portion thereof by written
notice to Contractor and which may fix the date on which Work will be resumed. Contractor
shall resume the Work on the date so fixed. During temporary suspension of the Work covered
by these Contract Documents, for any reason, the City will stop contract time on City
participation projects.
B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the
control of and without the fault or negligence of the Contractor, and should it be determined by
mutual consent of the Contractor and City that a solution to allow construction to proceed is not
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 34
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 34 of 35
available within a reasonable period of time, Contractor may request an extension in Contract
Time, directly attributable to any such suspension.
C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall
store all materials in such a manner that they will not obstruct or impede the public unnecessarily
nor become damaged in any way, and he shall take every precaution to prevent damage or
deterioration of the work performed; he shall provide suitable drainage about the work, and erect
temporary structures where necessary.
ARTICLE 14 — MISCELLANEOUS
14.01 Giving Notice
A. Whenever any provision of the Contract Documents requires the giving of written notice, it will
be deemed to have been validly given i£
1. delivered in person to the individual or to a member of the firm or to an officer of the
corporation for whom it is intended; or
2. delivered at or sent by registered or certified mail, postage prepaid, to the last business
address known to the giver of the notice.
B. Business address changes must be promptly made in writing to the other party.
C. Whenever the Contract Documents specifies giving notice by electronic means such electronic
notice shall be deemed sufficient upon confirmation of receipt by the receiving party.
14.02 Computation of Times
When any period of time is referred to in the Contract Documents by days, it will be computed to
exclude the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last
day of the period.
14.03 Cumulative Remedies
The duties and obligations imposed by these General Conditions and the rights and remedies
available hereunder to the parties hereto are in addition to, and are not to be construed in any way as
a limitation of, any rights and remedies available to any or all of them which are otherwise imposed
or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the
Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically
in the Contract Documents in connection with each particular duty, obligation, right, and remedy to
which they apply.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
00 73 10- 35
Standard City Conditions Of The Construction Contract For Developer Awarded Projects
Page 35 of 35
14.04 Survival of Obligations
All representations, indemnifications, warranties, and guarantees made in, required by, or given in
accordance with the Contract Documents, as well as all continuing obligations indicated in the
Contract Documents, will survive final payment, completion, and acceptance of the Work or
termination or completion of the Contract or termination of the services of Contractor.
14.05 Headings
Article and paragraph headings are inserted for convenience only and do not constitute parts of these
General Conditions.
CITY OF FORT WORTH
STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS
Revised: January 10, 2013
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 01 11 00
SUMMARY OF WORK
011100-1
DAP SUMMARY OF WORK
Pagel of 3
5 A. Section Includes:
6 1. Summary of Work to be performed in accordance with the Contract Documents
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract
11 2. Division 1 - General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
A. Work Covered by Contract Documents
1. Work is to include furnishing all labor, materials, and equipment, and performing
all Work necessary for this construction project as detailed in the Drawings and
Specifications.
B. Subsidiary Work
1. Any and all Work specifically governed by documentary requirements for the
project, such as conditions imposed by the Drawings or Contract Documents in
which no specific item for bid has been provided for in the Proposal and the item is
not a typical unit bid item included on the standard bid item list, then the item shall
be considered as a subsidiary item of Work, the cost of which shall be included in
the price bid in the Proposal for various bid items.
C. Use of Premises
1. Coordinate uses of premises under direction of the City.
2. Assume full responsibility for protection and safekeeping of materials and
equipment stored on the Site.
3. Use and occupy only portions of the public streets and alleys, or other public places
or other rights -of -way as provided for in the ordinances of the City, as shown in the
Contract Documents, or as may be specifically authorized in writing by the City.
a. A reasonable amount of tools, materials, and equipment for construction
purposes may be stored in such space, but no more than is necessary to avoid
delay in the construction operations.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 105753
Revised December 20, 2012
011100-2
DAP SUMMARY OF WORK
Page 2 of 3
1 b. Excavated and waste materials shall be stored in such a way as not to interfere
2 with the use of spaces that may be designated to be left free and unobstructed
3 and so as not to inconvenience occupants of adjacent property.
4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such
5 manner as not to interfere with the operation of the railroad.
6 1) All Work shall be in accordance with railroad requirements set forth in
7 Division 0 as well as the railroad permit.
8 D. Work within Easements
9 1. Do not enter upon private property for any purpose without having previously
10 obtained permission from the owner of such property.
11 2. Do not store equipment or material on private property unless and until the
12 specified approval of the property owner has been secured in writing by the
13 Contractor and a copy furnished to the City.
14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of
15 obstructions which must be removed to make possible proper prosecution of the
16 Work as a part of the project construction operations.
17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants,
18 lawns, fences, culverts, curbing, and all other types of structures or improvements,
19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or
20 appurtenances thereof, including the construction of temporary fences and to all
21 other public or private property adjacent to the Work.
22 5. Notify the proper representatives of the owners or occupants of the public or private
23 lands of interest in lands which might be affected by the Work.
24 a. Such notice shall be made at least 48 hours in advance of the beginning of the
25 Work.
26 b. Notices shall be applicable to both public and private utility companies and any
27 corporation, company, individual, or other, either as owners or occupants,
28 whose land or interest in land might be affected by the Work.
29 c. Be responsible for all damage or injury to property of any character resulting
30 from any act, omission, neglect, or misconduct in the manner or method or
31 execution of the Work, or at any time due to defective work, material, or
32 equipment.
33 6. Fence
34 a. Restore all fences encountered and removed during construction of the Project
35 to the original or a better than original condition.
36 b. Erect temporary fencing in place of the fencing removed whenever the Work is
37 not in progress and when the site is vacated overnight, and/or at all times to
38 provide site security.
39 c. The cost for all fence work within easements, including removal, temporary
40 closures and replacement, shall be subsidiary to the various items bid in the
41 project proposal, unless a bid item is specifically provided in the proposal.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 105753
Revised December 20, 2012
011100-3
DAP SUMMARY OF WORK
Page 3 of 3
1 1.5
SUBMITTALS [NOT USED]
2 1.6
ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
3 1.7
CLOSEOUT SUBMITTALS [NOT USED]
4 1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.9
QUALITY ASSURANCE [NOT USED]
6 1.10
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.11
FIELD [SITE] CONDITIONS [NOT USED]
8 1.12
WARRANTY [NOT USED]
9 PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11 END OF SECTION
12
13
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects 105753
Revised December 20, 2012
012500-1
DAP SUBSTITUTION PROCEDURES
Pagel of 4
1 SECTION 0125 00
2 SUBSTITUTION PROCEDURES
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. The procedure for requesting the approval of substitution of a product that is not
7 equivalent to a product which is specified by descriptive or performance criteria or
8 defined by reference to 1 or more of the following:
9 a. Name of manufacturer
10 b. Name of vendor
11 c. Trade name
12 d. Catalog number
13 2. Substitutions are not "or -equals".
14 B. Deviations from this City of Fort Worth Standard Specification
15 1. None.
16 C. Related Specification Sections include, but are not necessarily limited to:
17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
18 2. Division 1 — General Requirements
19 1.2 PRICE AND PAYMENT PROCEDURES
20 A. Measurement and Payment
21 1. Work associated with this Item is considered subsidiary to the various items bid. No
22 separate payment will be allowed for this Item.
23 1.3 REFERENCES [NOT USED]
24 1.4 ADMINISTRATIVE REQUIREMENTS
25 A. Request for Substitution - General
26 1. Within 30 days after award of Contract (unless noted otherwise), the City will
27 consider formal requests from Contractor for substitution of products in place of
28 those specified.
29 2. Certain types of equipment and kinds of material are described in Specifications by
30 means of references to names of manufacturers and vendors, trade names, or catalog
31 numbers.
32 a. When this method of specifying is used, it is not intended to exclude from
33 consideration other products bearing other manufacturer's or vendor's names,
34 trade names, or catalog numbers, provided said products are "or -equals," as
35 determined by City.
36 3. Other types of equipment and kinds of material may be acceptable substitutions
37 under the following conditions:
38 a. Or -equals are unavailable due to strike, discontinued production of products
39 meeting specified requirements, or other factors beyond control of Contractor;
40 or,
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
012500-2
DAP SUBSTITUTION PROCEDURES
Page 2 of 4
1 b. Contractor proposes a cost and/or time reduction incentive to the City.
2 1.5 SUBMITTALS
3 A. See Request for Substitution Form (attached)
4 B. Procedure for Requesting Substitution
5 1. Substitution shall be considered only:
6 a. After award of Contract
7 b. Under the conditions stated herein
8 2. Submit 3 copies of each written request for substitution, including:
9 a. Documentation
10 1) Complete data substantiating compliance of proposed substitution with
11 Contract Documents
12 2) Data relating to changes in construction schedule, when a reduction is
13 proposed
14 3) Data relating to changes in cost
15 b. For products
16 1) Product identification
17 a) Manufacturer's name
18 b) Telephone number and representative contact name
19 c) Specification Section or Drawing reference of originally specified
20 product, including discrete name or tag number assigned to original
21 product in the Contract Documents
22 2) Manufacturer's literature clearly marked to show compliance of proposed
23 product with Contract Documents
24 3) Itemized comparison of original and proposed product addressing product
25 characteristics including, but not necessarily limited to:
26 a) Size
27 b) Composition or materials of construction
28 c) Weight
29 d) Electrical or mechanical requirements
30 4) Product experience
31 a) Location of past projects utilizing product
32 b) Name and telephone number of persons associated with referenced
33 projects knowledgeable concerning proposed product
34 c) Available field data and reports associated with proposed product
35 5) Samples
36 a) Provide at request of City.
37 b) Samples become the property of the City.
38 c. For construction methods:
39 1) Detailed description of proposed method
40 2) Illustration drawings
41 C. Approval or Rejection
42 1. Written approval or rejection of substitution given by the City
43 2. City reserves the right to require proposed product to comply with color and pattern
44 of specified product if necessary to secure design intent.
45 3. In the event the substitution is approved, if a reduction in cost or time results, it will
46 be documented by Change Order.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
012500-3
DAP SUBSTITUTION PROCEDURES
Page 3 of 4
1 4. Substitution will be rejected if-
2 a. Submittal is not through the Contractor with his stamp of approval
3 b. Request is not made in accordance with this Specification Section
4 c. In the Developer's opinion, acceptance will require substantial revision of the
5 original design
6 d. In the City's or Developer's opinion, substitution will not perform adequately
7 the function consistent with the design intent
8 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
9 1.7 CLOSEOUT SUBMITTALS [NOT USED]
10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
11 1.9 QUALITY ASSURANCE
12 A. In making request for substitution or in using an approved product, the Contractor
13 represents that the Contractor:
14 1. Has investigated proposed product, and has determined that it is adequate or
15 superior in all respects to that specified, and that it will perform function for which it
16 is intended
17 2. Will provide same guarantee for substitute item as for product specified
18 3. Will coordinate installation of accepted substitution into Work, to include building
19 modifications if necessary, making such changes as may be required for Work to be
20 complete in all respects
21 4. Waives all claims for additional costs related to substitution which subsequently
22 arise
23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
24 1.11 FIELD [SITE] CONDITIONS [NOT USED]
25 1.12 WARRANTY [NOT USED]
26 PART 2 - PRODUCTS [NOT USED]
27 PART 3 - EXECUTION [NOT USED]
28
29
30
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
012500-4
DAP SUBSTITUTION PROCEDURES
Page 4 of 4
EXHIBIT A
REQUEST FOR SUBSTITUTION FORM:
TO:
PROJECT: DATE:
We hereby submit for your consideration the following product instead of the specified item for
the above project:
SECTION PARAGRAPH SPECIFIED ITEM
Proposed Substitution:
Reason for Substitution:
Include complete information on changes to Drawings and/or Specifications which proposed
substitution will require for its proper installation.
Fill in Blanks Below:
A. Will the undersigned contractor pay for changes to the building design, including engineering
and detailing costs caused by the requested substitution?
B. What effect does substitution have on other trades?
C. Differences between proposed substitution and specified item?
D. Differences in product cost or product delivery time?
E. Manufacturer's guarantees of the proposed and specified items are:
Equal Better (explain on attachment)
The undersigned states that the function, appearance and quality are equivalent or superior to the
specified item.
Submitted By: For Use by City
Signature
as noted
Firm
Address
Date
Telephone
For Use by City:
Approved
City
Recommended Recommended
Not recommended
By
Date
Remarks
Date
Rejected
Received late
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
0131 19- 1
DAP PRECONSTRUCTION MEETING
Pagel of 3
1 SECTION 01 31 19
2 PRECONSTRUCTION MEETING
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to
7 clarify construction contract administration procedures
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. No construction schedule required unless requested by the City.
10 C. Related Specification Sections include, but are not necessarily limited to:
11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
12 2. Division 1 — General Requirements
13 1.2 PRICE AND PAYMENT PROCEDURES
14 A. Measurement and Payment
15 1. Work associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT USED]
18 1.4 ADMINISTRATIVE REQUIREMENTS
19
A. Coordination
20
1.
Attend preconstruction meeting.
21
2.
Representatives of Contractor, subcontractors and suppliers attending meetings
22
shall be qualified and authorized to act on behalf of the entity each represents.
23
3.
Meeting administered by City may be tape recorded.
24
a. If recorded, tapes will be used to prepare minutes and retained by City for
25
future reference.
26
B. Preconstruction Meeting
27
1.
A preconstruction meeting will be held within 14 days after the delivery of the
28
distribution package to the City.
29
a. The meeting will be scheduled and administered by the City.
30
2.
The Project Representative will preside at the meeting, prepare the notes of the
31
meeting and distribute copies of same to all participants who so request by fully
32
completing the attendance form to be circulated at the beginning of the meeting.
33
3.
Attendance shall include:
34
a. Developer and Consultant
35
b. Contractor's project manager
36
c. Contractor's superintendent
37
d. Any subcontractor or supplier representatives whom the Contractor may desire
38
to invite or the City may request
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
01 31 19 - 2
DAP PRECONSTRUCTION MEETING
Page 2 of 3
e. Other City representatives
f. Others as appropriate
4. Preliminary Agenda may include:
a. Introduction of Project Personnel
b. General Description of Project
c. Status of right-of-way, utility clearances, easements or other pertinent permits
d. Contractor's work plan and schedule
e. Contract Time
f. Notice to Proceed
g. Construction Staking
h. Progress Payments
i. Extra Work and Change Order Procedures
j. Field Orders
k. Disposal Site Letter for Waste Material
1. Insurance Renewals
m. Payroll Certification
n. Material Certifications and Quality Control Testing
o. Public Safety and Convenience
p. Documentation of Pre -Construction Conditions
q. Weekend Work Notification
r. Legal Holidays
s. Trench Safety Plans
t. Confined Space Entry Standards
u. Coordination with the City's representative for operations of existing water
systems
v. Storm Water Pollution Prevention Plan
w. Coordination with other Contractors
x. Early Warning System
y. Contractor Evaluation
z. Special Conditions applicable to the project
aa. Damages Claims
bb. Submittal Procedures
cc. Substitution Procedures
dd. Correspondence Routing
ee. Record Drawings
ff. Temporary construction facilities
gg. MBE/SBE procedures
hh. Final Acceptance
ii. Final Payment
J. Questions or Comments
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
0131 19 - 3
DAP PRECONSTRUCTION MEETING
Page 3 of 3
1 1.5
SUBMITTALS [NOT USED]
2 1.6
ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
3 1.7
CLOSEOUT SUBMITTALS [NOT USED]
4 1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.9
QUALITY ASSURANCE [NOT USED]
6 1.10
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.11
FIELD [SITE] CONDITIONS [NOT USED]
8 1.12
WARRANTY [NOT USED]
9 PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11 END OF SECTION
12
13
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 0132 33
PRECONSTRUCTION VIDEO
01 32 33 - 1
DAP PRECONSTRUCTION VIDEO
Page 1 of 2
5 A. Section Includes:
6 1. Administrative and procedural requirements for:
7 a. Preconstruction Videos
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. Though not mandatory, it is highly recommended on infill developer projects.
10 C. Related Specification Sections include, but are not necessarily limited to:
11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
12 2. Division 1 — General Requirements
13 1.2 PRICE AND PAYMENT PROCEDURES
14 A. Measurement and Payment
15 1. Work associated with this Item is considered subsidiary to the various items bid.
16 No separate payment will be allowed for this Item.
17 1.3 REFERENCES [NOT USED]
18 1.4 ADMINISTRATIVE REQUIREMENTS
19 A. Preconstruction Video
20 1. Produce a preconstruction video of the site/alignment, including all areas in the
21 vicinity of and to be affected by construction.
22 a. Provide digital copy of video upon request by the City.
23 2. Retain a copy of the preconstruction video until the end of the maintenance surety
24 period.
25 1.5 SUBMITTALS [NOT USED]
26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
27 1.7 CLOSEOUT SUBMITTALS [NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCE [NOT USED]
30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
31 1.11 FIELD [SITE] CONDITIONS [NOT USED]
32 1.12 WARRANTY [NOT USED]
33 PART 2 - PRODUCTS [NOT USED]
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 32 33 - 2
DAP PRECONSTRUCTION VIDEO
Page 2 of 2
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
SECTION 0133 00
DAP SUBMITTALS
01 33 00 - 1
DAP SUBMITTALS
Page 1 of 13
6 1. General methods and requirements of submissions applicable to the following
7 Work -related submittals:
8 a. Shop Drawings
9 b. Product Data (including Standard Product List submittals)
10 c. Samples
11 d. Mock Ups
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include, but are not necessarily limited to:
15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the
16 Contract
17 2. Division 1 —General Requirements
18 1.2 PRICE AND PAYMENT PROCEDURES
19 A. Measurement and Payment
20 1. Work associated with this Item is considered subsidiary to the various items
21 bid. No separate payment will be allowed for this Item.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 33 00 - 2
DAP SUBMITTALS
Page 2 of 13
1 1.3 REFERENCES [NOT USED]
2 1.4 ADMINISTRATIVE REQUIREMENTS
3 A. Coordination
4 1. Notify the City in writing, at the time of submittal, of any deviations in the
5 submittals from the requirements of the Contract Documents.
6 2. Coordination of Submittal Times
7
a. Prepare, prioritize and transmit each submittal sufficiently in advance of
8
performing the related Work or other applicable activities, or within the
9
time specified in the individual Work Sections, of the Specifications.
10
b. Contractor is responsible such that the installation will not be delayed by
11
processing times including, but not limited to:
12 a) Disapproval and resubmittal (if required)
13 b) Coordination with other submittals
14 c) Testing
15 d) Purchasing
16 e) Fabrication
17 f) Delivery
18 g) Similar sequenced activities
19 c. No extension of time will be authorized because of the Contractor's failure
20 to transmit submittals sufficiently in advance of the Work.
21 d. Make submittals promptly in accordance with approved schedule, and in
22 such sequence as to cause no delay in the Work or in the work of any other
23 contractor.
24 B. Submittal Numbering
25 1. When submitting shop drawings or samples, utilize a 9-character submittal
26 cross-reference identification numbering system in the following manner:
27 a. Use the first 6 digits of the applicable Specification Section Number.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 3300-3
DAP SUBMITTALS
Page 3 of 13
1
b. For the next 2 digits number use numbers 01-99 to sequentially number
2
each initial separate item or drawing submitted under each specific
3
Section number.
4
c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e.
5
A=2nd submission, B=3rd submission, C=4th submission, etc.). Atypical
6
submittal number would be as follows:
7
8
03 30 00-08-B
9
10
1) 03 30 00 is the Specification Section for Concrete
11
2) 08 is the eighth initial submittal under this Specification Section
12
3) B is the third submission (second resubmission) of that particular shop
13
drawing
14 C. Contractor Certification
15
1. Review shop drawings, product data and samples, including those by
16
subcontractors, prior to submission to determine and verify the following:
17
a. Field measurements
18
b. Field construction criteria
19
c. Catalog numbers and similar data
20
d. Conformance with the Contract Documents
21
2. Provide each shop drawing, sample and product data submitted by the
22
Contractor with a Certification Statement affixed including:
23
a. The Contractor's Company name
24
b. Signature of submittal reviewer
25
c. Certification Statement
26
1) "By this submittal, I hereby represent that I have determined and
27
verified field measurements, field construction criteria, materials,
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
01 33 00 - 4
DAP SUBMITTALS
Page 4 of 13
dimensions, catalog numbers and similar data and I have checked and
coordinated each item with other applicable approved shop drawings."
D. Submittal Format
1. Fold shop drawings larger than 81/2 inches x 11 inches to 81/2 inches x
11 inches.
2. Bind shop drawings and product data sheets together.
3. Order
a. Cover Sheet
1) Description of Packet
2) Contractor Certification
b. List of items / Table of Contents
c. Product Data /Shop Drawings/Samples/Calculations
E. Submittal Content
1. The date of submission and the dates of any previous submissions
2. The Project title and number
3. Contractor identification
4. The names of:
a. Contractor
b. Supplier
c. Manufacturer
5. Identification of the product, with the Specification Section number, page and
paragraph(s)
6. Field dimensions, clearly identified as such
7. Relation to adjacent or critical features of the Work or materials
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
01 3300-5
DAP SUBMITTALS
Page 5 of 13
8. Applicable standards, such as ASTM or Federal Specification numbers
9. Identification by highlighting of deviations from Contract Documents
10. Identification by highlighting of revisions on resubmittals
11. An 8-inch x 3-inch blank space for Contractor and City stamps
F. Shop Drawings
1. As specified in individual Work Sections includes, but is not necessarily
Limited to:
a. Custom -prepared data such as fabrication and erection/installation
(working) drawings
b. Scheduled information
c. Setting diagrams
d. Actual shopwork manufacturing instructions
e. Custom templates
f. Special wiring diagrams
g. Coordination drawings
h. Individual system or equipment inspection and test reports including:
1) Performance curves and certifications
i. As applicable to the Work
2. Details
a. Relation of the various parts to the main members and lines of the
structure
b. Where correct fabrication of the Work depends upon field measurements
1) Provide such measurements and note on the drawings prior to
submitting for approval.
25 G. Product Data
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 3300-6
DAP SUBMITTALS
Page 6 of 13
1 1. For submittals of product data for products included on the City's Standard
2 Product List, clearly identify each item selected for use on the Project.
3 2. For submittals of product data for products not included on the City's
4 Standard Product List, submittal data may include, but is not necessarily
5 limited to:
6 a. Standard prepared data for manufactured products (sometimes referred to
7 as catalog data)
8 1) Such as the manufacturer's product specification and installation
9 instructions
10 2) Availability of colors and patterns
11 3) Manufacturer's printed statements of compliances and applicability
12 4) Roughing -in diagrams and templates
13 5) Catalog cuts
14 6) Product photographs
15 7) Standard wiring diagrams
16 8) Printed performance curves and operational -range diagrams
17 9) Production or quality control inspection and test reports and
18 certifications
19 10) Mill reports
20 11) Product operating and maintenance instructions and recommended
21 spare -parts listing and printed product warranties
22 12) As applicable to the Work
23 H. Samples
24 1. As specified in individual Sections, include, but are not necessarily limited to:
25 a. Physical examples of the Work such as:
26 1) Sections of manufactured or fabricated Work
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 3300-7
DAP SUBMITTALS
Page 7 of 13
1 2) Small cuts or containers of materials
2 3) Complete units of repetitively used products color/texture/pattern
3 swatches and range sets
4 4) Specimens for coordination of visual effect
5 5) Graphic symbols and units of Work to be used by the City for
6 independent inspection and testing, as applicable to the Work
7 I. Do not start Work requiring a shop drawing, sample or product data nor any
8 material to be fabricated or installed prior to the approval or qualified approval of
9 such item.
10 1. Fabrication performed, materials purchased or on -site construction
11 accomplished which does not conform to approved shop drawings and data is
12 at the Contractor's risk.
13 2. The City will not be liable for any expense or delay due to corrections or
14 remedies required to accomplish conformity.
15 3. Complete project Work, materials, fabrication, and installations in
16 conformance with approved shop drawings, applicable samples, and product
17 data.
18 J. Submittal Distribution
19 1. Electronic Distribution
20
a. Confirm development of Project directory for electronic submittals to be
21
uploaded to City's Buzzsaw site, or another external FTP site approved by
22
the City.
23
b. Shop Drawings
24
1) Upload submittalto designated project directory and notify
25
appropriate City representatives via email of submittal posting.
26
2) Hard Copies
27 a) 3 copies for all submittals
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
01 3300-8
DAP SUBMITTALS
Page 8 of 13
b) If Contractor requires more than 1 hard copy of Shop Drawings
returned, Contractor shall submit more than the number of copies
Listed above.
c. Product Data
1) Upload submittalto designated project directory and notify
appropriate City representatives via email of submittal posting.
2) Hard Copies
a) 3 copies for all submittals
d. Samples
1) Distributed to the Project Representative
2. Hard Copy Distribution (if required in lieu of electronic distribution)
a. Shop Drawings
1) Distributed to the City
2) Copies
a) 8 copies for mechanical submittals
b) 7 copies for all other submittals
c) If Contractor requires more than 3 copies of Shop Drawings
returned, Contractor shall submit more than the number of copies
listed above.
b. Product Data
1) Distributed to the City
2) Copies
a) 4 copies
c. Samples
1) Distributed to the Project Representative
2) Copies
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 3300-9
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
DAP SUBMITTALS
Page 9 of 13
a) Submit the number stated in the respective Specification Sections.
3. Distribute reproductions of approved shop drawings and copies of approved
product data and samples, where required, to the job site file and elsewhere
as directed by the City.
a. Provide number of copies as directed by the City but not exceeding the
number previously specified.
K. Submittal Review
1. The review of shop drawings, data and samples will be for general
conformance with the design concept and Contract Documents. This is not to
be construed as:
a. Permitting any departure from the Contract requirements
b. Relieving the Contractor of responsibility for any errors, including details,
dimensions, and materials
c. Approving departures from details furnished by the City, except as
otherwise provided herein
2. The review and approval of shop drawings, samples or product data by the City
does not relieve the Contractor from his/her responsibility with regard to the
fulfillment of the terms of the Contract.
a. All risks of error and omission are assumed by the Contractor, and the City
will have no responsibility therefore.
3. The Contractor remains responsible for details and accuracy, for coordinating
the Work with all other associated work and trades, for selecting fabrication
processes, for techniques of assembly and for performing Work in a safe
manner.
4. If the shop drawings, data or samples as submitted describe variations and
show a departure from the Contract requirements which City finds to be in the
interest of the City and to be so minor as not to involve a change in Contract
Price or time for performance, the City may return the reviewed drawings
without noting an exception.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 33 00 - 10
DAP SUBMITTALS
Page 10 of 13
1 5. Submittals will be returned to the Contractor under 1 of the following codes:
2 a. Code 1
3 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or
4 comments on the submittal.
5 a) When returned under this code the Contractor may release the
6 equipment and/or material for manufacture.
7 b. Code 2
8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of
9 the notations and comments IS NOT required by the Contractor.
10 a) The Contractor may release the equipment or material for
11 manufacture; however, all notations and comments must be
12 incorporated into the final product.
13 c. Code 3
14 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is
15 assigned when notations and comments are extensive enough to
16 require a resubmittal of the package.
17 a) The Contractor may release the equipment or material for
18 manufacture; however, all notations and comments must be
19 incorporated into the final product.
20 b) This resubmittal is to address all comments, omissions and
21 non -conforming items that were noted.
22 c) Resubmittal is to be received by the City within 15 Calendar Days
23 of the date of the City's transmittal requiring the resubmittal.
24 d. Code 4
25 1) "NOT APPROVED" is assigned when the submittal does not meet the
26 intent of the Contract Documents.
27 a) The Contractor must resubmit the entire package revised to bring
28 the submittal into conformance.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 33 00 - 11
DAP SUBMITTALS
Page 11 of 13
1 b) It maybe necessary to resubmit using a different
2 manufacturer/vendor to meet the Contract Documents.
3 6. Resubmittals
4 a. Handled in the same manner as first submittals
5 1) Corrections other than requested by the City
6 2) Marked with revision triangle or other similar method
7 a) At Contractor's risk if not marked
8 b. Submittals for each item will be reviewed no more than twice at the City's
9 expense.
10 1) All subsequent reviews will be performed at times convenient to the
11 City and at the Contractor's expense, based on the City's or City
12 Representative's then prevailing rates.
13 2) Provide Contractor reimbursement to the City within 30 Calendar Days
14 for all such fees invoiced by the City.
15 c. The need for more than 1 resubmission or any other delay in obtaining
16 City's review of submittals, will not entitle the Contractor to an extension of
17 Contract Time.
18 7. Partial Submittals
19 a. City reserves the right to not review submittals deemed partial, at the
20 City's discretion.
21 b. Submittals deemed by the City to be not complete will be returned to the
22 Contractor, and will be considered "Not Approved" until resubmitted.
23 c. The City may at its option provide a list or mark the submittal directing the
24 Contractor to the areas that are incomplete.
25 8. If the Contractor considers any correction indicated on the shop drawings to
26 constitute a change to the Contract Documents, then written notice must be
27 provided thereof to the Developer at least 7 Calendar Days prior to release for
28 manufacture.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 33 00 - 12
DAP SUBMITTALS
Page 12 of 13
1 9. When the shop drawings have been completed to the satisfaction of the City,
2 the Contractor may carry out the construction in accordance therewith and no
3 further changes therein except upon written instructions from the City.
4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days
5 following receipt of submittal by the City.
6 L. Mockups
7 1. Mock Up units as specified in individual Sections, include, but are not
8 necessarily limited to, complete units of the standard of acceptance for that
9 type of Workto be used on the Project. Remove at the completion of the Work
10 or when directed.
11 M. Qualifications
12 1. If specifically required in other Sections of these Specifications, submit a P.E.
13 Certification for each item required.
14 N. Request for Information (RFI)
15 1. Contractor Request for additional information
16 a. Clarification or interpretation of the contract documents
17 b. When the Contractor believes there is a conflict between Contract
18 Documents
19 c. When the Contractor believes there is a conflict between the Drawings and
20 Specifications
21 1) Identify the conflict and request clarification
22 2. Sufficient information shall be attached to permit a written response without
23 further information.
24
25
26
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS— DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
01 33 00 - 13
DAP SUBMITTALS
Page 13 of 13
1
2 1.5 SUBMITTALS [NOT USED]
3 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
4 1.7 CLOSEOUT SUBMITTALS [NOT USED]
5 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
6 1.9 QUALITY ASSURANCE [NOT USED]
7 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
8 1.11 FIELD [SITE] CONDITIONS [NOT USED]
9 1.12 WARRANTY [NOT USED]
10 PART 2 - PRODUCTS [NOT USED]
11 PART 3 - EXECUTION [NOT USED]
12 END OF SECTION
13
Revision Log
DATE NAME SUMMARY OF CHANGE
12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days
14
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS- DEVELOPER AWARDED PROJECTS 105753
Revised August 30, 2013
1
2
3
4 PART1- GENERAL
5 1.1 SUMMARY
0135 13- 1
DAP SPECIAL PROJECT PROCEDURES
Page 1 of 7
SECTION 0135 13
SPECIAL PROJECT PROCEDURES
6 A. Section Includes:
7 1. The procedures for special project circumstances that includes, but is not limited to:
8 a. Coordination with the Texas Department of Transportation
9 b. Work near High Voltage Lines
10 c. Confined Space Entry Program
11 d. Air Pollution Watch Days
12 e. Use of Explosives, Drop Weight, Etc.
13 £ Water Department Notification
14 g. Public Notification Prior to Beginning Construction
15 h. Coordination with United States Army Corps of Engineers
16 i. Coordination within Railroad permits areas
17 j. Dust Control
18 k. Employee Parking
19 B. Deviations from this City of Fort Worth Standard Specification
20 1. None.
21 C. Related Specification Sections include, but are not necessarily limited to:
22 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
23 2. Division 1 — General Requirements
24 3. Section 33 12 25 — Connection to Existing Water Mains
25
26 1.2 REFERENCES
27 A. Reference Standards
28 1. Reference standards cited in this Specification refer to the current reference
29 standard published at the time of the latest revision date logged at the end of this
30 Specification, unless a date is specifically cited.
31 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752.
32 High Voltage Overhead Lines.
33 3. North Central Texas Council of Governments (NCTCOG) Clean Construction
34 Specification
35 1.3 ADMINISTRATIVE REQUIREMENTS
36 A. Coordination with the Texas Department of Transportation
37 1. When work in the right-of-way which is under the jurisdiction of the Texas
38 Department of Transportation (TxDOT):
39 a. Notify the Texas Department of Transportation prior to commencing any work
40 therein in accordance with the provisions of the permit
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August, 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
013513-2
DAP SPECIAL PROJECT PROCEDURES
Page 2 of 7
b. All work performed in the TxDOT right-of-way shall be performed in
compliance with and subject to approval from the Texas Department of
Transportation
B. Work near High Voltage Lines
1. Regulatory Requirements
a. All Work near High Voltage Lines (more than 600 volts measured between
conductors or between a conductor and the ground) shall be in accordance with
Health and Safety Code, Title 9, Subtitle A, Chapter 752.
2. Warning sign
a. Provide sign of sufficient size meeting all OSHA requirements.
3. Equipment operating within 10 feet of high voltage lines will require the following
safety features
a. Insulating cage -type of guard about the boom or arm
b. Insulator links on the lift hook connections for back hoes or dippers
c. Equipment must meet the safety requirements as set forth by OSHA and the
safety requirements of the owner of the high voltage lines
4. Work within 6 feet of high voltage electric lines
a. Notification shall be given to:
1) The power company (example: ONCOR)
a) Maintain an accurate log of all such calls to power company and record
action taken in each case.
b. Coordination with power company
1) After notification coordinate with the power company to:
a) Erect temporary mechanical barriers, de -energize the lines, or raise or
lower the lines
c. No personnel may work within 6 feet of a high voltage line before the above
requirements have been met.
C. Confined Space Entry Program
1. Provide and follow approved Confined Space Entry Program in accordance with
OSHA requirements.
2. Confined Spaces include:
a. Manholes
b. All other confined spaces in accordance with OSHA's Permit Required for
Confined Spaces
D. Use of Explosives, Drop Weight, Etc.
1. When Contract Documents permit on the project the following will apply:
a. Public Notification
1) Submit notice to City and proof of adequate insurance coverage, 24 hours
prior to commencing.
2) Minimum 24 hour public notification in accordance with Section 0131 13
E. Water Department Coordination
1. During the construction of this project, it will be necessary to deactivate, for a
period of time, existing lines. The Contractor shall be required to coordinate with
the Water Department to determine the best times for deactivating and activating
those lines.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August, 30, 2013
013513-3
DAP SPECIAL PROJECT PROCEDURES
Page 3 of 7
1 2. Coordinate any event that will require connecting to or the operation of an existing
2 City water line system with the City's representative.
3 a. Coordination shall be in accordance with Section 33 12 25.
4 b. If needed, obtain a hydrant water meter from the Water Department for use
5 during the life of named project.
6 c. In the event that a water valve on an existing live system be turned off and on
7 to accommodate the construction of the project is required, coordinate this
8 activity through the appropriate City representative.
9 1) Do not operate water line valves of existing water system.
10 a) Failure to comply will render the Contractor in violation of Texas Penal
11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor
12 will be prosecuted to the full extent of the law.
13 b) In addition, the Contractor will assume all liabilities and
14 responsibilities as a result of these actions.
15 F. Public Notification Prior to Beginning Construction
16 1. Prior to beginning construction on any block in the project, on a block by block
17 basis, prepare and deliver a notice or flyer of the pending construction to the front
18 door of each residence or business that will be impacted by construction. The notice
19 shall be prepared as follows:
20 a. Post notice or flyer 7 days prior to beginning any construction activity on each
21 block in the project area.
22 1) Prepare flyer on the Contractor's letterhead and include the following
23 information:
24
a) Name of Project
25
b) City Project No (CPN)
26
c) Scope of Project (i.e. type of construction activity)
27
d) Actual construction duration within the block
28
e) Name of the contractor's foreman and phone number
29
f) Name of the City's inspector and phone number
30
g) City's after-hours phone number
31
2) A sample of the `pre -construction notification' flyer is attached as Exhibit
32
A.
33
3) Submit schedule showing the construction start and finish time for each
34
block of the project to the inspector.
35
4) Deliver flyer to the City Inspector for review prior to distribution.
36
b. No construction will be allowed to begin on any block until the flyer is
37
delivered to all residents of the block.
38 G. Public Notification of Temporary Water Service Interruption during Construction
39 1. In the event it becomes necessary to temporarily shut down water service to
40 residents or businesses during construction, prepare and deliver a notice or flyer of
41 the pending interruption to the front door of each affected resident.
42 2. Prepared notice as follows:
43 a. The notification or flyer shall be posted 24 hours prior to the temporary
44 interruption.
45 b. Prepare flyer on the contractor's letterhead and include the following
46 information:
47 1) Name of the project
48 2) City Project Number
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August, 30, 2013
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
01 35 13 - 4
DAP SPECIAL PROJECT PROCEDURES
Page 4 of 7
3) Date of the interruption of service
4) Period the interruption will take place
5) Name of the contractor's foreman and phone number
6) Name of the City's inspector and phone number
c. A sample of the temporary water service interruption notification is attached as
Exhibit B.
d. Deliver a copy of the temporary interruption notification to the City inspector
for review prior to being distributed.
e. No interruption of water service can occur until the flyer has been delivered to
all affected residents and businesses.
f. Electronic versions of the sample flyers can be obtained from the Project
Construction Inspector.
H. Coordination with United States Army Corps of Engineers (USACE)
1. At locations in the Project where construction activities occur in areas where
USACE permits are required, meet all requirements set forth in each designated
permit.
I. Coordination within Railroad Permit Areas
1. At locations in the project where construction activities occur in areas where
railroad permits are required, meet all requirements set forth in each designated
railroad permit. This includes, but is not limited to, provisions for:
a. Flagmen
b. Inspectors
c. Safety training
d. Additional insurance
e. Insurance certificates
f. Other employees required to protect the right-of-way and property of the
Railroad Company from damage arising out of and/or from the construction of
the project. Proper utility clearance procedures shall be used in accordance
with the permit guidelines.
2. Obtain any supplemental information needed to comply with the railroad's
requirements.
J. Dust Control
1. Use acceptable measures to control dust at the Site.
a. If water is used to control dust, capture and properly dispose of waste water.
b. If wet saw cutting is performed, capture and properly dispose of slurry.
K. Employee Parking
1. Provide parking for employees at locations approved by the City.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August, 30, 2013
013513-5
DAP SPECIAL PROJECT PROCEDURES
Page 5 of 7
1 1.4
SUBMITTALS [NOT USED]
2 1.5
ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
3 1.6
CLOSEOUT SUBMITTALS [NOT USED]
4 1.7
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
5 1.8
QUALITY ASSURANCE [NOT USED]
6 1.9
DELIVERY, STORAGE, AND HANDLING [NOT USED]
7 1.10
FIELD [SITE] CONDITIONS [NOT USED]
8 1.11
WARRANTY [NOT USED]
9 PART 2 - PRODUCTS [NOT USED]
10 PART 3 - EXECUTION [NOT USED]
11 END OF SECTION
12
13
Revision Log
DATE NAME SUMMARY OF CHANGE
1.3.13— Added requirement of compliance with Health and Safety Code, Title 9.
8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August, 30, 2013
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
01 35 13 - 6
DAP SPECIAL PROJECT PROCEDURES
Page 6 of 7
EXHIBIT A
(To be printed on Contractor's Letterhead)
Date:
CPN No.:
Project Name:
Mapsco Location:
Limits of Construction:
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT
WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR
PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE
OF THIS NOTICE.
IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER
ISSUE, PLEASE CALL:
Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT < TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August, 30, 2013
2
4
Date:
EXHIBIT B
FORT WORTH
DOE NO. xxxx
Project Name:
013513-7
DAP SPECIAL PROJECT PROCEDURES
Page 7 of 7
NOTICE OF TEMPORARY WATER SERVICE
INTERRUPTION
DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR
WATER SERVICE WILL BE INTERRUPTED ON
BETWEEN THE HOURS OF AND
IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL:
MR. AT
(CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER)
OR
MR. AT
(CITY INSPECTOR) (TELEPHONE NUMBER)
THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE.
THANK YOU,
,CONTRACTOR
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised August, 30, 2013
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 1 of 2
SECTION 0145 23
TESTING AND INSPECTION SERVICES
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
1. Testing and inspection services procedures and coordination
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
Work associated with this Item is considered subsidiary to the various Items bid.
No separate payment will be allowed for this Item.
a. Contractor is responsible for performing, coordinating, and payment of all
Quality Control testing.
b. City is responsible for performing and payment for first set of Quality
Assurance testing.
1) If the first Quality Assurance test performed by the City fails, the
Contractor is responsible for payment of subsequent Quality Assurance
testing until a passing test occurs.
a) Final acceptance will not be issued by City until all required payments
for testing by Contractor have been paid in full.
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A. Testing
1. Complete testing in accordance with the Contract Documents.
2. Coordination
a. When testing is required to be performed by the City, notify City, sufficiently
in advance, when testing is needed.
b. When testing is required to be completed by the Contractor, notify City,
sufficiently in advance, that testing will be performed.
3. Distribution of Testing Reports
a. Electronic Distribution
1) Confirm development of Project directory for electronic submittals to be
uploaded to the City's document management system, or another form of
distribution approved by the City.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
01 45 23
DAP TESTING AND INSPECTION SERVICES
Page 2 of 2
2) Upload test reports to designated project directory and notify appropriate
City representatives via email of submittal posting.
3) Hard Copies
a) 1 copy for all submittals submitted to the Project Representative
b. Hard Copy Distribution (if required in lieu of electronic distribution)
1) Tests performed by City
a) Distribute 1 hard copy to the Contractor
2) Tests performed by the Contractor
a) Distribute 3 hard copies to City's Project Representative
4. Provide City's Project Representative with trip tickets for each delivered load of
Concrete or Lime material including the following information:
a. Name of pit
b. Date of delivery
c. Material delivered
B. Inspection
1. Inspection or lack of inspection does not relieve the Contractor from obligation to
perform work in accordance with the Contract Documents.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
03/20/2020 D.V. Magana Removed reference to Buzzsaw and noted that electronic submittals be uploaded
through the City's document management system.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
01 50 00 - 1
DAP TEMPORARY FACILITIES AND CONTROLS
Pagel of 4
1 SECTION 0150 00
2 TEMPORARY FACILITIES AND CONTROLS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Provide temporary facilities and controls needed for the Work including, but not
7 necessarily limited to:
8 a. Temporary utilities
9 b. Sanitary facilities
10 c. Storage Sheds and Buildings
11 d. Dust control
12 e. Temporary fencing of the construction site
13 B. Deviations from this City of Fort Worth Standard Specification
14 1. None.
15 C. Related Specification Sections include, but are not necessarily limited to:
16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
17 2. Division 1 — General Requirements
18 1.2 PRICE AND PAYMENT PROCEDURES
19 A. Measurement and Payment
20 1. Work associated with this Item is considered subsidiary to the various Items bid.
21 No separate payment will be allowed for this Item.
22 1.3 REFERENCES [NOT USED]
23 1.4 ADMINISTRATIVE REQUIREMENTS
24 A. Temporary Utilities
25 1. Obtaining Temporary Service
26 a. Make arrangements with utility service companies for temporary services.
27 b. Abide by rules and regulations of utility service companies or authorities
28 having jurisdiction.
29 c. Be responsible for utility service costs until Work is approved for Final
30 Acceptance.
31 1) Included are fuel, power, light, heat and other utility services necessary for
32 execution, completion, testing and initial operation of Work.
33 2. Water
34 a. Contractor to provide water required for and in connection with Work to be
35 performed and for specified tests of piping, equipment, devices or other use as
36 required for the completion of the Work.
37 b. Provide and maintain adequate supply of potable water for domestic
38 consumption by Contractor personnel and City's Project Representatives.
39 c. Coordination
40 1) Contact City 1 week before water for construction is desired
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised JULY 1, 2011
01 50 00 - 2
DAP TEMPORARY FACILITIES AND CONTROLS
Page 2 of 4
1
d. Contractor Payment for Construction Water
2
1) Obtain construction water meter from City for payment as billed by City's
3
established rates.
4
3.
Electricity and Lighting
5
a. Provide and pay for electric powered service as required for Work, including
6
testing of Work.
7
1) Provide power for lighting, operation of equipment, or other use.
8
b. Electric power service includes temporary power service or generator to
9
maintain operations during scheduled shutdown.
10
4.
Telephone
11
a. Provide emergency telephone service at Site for use by Contractor personnel
12
and others performing work or furnishing services at Site.
13
5.
Temporary Heat and Ventilation
14
a. Provide temporary heat as necessary for protection or completion of Work.
15
b. Provide temporary heat and ventilation to assure safe working conditions.
16
B. Sanitary Facilities
17
1.
Provide and maintain sanitary facilities for persons on Site.
18
a. Comply with regulations of State and local departments of health.
19
2.
Enforce use of sanitary facilities by construction personnel at job site.
20
a. Enclose and anchor sanitary facilities.
21
b. No discharge will be allowed from these facilities.
22
c. Collect and store sewage and waste so as not to cause nuisance or health
23
problem.
24
d. Haul sewage and waste off -site at no less than weekly intervals and properly
25
dispose in accordance with applicable regulation.
26
3.
Locate facilities near Work Site and keep clean and maintained throughout Project.
27
4.
Remove facilities at completion of Project
28
C. Storage Sheds and Buildings
29
1.
Provide adequately ventilated, watertight, weatherproof storage facilities with floor
30
above ground level for materials and equipment susceptible to weather damage.
31
2.
Storage of materials not susceptible to weather damage may be on blocks off
32
ground.
33
3.
Store materials in a neat and orderly manner.
34
a. Place materials and equipment to permit easy access for identification,
35
inspection and inventory.
36
4.
Equip building with lockable doors and lighting, and provide electrical service for
37
equipment space heaters and heating or ventilation as necessary to provide storage
38
environments acceptable to specified manufacturers.
39
5.
Fill and grade site for temporary structures to provide drainage away from
40
temporary and existing buildings.
41
6.
Remove building from site prior to Final Acceptance.
42
D. Temporary Fencing
43
1.
Provide and maintain for the duration or construction when required in contract
44
documents
45
E. Dust
Control
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised JULY 1, 2011
01 50 00 - 3
DAP TEMPORARY FACILITIES AND CONTROLS
Page 3 of 4
1 1. Contractor is responsible for maintaining dust control through the duration of the
2 project.
3 a. Contractor remains on -call at all times
4 b. Must respond in a timely manner
5 F. Temporary Protection of Construction
6 1. Contractor or subcontractors are responsible for protecting Work from damage due
7 to weather.
8 1.5 SUBMITTALS [NOT USED]
9 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
10 1.7 CLOSEOUT SUBMITTALS [NOT USED]
11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
12 1.9 QUALITY ASSURANCE [NOT USED]
13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
14 1.11 FIELD [SITE] CONDITIONS [NOT USED]
15 1.12 WARRANTY [NOT USED]
16 PART 2 - PRODUCTS [NOT USED]
17 PART 3 - EXECUTION [NOT USED]
18 3.1 INSTALLERS [NOT USED]
19 3.2 EXAMINATION [NOT USED]
20 3.3 PREPARATION [NOT USED]
21 3.4 INSTALLATION
22 A. Temporary Facilities
23 1. Maintain all temporary facilities for duration of construction activities as needed.
24 3.5 [REPAIR] / [RESTORATION]
25 3.6 RE -INSTALLATION
26
3.7
FIELD [OR] SITE QUALITY CONTROL [NOT USED]
27
3.8
SYSTEM STARTUP [NOT USED]
28
3.9
ADJUSTING [NOT USED]
29
3.10
CLEANING [NOT USED]
30
3.11
CLOSEOUT ACTIVITIES
31 A. Temporary Facilities
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised JULY 1, 2011
01 50 00 - 4
DAP TEMPORARY FACILITIES AND CONTROLS
Page 4 of 4
1 1. Remove all temporary facilities and restore area after completion of the Work, to a
2 condition equal to or better than prior to start of Work.
3 3.12 PROTECTION [NOT USED]
4 3.13 MAINTENANCE [NOT USED]
5 3.14 ATTACHMENTS [NOT USED]
6 END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised JULY 1, 2011
01 55 26 - 1
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Pagel of 3
1 SECTION 0155 26
2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Administrative procedures for:
7 a. Street Use Permit
8 b. Modification of approved traffic control
9 c. Removal of Street Signs
10 B. Deviations from this City of Fort Worth Standard Specification
11 1. None.
12 C. Related Specification Sections include, but are not necessarily limited to:
13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
14 2. Division 1 — General Requirements
15 3. Section 34 71 13 — Traffic Control
16 1.2 PRICE AND PAYMENT PROCEDURES
17 A. Measurement and Payment
18 1. Work associated with this Item is considered subsidiary to the various Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 REFERENCES
21 A. Reference Standards
22 1. Reference standards cited in this specification refer to the current reference standard
23 published at the time of the latest revision date logged at the end of this
24 specification, unless a date is specifically cited.
25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD).
26 1.4 ADMINISTRATIVE REQUIREMENTS
27 A. Traffic Control
28 1. General
29 a. When traffic control plans are included in the Drawings, provide Traffic
30 Control in accordance with Drawings and Section 34 71 13.
31 b. When traffic control plans are not included in the Drawings, prepare traffic
32 control plans in accordance with Section 34 71 13 and submit to City for
33 review.
34 1) Allow minimum 10 working days for review of proposed Traffic Control.
35 B. Street Use Permit
36 1. Prior to installation of Traffic Control, a City Street Use Permit is required.
37 a. To obtain Street Use Permit, submit Traffic Control Plans to City
38 Transportation and Public Works Department.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised July 1, 2011
015526-2
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 2 of 3
1 1) Allow a minimum of 5 working days for permit review.
2 2) Contractor's responsibility to coordinate review of Traffic Control plans for
3 Street Use Permit, such that construction is not delayed.
4 C. Modification to Approved Traffic Control
5 1. Prior to installation traffic control:
6 a. Submit revised traffic control plans to City Department Transportation and
7 Public Works Department.
8 1) Revise Traffic Control plans in accordance with Section 34 71 13.
9 2) Allow minimum 5 working days for review of revised Traffic Control.
10 3) It is the Contractor's responsibility to coordinate review of Traffic Control
11 plans for Street Use Permit, such that construction is not delayed.
12 D. Removal of Street Sign
13 1. If it is determined that a street sign must be removed for construction, then contact
14 City Transportation and Public Works Department, Signs and Markings Division to
15 remove the sign.
16 E. Temporary Signage
17 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting
18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control
19 Devices (MUTCD).
20 2. Install temporary sign before the removal of permanent sign.
21 3. When construction is complete, to the extent that the permanent sign can be
22 reinstalled, contact the City Transportation and Public Works Department, Signs
23 and Markings Division, to reinstall the permanent sign.
24 F. Traffic Control Standards
25 1. Traffic Control Standards can be found on the City's Buzzsaw website.
26 1.5 SUBMITTALS [NOT USED]
27 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
28 1.7 CLOSEOUT SUBMITTALS [NOT USED]
29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
30 1.9 QUALITY ASSURANCE [NOT USED]
31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
32 1.11 FIELD [SITE] CONDITIONS [NOT USED]
33 1.12 WARRANTY [NOT USED]
34 PART 2 - PRODUCTS [NOT USED]
35 PART 3 - EXECUTION [NOT USED]
36 END OF SECTION
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised July 1, 2011
015526-3
DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL
Page 3 of 3
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised July 1, 2011
0157 13- 1
DAP STORM WATER POLLUTION PREVENTION
Pagel of 3
1 SECTION 0157 13
2 STORM WATER POLLUTION PREVENTION
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Procedures for Storm Water Pollution Prevention Plans
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the
11 Contract
12 2. Division 1 — General Requirements
13 3. Section 3125 00 — Erosion and Sediment Control
14 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1. Construction Activities resulting in less than 1 acre of disturbance
17 a. Work associated with this Item is considered subsidiary to the various Items
18 bid. No separate payment will be allowed for this Item.
19 2. Construction Activities resulting in greater than 1 acre of disturbance
20 a. Measurement and Payment shall be in accordance with Section 3125 00.
21 1.3 REFERENCES
22 A. Abbreviations and Acronyms
23 1. Notice of Intent: NOI
24 2. Notice of Termination: NOT
25 3. Storm Water Pollution Prevention Plan: SWPPP
26 4. Texas Commission on Environmental Quality: TCEQ
27 5. Notice of Change: NOC
28 A. Reference Standards
29 1. Reference standards cited in this Specification refer to the current reference
30 standard published at the time of the latest revision date logged at the end of this
31 Specification, unless a date is specifically cited.
32 2. Integrated Storm Management (iSWM) Technical Manual for Construction
33 Controls
34 1.4 ADMINISTRATIVE REQUIREMENTS
35 A. General
36 1. Contractor is responsible for resolution and payment of any fines issued associated
37 with compliance to Stormwater Pollution Prevention Plan.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised July 1, 2011
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
01 57 13 - 2
DAP STORM WATER POLLUTION PREVENTION
Page 2 of 3
B. Construction Activities resulting in:
1. Less than 1 acre of disturbance
a. Provide erosion and sediment control in accordance with Section 3125 00 and
Drawings.
2. 1 to less than 5 acres of disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) TCEQ Small Construction Site Notice Required under general permit
TXR150000
a) Sign and post at job site
b) Prior to Preconstruction Meeting, send 1 copy to City Department of
Transportation and Public Works, Environmental Division, (817) 392-
6088.
2) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
3. 5 acres or more of Disturbance
a. Texas Pollutant Discharge Elimination System (TPDES) General Construction
Permit is required
b. Complete SWPPP in accordance with TCEQ requirements
1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee
a) Sign and post at job site
b) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
2) TCEQ Notice of Change required if making changes or updates to NOI
3) Provide erosion and sediment control in accordance with:
a) Section 3125 00
b) The Drawings
c) TXR150000 General Permit
d) SWPPP
e) TCEQ requirements
4) Once the project has been completed and all the closeout requirements of
TCEQ have been met a TCEQ Notice of Termination can be submitted.
a) Send copy to City Department of Transportation and Public Works,
Environmental Division, (817) 392-6088.
40 1.5 SUBMITTALS
41
42
43
44
45
46
47
A. SWPPP
1. Submit in accordance with Section 0133 00, except as stated herein.
a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City
as follows:
1) 1 copy to the City Project Manager
a) City Project Manager will forward to the City Department of
Transportation and Public Works, Environmental Division for review
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised July 1, 2011
0157 13 - 3
DAP STORM WATER POLLUTION PREVENTION
Page 3 of 3
1 B. Modified SWPPP
2 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City
3 in accordance with Section 0133 00.
4 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
5 1.7 CLOSEOUT SUBMITTALS [NOT USED]
6 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
7 1.9 QUALITY ASSURANCE [NOT USED]
8 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
9 1.11 FIELD [SITE] CONDITIONS [NOT USED]
10 1.12 WARRANTY [NOT USED]
11 PART 2 - PRODUCTS [NOT USED]
12 PART 3 - EXECUTION [NOT USED]
13 END OF SECTION
14
15
Revision Log
DATE NAME SUMMARY OF CHANGE
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised July 1, 2011
SECTION 0160 00
PRODUCT REQUIREMENTS
PART1- GENERAL
1.1 SUMMARY
A. Section Includes:
01 60 00
DAP PRODUCT REQUIREMENTS
Page 1 of 2
1. References for Product Requirements and City Standard Products List
B. Deviations from this City of Fort Worth Standard Specification
1. None.
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
1.2 PRICE AND PAYMENT PROCEDURES [NOT USED]
1.3 REFERENCES [NOT USED]
1.4 ADMINISTRATIVE REQUIREMENTS
A list of City approved products for use is available through the City's website at:
httDs://apps.fortworthtexas.2ov/ProiectResources/ and following the directory
path: 02 - Construction Documents\Standard Products List
A. Only products specifically included on City's Standard Product List in these Contract
Documents shall be allowed for use on the Project.
1. Any subsequently approved products will only be allowed for use upon specific
approval by the City.
B. Any specific product requirements in the Contract Documents supersede similar
products included on the City's Standard Product List.
1. The City reserves the right to not allow products to be used for certain projects even
though the product is listed on the City's Standard Product List.
C. Although a specific product is included on City's Standard Product List, not all
products from that manufacturer are approved for use, including but not limited to, that
manufacturer's standard product.
D. See Section 0133 00 for submittal requirements of Product Data included on City's
Standard Product List.
1.5 SUBMITTALS [NOT USED]
1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED]
1.7 CLOSEOUT SUBMITTALS [NOT USED]
1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
1.9 QUALITY ASSURANCE [NOT USED]
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
01 60 00
DAP PRODUCT REQUIREMENTS
Page 2 of 2
1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
1.11 FIELD [SITE] CONDITIONS [NOT USED]
1.12 WARRANTY [NOT USED]
PART 2 - PRODUCTS [NOT USED]
PART 3 - EXECUTION [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
10/12/12 D. Johnson Modified Location of City's Standard Product List
4/7/2014 M.Domenech Revised for DAP application
03/20/2020 D.V. Magafia Removed reference to Buzzsaw and noted that the City approved products list is
accessible through the City's website.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised March 20, 2020
01 66 00 - 1
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Pagel of 4
1 SECTION 0166 00
2 PRODUCT STORAGE AND HANDLING REQUIREMENTS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Scheduling of product delivery
7 2. Packaging of products for delivery
8 3. Protection of products against damage from:
9 a. Handling
10 b. Exposure to elements or harsh environments
11 B. Deviations from this City of Fort Worth Standard Specification
12 1. None.
13 C. Related Specification Sections include, but are not necessarily limited to:
14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
15 2. Division 1 — General Requirements
16 1.2 PRICE AND PAYMENT PROCEDURES
17 A. Measurement and Payment
18 1. Work associated with this Item is considered subsidiary to the various Items bid.
19 No separate payment will be allowed for this Item.
20 1.3 REFERENCES [NOT USED]
21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
22 1.5 SUBMITTALS [NOT USED]
23 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
24 1.7 CLOSEOUT SUBMITTALS [NOT USED]
25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
26 1.9 QUALITY ASSURANCE [NOT USED]
27 1.10 DELIVERY AND HANDLING
28 A. Delivery Requirements
29 1. Schedule delivery of products or equipment as required to allow timely installation
30 and to avoid prolonged storage.
31 2. Provide appropriate personnel and equipment to receive deliveries.
32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site
33 for personnel or equipment to receive the delivery.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 66 00 - 2
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 2 of 4
1
4.
Deliver products or equipment in manufacturer's original unbroken cartons or other
2
containers designed and constructed to protect the contents from physical or
3
environmental damage.
4
5.
Clearly and fully mark and identify as to manufacturer, item and installation
5
location.
6
6.
Provide manufacturer's instructions for storage and handling.
7
B. Handling
Requirements
8
1.
Handle products or equipment in accordance with these Contract Documents and
9
manufacturer's recommendations and instructions.
10
C. Storage Requirements
11
1.
Store materials in accordance with manufacturer's recommendations and
12
requirements of these Specifications.
13
2.
Make necessary provisions for safe storage of materials and equipment.
14
a. Place loose soil materials and materials to be incorporated into Work to prevent
15
damage to any part of Work or existing facilities and to maintain free access at
16
all times to all parts of Work and to utility service company installations in
17
vicinity of Work.
18
3.
Keep materials and equipment neatly and compactly stored in locations that will
19
cause minimum inconvenience to other contractors, public travel, adjoining owners,
20
tenants and occupants.
21
a. Arrange storage to provide easy access for inspection.
22
4.
Restrict storage to areas available on construction site for storage of material and
23
equipment as shown on Drawings, or approved by City's Project Representative.
24
5.
Provide off -site storage and protection when on -site storage is not adequate.
25
a. Provide addresses of and access to off -site storage locations for inspection by
26
City's Project Representative.
27
6.
Do not use lawns, grass plots or other private property for storage purposes without
28
written permission of owner or other person in possession or control of premises.
29
7.
Store in manufacturers' unopened containers.
30
8.
Neatly, safely and compactly stack materials delivered and stored along line of
31
Work to avoid inconvenience and damage to property owners and general public
32
and maintain at least 3 feet from fire hydrant.
33
9.
Keep public and private driveways and street crossings open.
34
10. Repair or replace damaged lawns, sidewalks, streets or other improvements to
35
satisfaction of City's Project Representative.
36
a. Total length which materials may be distributed along route of construction at
37
one time is 1,000 linear feet, unless otherwise approved in writing by City's
38
Project Representative.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 66 00 - 3
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 3 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART 2 - PRODUCTS [NOT USED]
4 PART 3 - EXECUTION
5 3.1
INSTALLERS [NOT USED]
6 3.2
EXAMINATION [NOT USED]
7 3.3
PREPARATION [NOT USED]
8 3.4
ERECTION [NOT USED]
9 3.5
REPAIR / RESTORATION [NOT USED]
10 3.6
RE -INSTALLATION [NOT USED]
11 3.7
FIELD [OR] SITE QUALITY CONTROL
12 A. Tests and Inspections
13 1. Inspect all products or equipment delivered to the site prior to unloading.
14 B. Non -Conforming Work
15 1. Reject all products or equipment that are damaged, used or in any other way
16 unsatisfactory for use on the project.
17 3.8 SYSTEM STARTUP [NOT USED]
18 3.9 ADJUSTING [NOT USED]
19 3.10 CLEANING [NOT USED]
20 3.11 CLOSEOUT ACTIVITIES [NOT USED]
21 3.12 PROTECTION
22 A. Protect all products or equipment in accordance with manufacturer's written directions.
23 B. Store products or equipment in location to avoid physical damage to items while in
24 storage.
25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by
26 the manufacturer.
27 3.13 MAINTENANCE [NOT USED]
28 3.14 ATTACHMENTS [NOT USED]
29 END OF SECTION
30
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 66 00 - 4
DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS
Page 4 of 4
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
5
6
7
8
9
10
11
12 1.2
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
017123-1
CONSTRUCTION STAKING AND SURVEY
Pagel of 8
SECTION 01 71 23
CONSTRUCTION STAKING AND SURVEY
A. Section Includes:
1. Requirements for construction staking and construction survey
B. Deviations from this City of Fort Worth Standard Specification
1. See Changes (Highlighted in Yellow).
C. Related Specification Sections include, but are not necessarily limited to:
1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
2. Division 1 — General Requirements
PRICE AND PAYMENT PROCEDURES
A. Measurement and Payment
1. Construction Staking
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will
be allowed.
2. Construction Survey
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will be
allowed.
3. As -Built Survey
a. Measurement
1) This Item is considered subsidiary to the various Items bid.
b. Payment
1) The work performed and the materials furnished in accordance with this
Item are subsidiary to the various Items bid and no other compensation will be
allowed.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised February 14, 2018
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
017123-2
CONSTRUCTION STAKING AND SURVEY
Page 2 of 8
1.3 REFERENCES
A. Definitions
1. Construction Survev - The survey measurements made prior to or while
construction is in progress to control elevation, horizontal position, dimensions and
configuration of structures/improvements included in the Project Drawings.
2. As -built Survev —The measurements made after the construction of the
improvement features are complete to provide position coordinates for the features
of a project.
3. Construction Stakins — The placement of stakes and markings to provide offsets
and elevations to cut and fill in order to locate on the ground the designed
structures/improvements included in the Project Drawings. Construction staking
shall include staking easements and/or right of way if indicated on the plans.
4. Survev "Field Checks" — Measurements made after construction staking is
completed and before construction work begins to ensure that structures marked on
the ground are accurately located per Project Drawings.
B. Technical References
1. City of Fort Worth — Construction Staking Standards (available on City's Buzzsaw
website) — 01 71 23.16.01— Attachment A Survey Staking Standards
2. City of Fort Worth - Standard Survey Data Collector Library (fxl) files (available
on City's Buzzsaw website).
3. Texas Department of Transportation (TxDOT) Survey Manual, latest revision
4. Texas Society of Professional Land Surveyors (TSPS), Manual of Practice for Land
Surveying in the State of Texas, Category 5
25 1.4 ADMINISTRATIVE REQUIREMENTS
26 A. The Contractor's selection of a surveyor must comply with Texas Government
27 Code 2254 (qualifications based selection) for this project.
28 1.5 SUBMITTALS
29 A. Submittals, if required, shall be in accordance with Section 0133 00.
30 B. All submittals shall be received and reviewed by the City prior to delivery of work.
31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS
32 A. Field Quality Control Submittals
33 1. Documentation verifying accuracy of field engineering work, including coordinate
34 conversions if plans do not indicate grid or ground coordinates.
35 2. Submit "Cut -Sheets" conforming to the standard template provided by the City
36 (refer to 01 71 23.16.01 — Attachment A — Survey Staking Standards).
37
38 1.7 CLOSEOUT SUBMITTALS
39 B. As -built Redline Drawing Submittal
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised February 14, 2018
017123-3
CONSTRUCTION STAKING AND SURVEY
Page 3 of 8
1 1. Submit As -Built Survey Redline Drawings documenting the locations/elevations of
2 constructed improvements signed and sealed by Registered Professional Land
3 Surveyor (RPLS) responsible for the work (refer to 01 71 23.16.01 — Attachment A
4 — Survey Staking Standards) .
5 2. Contractor shall submit the proposed as -built and completed redline drawing
6 submittal one (1) week prior to scheduling the project final inspection for City
7 review and comment. Revisions, if necessary, shall be made to the as -built redline
8 drawings and resubmitted to the City prior to scheduling the construction final
9 inspection.
10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
11 1.9 QUALITY ASSURANCE
12 A. Construction Staking
13 1. Construction staking will be performed by the Contractor.
14 2. Coordination
15 a. Contact City and Developer's Project Representative at least one week in
16 advance notifying the City of when Construction Staking is scheduled.
17 b. It is the Contractor's responsibility to coordinate staking such that
18 construction activities are not delayed or negatively impacted.
19 3. General
20 a. Contractor is responsible for preserving and maintaining stakes. If City
21 surveyors or Developer's Project Representative are required to re -stake for
22 any reason, the Contractor will be responsible for costs to perform staking. If
23 in the opinion of the City, a sufficient number of stakes or markings have been
24 lost, destroyed disturbed or omitted that the contracted Work cannot take place
25 then the Contractor will be required to stake or re -stake the deficient areas.
26 B. Construction Survey
27 1. Construction Survey will be performed by the Contractor.
28 2. Coordination
29 a. Contractor to verify that horizontal and vertical control data established in the
30 design survey and required for construction survey is available and in place.
31 3. General
32 a. Construction survey will be performed in order to construct the work shown
33 on the Construction Drawings and specified in the Contract Documents.
34 b. For construction methods other than open cut, the Contractor shall perform
35 construction survey and verify control data including, but not limited to, the
36 following:
37 1) Verification that established benchmarks and control are accurate.
38 2) Use of Benchmarks to furnish and maintain all reference lines and grades
39 for tunneling.
40 3) Use of line and grades to establish the location of the pipe.
41 4) Submit to the City copies of field notes used to establish all lines and
42 grades, if requested, and allow the City to check guidance system setup prior
43 to beginning each tunneling drive.
44 5) Provide access for the City, if requested, to verify the guidance system and
45 the line and grade of the carrier pipe.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised February 14, 2018
01 71 23 - 4
CONSTRUCTION STAKING AND SURVEY
Page 4 of 8
1 6) The Contractor remains fully responsible for the accuracy of the work and
2 correction of it, as required.
3 7) Monitor line and grade continuously during construction.
4 8) Record deviation with respect to design line and grade once at each pipe
5 joint and submit daily records to the City.
6 9) If the installation does not meet the specified tolerances (as outlined in
7 Sections 33 05 23 and/or 33 05 24), immediately notify the City and correct
8 the installation in accordance with the Contract Documents.
9 C. As -Built Survey
10 1. Required As -Built Survey will be performed by the Contractor.
11 2. Coordination
12 a. Contractor is to coordinate with City to confirm which features require as-
13 built surveying.
14 b. It is the Contractor's responsibility to coordinate the as -built survey and
15 required measurements for items that are to be buried such that construction
16 activities are not delayed or negatively impacted.
17 c. For sewer mains and water mains 12" and under in diameter, it is acceptable
18 to physically measure depth and mark the location during the progress of
19 construction and take as -built survey after the facility has been buried. The
20 Contractor is responsible for the quality control needed to ensure accuracy.
21 3. General
22 a. The Contractor shall provide as -built survey including the elevation and
23 location (and provide written documentation to the City) of construction
24 features during the progress of the construction including the following:
25 1) Water Lines
26 a) Top of pipe elevations and coordinates for waterlines at the following
27 locations:
28
(1) Minimum every 250 linear feet, including
29
(2) Horizontal and vertical points of inflection, curvature,
30
etc.
31
(3) Fire line tee
32
(4) Plugs, stub -outs, dead-end lines
33
(5) Casing pipe (each end) and all buried fittings
34
2) Sanitary Sewer
35
a) Top of pipe elevations and coordinates for force mains and siphon
36
sanitary sewer lines (non -gravity facilities) at the following locations:
37
(1) Minimum every 250 linear feet and any buried fittings
38
(2) Horizontal and vertical points of inflection, curvature,
39
etc.
40
3) Stormwater — Not Applicable
41
b. The Contractor shall provide as -built survey including the elevation and
42
location (and provide written documentation to the City) of construction
43
features after the construction is completed including the following:
44
1) Manholes
45
a) Rim and flowline elevations and coordinates for each manhole
46
2) Water Lines
47
a) Cathodic protection test stations
48
b) Sampling stations
49
c) Meter boxes/vaults (All sizes)
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised February 14, 2018
017123-5
CONSTRUCTION STAKING AND SURVEY
Page 5 of 8
1 d)
Fire hydrants
2 e)
Valves (gate, butterfly, etc.)
3 f)
Air Release valves (Manhole rim and vent pipe)
4 g)
Blow off valves (Manhole rim and valve lid)
5 h)
Pressure plane valves
6 i)
Underground Vaults
7
(1) Rim and flowline elevations and coordinates for each
8
Underground Vault.
9 3) Sanitary
Sewer
10 a)
Cleanouts
11
(1) Rim and flowline elevations and coordinates for each
12 b)
Manholes and Junction Structures
13
(1) Rim and flowline elevations and coordinates for each
14
manhole and junction structure.
15 4) Stormwater — Not Applicable
16 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
17 1.11 FIELD [SITE] CONDITIONS [NOT USED]
18 1.12 WARRANTY
19 PART 2 - PRODUCTS
20
A. A construction survey will produce, but will not be limited to:
21
1.
Recovery of relevant control points, points of curvature and points of intersection.
22
2.
Establish temporary horizontal and vertical control elevations (benchmarks)
23
sufficiently permanent and located in a manner to be used throughout construction.
24
3.
The location of planned facilities, easements and improvements.
25
a. Establishing final line and grade stakes for piers, floors, grade beams, parking
26
areas, utilities, streets, highways, tunnels, and other construction.
27
b. A record of revisions or corrections noted in an orderly manner for reference.
28
c. A drawing, when required by the client, indicating the horizontal and vertical
29
location of facilities, easements and improvements, as built.
30
4.
Cut sheets shall be provided to the City inspector and Survey Superintendent for all
31
construction staking projects. These cut sheets shall be on the standard city template
32
which can be obtained from the Survey Superintendent (817-392-7925).
33
5.
Digital survey files in the following formats shall be acceptable:
34
a. AutoCAD (.dwg)
35
b. ESRI Shapefile (.shp)
36
c. CSV file (.csv), formatted with X and Y coordinates in separate columns (use
37
standard templates, if available)
38
6.
Survey files shall include vertical and horizontal data tied to original project
39
control and benchmarks, and shall include feature descriptions
40 PART 3 - EXECUTION
41 3.1 INSTALLERS
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised February 14, 2018
017123-6
CONSTRUCTION STAKING AND SURVEY
Page 6 of 8
1 A. Tolerances:
2
1. The staked location of any improvement or facility should be as accurate as
3
practical and necessary. The degree of precision required is dependent on many
4
factors all of which must remain judgmental. The tolerances listed hereafter are
5
based on generalities and, under certain circumstances, shall yield to specific
6
requirements. The surveyor shall assess any situation by review of the overall plans
7
and through consultation with responsible parties as to the need for specific
8
tolerances.
9
a. Earthwork: Grades for earthwork or rough cut should not exceed 0.1 ft. vertical
10
tolerance. Horizontal alignment for earthwork and rough cut should not exceed
11
1.0 ft. tolerance.
12
b. Horizontal alignment on a structure shall be within .0.1 ft tolerance.
13
c. Paving or concrete for streets, curbs, gutters, parking areas, drives, alleys and
14
walkways shall be located within the confines of the site boundaries and,
15
occasionally, along a boundary or any other restrictive line. Away from any
16
restrictive line, these facilities should be staked with an accuracy producing no
17
more than 0.05ft. tolerance from their specified locations.
18
d. Underground and overhead utilities, such as sewers, gas, water, telephone and
19
electric lines, shall be located horizontally within their prescribed areas or
20
easements. Within assigned areas, these utilities should be staked with an
21
accuracy producing no more than 0.1 ft tolerance from a specified location.
22
e. The accuracy required for the vertical location of utilities varies widely. Many
23
underground utilities require only a minimum cover and a tolerance of 0.1 ft.
24
should be maintained. Underground and overhead utilities on planned profile,
25
but not depending on gravity flow for performance, should not exceed 0.1 ft.
26
tolerance.
27 B. Surveying instruments shall be kept in close adjustment according to manufacturer's
28 specifications or in compliance to standards. The City reserves the right to request a
29 calibration report at any time and recommends regular maintenance schedule be
30 performed by a certified technician every 6 months.
31 1. Field measurements of angles and distances shall be done in such fashion as to
32 satisfy the closures and tolerances expressed in Part 3.1.A.
33 2. Vertical locations shall be established from a pre -established benchmark and
34 checked by closing to a different bench mark on the same datum.
35 3. Construction survey field work shall correspond to the client's plans. Irregularities
36 or conflicts found shall be reported promptly to the City.
37 4. Revisions, corrections and other pertinent data shall be logged for future reference.
38
39 3.2 EXAMINATION [NOT USED]
40 3.3 PREPARATION [NOT USED]
41 3.4 APPLICATION
42 3.5 REPAIR / RESTORATION
43 A. If the Contractor's work damages or destroys one or more of the control
44 monuments/points set by the City or Developer's Project Representative, the monuments
45 shall be adequately referenced for expedient restoration.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised February 14, 2018
017123-7
CONSTRUCTION STAKING AND SURVEY
Page 7 of 8
1 1. Notify City or Developer's Project Representative if any control data needs to be
2 restored or replaced due to damage caused during construction operations.
3 a. Contractor shall perform replacements and/or restorations.
4 b. The City or Developer's Project Representative may require at anytime a
5 survey "Field Check" of any monument or benchmarks that are set be verified
6 by the City surveyors or Developer's Project Representative before further
7 associated work can move forward.
S 3.6 RE -INSTALLATION [NOT USED]
9 3.7 FIELD [OR] SITE QUALITY CONTROL
10 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the
11 City or Developer's Project Representative in accordance with this Specification. This
12 includes easements and right of way, if noted on the plans.
13 B. Do not change or relocate stakes or control data without approval from the City.
14 3.8 SYSTEM STARTUP
15 A. Survey Checks
16 1. The City reserves the right to perform a Survey Check at any time deemed
17 necessary.
18 2. Checks by City personnel or 3' party contracted surveyor are not intended to
19 relieve the contractor of his/her responsibility for accuracy.
20
21 3.9 ADJUSTING [NOT USED]
22 3.10 CLEANING [NOT USED]
23 3.11 CLOSEOUT ACTIVITIES [NOT USED]
24 3.12 PROTECTION [NOT USED]
25 3.13 MAINTENANCE [NOT USED]
26 3.14 ATTACHMENTS [NOT USED]
27 END OF SECTION
28
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D. Johnson
Added instruction and modified measurement & payment under 1.2; added
8/31/2017 M. Owen definitions and references under 1.3; modified 1.6; added 1.7 closeout submittal
requirements; modified 1.9 Quality Assurance; added PART 2 — PRODUCTS;
Added 3.1 Installers; added 3.5 Repair/Restoration; and added 3.8 System Startup.
Removed "blue text"; revised measurement and payment sections for Construction
2/14/2018 M Owen Staking and As -Built Survey; added reference to selection compliance with TGC
2254; revised action and Closeout submittal requirements; added acceptable depth
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised February 14, 2018
017123-8
CONSTRUCTION STAKING AND SURVEY
Page 8 of 8
measurement criteria; revised list of items requiring as -built survey "during" and
"after" construction; and revised acceptable digital survey file format
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised February 14, 2018
017423-1
DAP CLEANING
Pagel of 4
1 SECTION 0174 23
2 CLEANING
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Intermediate and final cleaning for Work not including special cleaning of closed
7 systems specified elsewhere
8 B. Deviations from this City of Fort Worth Standard Specification
9 1. None.
10 C. Related Specification Sections include, but are not necessarily limited to:
11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
12 2. Division 1 — General Requirements
13 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding
14 1.2 PRICE AND PAYMENT PROCEDURES
15 A. Measurement and Payment
16 1. Work associated with this Item is considered subsidiary to the various Items bid.
17 No separate payment will be allowed for this Item.
18 1.3 REFERENCES [NOT USED]
19 1.4 ADMINISTRATIVE REQUIREMENTS
20
A. Scheduling
21
1. Schedule cleaning operations so that dust and other contaminants disturbed by
22
cleaning process will not fall on newly painted surfaces.
23
2. Schedule final cleaning upon completion of Work and immediately prior to final
24
inspection.
25
1.5
SUBMITTALS [NOT USED]
26
1.6
ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
27
1.7
CLOSEOUT SUBMITTALS [NOT USED]
28
1.8
MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29
1.9
QUALITY ASSURANCE [NOT USED]
30
1.10
STORAGE, AND HANDLING
31
A. Storage and Handling Requirements
32
1. Store cleaning products and cleaning wastes in containers specifically designed for
33
those materials.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 74 23 - 2
DAP CLEANING
Page 2 of 4
1 1.11 FIELD [SITE] CONDITIONS [NOT USED]
2 1.12 WARRANTY [NOT USED]
3 PART 2 - PRODUCTS
4 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED]
5 2.2 MATERIALS
6 A. Cleaning Agents
7 1. Compatible with surface being cleaned
8 2. New and uncontaminated
9 3. For manufactured surfaces
10 a. Material recommended by manufacturer
11 2.3 ACCESSORIES [NOT USED]
12 2.4 SOURCE QUALITY CONTROL [NOT USED]
13 PART 3 - EXECUTION
14
3.1
INSTALLERS [NOT USED]
15
3.2
EXAMINATION [NOT USED]
16
3.3
PREPARATION [NOT USED]
17
3.4
APPLICATION [NOT USED]
18
3.5
REPAIR / RESTORATION [NOT USED]
19
3.6
RE -INSTALLATION [NOT USED]
20
3.7
FIELD [OR] SITE QUALITY CONTROL [NOT USED]
21
3.8
SYSTEM STARTUP [NOT USED]
22
3.9
ADJUSTING [NOT USED]
23
3.10
CLEANING
24 A. General
25 1. Prevent accumulation of wastes that create hazardous conditions.
26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of
27 governing authorities.
28 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in
29 storm or sanitary drains or sewers.
30 4. Dispose of degradable debris at an approved solid waste disposal site.
31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an
32 alternate manner approved by City and regulatory agencies.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 74 23 - 3
DAP CLEANING
Page 3 of 4
1
6.
Handle materials in a controlled manner with as few handlings as possible.
2
7.
Thoroughly clean, sweep, wash and polish all Work and equipment associated with
3
this project.
4
8.
Remove all signs of temporary construction and activities incidental to construction
5
of required permanent Work.
6
9.
If project is not cleaned to the satisfaction of the City, the City reserves the right to
7
have the cleaning completed at the expense of the Contractor.
8
10.
Do not burn on -site.
9
B. Intermediate Cleaning during Construction
10
1.
Keep Work areas clean so as not to hinder health, safety or convenience of
11
personnel in existing facility operations.
12
2.
At maximum weekly intervals, dispose of waste materials, debris and rubbish.
13
3.
Confine construction debris daily in strategically located container(s):
14
a. Cover to prevent blowing by wind
15
b. Store debris away from construction or operational activities
16
c. Haul from site at a minimum of once per week
17
4.
Vacuum clean interior areas when ready to receive finish painting.
18
a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance.
19
5.
Prior to storm events, thoroughly clean site of all loose or unsecured items, which
20
may become airborne or transported by flowing water during the storm.
21
C. Exterior
(Site or Right of Way) Final Cleaning
22
1.
Remove trash and debris containers from site.
23
a. Re -seed areas disturbed by location of trash and debris containers in accordance
24
with Section 32 92 13.
25
2.
Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object
26
that may hinder or disrupt the flow of traffic along the roadway.
27
3.
Clean any interior areas including, but not limited to, vaults, manholes, structures,
28
junction boxes and inlets.
29
4.
If no longer required for maintenance of erosion facilities, and upon approval by
30
City, remove erosion control from site.
31
5.
Clean signs, lights, signals, etc.
32
3.11 CLOSEOUT
ACTIVITIES [NOT USED]
33 3.12 PROTECTION [NOT USED]
34 3.13 MAINTENANCE [NOT USED]
35 3.14 ATTACHMENTS [NOT USED]
t1ro
37
38
39
40
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 74 23 - 4
DAP CLEANING
Page 4 of 4
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP application
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
1
2
3 PART1- GENERAL
4 1.1 SUMMARY
SECTION 0177 19
CLOSEOUT REQUIREMENTS
017719-1
DAP CLOSEOUT REQUIREMENTS
Pagel of 3
5 A. Section Includes:
6 1. The procedure for closing out a contract
7 B. Deviations from this City of Fort Worth Standard Specification
8 1. None.
9 C. Related Specification Sections include, but are not necessarily limited to:
10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
11 2. Division 1 — General Requirements
12 1.2 PRICE AND PAYMENT PROCEDURES
13 A. Measurement and Payment
14 1. Work associated with this Item is considered subsidiary to the various Items bid.
15 No separate payment will be allowed for this Item.
16 1.3 REFERENCES [NOT USED]
17 1.4 ADMINISTRATIVE REQUIREMENTS
18 A. Guarantees, Bonds and Affidavits
19 1. No application for final payment will be accepted until all guarantees, bonds,
20 certificates, licenses and affidavits required for Work or equipment as specified are
21 satisfactorily filed with the City.
22 B. Release of Liens or Claims
23 1. No application for final payment will be accepted until satisfactory evidence of
24 release of liens has been submitted to the City.
25 1.5 SUBMITTALS
26 A. Submit all required documentation to City's Project Representative.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
017719-2
DAP CLOSEOUT REQUIREMENTS
Page 2 of 3
1.6 INFORMATIONAL SUBMITTALS [NOT USED]
2 1.7 CLOSEOUT SUBMITTALS [NOT USED]
3 PART 2 - PRODUCTS [NOT USED]
4 PART 3 - EXECUTION
5 3.1 INSTALLERS [NOT USED]
6 3.2 EXAMINATION [NOT USED]
7 3.3 PREPARATION [NOT USED]
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
3.4 CLOSEOUT PROCEDURE
A. Prior to requesting Final Inspection, submit:
1. Project Record Documents in accordance with Section 0178 39
2. Operation and Maintenance Data, if required, in accordance with Section 0178 23
B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section
01 74 23.
C. Final Inspection
1. After final cleaning, provide notice to the City Project Representative that the Work
is completed.
a. The City will make an initial Final Inspection with the Contractor present.
b. Upon completion of this inspection, the City will notify the Contractor, in
writing within 10 business days, of any particulars in which this inspection
reveals that the Work is defective or incomplete.
2. Upon receiving written notice from the City, immediately undertake the Work
required to remedy deficiencies and complete the Work to the satisfaction of the
City.
3. Upon completion of Work associated with the items listed in the City's written
notice, inform the City, that the required Work has been completed. Upon receipt
of this notice, the City, in the presence of the Contractor, will make a subsequent
Final Inspection of the project.
4. Provide all special accessories required to place each item of equipment in full
operation. These special accessory items include, but are not limited to:
a. Specified spare parts
b. Adequate oil and grease as required for the first lubrication of the equipment
c. Initial fill up of all chemical tanks and fuel tanks
d. Light bulbs
e. Fuses
f. Vault keys
g. Handwheels
h. Other expendable items as required for initial start-up and operation of all
equipment
39 D. Notice of Project Completion
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
017719-3
DAP CLOSEOUT REQUIREMENTS
Page 3 of 3
1. Once the City Project Representative finds the Work subsequent to Final Inspection
to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet).
E. Supporting Documentation
1. Coordinate with the City Project Representative to complete the following
additional forms:
a. Final Payment Request
b. Statement of Contract Time
c. Affidavit of Payment and Release of Liens
d. Consent of Surety to Final Payment
e. Pipe Report (if required)
f. Contractor's Evaluation of City
g. Performance Evaluation of Contractor
F. Letter of Final Acceptance
1. Upon review and acceptance of Notice of Project Completion and Supporting
Documentation, in accordance with General Conditions, City will issue Letter of
Final Acceptance and release the Final Payment Request for payment.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
DATE NAME
4/7/2014 M.Domenech
END OF SECTION
Revision Log
SUMMARY OF CHANGE
Revised for DAP application
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
017823-1
DAP OPERATION AND MAINTENANCE DATA
Pagel of 5
1 SECTION 0178 23
2 OPERATION AND MAINTENANCE DATA
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Product data and related information appropriate for City's maintenance and
7 operation of products furnished under Contract
8 2. Such products may include, but are not limited to:
9 a. Traffic Controllers
10 b. Irrigation Controllers (to be operated by the City)
11 c. Butterfly Valves
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include, but are not necessarily limited to:
15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
16 2. Division 1 — General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various Items bid.
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS
23 A. Schedule
24 1. Submit manuals in final form to the City within 30 calendar days of product
25 shipment to the project site.
26 1.5 SUBMITTALS
27 A. Submittals shall be in accordance with Section 0133 00. All submittals shall be
28 approved by the City prior to delivery.
29 1.6 INFORMATIONAL SUBMITTALS
30 A. Submittal Form
31 1. Prepare data in form of an instructional manual for use by City personnel.
32 2. Format
33 a. Size: 8 '/2 inches x 11 inches
34 b. Paper
35 1) 40 pound minimum, white, for typed pages
36 2) Holes reinforced with plastic, cloth or metal
37 c. Text: Manufacturer's printed data, or neatly typewritten
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 78 23 - 2
DAP OPERATION AND MAINTENANCE DATA
Page 2 of 5
1 d. Drawings
2 1) Provide reinforced punched binder tab, bind in with text
3 2) Reduce larger drawings and fold to size of text pages.
4 e. Provide fly -leaf for each separate product, or each piece of operating
5 equipment.
6 1) Provide typed description of product, and major component parts of
7 equipment.
8 2) Provide indexed tabs.
9 £ Cover
10 1) Identify each volume with typed or printed title "OPERATING AND
11 MAINTENANCE INSTRUCTIONS".
12 2) List:
13 a) Title of Project
14 b) Identity of separate structure as applicable
15 c) Identity of general subject matter covered in the manual
16 3. Binders
17 a. Commercial quality 3-ring binders with durable and cleanable plastic covers
18 b. When multiple binders are used, correlate the data into related consistent
19 groupings.
20 4. If available, provide an electronic form of the O&M Manual.
21 B. Manual Content
22 1. Neatly typewritten table of contents for each volume, arranged in systematic order
23 a. Contractor, name of responsible principal, address and telephone number
24 b. A list of each product required to be included, indexed to content of the volume
25 c. List, with each product:
26 1) The name, address and telephone number of the subcontractor or installer
27 2) A list of each product required to be included, indexed to content of the
28 volume
29 3) Identify area of responsibility of each
30 4) Local source of supply for parts and replacement
31 d. Identify each product by product name and other identifying symbols as set
32 forth in Contract Documents.
33 2. Product Data
34 a. Include only those sheets which are pertinent to the specific product.
35 b. Annotate each sheet to:
36 1) Clearly identify specific product or part installed
37 2) Clearly identify data applicable to installation
38 3) Delete references to inapplicable information
39 3. Drawings
40 a. Supplement product data with drawings as necessary to clearly illustrate:
41 1) Relations of component parts of equipment and systems
42 2) Control and flow diagrams
43 b. Coordinate drawings with information in Project Record Documents to assure
44 correct illustration of completed installation.
45 c. Do not use Project Record Drawings as maintenance drawings.
46 4. Written text, as required to supplement product data for the particular installation:
47 a. Organize in consistent format under separate headings for different procedures.
48 b. Provide logical sequence of instructions of each procedure.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
01 78 23 - 3
DAP OPERATION AND MAINTENANCE DATA
Page 3 of 5
5. Copy of each warranty, bond and service contract issued
a. Provide information sheet for City personnel giving:
1) Proper procedures in event of failure
2) Instances which might affect validity of warranties or bonds
C. Manual for Materials and Finishes
1. Submit 5 copies of complete manual in final form.
2. Content, for architectural products, applied materials and finishes:
a. Manufacturer's data, giving full information on products
1) Catalog number, size, composition
2) Color and texture designations
3) Information required for reordering special manufactured products
b. Instructions for care and maintenance
1) Manufacturer's recommendation for types of cleaning agents and methods
2) Cautions against cleaning agents and methods which are detrimental to
product
3) Recommended schedule for cleaning and maintenance
3. Content, for moisture protection and weather exposure products:
a. Manufacturer's data, giving full information on products
1) Applicable standards
2) Chemical composition
3) Details of installation
b. Instructions for inspection, maintenance and repair
D. Manual for Equipment and Systems
1. Submit 5 copies of complete manual in final form.
2. Content, for each unit of equipment and system, as appropriate:
a. Description of unit and component parts
1) Function, normal operating characteristics and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Operating procedures
1) Start-up, break-in, routine and normal operating instructions
2) Regulation, control, stopping, shut -down and emergency instructions
3) Summer and winter operating instructions
4) Special operating instructions
c. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Alignment, adjusting and checking
d. Servicing and lubrication schedule
1) List of lubricants required
e. Manufacturer's printed operating and maintenance instructions
£ Description of sequence of operation by control manufacturer
1) Predicted life of parts subject to wear
2) Items recommended to be stocked as spare parts
g. As installed control diagrams by controls manufacturer
h. Each contractor's coordination drawings
1) As installed color coded piping diagrams
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
01 78 23 - 4
DAP OPERATION AND MAINTENANCE DATA
Page 4 of 5
i. Charts of valve tag numbers, with location and function of each valve
j. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
k. Other data as required under pertinent Sections of Specifications
3. Content, for each electric and electronic system, as appropriate:
a. Description of system and component parts
1) Function, normal operating characteristics, and limiting conditions
2) Performance curves, engineering data and tests
3) Complete nomenclature and commercial number of replaceable parts
b. Circuit directories of panelboards
1) Electrical service
2) Controls
3) Communications
c. As installed color coded wiring diagrams
d. Operating procedures
1) Routine and normal operating instructions
2) Sequences required
3) Special operating instructions
e. Maintenance procedures
1) Routine operations
2) Guide to "trouble shooting"
3) Disassembly, repair and reassembly
4) Adjustment and checking
£ Manufacturer's printed operating and maintenance instructions
g. List of original manufacturer's spare parts, manufacturer's current prices, and
recommended quantities to be maintained in storage
h. Other data as required under pertinent Sections of Specifications
4. Prepare and include additional data when the need for such data becomes apparent
during instruction of City's personnel.
30 1.7 CLOSEOUT SUBMITTALS [NOT USED]
31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
32 1.9 QUALITY ASSURANCE
33 A. Provide operation and maintenance data by personnel with the following criteria:
34 1. Trained and experienced in maintenance and operation of described products
35 2. Skilled as technical writer to the extent required to communicate essential data
36 3. Skilled as draftsman competent to prepare required drawings
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 78 23 - 5
DAP OPERATION AND MAINTENANCE DATA
Page 5 of 5
1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED]
2 1.11 FIELD [SITE] CONDITIONS [NOT USED]
3 1.12 WARRANTY [NOT USED]
4 PART 2 - PRODUCTS [NOT USED]
5 PART 3 - EXECUTION [NOT USED]
6 END OF SECTION
7
Revision Log
DATE NAME SUMMARY OF CHANGE
8/31/2012 D. Johnson 1.5.A.1 — title of section removed
4/7/2014 M.Domenech Revised for DAP Application
8
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
01 78 39 - 1
DAP PROJECT RECORD DOCUMENTS
Pagel of 4
1 SECTION 0178 39
2 PROJECT RECORD DOCUMENTS
3 PART1- GENERAL
4 1.1 SUMMARY
5 A. Section Includes:
6 1. Work associated with the documenting the project and recording changes to project
7 documents, including:
8 a. Record Drawings
9 b. Water Meter Service Reports
10 c. Sanitary Sewer Service Reports
11 d. Large Water Meter Reports
12 B. Deviations from this City of Fort Worth Standard Specification
13 1. None.
14 C. Related Specification Sections include, but are not necessarily limited to:
15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract
16 2. Division 1 — General Requirements
17 1.2 PRICE AND PAYMENT PROCEDURES
18 A. Measurement and Payment
19 1. Work associated with this Item is considered subsidiary to the various Items bid.
20 No separate payment will be allowed for this Item.
21 1.3 REFERENCES [NOT USED]
22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED]
23 1.5 SUBMITTALS
24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to
25 City's Project Representative.
26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED]
27 1.7 CLOSEOUT SUBMITTALS [NOT USED]
28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED]
29 1.9 QUALITY ASSURANCES
30 A. Accuracy of Records
31 1. Thoroughly coordinate changes within the Record Documents, making adequate
32 and proper entries on each page of Specifications and each sheet of Drawings and
33 other Documents where such entry is required to show the change properly.
34 2. Accuracy of records shall be such that future search for items shown in the Contract
35 Documents may rely reasonably on information obtained from the approved Project
36 Record Documents.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
017839-2
DAP PROJECT RECORD DOCUMENTS
Page 2 of 4
1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of
2 information that the change has occurred.
3 4. Provide factual information regarding all aspects of the Work, both concealed and
4 visible, to enable future modification of the Work to proceed without lengthy and
5 expensive site measurement, investigation and examination.
6 1.10 STORAGE AND HANDLING
7 A. Storage and Handling Requirements
8 1. Maintain the job set of Record Documents completely protected from deterioration
9 and from loss and damage until completion of the Work and transfer of all recorded
10 data to the final Project Record Documents.
11 2. In the event of loss of recorded data, use means necessary to again secure the data
12 to the City's approval.
13 a. In such case, provide replacements to the standards originally required by the
14 Contract Documents.
15 1.11 FIELD [SITE] CONDITIONS [NOT USED]
16 1.12 WARRANTY [NOT USED]
17 PART 2 - PRODUCTS
18 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED]
19 2.2 RECORD DOCUMENTS
20 A. Job set
21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no
22 charge to the Contractor, 1 complete set of all Documents comprising the Contract.
23 B. Final Record Documents
24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide
25 the City 1 complete set of all Final Record Drawings in the Contract.
26 2.3 ACCESSORIES [NOT USED]
27 2.4 SOURCE QUALITY CONTROL [NOT USED]
28 PART 3 - EXECUTION
29 3.1 INSTALLERS [NOT USED]
30 3.2 EXAMINATION [NOT USED]
31 3.3 PREPARATION [NOT USED]
32 3.4 MAINTENANCE DOCUMENTS
33 A. Maintenance of Job Set
34 1. Immediately upon receipt of the job set, identify each of the Documents with the
35 title, "RECORD DOCUMENTS - JOB SET".
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
017839-3
DAP PROJECT RECORD DOCUMENTS
Page 3 of 4
1 2. Preservation
2 a. Considering the Contract completion time, the probable number of occasions
3 upon which the job set must be taken out for new entries and for examination,
4 and the conditions under which these activities will be performed, devise a
5 suitable method for protecting the job set.
6 b. Do not use the job set for any purpose except entry of new data and for review
7 by the City, until start of transfer of data to final Project Record Documents.
8 c. Maintain the job set at the site of work.
9 3. Coordination with Construction Survey
10 a. At a minimum clearly mark any deviations from Contract Documents
11 associated with installation of the infrastructure.
12 4. Making entries on Drawings
13 a. Record any deviations from Contract Documents.
14 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the
15 change by graphic line and note as required.
16 c. Date all entries.
17 d. Call attention to the entry by a "cloud" drawn around the area or areas affected.
18 e. In the event of overlapping changes, use different colors for the overlapping
19 changes.
20 5. Conversion of schematic layouts
21 a. In some cases on the Drawings, arrangements of conduits, circuits, piping,
22 ducts, and similar items, are shown schematically and are not intended to
23 portray precise physical layout.
24 1) Final physical arrangement is determined by the Contractor, subject to the
25 City's approval.
26 2) However, design of future modifications of the facility may require
27 accurate information as to the final physical layout of items which are
28 shown only schematically on the Drawings.
29 b. Show on the job set of Record Drawings, by dimension accurate to within 1
30 inch, the centerline of each run of items.
31 1) Final physical arrangement is determined by the Contractor, subject to the
32 City's approval.
33 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in
34 ceiling plenum", "exposed", and the like).
35 3) Make all identification sufficiently descriptive that it may be related
36 reliably to the Specifications.
37 c. The City may waive the requirements for conversion of schematic layouts
38 where, in the City's judgment, conversion serves no useful purpose. However,
39 do not rely upon waivers being issued except as specifically issued in writing
40 by the City.
41 B. Final Project Record Documents
42 1. Transfer of data to Drawings
43 a. Carefully transfer change data shown on the job set of Record Drawings to the
44 corresponding final documents, coordinating the changes as required.
45 b. Clearly indicate at each affected detail and other Drawing a full description of
46 changes made during construction, and the actual location of items.
47 c. Call attention to each entry by drawing a "cloud" around the area or areas
48 affected.
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
01 78 39 - 4
DAP PROJECT RECORD DOCUMENTS
Page 4 of 4
d. Make changes neatly, consistently and with the proper media to assure
longevity and clear reproduction.
2. Transfer of data to other Documents
a. If the Documents, other than Drawings, have been kept clean during progress of
the Work, and if entries thereon have been orderly to the approval of the City,
the job set of those Documents, other than Drawings, will be accepted as final
Record Documents.
b. If any such Document is not so approved by the City, secure a new copy of that
Document from the City at the City's usual charge for reproduction and
handling, and carefully transfer the change data to the new copy to the approval
of the City.
3.5 REPAIR / RESTORATION [NOT USED]
3.6 RE -INSTALLATION [NOT USED]
3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED]
3.8 SYSTEM STARTUP [NOT USED]
3.9 ADJUSTING [NOT USED]
3.10 CLEANING [NOT USED]
3.11 CLOSEOUT ACTIVITIES [NOT USED]
3.12 PROTECTION [NOT USED]
3.13 MAINTENANCE [NOT USED]
3.14 ATTACHMENTS [NOT USED]
END OF SECTION
Revision Log
DATE NAME SUMMARY OF CHANGE
4/7/2014 M.Domenech Revised for DAP Application
CITY OF FORT WORTH FWISD Forest Oak Middle School Addition/Renovation
STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS 105753
Revised April 7, 2014
FORT WORTH.
Approval Spec No.
Classsification
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Manufacturer
Water & Sewer - Manholes & Bases/Components 33-39-10 (Rev 2/3/16)
Model No.
National Spec
Updated: 11-6-24
Size
07/23/97
33 05 13
Urethane Hydrophilic Waterstop
Asahi Kogyo K.K.
Adeka Ultra -Seal P-201
ASTM D2240/D412/D792
04/26/00
33 05 13
Offset Joint for 4' Diam. MH
Hanson Concrete Products
Drawing No. 35-0048-001
04/26/00
33 05 13
Profile Gasket for 4' Diam. MH.
Press -Seal Gasket Corp.
2504G Gasket
ASTM C-443/C-361
SS MH
1/26/99
33 05 13
HDPE Manhole Adjustment Rings
Ladtech, Inc
HDPE Adjustment Ring
Traffic and Non -traffic area
5/13/05
33 05 13
Manhole External Wrap
Canusa - CPS WrapidSeal Manhole Encapsulation System
Water & Sewer - Manholes & Bases/FiberLlass 33-39-13 (1/8/13)
1/26/99
33 39 13
Fiberglass Manhole
Fluid Containment, Inc.
I
Flowtite
ASTM 3753
Non -traffic area
08/30/06
33 39 13
Fiberglass Manhole
L.F. Manufacturing
Non -traffic area
Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16)
*
33 05 13
(Manhole Frames and Covers
I Western Iron Works, Bass & Hays Foundry f
1001
24"x40" WD
Water & Sewer - Manholes & Bases/Frames & Covers/Standard
(Round) 33-05-13 (Rev 2/3/16)
*
33 05 13
Manhole Frames and Covers
Western Iron Works, Bass & Hays Foundry
30024
24" Dia.
*
33 05 13
Manhole Frames and Covers
McKinley Iron Works Inc.
A 24 AM
24" Dia.
08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
R-1272
ASTM A48 & AASHTO M306
24" Dia.
08/24/18
33 05 13
Manhole Frames and Covers
Neenah Foundry
NF 1274
ASTM A48 & AASHTO M306
30" Dia.
33 05 13
Manhole Frames and Covers
Sigma Corporation
MH-144N
33 05 13
Manhole Frames and Covers
Sigma Corporation
MH-143N
33 05 13
Manhole Frames and Covers
Pont-A-Mousson
GTS-STD
24" dia.
33 05 13
Manhole Frames and Covers
Neenah Casting
24" dia.
10/31/06
33 05 13
Manhole Frames and Covers (Hinged)
Powerseal
Hinged Ductile Iron Manhole
ASTM A536
24" Dia.
7/25/03
33 05 13
Manhole Frames and Covers
Saint-Gobain Pipelines (Pamrex/rexus)
RE32-R817S
30" Dia.
01/31/06
33 05 13
30" Dia. MH Ring and Cover
East Jordan Iron Works
V1432-2 and V1483 Designs
AASHTO M306-04
30" Dia.
11/02/10
33 05 13
30" Dia. MH Ring and Cover
Sigma Corporation
MH1651FWN & MH16502
30" Dia
07/19/11
33 05 13
30" Dia. MH Ring and Cover
Star Pipe Products
MH32FTWSS-DC
30" Dia
08/10/11
33 05 13
30" Dia. MH Ring and Cover
Accucast
220700 Heavy Duty with Gasket Ring
30" Dia
30" ERGO XL Assembly
10/14/13
33 05 13
30" Dia. MH Ring and Cover (Hinged & Lockable)
East Jordan Iron Works
with Cam Lock/MPIC/T-Gasket
ASSHTO M105 & ASTM A536
30" Dia
06/01/17
3405 13
30" Dia. MH Ring and Cover (Lockable) Cl
SIP Industries
2280 (32")
ASTM A 48
30" Dia.
12/05/23
3405 13
30" Dia. MH Ring and Cover (Hinged & Lockable) Cl
SIP Industries
4267WT - Hinged (32")
ASTM A 48
30" Dia.
CAP-ONE-30-FTW, Composite, w/ Lock
09/16/19
33 05 13
30" Dia. MH Ring and Cover
Composite Access Products, L.P.
w/o Hing
30" Dia.
10/07/21
3405 13
30" Dia. MH Ring and Cover
Trumbull Manufacturing
32"(30") Frame and Cover
30" Dia.
Water & Sewer - Manholes & Bases/Frames & Covers/Water
Tight & Pressure Tight 33-05-13 (Rev 2/3/16)
*
33 05 13
Manhole Frames and Covers
Pont-A-Mousson
Pamtight
24" Dia.
*
33 05 13
Manhole Frames and Covers
Neenah Casting
24" Dia.
*
33 05 13
Manhole Frames and Covers
Western Iron Works,Bass & Hays Foundry
300-24P
24" Dia.
*
33 05 13
Manhole Frames and Covers
McKinley Iron Works Inc.
WPA24AM
24" Dia.
03/08/00
33 05 13
Manhole Frames and Covers
Accucast
RC-2100
ASTM A 48
24" Dia.
04/20/01
33 05 13
Manhole Frames and Covers
(SIP)Serampore Industries Private Ltd.
300-24-23.75 Ring and Cover
ASTM A 48
24" Dia.
Water & Sewer - Manholes & Bases/Precast Concrete (Rev
1/8/13)
*
33 39 10
Manhole, Precast Concrete
Hydro Conduit Corp
SPL Item #49
ASTM C 478
48"
*
33 39 10
Manhole, Precast Concrete
Wall Concrete Pipe Co. Inc.
ASTM C-443
48"
09/23/96
33 39 10
Manhole, Precast Concrete
Concrete Product Inc.
48" I.D. Manhole w/ 32" Cone
ASTM C 478
48" w/32" cone
12/05/23
33 39 10
Manhole, Precast Concrete
The Turner Company
72" I.D. Manhole w/ 32" Cone
ASTM C 478
72"
05/08/18
33 39 10
Manhole, Precast Concrete
The Turner Company
48", 60" I.D. Manhole w/ 32" Cone
ASTM C 478
4811,6011
Manhole, 32" Opening and Flat top, (No
09/03/24
33 39 10
Manhole, Precast Concrete
Oldcastle Precast Inc.
Transition Cones)
ASTM C 478
48" to 84" I.D.
06/09/10
33 39 10
Manhole, Precast (Reinforced Polymer)Concrete
US Composite Pipe
Reinforced Polymer Concrete
ASTM C-76
48" to 72"
09/06/19
33 39 20
Manhole, Precast Concrete
Forterra Pipe and Precast
60" & 72" I.D. Manhole w/32" Cone
ASTM C-76
60" & 72"
10/07/21
32 39 20
Manhole, Precast Concrete
Forterra Pipe and Precast
48" I.D. Manhole w/32" Cone
ASTM C-77
48"
10/07/21
33 39 20
Manhole, Precast (Reinforced Polymer) Concrete
Armorock
48" & 60" I.D. Manhole w/32" Cone
48" & 60"
10/07/21
33 39 20
Manhole, Precast (Hybrid) Polymer & PVC
Geneva Pipe and Precast (Predl Systems)
48" & 60" I.D. Manhole w/32" Cone
48" & 60" Non Traffic Areas
ASTM C-478; ASTM C-923;
03/07/23
33 39 20
Manhole, Precast Concrete
AmeriTex Pipe and Products, LLC
48" & 60" I.D. Manhole w/32" Cone
ASTM C-443
03/07/23
33 39 20
Manhole, Precast (Reinforced Polymer) Concrete
P3 Polymers, RockHardscp
48" & 60" I.D. Manhole w/32" Cone
04/28/07
Manhole, Precast (Reinforced Polymer) Concrete
Amitech USA
Meyer Polycrete Pipe
Sewer -(WAC) Wastewater Access Chamber 33 39 40
For use when Std. MH cannot be
12/29/23
33 39 20
Wastewater Access Chamber
Quickstream Solutions, Inc.
Type 8 Maintenace Shaft (Poopit)
installed due to depth
Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious
*
E1-14
Manhole Rehab Systems
Quadex
04/23/01
E1-14
Manhole Rehab Systems
Standard Cement Materials, Inc.
Reliner MSP
E1-14
Manhole Rehab Systems
AP/M Permaform
4/20/01
E1-14
Manhole Rehab System
Strong Company
Strong Seal MS2A Rehab System
5/12/03
E1-14
Manhole Rehab System (Liner)
Triplex Lining System
MH repair product to stop infiltration
ASTM D5813
08/30/06
General Concrete Repair
F1exKrete Technologies
Vinyl Polyester Repair Product
Misc. Use
* From Original Standard Products List 1
FORT WORTH.
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 11-6-24
Approval
Spec No.
I Classsification I
Manufacturer
Model No.
National Spec
Size
Water & Sewer
- Manholes & Bases/Rehab Svstems/NonCementitious
05/20/96
E1-14
Manhole Rehab Systems
Sprayroq,
Spray Wall Polyurethane Coating
ASTM D639/D790
12/14/01
Coating for Corrosion protection(Exterior)
ERTECH
Series 20230 and 2100 (Asphatic Emulsion)
Structures Only
01/31/06
Coatings for Corrosion Protection
Chesterton
Arc 791, S1HB, S1, S2
Acid Resistance Test
Sewer Applications
8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
Sewer Applications
33 05 16, 33 39 10,
RR&C Dampproofing Non-Fibered Spray
For Exterior Coating of Concrete
03/19/18
33 39 20
Coating for Corrosion protection(Exterior)
Sherwin Williams
Grade (Asphatic Emulsion)
Structures Only
Water & Sewer
- Manhole Inserts - Field Operations Use Onlv (Rev 2/3/16)
*
33 05 13
Manhole Insert
Knutson Enterprises
Made to Order - Plastic
ASTM D 1248
For 24" dia.
*
33 05 13
Manhole Insert
South Western Packaging
Made to Order - Plastic
ASTM D 1248
For 24" dia.
*
33 05 13
Manhole Insert
Noflow-Inflow
Made to Order - Plastic
ASTM D 1248
For 24" dia.
09/23/96
33 05 13
Manhole Insert
Southwestern Packing & Seals, Inc.
Lifesaver - Stainless Steel
For 24" dia.
09/23/96
33 05 13
Manhole Insert
Southwestern Packing & Seals, Inc.
TetherLok - Stainless Steel
For 24" dia
Water & Sewer
- Pipe Casino Spacers 33-05-24 (07/01/13)
11/04/02
Steel Band Casing Spacers
Advanced Products and Systems, Inc.
Carbon Steel Spacers, Model SI
02/02/93
Stainless Steel Casing Spacer
Advanced Products and Systems, Inc.
Stainless Steel Spacer, Model SSI
04/22/87
Casing Spacers
Cascade Waterworks Manufacturing
Casing Spacers
09/14/10
Stainless Steel Casing Spacer
Pipeline Seal and Insulator
Stainless Steel Casing Spacer
Up to 48"
09/14/10
Coated Steel Casin Spacers
Pipeline Seal and Insulator
Coated Steel Casing Spacers
Up to 48"
05/10/11
Stainless Steel Casing Spacer
Powerseal
4810 Powerchock
Up to 48"
03/19/18
Casing Spacers
BWM
SS-12 Casing Spacer(Stainless Steel)
03/19/18
Casing Spacers
BWM
FB-12 Casing Spacer (Coated Carbon Steel)
for Non pressure Pipe and Grouted Casing
03/29/22
33 05 13
Casing Spacers
CCI Pipeline Systems
CSC12, CSS12
09/03/24
33 05 13
Casing Spacers
Raci (Completely HDPE)
Per Manufacturers Requirements (Sewer
8" - 12" (Sewer Only)
Applications Only)
Water & Sewer - Pipes/Ductile Iron 33-11-10(1/8/13)
*
33 11 10 Ductile Iron Pipe
Griffin Pipe Products, Co.
Super Bell-Tite Ductile Iron Pressure Pipe,
AWWA C150, C151
3" thru 24"
08/24/18
33 11 10 Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Fastite Pipe (Bell Spigot)
AWWA C150, C151
4" thru 30"
08/24/18
33 11 10 Ductile Iron Pipe
American Ductile Iron Pipe Co.
American Flex Ring (Restrained Joint)
AWWA C150, C151
4" thru 30"
*
33 11 10 Ductile Iron Pipe
U.S. Pipe and Foundry Co.
AWWA C150, C151
*
33 11 10 Ductile Iron Pipe
McWane Cast Iron Pipe Co.
AWWA C150, C151
Water & Sewer - Utility Line Marker (08/24/2018)
Sewer - Coatings/Evoxv 33-39-60 (01/08/13)
02/25/02
Epoxy Lining System
Sauereisen, Inc
SewerGard 210RS
LA County #210-1.33
12/14/01
Epoxy Lining System
Ertech Technical Coatings
Ertech 2030 and 2100 Series
04/14/05
Interior Ductile Iron Pipe Coating
Induron
Protecto 401
ASTM B-117
Ductile Iron Pipe Only
01/31/06
Coatings for Corrosion Protection
Chesterton
Arc 791, S1HB, S1, S2
Acid Resistance Test
Sewer Applications
8/28/2006
Coatings for Corrosion Protection
Warren Environmental
S-301 and M-301
Sewer Applications
Sewer - Coatings/Polyurethane
Sewer - Combination Air Valves
05/25/18
33-31-70
Air Release Valve
A.R.I. USA, Inc.
D025LTP02(Composite Body)
2"
Sewer - Pipes/Concrete
*
E1-04 Conc. Pipe, Reinforced
Wall Concrete Pipe Co. Inc.
ASTM C 76
*
E1-04 Conc. Pipe, Reinforced
Hydro Conduit Corporation
Class III T&G, SPL Item #77
ASTM C 76
*
E1-04 Conc. Pipe, Reinforced
Hanson Concrete Products
SPL i«o. #95 ra,...hol #99 Pip
ASTM C 76
*
E1-04 Conc. Pipe, Reinforced
Concrete Pipe & Products Co. Inc.
ASTM C 76
Sewer - Pipe Enlarcment Svstem (Method)33-31-23 (01/18/13)
PIM System
PIM Corporation
Polyethylene
PIM Corp., Piscata Way, N.J.
Approved Previously
McConnell Systems
McLat Construction
Polyethylene
Houston, Texas
Approved Previously
TRS Systems
Trenchless Replacement System
Polyethylene
Calgary, Canada
Approved Previously
Sewer - Pipe/Fiberclass Reinforced/ 33-31-13(1/8/13)
7/21/97
33 31 13 Cent. Cast Fiberglass (FRP)
Hobas Pipe USA, Inc.
Hobas Pipe (Non -Pressure)
ASTM D3262/D3754
03/22/10
33 31 13 Fiberglass Pipe (FRP)
Ameron
Bondstrand RPMP Pipe
ASTM D3262/D3754
04/09/21
33 31 13 Glass -Fiber Reinforced Polymer Pipe (FRP)
Thompson Pipe Group
Thompson Pipe (Flowtite)
ASTM D3262/D3754
ASTM D3262, ASTM D3681,
03/07/23
33 31 13 Fiberglass Pipe (FRP)
Future Pipe Industries
Fiberstrong FRP
ASTM D4161, AWWA M45
ASTM D3262, ASTM D3517,
09/03/24
33 31 13 Fiberglass Pipe (FRP)
Superlit Boru Sanayi A.S.
Superlit FRP
ASTM 3754, AWWA C950
* From Original Standard Products List 2
FORT WORTH.
Approval Spec No. I Classsification
Sewer - Pipe/Polymer Pipe
4/14/05 Polymer Modified Concrete Pipe
06/09/10 E1-9 Reinforced Polymer Concrete Pipe
Sewer - Pipes/HDPE 33-31-23(1/8/13)
* High -density polyethylene pipe
* High -density polyethylene pipe
* High -density polyethylene pipe
High -density polyethylene pipe
Sewer - Pipes/PVC (Pressure Sewer) 33-11-12 (4/1/13)
12/02/11 33-11-12 DR-14 PVC Pressure Pipe
10/22/14 33-11-12 DR-14 PVC Pressure Pipe
Sewer - Pipes/PVC* 33-31-20 (7/1/13)
*
33-31-20
PVC Sewer Pipe
12/23/97*
33-31-20
PVC Sewer Pipe
*
33-31-20
PVC Sewer Pipe
12/05/23
33-31-20
PVC Sewer Pipe
12/05/23
33-31-20
PVC Sewer Pipe
*
33-31-20
PVC Sewer Pipe
05/06/05
33-31-20
PVC Solid Wall Pipe
04/27/06
33-31-20
PVC Sewer Fittings
*
33-31-20
PVC Sewer Fittings
3/19/2018
33 31 20
PVC Sewer Pipe
3/19/2018
33 31 20
PVC Sewer Pipe
3/29/2019
33 31 20
Gasketed Fittings (PVC)
10/21/2020
33 31 20
PVC Sewer Pipe
10/22/2020
33 31 20
PVC Sewer Pipe
10/21/2020
33 3120
PVC Sewer Pipe
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 11-6-24
Manufacturer Model No. National Spec Size
Amitech USA Meyer Polycrete Pipe ASTM C33, A276, F477 8" to 102", Class V
US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76
Phillips Driscopipe, Inc.
Opticore Ductile Polyethylene Pipe
ASTM D 1248
8"
Plexco Inc.
ASTM D 1248
8"
Polly Pipe, Inc.
ASTM D 1248
8"
CSR Hydro Conduit/Pipeline Systems
McConnell Pipe Enlargement
ASTM D 1248
Pipelife Jetstream
PVC Pressure Pipe
AWWA C900
4" thru 12"
Royal Building Products
Royal Seal PVC Pressure Pipe
AWWA C900
4" thru 12"
J-M Manufacturing Co., Inc. QM Eagle)
SDR-26 (PSI 15)
ASTM D 3034
4" - 15"
Diamond Plastics Corporation
SDR-26 (PSI 15)
ASTM D 3034
4" thru 15"
Lamson Vylon Pipe
SDR-26 (PSI 15)
ASTM D 3034
4" thru 15"
Vinyltech PVC Pipe
SDR-26 (PSI 15)
ASTM D3034
4" thru 15"
Vinyltech PVC Pipe
Gravity Sewer PS 115
ASTM F 679
18"
J-M Manufacturing Co, Inc. (JM Eagle)
PS 115
ASTM F 679
18" - 28"
Diamond Plastics Corporation
PS 115
ASTM F-679
18" to 48"
Harco
SDR-26 (PS 115) Gasket Fittings
ASTM D-3034, D-1784, etc
4" - 15"
Plastic Trends, Inc.(Westlake)
Gasketed PVC Sewer Main Fittings
ASTM D 3034
Pipelife Jet Stream
SDR 26 (PS 115)
ASTM F679
1811- 24"
Pipelife Jet Stream
SDR 26
ASTM D3034
4"- 15"
GPK Products, Inc.
SDR 26
ASTM D3034
4"- 15"
NAPCO(Westlake)
SDR 26
ASTM D3034
4" - 15"
Sanderson Pipe Corp.
SDR 26
ASTM D3034
4"- 15"
NAPCO(Westlake)
SDR 26 PS 115
ASTM F-679
1811- 36"
* From Original Standard Products List 3
FORT WORTH.
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Updated: 11-6-24
Approval
Spec No.
I Classsification
Manufacturer
Model No.
National Spec
Size
Water - Appurtenances
33-12-10 (07/01/13)
09/03/24
33-12-10
Double Strap Saddle
Ford Meter Box Co., Inc.
202B
V-2" SVC, up to 16" Pipe
01/18/18
33-12-10
Double Strap Saddle
Romac
202NS Nylon Coated
AWWA C800
V-2" SVC, up to 24" Pipe
08/28/02
Double Strap Saddle
Smith Blair
#317 Nylon Coated Double Strap Saddle
07/23/12
33-12-10
Double Strap Service Saddle
Mueller Company
DR2S Double (SS) Strap DI Saddle
AWWA C800
1"-2" SVC, up to 24" Pipe
03/07/23
33-12-10
Double Strap Service Saddle
Powerseal
3450AS, Inc]. Corp. Stop, Dbl Strap, Stainless
NSF ANSI 372
1"-2" SVC, up to 24" Pipe
10/27/87
Curb Stops -Ball Meter Valves
McDonald
6100M,6100MT & 61OMT
3/4" and 1"
10/27/87
Curb Stops -Ball Meter Valves
McDonald
4603B, 4604B, 6100M, 610OTM and 6101M
1'/2" and 2"
FB600-7NL, FB1600-7-NL, FV23-777-W-NL,
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
L22-77NL
AWWA C800
2"
FB600-6-NL, FB1600-6-NL, FV23-666-W-
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
NL, L22-66NL
AWWA C800
1-1/2"
FB600-4-NL, FBI600-4-NL, B I 1-444-WR-
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Ford Meter Box Co., Inc.
NL, B22444-WR-NL, L28-44NL
AWWA C800
I"
B-25000N, B-24277N-3, B-20200N-3, H-
AWWA C800, ANSF 61,
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15000N, , H-1552N, H142276N
ANSI/NSF 372
2"
B-25000N, B-20200N-3, B-24277N-3,H-
AWWA C800, ANSF 61,
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15000N, H-14276N, H-15525N
ANSI/NSF 372
1-1/2"
B-25000N, B-20200N-3,H-15000N, H-
AWWA C800, ANSF 61,
5/25/2018
33-12-10
Curb Stops -Ball Meter Valves
Mueller Co., Ltd.
15530N
ANSI/NSF 372
1"
01/26/00
Coated Tapping Saddle with Double SS Straps
JCM Industries, Inc.
#406 Double Band SS Saddle
1"-2" Taps on up to 12"
0/5/21/12
33-12-25
Tapping Sleeve (Coated Steel)
JCM Industries, Inc.
412 Tapping Sleeve ESS
AWWA C-223
Up to 30" w/12" Out
03/29/22
33-12-25
Tapping Sleeve (Coated or Stainless Steel)
JCM Industries, Inc.
415 Tapping Sleeve
AWWA C-223
Concrete Pipe Only
05/10/11
Tapping Sleeve (Stainless Steel)
Powerseal
3490AS (Flange) & 3490MJ
4"-8" and 16"
02/29/12
33-12-25
Tapping Sleeve (Coated Steel)
Romac
FTS 420
AWWA C-223
U p to 42" w/24" Out
02/29/12
33-12-25
Tapping Sleeve (Stainless Steel)
Romac
SST Stainless Steel
AWWA C-223
Up to 24" w/12" Out
02/29/12
33-12-25
Tapping Sleeve (Stainless Steel)
Romac
SST III Stainless Steel
AWWA C-223
Up to 30" w/12" Out
05/10/11
Joint Repair Clamp
Powerseal
3232 Bell Joint Repair Clamp
4" to 30"
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW37C-12-IEPAF FTW
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW39C-12-IEPAF FTW
08/30/06
Plastic Meter Box w/Composite Lid
DFW Plastics Inc.
DFW65C-14-IEPAF FTW
Class "A"
Concrete Meter Box
Bass & Hays
CM1337-1312 1118 LID-9
Concrete Meter Box
Bass & Hays
CMB-I8-Dual 1416 LID-9
Concrete Meter Box
Bass & Hays
CM1365-1365 1527 LID-9
Water - Bolts, Nuts, and Gaskets 33-11-05 (01/08/13)
None
Water - Combination Air Release 33-31-70 (01/08/13)
*
EI-11
Combination Air Release Valve
GA Industries, Inc.
Empire Air and Vacuum Valve, Model 935
ASTM A 126 Class B, ASTM A
1" & 2"
*
E1-11
Combination Air Release Valve
Multiplex Manufacturing Co.
Crispin Air and Vacuum Valves, Model No.
1/211, 1" & 2"
*
E1-11
Combination Air Release Valve
Valve and Primer Corp.
APCO #143C, #145C and #147C
111, 2" & 3"
Water - Dry Barrel Fire Hvdrants 33-12-40 (01/15/14)
10/01/87
E-1-12
Dry Barrel Fire Hydrant
American -Darling Valve
Drawing Nos. 90-18608, 94-18560
AWWA C-502
03/31/88
E-1-12
Dry Barrel Fire Hydrant
American Darling Valve
Shop Drawing No. 94-18791
AWWA C-502
09/30/87
E-1-12
Dry Barrel Fire Hydrant
Clow Corporation
Shop Drawing No. D-19895
AWWA C-502
01/12/93
E-1-12
Dry Barrel Fire Hydrant
American AVK Company
Model 2700
AWWA C-502
08/24/88
E-1-12
Dry Barrel Fire Hydrant
Clow Corporation
Drawings D20435, D20436, B20506
AWWA C-502
E-1-12
Dry Barrel Fire Hydrant
ITT Kennedy Valve
Shop Drawing No. D-80783FW
AWWA C-502
09/24/87
E-1-12
Dry Barrel Fire Hydrant
M&H Valve Company
Shop Drawing No. 13476
AWWA C-502
Shop Drawings No. 6461
10/14/87
E-1-12
Dry Barrel Fire Hydrant
Mueller Company
A-423 Centurion
AWWA C-502
Shop Drawing FH-12
01/15/88
E1-12
Dry Barrel Fire Hydrant
Mueller Company
A-423 Super Centurion 200
AWWA C-502
10/09/87
E-1-12
Dry Barrel Fire Hydrant
U.S. Pipe & Foundry
Shop Drawing No. 960250
AWWA C-502
09/16/87
E-1-12
Dry Barrel Fire Hydrant
American Flow Control (AFC)
Waterous Pacer W1367
AWWA C-502
08/12/16
33-12-40
Dry Barrel Fire Hydrant
EJ (East Jordan Iron Works)
WaterMaster 5CD250
Water - Meters
02/05/93
E101-5
Detector Check Meter
Ames Company
Model 1000 Detector Check Valve
AWWA C550
4" - 10"
08/05/04
Magnetic Drive Vertical Turbine
Hersey
Magnetic Drive Vertical
AWWA C701, Class 1
3/4" - 6"
* From Original Standard Products List 4
FORT WORTH.
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Approval
Spec No.
�Classsification I
Manufacturer I
Model No.
Water - Pipes/PVC (Pressure Water) 33-31-70 (01/08/13)
12/05/23
33-11-12
PVC Pressure Pipe
Vinyltech PVC Pipe
DR14
12/05/23
33-11-12
PVC Pressure Pipe
Vinyltech PVC Pipe
DR18
09/03/24
33-11-12
PVC Pressure Pipe
Northern Pipe Products
DR14
09/03/24
33-11-12
PVC Pressure Pipe
Northern Pipe Products
DR18
3/19/2018
33 11 12
PVC Pressure Pipe
Pipelife Jet Stream
DR14
3/19/2018
33 11 12
PVC Pressure Pipe
Pipelife Jet Stream
DR18
5/25/2018
33 11 12
PVC Pressure Pipe
Diamond Plastics Corporation
DR 14
5/25/2018
33 11 12
PVC Pressure Pipe
Diamond Plastics Corporation
DR 18
12/6/2018
33 11 12
PVC Pressure Pipe
J-M Manufacturing Co., Inc d/b/a JM Eagle
DR 14
12/6/2018
33 11 12
PVC Pressure Pipe
J-M Manufacturing Co., Inc d/b/a JM Eagle
DR 18
9/6/2019
33 11 12
PVC Pressure Pipe
Underground Solutions Inc.
DR14 Fusible PVC
9/6/2019
33 11 12
PVC Pressure Pipe
NAPCO(Westlake)
DR18
9/6/2019
33 11 12
PVC Pressure Pipe
NAPCO(Westlake)
DR14
9/6/2019
33 11 12
PVC Pressure Pipe
Sanderson Pipe Corp.
DR14
Water - Pives/Valves & Fittines/Ductile Iron Fittincs 33-11-11 (01/08/13)
07/23/92
E1-07
Ductile Iron Fittings
Star Pipe Products, Inc.
*
E1-07
Ductile Iron Fittings
Griffin Pipe Products, Co.
*
E1-07
Ductile Iron Fittings
McWane/Tyler Pipe/ Union Utilities Division
08/11/98
E1-07
Ductile Iron Fittings
Sigma, Co.
02/26/14
E1-07
MJ Fittings
Accucast
05/14/98
E1-07
Ductile Iron Joint Restraints
Ford Meter Box Co./Uni-Flange
05/14/98
E1-24
PVC Joint Restraints
Ford Meter Box Co./Uni-Flange
11/09/04
E1-07
Ductile Iron Joint Restraints
One Bolt, Inc.
02/29/12
33-11-11
Ductile Iron Pipe Mechanical Joint Restraint
EBAA Iron, Inc.
02/29/12
33-11-11
PVC Pipe Mechanical Joint Restraint
EBAA Iron, Inc.
08/05/04
E1-07
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
03/06/19
33-11-11
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
08/05/04
E1-07
Mechanical Joint Retainer Glands(PVC)
Sigma, Co.
08/10/98
E1-07
MJ Fittings(DIP)
Sigma, Co.
10/12/10
E1-24
Interior Restrained Joint System
S & B Techncial Products
08/16/06
E1-07
Mechanical Joint Fittings
SIP Industries(Serampore)
11/07/16
33-11-11
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
11/07/16
33-11-11
Mechanical Joint Retainer Glands
Star Pipe Products, Inc.
03/19/18
33-11-11
Mechanical Joint Retainer Glands
SIP Industries(Serampore)
03/19/18
33-11-11
Mechanical Joint Retainer Glands
SIP Industries(Serampore)
03/19/18
33-11-11
Mechanical Joint Retainer Glands
SIP Industries(Serampore)
Mechanical Joint Fittings
Mechanical Joint Fittings
Mechanical Joint Fittings, SSB Class 350
Mechanical Joint Fittings, SSB Class 351
Class 350 C-153 MJ Fittings
Uni-Flange Series 1400
Uni-Flange Series 1500 Circle -Lock
One Bolt Restrained Joint Fitting
Megalug Series 1100 (for DI Pipe)
Megalug Series 2000 (for PVC Pipe)
Sigma One-Lok SLC4 - SLC10
Sigma One-Lok SLCS4 - SLCS12
Sigma One-Lok SLCE
Sigma One-Lok SLDE
Bulldog System ( Diamond Lok 21 & JM
Mechanical Joint Fittings
PVC Stargrip Series 4000
DIP Stargrip Series 3000
EZ Grip Joint Restraint (EZD) Black For DIP
EZ Grip Joint Restraint (EZD) Red for C900
DR14 PVC Pipe
EZ Grip Joint Restraint (EZD) Red for C900
DR18 PVC Pipe
National Spec
AWWA C900, AWWA C605,
ASTM D1784
AWWA C900, AWWA C605,
ASTM D1784
AWWA C900, AWWA C605,
ASTM D1784
AWWA C900, AWWA C605,
ASTM D1784
AWWA C900
AWWA C900
AWWA C900
AWWA C900
AWWA C900-16
UL 1285
ANSI/NSF 61
FM 1612
AWWA C900-16
UL 1285
ANSI/NSF 61
FM 1612
AWWA C900
AWWA C900
AWWA C900
AWWA C900
AWWA C153 & C110
AWWA C 110
AWWA C 153, C 110, C III
AWWA C 153, C 110, C 112
AWWA C153
AWWA Clll/C153
AWWA C111/C153
AWWA C111/Cll6/C153
AWWA C111/Cll6/C153
AWWA C111/C116/C153
AWWA C111/C153
AWWA C111/C153
AWWA Clll/C153
AWWA C153
ASTM F-1624
AWWA C153
ASTM A536 AWWA C111
ASTM A536 AWWA C111
ASTM A536 AWWA C111
ASTM A536 AWWA CI I I
ASTM A536 AWWA CI I I
Updated: 11-6-24
Size
4"-1 6"
16"-18"
4"-1 6"
16"-18"
4"-12"
16"-24"
4"-12"
1 6"-24"
4"-28"
16"-24"
4" - 8"
16" - 24"
4"- 12"
4'1- 12'1
4"-12"
4" to 36"
4" to 24"
4" to 12"
4" to 42"
4" to 24"
4" to 10"
4" to 12"
12" to 24"
4" - 24"
4" to 12"
4" to 24"
3"-48"
4"-12"
16"-24"
* From Original Standard Products List 5
FORT WORTH.
CITY OF FORT WORTH
WATER DEPARTMENT
STANDARD PRODUCT LIST
Approval
Spec No.
I Classsification
I Manufacturer
Water - Pives/Valves
& Fittincs/Resilient Seated Gate
Valve* 33-12-20 (05/13/15)
Resilient Wedged Gate Valve w/no Gears
American Flow Control
12/13/02
Resilient Wedge Gate Valve
American Flow Control
08/31/99
Resilient Wedge Gate Valve
American Flow Control
05/18/99
Resilient Wedge Gate Valve
American Flow Control
10/24/00
E1-26
Resilient Wedge Gate Valve
American Flow Control
08/05/04
Resilient Wedge Gate Valve
American Flow Control
05/23/91
E1-26
Resilient Wedge Gate Valve
American AVK Company
01/24/02
E1-26
Resilient Wedge Gate Valve
American AVK Company
*
E1-26
Resilient Seated Gate Valve
Kennedy
*
E1-26
Resilient Seated Gate Valve
M&H
*
E1-26
Resilient Seated Gate Valve
Mueller Co.
11/08/99
Resilient Wedge Gate Valve
Mueller Co.
01/23/03
Resilient Wedge Gate Valve
Mueller Co.
05/13/05
Resilient Wedge Gate Valve
Mueller Co.
01/31/06
Resilient Wedge Gate Valve
Mueller Co.
01/28/88
E1-26
Resilient Wedge Gate Valve
Clow Valve Co.
10/04/94
Resilient Wedge Gate Valve
Clow Valve Co.
11/08/99
E1-26
Resilient Wedge Gate Valve
Clow Valve Co.
11/29/04
Resilient Wedge Gate Valve
Clow Valve Co.
11/30/12
Resilient Wedge Gate Valve
Clow Valve Co.
05/08/91
E1-26
Resilient Seated Gate Valve
Stockham Valves & Fittings
*
E1-26
Resilient Seated Gate Valve
U.S. Pipe and Foundry Co.
10/26/16
33-12-20
Resilient Seated Gate Valve
EJ (East Jordan Iron Works)
08/24/18
Matco Gate Valve
Matco-Norca
Water - Pives/Valves
& Fittincs/Rubber Seated Butterflv
Valve 33-12-21 (07/10/14)
*
E1-30
Rubber Seated Butterfly Valve
Henry Pratt Co.
*
E1-30
Rubber Seated Butterfly Valve
Mueller Co.
1/11/99
E1-30
Rubber Seated Butterfly Valve
Dezurik Valves Co.
06/12/03
E1-30
Valmatic American Butterfly Valve
Valmatic Valve and Manufacturing Corp
04/06/07
E1-30
Rubber Seated Butterfly Valve
M&H Valve
03/19/18
33 1221
Rubber Seated Butterfly Valve
G. A. Industries (Golden Anderson)
09/03/24
33 1221
Rubber Seated Butterfly Valve
American AVK Company
Water - Polvethvlene Encasement 33-11-10 (01/08/13)
05/12/05
E1-13
Polyethylene Encasment
05/12/05
E1-13
Polyethylene Encasment
05/12/05
E1-13
Polyethylene Encasment
09/06/19
33-11-11
Polyethylene Encasment
Model No.
Series 2500 Drawing # 94-20247
Series 2530 and Series 2536
Series 2520 & 2524 (SD 94-20255)
Series 2516 (SD 94-20247)
Series 2500 (Ductile Iron)
42" and 48" AFC 2500
American AVK Resilient Seaded GV
Series A2361 (SD 6647)
Series A2360 for 18"-24" (SD 6709)
Mueller 30" & 36", C-515
Mueller 42" & 48", C-515
16" RS GV (SD D-20995)
Clow RW Valve (SD D-21652)
Clow 30" & 36" C-515
Clow Valve Model 2638
Metroseal 250, requirements SPL #74
EJ F1owMaster Gate Valve & Boxes
225 MR
Valmatic American Butterfly Valve.
M&H Style 4500 & 1450
AWWA C504 Butterfly Valve
AWWA C504 Butterfly Valve Class 250B
Flexsol Packaging Fulton Enterprises
Mountain States Plastics (MSP) and AEP Ind. Standard Hardware
AEP Industries Bullstrong by Cowtown Bolt & Gasket
Northtown Products Inc. PE Encasement for DIP
National Spec
AWWA C515
AWWA C515
AWWA C515
AWWA C515
AWWA C515
AWWA C509
AWWA C515
AWWA C515
AWWA C515
AWWA C515
AWWA C509
AWWA C515
AWWA C515
AWWA C515
AWWA C515
AWWA C 509, ANSI 420 - stem,
AWWA/ANSI C115/An21.15
AWWA C-504
AWWA C-504
AWWA C-504
AWWA C-504
AWWA C-504
AWWA C-504
AWWA C-504
AWWA C105
AWWA C105
AWWA C105
AWWA C105
Updated: 11-6-24
Size
16"
30" and 36"
20" and 24"
16"
4" to 12"
42" and 48"
4" to 12"
20" and smaller
4" - 12"
4" - 12"
4" - 12"
16"
24" and smaller
30" and 36"
42" and 48"
4" - 12"
16"
24" and smaller
30" and 36" (Note 3)
24" to 48" (Note 3)
4" - 12"
3" to 16"
4" to 16"
24"
24"and smaller
24" and larger
Up to 84" diameter
24" to 48"
30"-54"
24" - 48"
8 mil LLD
8 mil LLD
8 mil LLD
8 mil LLD
Water - Samplinc Station
03/07/23 33 12 50 Water Sampling Station Kupferle Foundry Company Eclipse, Number 88 , 12-inch Depth of Bury As shown in spec. 33 12 50
09/02/24 33 i2 50 Mueller Water Products, Inc;a BSS0 r, UDG2 D N This product removed
�-rcw ,�Oc� vvvvi-36-rvronvz, C�v-rr�€'�oe$�
10/21/20
04/09/21
04/09/21
Water - Automatic Flusher
Automated Flushing System
Automated Flushing System
Automated Flushing System
HG6-A-IN-2-BRN-LPRR(Portable)
Mueller Hydroguard HG2-A-IN--2-PVC-018-LPLG(Permanent)
Kupferle Foundry Company Eclipse #9800wc
Kupferle Foundry Company Eclipse #9700 (Portable)
The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review of products which meet the Fort Worth Water Department's Standard Specifications during utility construction projects. When Technical
Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's
Standard Products List and approval of the specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water
Yellow Highlight indicates recent changes
* From Original Standard Products List 6
FORT WORTH-. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 2/4/2025
I erete
I Class AJSidewe�, ADA Ramos, Driveways,Curb/Gutter
Median Pavement)
19/9/2022 03 30 OU
Mirz Ue Ip,
American Covcrete Company
30CAF029
3000 psi C.for Sidewalk. & ADA Ramps
3-5" Slump; 3-6% Av
1612412124 03 3001
Mi. De, p
Big Town Concrete
302050-1
3000 psi Concrete for Cubs and Sidewalks
31" Slump, 3-6%Ab
19/9/2022 03 30 00
M. De I,
Bumco Tex..
30U101AG
3000 psi Co ,c Ie M, for Flatwork
3-5" Slump; 3-696 -
14/12024 03 30 00
Mi. Dls
Bumco Texas
3OU500BG
3000gsi Concrete Mu for Sidewalks
3-5" Slump, 3-6% Ai,
19/92022 033000
Mm Design
Carder Concrete
FWCC502001
3006 psi for Sidewalk., Driveways, Ramps, Cmb &Gutter, Elatwork
3-5" Slump; 3-6 Ai,
19/92022 03 30 00
Mi. Design
Carder ConmUe
FWCC502021
3500 psi concrete for Sidewalks, Drivewaj'�, Ramps, Cmb &Gutter
3-5" Slump. 3fi%Air
19/92022 03 30 00
M. Design
Chisholm Trail Redi Ma
C13020AE
3000 psi Concrete for Driveways, Cmb &Gutter
3-5" Slump; 4.5-7.5%Au
19/92022 03 30 0
M& Des'
City Conmete Comp?4)'
30HA20R
3000 psi Concxeta Mi, fr Bloc ' Sidewalks, F7stwork, Pads
3-5" Slump, 36%Air
19/92022 033000 0
Ma Degrg�n
Cow Town Redi Min
253-W
3000 psi Concrete Mix Sidewa0. ,ADA Ramps, Driveways, Curb &Gutter, Safety End Treatments, Nov-TxDOT RGammg Wall.
3-5" Slump; 3-6% Av
19/92022 03 30 00
Miz DIP,
Cow Town Redi Mi.
250
3000 psi ConmUe Mi. f., Sidewalks, Driveways, ADA Ramps
3-5" Slump, 36%Air
19/9/2022 03 30 00
M. Desrgo
Cow Town R.MLx
350
3000 psi Concrete Mix for Sidewalks, Driveways, ADA Ramps
3-5" Slump; 3-6% Ai,11/29/2024
03 30 00
Mu DeslP,p
Estrada Ready Mi.
R3050AEWR
5.00 Sacks / 3,000 psi Concrete for Sidewalks, Ramps, Inlets, and Manholes
3-5" Slump, 36%Air
19/9/2022 03 30 00
M. Design
GCH Concrete Services
GCH4000
4000 psi Concrete for for Sidewalks, Ramps, Headwalls, mkts, and Storm Dram S.3-5"
Slump; 3-6 n' %A
19/9/2022 03 30 00
Miz D.0
Holcim - SOR, Inc
1261
3000 psi Concrete Mix f., Sidewalks
3-5" Slump, 36%Air
19/23/2024 03 30 00
M. Design
Hokim - SOR, Inc.
5177
3000 Ni Concrete M. for Sidewalks, Curbs and Gutters
3-5" Slump; 36%An
19/9/2022 03 30 00
Mu Desjp
Holcim - SOR, Inc.
5409
4000 Ni Concrete Mu for Sidewalks, inlets
3-5" Slump, 36%Air
14n2023 03 30 00
M. Design
Liquid Stove
C301D
3,000 psi Concrete for Sidewalks, Approaches, and Driveways
3-5" Slump; 36%Ai,
19/92022 033000
3 30 00
Mi. Design
Martin Marietta
R2136214
3,000 psi Concrete for Sidewalks & Ramps
3-5" Slump, 36%Air
19/92022 033000
M. Design
Mart. Marietta
R2136014
3,000 psi Concrete for Sidewalks & Ramps
3-5" Slump; 36%Air
14/12023 03 3000
Mi. Des�p
Martin Marietta
R2136N14
5.00 sacks / 3,000oncrete fr Sidewalks
3-5" Slump. 3-6%Ab
16/12023 03 3000
M. De I,
Marts Marietta
R2136FL20
3,000 psi Cof _Ti,iSrdewally; and Ramp.
3-5" Slump; 3-6%Au
16/1/2023 03 30 00
Mac Desp
Marlin M.M.
R2136N20
3,000 psi Concrete fr Sidewalks and Rampns
3-5" Slump. 3-6%Ab
11122022 03 3000
M. Desrg,
Man. Marietta
R2141K24
4,000 p.r Covcrete for Ju,aio, Boxes, Sidewahrs and Ramps
3-5" Slump; 3fi%Au
14/7/2023 03 30 00
Mi. Design
Marlin Marietta
R2136K14
3,000 psi conmae f,, sidewalks and rumps
31" Slump, 36%Air
19/9/2022 03 30 00
M. Design
Mart. M—uu
R2131314
3,000 psi Co—te for Sidewalk, & Ramps
3-5" Sh—p; 3fi%Air
19/92022 03 30 00
Mi. Design
Marlin Marietta
R2132214
3,000 psi Concrete for Sidewalks & Ramps
31" Slump, 36%Air
19/9/2022 03 30 00
M. Design
Mart. Marieta
D9490SC
3,000 psi Concrete for Sidewalks & Ramps
3-5" Slump; 4.5-7.5%An
110/42023 03 30 00
Mu Des�p
NBR Readyy Mi,
CLS A-YY
5.00 Sacks / 3,000 psi Concrete for Sidewalks & Ramps, and Cud, & Gutter
3-5" Slump, 36%Ate
110/4/2023 03 30 00
Mac Design
NBR R,aAy Mix
CLS A -NY
5 00 Sacks / 3,000 psi Concrete for Sidewalks & Ramps, and Curb & Gutter
3-5" Slump; 3-6%At,
17/102023 03 30 00
Mi. Desinq
M u
30A50MR
5 SK / 3,000 psi Concrete for Sidewalks
3-5" Slump, 36%Ate
11/18/2023 03 30 00
M. Design
Rapid Redi M.
RRM5020A
3000 psi Concrete f Curb, Gutter, Driveways, Sidewalk, Ramps
3-5" Slump; 3-6%An'
11242023 03 30 00
Mu Des1F
Rapid Redi Mi.
RRM5525A
3600 psi Concrete for Sidewalks, Approaches, ADA Ramps
3-5" Slump, 36%Air
19/9/2022 -33 30 00
M. Design
Redi-Mix
IOL11504
6 00 Sacks / 4,000 Ni Concrete Mix for Sidewalks, Curb & Gutter, Sewer Mauhom, Inlets, & Junction Boxes
3-5" Slump; 36%Air
110242024 -D3 30 00
Mu D-01
SRM Concrete
30850
3000 psi Concrete for Sidewalks & ADA Ramps
3-5" Slump, 36%Air
110/24/2024 133 30 00
M. Design
SRM Covcrete
30350
3000 Ni Concrete for Sidewalks & ADA Ramps
3-5" Slump; 3-6%Air
110/182024 -D3 30 00
Mu D-0
SRM Concrete
30050
3000 psi Concrete for Sidewalks, Ramps, Inlets, Junction Boxes, Thmst Blocks, Cud, and Gutter, Driveways, Barrier Ramp
3-5" Slump, 36%Air
33000
19/9/2022033000
M. De.igo
Tarrant Covcrete
FW5025A
3000 Ni Concrete Mu f., Curb & Gutter, Driveway., Sidewalks, ADA Ramps
3-5" Slump; 36%Air
19/9/2022 -33 30 00
Mi. D.i¢p
Taaa¢t Concrete
CP5020A
3000 psi Covcrete Mix for Cuff and Gutter
3-5" Slump, 36%Air
110/102022 033000
M. Design
Tarrant Concrete
TCFW5020A
3000 psi Concrete f., Sidewalks
3-5" Slump; 3-6%A,,
19/9/2022 -33 3000
Mi. De101
Tam.it Concrete
FW5525A2
3600 psi Concrete Mix for Sidewalks, Drive Approaches, ADA Ramp, Cuff and Gutter
3-5" Slump, 3-6%Ab
19/9/2022 -33 3000
M. D-I,
Tim Ready M.
3020AE
3000 psi C.iu=te for Sidewalk.
3-5" Slump; 3-6%Au
19/9/2022 -03 3000
Mi. Me p
True Grit Rd i Mix
0250.230
3000 si Concrete Mix for F'latwork, Cmb & Gutter, D i em. Sidewalks, ADA Ramos
31" Slump, 36%Ab
9/92022 sae. 00
D,s6�es,
i Mi.
0250.2301
3000 psi Concrete Mix f Cub & Gutter, Driveways, Sidewalks, ADA Rumps
31" Slump, 36%Ab
/In� .Y��i,
Junction
Boxes, casemen/tt ¢. Collars. Lichtoart Foundations)
19/92022 03 30 00
Mae Drsug,
America, loncrete Company
40CNF06'
4000 psi Covcrete for Manholes & Ubhty Stu,t
3-5" Slump; 0-3%Au
19/9/2022 03 3000
Mix M p
Bumco Texas
40U500BG
4000 psi Concrete Mix fm Storm Drain Structures, Drwewa Screen Walls, Collars
3-5" Slump. 3-6%Ab
19/92022 03 30 00
M. D-I,
Cow Tow, Red, M.
255-2
3000 psi Co i=te Mix for Inlets, Thrust Block.g, Co,cree vcas meet
3-5" Slump; 3-6%Au
19/9/2022 03 30 00
Mi. Design
Cow Town Redi Mi.
355
3000 psi Concrete Mix fire Liles, Thm,t BI-km, Conmete Encasement
31" Slump, 36%Ab
19/9/2022 03 30 00
M. Design
Cow Town Redi M.
255
3500 psi Concrete Mix for Flatwork, I.]..' Th—t Bldg Concrete Encasement
3-5" Slump; 3fi%Au
19/9/2022 03 30 00
Mi. Design
Cow Town Redi Mi.
270
5000 psi Conmee Mix fr Cast -in -Place Box Culverts
31" Slump, 36%Air
19/9/2022 03 30 00
M. Design
Cow Town Redi M.
370
5000 psi Concrete Mix for Cast -.-Place Box Culverts
3-5" Slump; 3-6%Au
19/92022 03 30 00
Mu DIP
Cow Town Redi Mi.
353
3000 psi Concrete Mi. for Sidewalks, ADA Ramoqss, Driveways, Curb & Gutter, Safety End Treamre , Nov-T.DOT Retaining Wags
31" Slump, 36%Ate
19/9/2022 033000
Mi: DmIiu
Cow Town Redi M.
257
3600 psi Concree mixfor V,11y Gutters, Lightpole Foundations
3-5"Slum; 3-6%At,
19/9/2022 03 30 00
Miz D-01
Cow Town Redi M&
357
3600 psi Conmee Mi. fr Valle Gutters, Lightpole Foundations
3-5" slum, 36%Air
19/9/2022 03 30 00
M. Design
H.1a. SOR, lac.
1701
4000 psi Concrete Mix for Stprm�min Swcmres, Sanitary Sewer Manholes, Junction Box
3-5" Slump; 3-6%An'
19/9/2022 033000
Mix D-01
Holcim-SOR , Ina
1551
3000psi Co uu, M&fr Blockvl$
3-5"Slump, 3-%Air
3 30 00
19/92022 033000
M. Design
Holcmi - SOR, lac.
5409
4000 psi Concrete Mix for Sidewalks, Inlets
3-5" Slump; 3-6%An'
14272023 03300 0
Mu DeslP,p
Liquid Smne
C361DNFA
3,600 psi Concrete for Retaining wall, drivewa ,junction box apron, approach
3-5" Slump, 36%Air
3 30 00
I9/92022 033000
M. Design
Mart. Marietta
R2141230
4,000 psi Concrete for Manholes, Inlets & He.Aw.M, Valve Pads
3-5" Slump; 36%Av
3 30 00
18/42023 033000
Mu D-01
Marlin Marietta
R2141R24
5.53 Sacks / 4,000 psi Covcrete for Junction Box, Box Culvert, Sidewalks and Ramos.
3-5" Slump, 36%Air
1112M023 033000
M. Design
Mart. Marietta
R2146R33
60l Sacks/4,000psi Concrete Mix for CIPSewer Manholes
3-5" Slump; 36%Air
111202023 033000
Mi. Desi¢p
Martin Marietta
R2146K33
6.01 Sacks/4,000 psi Covcrete Mu for CIP Sewer Manholes.
3-5"Slum; 36%Air
19/9/2022 03 30 00
M. Design
Mart. Marietta
R2142233
3,600 psi Concrete for Manholes, inlets & Headwalls
3-5" Slump; 4.5-7.5%An
19/92022 03 3000
Mi. Desk
Marlin Marietta
R2136224
3,600 psi Concrete f Curb lulets
31" Slump, 3-6%Ab
19/9/2022 03 3000
M. De I,
Martin Marietta
R2141233
3,600 psi Covcrete for Storm Structure., inlet., Blmk.g & E,caseme,t
3-5" Slump; 3-6%Au
19/9/2022 03 30 00
Mi. Des�9p
Marlin Marietta
R2146038
4,500 Ri Concrete fin inlets, Stmm Dmin Stm ,s
31" Slump, 3-6%Ab
110242024 03 3000
M. Desrg,
Mart. Marietta
R2146K34
4000 psi Co,crete fr inlets, M.iholes, Headwalls, Thmst Blocks, Cullum
3-5" Slump; 3-6%Au
19/122023 033000
Mi. Design
NBRR7a Mix
CISPI-YY
6.00 Sacks/4,000��{{ggii Co u,te fr C.11m, Manholes, Box Culverts
31" Slum, 36%Air
19/92022 03 30 00
M. Design
NBR Ready Mix
TX C-YY
3000 psi Concrete Rxix for Curb lulets
3-5" Slum; 3fi%Air
19/92022 03 30 00
Mix Desigu
NB Read Mix
TX C-NY
3000 psi Conmee Mix f., Cud, lnlels
31" Slump, 36%Air
11/182023 03 30 00
Mu, Desreo
Rapid Redi .
RRM5320A
3000 psi Concrete fin Blacking
3-5" Slump; 3-6%At,
11/182023 03 3000
M. Design
Rapid Redi M,c
RRM6020ASS
4000 psi Concrete f., Strom Dim Structures
3-5" Slump; 3-6%Au
FORT WORTH-. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 2/4/2025
I Concrete (Continued)
I10/24/2024
03 30 00
Mu Des�P1,
SRM Concrete
4000 psi Concrete for Inlets, Manholes, Headwalls, Thrust Blocks, Collars
3-5" Slump. 3-6% Ai,
110/24/2024
03 3000
Ma Des eo
SRM Concrete
40U'l
4000 psi Comae for Inlets, Manholes, Headwalls, Thmat Blocks, Collars
3-5" Slump; 3-6%Au
I9/l6/2024
03 30 00
Mu D:,p
SRM Concrele
�403'0
35050
3500 psi Concrete for Tluuat Blocks and Collars
3-5" Slump. 3-6% A'v
I9/9/2022
03 30 00
es,gn
TarrantCncrete
FW5320A
3000 psi Concrete Mix for Blockg
3-5"Slump; 36% Aa
10/]0/2022
03Ma
JM.D
Des fnewaDa,Culverts,Dr�led
par Concrete for Manholes
3-5" Slump; 3fi%A ,
waDs, N�`
Sha ocreteTCFW6025A24000
Willed
I Drilled Shafts
:919/2022 03 00
Ma Design
Bumco Texas
36U500BG
3600 os, Concrete Ma for L¢him¢ and Traffic Sins] Foundations (Dulled Shafts)
5.5-7.5" Slump; 3-6% Av
I6/21/2023 03 30 00
Mu Des�P1,
Cow Town Redi Mu
360-DS
3600 osi Concrete for Dnff d ShaNLiehtine and Traffic Si ao,l Foundation (Drilled Sh:fb
5.5-7.5" Slump. 3-6% At
I10/30/2024 03 30 00
Ma Design
Estrada Ready Ma
R36575AEWR
3600 osr Concrete for Dolled ShaR/Luthtm¢ and Traffic S,¢ne1 Foundation!Drilled Shafts)
5.5-7.5" Slump; 3-6%An
I12/52022 03 30 00
Mu Des0
Hold. - SOR Inc
1822
3600 vsi Concrete for (Dr lW Shafb)/Liehtine and Traffic Sianal Foundations
5.5-7.5" Slump.0-3%Ate
I9/92022 03 3000
Ma Design
Holcun - SDR, Inc
1859
4000 osr Concrete for fDrRled Shaftsld.i¢hhn¢snd Traffic Si¢nal Foundehons
5.5-7.5" Slump; 3-6% An
I4n/2023 03 300
Mu Des�P1,
L�:d Stone
C361DHR
3.600 osi Concrete for (DrM,d Shuft)/Liehtine and Traffic Slenal Foundations
5.5-7.5" Slump. 3-6% Ai,
I6272023 03 3000
Ma Design
Manm Manate
U2146N41
6.44sacks / 3.600 osi Concrete for (Drilled Shafts) / Lr¢htm¢ and Tmffc S,¢ne1 Foundehons
5-7" Slump; 3-6% Av
16272023 03 300
Mu Des�P1,
Martin Marietta
U2146K45
6.65 sacks / 3.600 vsi Concrete for (Drilled Shafts) / Liehting and Trefic Signal Foundations
5-7" Slump. 3-6%Ate
I8222024 03 30 00
Ma Design
NBR Ready Ma
135K2524
3500 osi Concrete for !Drilled Shaft) Li¢htoole Foundehons
5.5" Slump; 3-6% Av
I8222024 0``3 30 00
Ma De'a n
NBR Ready Ma
135K0524
3500 vsi Concrete for (DrMW Shaft) Liehtvole Foundations
5.5" Slump; 3-6%An
I Vther Applications
I9/9/2022 03 30 00
Mi Design
Ca der Concrete
FWCC602001
4000 psi Concrete fr Storm Dmin Structures, Manholes, Headwalls, Retaining Walls, Valley Gutters, Drive AWm hes
3-5" Slump. 3-6%Ate
I9/9/2022 03 3000
Ma Design
City Conaete Company
40LA2011
4000 par Comae Ma for Stoma Dram Structures
3-5" Slump; 3-6%Au
I9/9/2022 03 300
Mu Des�P1,
Cow Town Redi Mu
260-2
3600 osi Concrete Mu for Box Culverts, Headwalls
3-5" Slump, 3-6% Av
I9/92022 03 3000
Ma Design
Cow Town Rah Ma
360-1
3600 psi Concrete Mix for Box Culverts, Headwalls, Wingwalls
3-5" Slump; 3-6% Au
I9/9/2022 03 30 00
Mi. Design
Cow Town Redi M&
260-1
3600 g/si Concrete Mix for Headwalls
3-5" Slump. 3fi% Air
I1292024 03 30 00
Ma Design
Estrada Ready Mix
R3655AEWR
550 Sacks / 3,600 psi Comae for HeAwAs, Wmgwalls, and Culverts
3-5" Slump; 3-6%Air
I9/92022 03 30 00
Mu Desiga
GCH Concrele Services
GCH4000
4000 psi Concmte for for Sidewalks, Ramps, Headwalls, hdels, and Storm Draw Swctures
3-5" Slump. 3-6% At,
I9/92022 03 30 00
Ma Design
Hold. - SOP_ Inc.
1851
4500 psi Concise fm Stoon Dram Structures, Hand Placed Pavmg
3-5" Slump; 3-6%Ate
I4/12023 03 30 00
Mu D-01
Mann, Marietta
3 JOLBP
3,600 nQ�i Concrele for Reta�' -'9y Walls
3-5" Slump, 4-7%At,
I8/30/2023 03 30 00
Ma Desrgo
Martm Manata
R2141R30
5 85 SK/ 4,000 psi Concrete im Box Culverts & Headwalls
3-5 , SlumP; 3-6% Ah
I9/92022 03 30 00
Mu D-01
Mann, Marietta
R2146035
4,000 psi Concrete for Manholes, inlets &Headwalls, Valve Pads
3-5" Slump, 3fi% Air
I9/9/2022 03 30 00
Ma Design
SRM Covmi,
40050
4,000 psi Covaete for Headwalla, Raammg Wall, Collars
3-5" Slump; 3fi%Air
I9/92022 03 30 00
Mh' Desp
SRM Concrete
35022
3,600 pai Concrete for ]unction Box, Rdan,n,g Walls
3-5" Slump, 3fi%Ate
I4/12024 03 30 00
Ma Design
SRM Concrete
45050
4500 psi Concrete for Storm Structures
3-5" Slump; 36%Air
I9/92022 033.000 00
Mi,Des�"P
Tarrant Concrete
FW6020A2
4000 psi Concrete Mu for Sturm Draw Structures
3-5" Slump, 36%Air
I lass P (Mae... Placed Pavin¢)
1624/2024 3213 13
Mix Desp
B? Town Concrete
360060-1
3600 psi Concrde fr Machine Placed Pavl9P
L 3" Slump. 3-6%Ate
I6242024 32
Ma Dedgv
Big Town Concrete
362060-1
3600 psi Conaae for Mach —Placed Pavmg
t-3"Slump; 3-6%Au
I9/9/2022 32 13 l3
Mi. Desp
Carder C.—de
FWCC552091
3600 psi for Machine Placed Paving
l-3" Slamp. 3-6%Ate
I9/92022 3213 13
Ma Design
Carder Comae
FWCC602091
4000 psi for Machme Placed Pavmg
1-3" Slump; 3-6% Aa
I9/9/2022 32 13 13
Mix Desigp
Ciry Comae Comp?nv
36LA2011
3600 pin Concrete Mix for Machine Placed Paving
L-3" Slump. 36% Air
I9/92022 33 13 l3
Ma Design
Cow Town Redi Min
257-M
3600 psi Conaae Mix for Machme Placed Paving
1-3" Slump; 3-6 Air
111/142022 3213 L3
Mix Desi¢a
Cow Town Rath Mix
357-M
36001si Concrete Mi !.,Machine Placed Paving
13 "Slump. 36%Air
I9/92022 3213 l3
Ma Design
Cow Town Rati Ma
260-M
4000 psi Cncrae Mix for Machme Placed Paving
1-3" Slump; 3-6 At,
I9/92022 32 13 13
Mix Design
Cow Town Redi Mix
360-M
4000P�i Concrete Mix fin Machine Placed Pavii'44��
L 3" Slump, 3-6 Air
I2/62024 321313
Ma Design
Estrada Ready Mix
TD3655AEWR
5505acks/ 3,600 psi Cortese li Machine Placed Pavmg
1-3"Slump; 3-6%Av
I8/4/2023 321313
Mix Des�p
Mann, Marietta
Q214IR27
5.69 sacks/4,000 psi Concrete for Machine Placed Paving
13"Stamp, 36%A'v
I11/2/2022 32 13 13
Ma Design
Mertm Maoata
Q214IK30
4,000 psi Concrete for Machme Placed Paving
1-3" Slump; 36o AQ
I10/42023 321313
M&Des�p
NB R Ready Mix
TXCSP-YY
5.50 Sacks/3,600 psi Concrele for Machine Placed Paving
13"Slump, 36%Ate
I10/4/2023 32 13 13
Ma Dong i
NBR Ready Mix
TX C SF -NY
5 50 Sacks / 3,600 psi Concrete for Machme Placed Pavmg
1-3" Slump; 36% Air
I10242024 321313
Mix Desi1
SRM Concrete
40068
4000 psi Concrete for Machine Placed Paving
1-3"Slump, 36%Air
I10/24/2024 321313
Ma Desopi
SRM Cpnmt,
40825
4000NiConcretefn Machine Placed Pav mg
1-3" Stamp;36%Ah
19/162024 321313
Mu Des�p
SRM Concie[e
40@5
4000 psi Concrete for Machine Placed Paving
1-3"Slump, 36%Air
I l0/182024 32 13 13
Ma Dea,go
SRM Coi aete
35023
3600 psi Concrete for Machme Placed Pavmg
1-3" Slump; 36% Air
I9/92022 32 13 13
Mu Design
Tarrant Concrete
FW5520AW
3600 psi Concrete for Machine Placed Paving
1-3" Slump, 36%Ate
I9/92022 32 13 13
Ma Design
Tme Got Rah Ma
0255.2301
3600 psi Comae Ma for Machme Placed Paving
l-3" Slump; 3 5-6 5 % Av
I9/9/2022 13 13
Ma Deai
Tme Got Red, Ma
0260.2302
4000 psi Conaae Ma for Machme Placed P-on,
l-3" Slump; 3 5-6 5% Au
9
I Class R (Ham I Placed � ¢)
I9/9/2022 3213 13
Mix Dew
American Concrete Company
45CAF076
4500 psi C.—de for Hand Placed Paving
3-5" Slani" 3-'%Ate
I52/2023 32 13 13
Ma Dedgv
Big D Concrete
CM14520AE
4500 psi Comae for Hand Placed Pavmg
3-5" Slump; 3-6%Au
I9/9/2022 32 13 l3
Mu Desp
B? Town Concrele
452065-1
4500 osi hand placed ,in
31" Slamp, 3-6%Ate
I9/92022 32 13 l3
Ma Des,gn
Big Town Concrete
450065-1
4500 pai hand placed pavaig
3-5" Slump; 3-6% Aa
I9/9/2022 32 13 l3
Mix Desigp
Bumco Tenors
45U500BG
4500 psi Concrete Mix fr Hand Placed Paving, Sturm Suneones
3-5" Slumo, 36%Air
I9/92022 32 13 13
Ma Des n,
Corder Comae
FWCC602021
4500 psi concrete for Hand Placed Paving
3-5" Slump; 3-6%Air
I9/92022 32 13 L3
Mix Design
City Concrete Coi�i�ppany
4SNA206
4500 psi Concrete Mu fr Hand Placed Paving
3-S" Slump. 36% At,
I9/92022 3213 l3
Ma Design
Cow Town Rali Ma
265
4500 psi Cnaae Mix fr Hand Placed Paving
3-5" Slump; 36%Ate
I9/92022 321313
Mix D-01
Cow Town Redi Mix
365
4500 i Concrete Mu fr Hand Placed Pavi'4�
3-5"SI—P,36%Air
I.19/2024 321313
Ma Desreo
Estrada Ready Mix
R4560AEWR/
600 Sacks/4,500 psi Conc fi Hand Placed Pavmg
3-5"SIumP;46%Ah
I9/9/2022 32 13 13
Mix DIPp
GCH Concrete Services
GCH4500
4500 psi Concrete Hand Placed Paving
3-5" Slump, 36% Air
I10/4/2024 321313
Ma Deni;a
Holemn SOR, Inc.
5507
4500 psi Concise Hand Paced Paving
3-5"Slump; 36%An'
I9/92022 32 13 13
Mh' Des
Hold. - SOR, Me.
1851
4500 psi Conaae for Stom, Dian, Structures, Hand Placed Pavia
3-5" Slump, 36% A'v
I1122022 32 13 13
Mi. Design
Mann, Marietta
R2146N35
6.11 sacks /4,500 psi arncrete fin, Hand Pl wPaving, hdds, Mlles, Headwalls
3-5" Slump, 36%Air
FORT WORTH-. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 2/4/2025
I Coserete(Con'inued)
18/4/2023 32 13 13
Mac -es ,
Marlin Marietta
R2146R36
6.17 / 4,500 psi Concrete fr Hand Placed Pavmg
31" Slamp, 3-6%Air
I 1 l/22022 32 13 13
Mu Desigv
Mart, Maneita
R2146N36
4,500 psi Concmte for Head Placed Pavmg
3-5" Slump; 3-6% Au
11l/2/2022 32 13 l3
Mac Dee'
Marlin Male,
R2146K36
4,500 Concreta fr Hand Placed Pav' a
Placed
3-5" Slump. 3-6% Av
15222023 321313
Ma Design
Mari, Marietta
R2146K37
6.22 sack/4,500 pa Concrete for Head Pavmg
3-5"Slump; 3-6%Au
112/22/2023 32 13 l3
Mi. Deaigp
Marlin Marie,
R2146R44
6.60 Sachs / 4,500 psi Concrete Mix fr Hand Placed Paving
3-5" Slam,. 36% Air
112/22/2023 32 13 l3
Ma Deaga
Mahn Marlette
R2146K44
6.60 Sacks / 4,500 psi Concrete Mix for Hand Placed Pavmg
3-5" Slump; 36% Air
111/152022 32 13 l3
M. DesiPA
Marlin Marie,
R2146136
4,500 ,ei Covcrete fr Hand Placed Paving
3-S" Slump. 36%Air
I11/1 S/2022 321313
Ma Deagn
Mat, Maneta
R2146K36
4,500 psi C..—te for Hand Placed Pavivg
3-5"Slump;3fi%A,
19/92022 32 13 13
Mu Desl�p
Marlin Marietta
R2147241
4,500 psi Concrete for Hand Placed Paving
3-5" Slamp, 4.5-7.5%Air
19/9/2022 3213 L3
Ma Desgn
Mat, Marietta
R2146236
4,500 psi Concrete for Hand Placed Pavmg
3-5" Slump; 3fi% An
19/9/2022 32 13 13
Mu Des1P,p
Marlin Marietta
R2146036
4,500 psi Concrete for Hand Placed Paviaa, Wets
3-5" Slump, 36%Air
19/9/2022 32 13 13
Ma Destgo
Mat, Maneta
R2146242
4,500 psi Covcrete for Hand Placed Pavmg
3-5" Slump; 3fi% Air
19/92022 32 13 13
Mu Des1P,p
Marlin Marietta
R2146042
4,500 psi Concrete for Hand Placed Pavio\
3-5" Slump, 36% Air
110/4/2023 32 13 13
Mu Des,ga
NBR Ready Mu
CLS P2-YY
6 50 Sacks / 4,500 Ni Concrete for Hevd led Pavmg
3-5" Slump; 3fi% Ah
110/42023 321313
M&Deem
NBR Ready Mix
CLS P2-NY
6.50 Sacks/4,500 psi Coacrte for Hand Placed Paving
3-5"Slump, 36%Air
17/10/2023 32 13 13
Mu Design
Osbum
45A60MR
6SK/4,500 psi Concrete for Hand Placed Paving
3-5"Slump; 3fi%Air
11/24/2023 321313
Mu Desi�p
Rapid Redi Mu
RRM6320ARP
4500pei Coacretefa Hand Placed Paving
3-5"Slump, 36%Air
11/13/2023 321313
Ma Desigo
SRM Covcrete
45023
4500 psi Concrete for Hevd Placed Pavmg
3-5"Stump; 3fi%Air
19/92022 32 13 13
Mu Design
SRM Concrete
45000
4500 psi Concrete for Hand Placed Paving
3-5" SI.— 36%Au
I10242024 32 13 l3
Mu Desigv
SRM Covcrete
45350
4500 psi Cmrree for Hand Placed Pavmg
3-5" Slump; 3-6%Au
110/24/2024 32 13 l3
Mi. Delp
SRM Concrete
45850
4500 psi Concrete for Hand Placed Paving
3-5" Slamp, 3-6%Air
110/182024 321313
Ma Desigv
SRM Covcrete
45050
4500 psi Covcrete for Hand Placed Pavmg
3-5"Slump; 3-6%Av
19/9/2022 32 13 l3
Mi. Design
Ta,aat Concrete
FW6020AHP
4500 psi Concrete Mix fr Hand Placed Paving
3-5" Slamp. 3-6 Av
19N2022 32 13 l3
Ma M iga
Tartavt Covcrete
FW60AHP
4500 pa Cmade Ma for Head Placed Pavivg
3-5" Slump; 3fi%Au
19/92022 32 13 l3
Mi. Design
Tavant Concrete
TCFW6020AHP
4500 psi Concrete Mix fr Hand Placed Paviaa
3-S" Shav,, 3-%Air
19/92022 3213 L3
Ma Deagn
Titan Ready Mix
TRC4520
4500 psi Concrete for Hand Placed Pavmg
3-5" Slump; 3fi% Aa
19/92022 32 13 l3
Mie Design
True Grit Redi Mie
0260.2301
4500 psi Concrete Mu fr Hand Placed Paving
3-S" Slum,.36% Air
19110. 3213 13
Ma Deagn
T1ue Grit Red1 Ma
0265 2301
4500 psi Concrete Mix fr Valley Gutters, Head Placed Paving
3-5" Slump; 3.5-6 5%At,
19/92022 321313
Mix Des
True Grit Redi Mix
270.230
5000 psi Concrete for Head Placed Paving
3-5"Slump, 36%Air
110/92024 32 13 13
M. Destgp
Wildcatter
4520AI
4500 psi Concrete for Head Placed Paving
3-5" Slam,, 36%Air
1 h". HES
(� 77h Earl, Stre th Psvina)
19/92022 3213 13
U. Design
Big D Concrete
14500AE
4500 psi Concrete f,, High Early Strength Pavmg
3-5" Slump; 3-6% Au
19/9/2022 32 13 13
Mu Des ,
Bumco Texas
55U120AG
4000 psi Concrete Mix for High Earl, Strength Paving
3-5" Slamp. 3-6%Air
19/92022 3213 13
M. Desigv
Cow Towv Redi Ma
370-INC
4500 psi Covcrete for HES Pavmg
3-5" Slump; 3-696 An
19/92022 32 13 l3
Mu Desigp
Cow Tower Rath Mu
375-NC
5000 psi Concrete for HES Paviag
3-5" Slamp, 36%Ah
19/92022 3213 13
Ma M iga
Cow Town Ro& M.
370-NC
4500 pa C.—de fr HES Pavmg
3-5" Slump; 3fi% Au
'1/182023 321313
Mix Desiga
Cow Town Redi Mix
380-NC
4500 g�i Conrreefr HESPav�' °
3-S"Slump.36%Air
11292024 3213 l3
Ma Deagn
Estrada Ready Mix
4575AESC
7 50 Sacks / 4,500 psi 13,000 p (a) 3-day) Covcrete fr HE$ Pavmg
3-5" Slump; 3fi% Av
19/92022 321313
Mix D-01
Holcim -SOR Inc.
2125
5000 psi Concrete for HES Paviaa
3-5"Slump. 36%Air
11/24/2023 3213 13
Ma Deaga
Liquid Stone
C45 tDHR-A
4500psi Covcrete for HES Pavmg
3-5" Slump; 3fi% At,
14/72023 32 13 13
Mix D-01
Madill Marietta
R2161K70
6,000 psi (3,000 psi R 24 hrs.) fr HES Paving
3-5" Slam,, 36%Air
12/10/2023 32 13 l3
Ma De aga
SRM Covcrete
50310
5,000 psi Covncrete for HES Pavmg
3-5" Slump; 3fi% Air
19/9/2022 32 13 13
Mis Des'gp
SRM Covcrete
40326
4,500 (3,000 \' 3-0ayyss) psi Coacrele for HES Paving
3-5" Slump, 36%Air
19/92022 32 13 13
Mu Design
TaranI Concrete
FW6520AMR
4500 (3000 psi (d, 3daw) psi HES Pavmg
3-5" Slump; 3fi% An
19/92022 32 13 13
Ma Descp�
T-1 Covcrete
FW7520AMR
4500 (3000 psi (a, 3daw) psi Covcrete HES Pavmg
3-5" Slump; 3fi% "a
I glass S (Bridge
Top Slabs of Direct
Traffic Cutrerts, Approach Slab&)
19/9/2022 32 13 13
Miz Des
Cow Towu Redi Mix
260
4000 psi Covcrete Miz fr Bri��Fl/e Slabs, Box Culvete, Headwalls
3-5" Slump. 3-6%Air
19/9/2022 32 13 13
M. Desigv
Cow Towv Redi M.
360
4000 psi Covcrete Mu for Br tlge Slabs, Box Culverts, Headwalls
31" Slump; 3-6% Au
19/92022 32 13 l3
Mu Des ,
Cow Town Redi Mu
365-STX
4000 psi Concrete for Bridge slabs, t,� slabs ofdiml traffic culverts, apt ach slabs-TXDOT Class S-No Fly Ash
3-5" Slamp. 3-6%Air
11292024 321313
Moe Desiga
Estrada Ready Mix
R4060AEWR
6.00 Sacks/4,000 pa C.—de fr Bridge Slabs, Top Slabs, and App� cli Slabs
4-6 Slump; 3fi%Au
15/3/2023 32 13 l3
Mil Della
Malin Marietta
M7842344
4,000 Concrete fr Bddge Deck
3-5" Slam,. 4.5-7.5%Air
14/12023 3213 l3
Ma Deaga
Mahn Maneta
R2146P33
6.01 s>u'ks / 4,000 psi Covcrete for Bridge Deck
3-5" Shrmp; 3fi% Air
14/152024 32 13 l3
Mu Desiga
NBR Readyy Mix
TX S-NY
S.SO Sacks / 4000yysi Concrete Mix for Class S Slab Paviaa -No Fly Ash
3-S" Slum,. 36% Air
14/152024 32 13 l3
Mvc Deagn
NBR Ready Mix
TX S-yy
4.50 Sacks / 4000axi Concrete Mix for Class S Slab Pavmg
3-5" Slump; 3fi% At,
15/52023 3213 13
Ma Desig�n
SRM Covcrete
D100008553CB
4,000 psi Concrete for Bdiidge Approach Slab, Deck Slab
3-5" Slump; 3fi%Air
I ipn—is Ba&etrweh Re pair
14/1Air
2022 03 34 16
Mix Dcs
IH�co
osr Con"w
577"
19/92023 \1_1416
Mi, D,,IN„hr
Texas
08Y450BA
800 Ma fo Ht a fr eah Rape?
Sllump. 3 61%A%ir
I oatro]led
Low Sireaat Material
19/9/2022 03 34 13
Mac Design
B—
OIY690BF
100 psi Concrete Moe for Flowabk Fill
Flowable; 8 5-11.5%Air
19/9/2022 03
Mac Desp
Carder Coaarete
FWCC359101
50-150pal Flowable PW-CLSM
3-5"Slam(, 8-12%Air
19/9/2022 0334 L3
Ma Desigv
Ceder Covcrete
FWFF237501
So- 150ps,Flowable Fdl-CLSM
Flowable;15-11.5%Air
19/9/2022 0334 L3
Mix Des'pp
City Concrete Comp,a4y
11-350-FF
50-150p Coaorete Cor Flowable PiO-CLSM
Plowable, 8-12%Air
19/92022 11 34 l3
Ma Desiga
Cow Town Red, Mhe
M.#9
70 pa Rlo able Pdl-CLSM
7-9"Slamp; 8-11%Air
110/42023 0334 13
Mi. Design
NBR Ready Mix
FTW FLOW FILL
150nsi concrete Cor —able
7-10"Stu 8-12%Air
19/9/2022 03 34 13
Mi.Des—
Tairea[Concrete
FWFF150CLSM
50- 0 psi Flowable Fill -CLSM
£Towable, 2%Ah
14/l/2023 31 37 00
Mbe Des,gn
Rt 41030
4,000 psi Concrete for R,pmp
3-5" 51— ; 3-6%Au
1313700
14/l/2023 31 37 00
Moe D.-
(Martin Mane to
R2146033
4.000 psi Concrete for R.-
3-5" Slump; 3-6%Au
1 A�Ihall Pavia?
19/92022 3112 16
M ve Design
Aust, Asphalt
FTSB117965
FT5BI17965 PG64-22 Type B F,e Base
19/9/2022 32 12 16
Mu Des ,
Austin Asphalt
FT B139965
FFHH 39965 PG64-22 TyYVIk Fine Hase
19/92024 321216
Ma Desigv
Aust, Asphalt
FT]B1172
FP1B117.2PG64-22TypeB F,e Be.
15/12024 32 12 l6
Mix Desiap
Reynolds As1{halt
340-DG-B P
340-DG-B PG64-22 Ty1� B Base Course
19/92022 3212 l6
Ma Deaga
Reyaolds Asphalt
1112B
11012B PG64-22 TypeB A,e Base
19/92022 32 12 16
Mix Desiga
Reynolds AA halt
1612B
1612B PG64-22 Tom�,, &&B Pine Base
112/52022 331216
Ma Deaga
Suntnount Fav,g
3076BV6422
3076BV6422 P2(; 2i Type B Fine Base
19/92022 32 12 16
Mix Desl�p
Samnoant Paving
341-BRAP6422ERG
341-BRAP6422ERG PG64-22 T e H Fine Hase
19/92022 3212 16
Ma Deaga
TXBIT
37-211305-20
37-211305-20 PG64-22 Type B e Base
19/9/2022 32 12 16
Mix Des�f,
TXHIT
44-211305-17
44-211305-17 PG64-22 Type H Fine Base
19/9/2022 32 12 16
Mi. Desigo
TXBIT
211305 (1757)
211305 (1757) PG64-22 Type B Pine Base
FORT WORTH-. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 2/4/2025
I Asphalt(Continued)
19/92022 32 12 16
Mix Des�af
TXBIT
64-224125-18 PG
64-224125-18 PG70-22 Type D Fine Surface
I4/l/2024 32 12 l6
1
Ma Des�e
TXBIT
344 MAGSP-D 70-22XR
344 MACSP-D 70-22XR SAC A-R Tvce D Fme Surface
19/9/2022
eteemble
321320
a i 77 Su�ace
DW$-Pavers
Pme Hall Bnck(Wmston Smem,NG)
Taade
19/92022
321320
DWS-Pavers
Wtem Bik Co.(11—ton, TX)
Demcmle Warm,¢ Pavers
I9/92022
321320
DWS-Composite
Armor ile
Pic
19/9/2022
321320
DWS -Composite
ADA Solutions (Wihningmn, MA)
HeritagBrick CIE Composite Paver
I4/72023
321320
DWS-Pavers
ADA Solutions(Wilmington, MA)
DetectaWemmg Pavers
I SWcone Joint Sealant
199/2022
32 13 73
Join[ Sealant
Dow
890SL
8905E -Cold �etp°�nlied Sit�'e Component, Sibcone Joint Sealant
ASTM D5893
I9/92022
32 13 73
lomt Sealant
To—
90OSL
900SL - Cold 1pPl. Sm� Co. Sihcone Jomt Sealant
ASTM D5893
ld Jp�onrnt,
-Cold�h'ed, conetJoint
ASTM D589
19 9/2022
32 13 73
Joint Sealant
Curb.
RoadSaver Silicone
RoodSaveroSifi—cSe gle Component, Si Sealant
ASTM D58933
I UtWty Trench Embedment Sand
t. �s
Utili }}�� Both druent Send
ASTM 31
I9/9/2 022
33 OS l0
Embedment Sand
Crouch Materals
Utd{tyEmbedmrnt Send
ASTM C33
19/9/2022
3305 10
Embedment Sand
F and L Dirt Movers
Utdi}}_��Embedment Sand
ASTM C33
I9/92022
330510
Embedment Sand
FandLDm Movers
Utmincubedmrnt Sund
ASTM C33
19/92022
3305 10
Embedmem Send
Tm Top Marts Manetm
UbhN Embedment Send
ASTM C33
1 Storm Sewer- Manholes & Bases/Frames & Covers/Standard JRound)11-01 13
19282018 3305 13
McMOIe Flames and CO1,1
AxuCast (Crovia Steel Company, LTD)
NIB C #220605
MHRC #220605 (Size -•e24" Dia.)
ASTM A48 AASHTO M306
19282018 33 OS 13
Manhole Cover
Neenah Foundry
NF-1274-T91
NF-1274-T91 (Size - 32" Die)
ASTM A48 AASHTO M306
1928/2 18 3305 13
Manhole Frames end Covers
Neenah Foundry
NF-1743-LM (Hlvged)
NF-1743-LM (Hinged) (Sze- 32" D.)
ASTM A48 AASHTO M306
1928/2 18 3305 13
Manhole Frame
Neenah Foundry
NF-1930-30
NF-1930-30 (Size - 32.25" Die)
ASTM A48 AASHTO M306
I9282018 330513
Manhole Fum and Covers
Neenah Foundry
R-1743-HV
R-1743-HV(S�ze-32"Din)
ASTM A48 AASHTO M306
14/3/2019 3305 13
Manhole Fre to a and Covers
SIP htdustries++
2279ST
2279ST (Size - 24" Die )
ASTM A48 AASHTO M306
I4/32019 330513
Manhole Fo—and Covers
SIP fiohrtnes++
2280ST
2280ST(S--32"Din)
ASTM A48 AASHTO M306
110/8/2020 3305 13
Manhole Frames and Covers
EJ (FomtaQy East Jordan too, Works)
EI033 M/A
EJ 1033 Z2/A (Size -32 25" Dia)
ASTM A536 AASHTO M306
13/8/2024 3305 13
Cmb Inlet Covers
SIP fiolm nes++
2296T
2296T (Sze-' 24" Too.)
ASTM A48 AASHTO M306
16/182024 3305 13
Curb Inlet Covers
SIP fiolm nes ++
2279STN
2279STN (S ze-24" Due.)
ASTM A48 AASHTO M306
—Note: Alf— developmert(artd
new insmllan'ort me.ho/e lids
shall meet the minimum 304rtch opening regm ementes Decked in OVSpecification 33 0513. Any smaller opening sins will only be allowed for ermim, manholes that require replacemertefiames a.d covers
I Storm Sewer- Inlet & St m r, s 33-05-13
110/8/2020 33 49 20
Cmb lidets
Fonema
FRT-l0x3-005-PRECAST'" (Smc-10' X 31
ASTM C913
I N.020 33 49 20
Curb Inlets
Tortenm
FRT-l0x3-006-PRECAST'" (Stze-10' X 31
ASTM C913
110/82020 334 20
Curl, Inlets
Fortema
FRT-10x4.5-407-ERECAST`e (Size -10' X 4 51
ASTM C913
110/8/2020 334 20
Curb klcts
Romaine
FRT_,th l 5-020-PRECAST" (S--10' X 4.5)
ASTM C913
110/8/2020 33 3920
Manhole
Fonema
41
FRT-0X4-00
AST C913
110/82020 33 39 20
Manhole
Tom,
- CAST-� E (Srzi.-44XX 4)
PRT-0X4 �j�CA$� �f
ASTM C913
110/82020 33 39 20
Manhole
Fonema
FRT-5X54 0-PRECAST-TOP (Si. - 5' X 51
ASTM C913
110/82020 333920
Manhole
Fortema
FRT-5X54 0-PRECAST-BASE(Size -5'X 5)
ASTM C913
110/8/2020 333920
Manhole
Fonema
FRT6X6-011-PRECAST-TOP(Size-6'X 61
AS C913
110/8/2020 33 39 20
Manhole
I—FRT_6X64
1 PRECAST -BASE (Si. -6' X 6)
AS C913
13/19/2021 33 49 20
Curb Inlets
Thompson P�e Group
TPG-I OX3405-PRECAST INLET" (Size -10' X 31
AS 615
I3/19/2021 33 49 20
C. Inlets
Thompson Pme Group
TPG-ISX3-0OS-PRECAST INLET" (Suz -15' X 3)
AS 615
13/19/2021 33 49 20
Curb Inlets
Thompson Pipe Group
TPG-2OX3-005-PRECAST INLET" (Size -20' X 7)
AS 615
13/19/2021 33 39 20
Manhole
Thompson Pipe Group
TPG-0X4-009-PRECAST TOP (Sue -4' X 4)
AS 615
13/19/2021 33 39 20
Manhole
Thompson Pipe Group
TPG-0X4-009-PRECAST BASE (Size -T X 41
AS 615
13/19/2021 33 39 20
Mavhole
Thump— Pipe Group
TPG-0X4-012-PRECAST 4-FT RISER (Sue -4' X 4)
AS 615
13/19/2021 33 39 20
Manhole
Thompson Pipe Group
TPG-5X5-010-PRECAST TOP (Size - 5' X 51
AS 615
13/19/2021 33 39 20
Manhole
Thump— Pipe Group
TPG-5X5-010-PRECAST BASE (SRO - 5' X 51
AS 615
13/19/2021 33 39 20
Msuhole
Thompson Pipe Group
TPG-5X5412-PRECAST 5-1T RISER (Size- 5'X 51
AS 615
13/19/2021 333920
Manhole
Thompson Pipe Group
6
TPGX6-0ll-PRECAST TOP (S=-6'X 61
ASTM 615
13/19/2021 33 39 20
Manhole
Thompson Pipe Group
TPG6X6-011-PRECAST BASE (Si.- 6' X 61
AS 615
13/19/2021 33 39 20
Manhole
Thompson Pipe Group
TPG6X6-012-PRECAST 6-FT RISER (S-- 6' X 6)
AS 615
13/19/2021 333920
Manhole
Thompson Pipe Group
TPG-7X7-011-PRECAST TOP (St. -TX 7)
ASTM 6l5
13/19/2021 333920
Manhole
Thompson Pipe Group
TPG-7X7-011-PRECAST BASE(Soc - TX 7)
ASTM fi15
13/192021 33 392
Manhole
Thompson P�e Group
TPG-7X7-012-PRECAST 4-FT RISER (Size - TX 71
ASTM 615
13/192021 333920
Manhole
Thompson Pipe Group
TPG-8X8-01]-PRECAST TOP (S=-8'X 8)
ASTM 615
13/19/2021 33 39 20
Manhole
Thompson P�e Group
TPG-8X841 l-PRECAST BASE (Size - 8' X 81
ASTM 615
13/192021 33 39 20
Manhole
Thompson Pyle Group
TPG-8X8-012-PRECAST 5-FT RISER (Sze- 8' X 8)
ASTM 615
13/192021 33 49 20
Drol�lnle[
Thompson P�e Group
TPG-0X4-0O8-PRECAST INLET (Size -4' X 41
ASTM 615
I3/192021 33 49 20
Inlet
Drop13/19/2021
Thompnson Pipe Group
TPG-5X5-0PRECAST-PRECAST INLET (Sve - 5' X 5)
ASTM 615
33492q
em
Pipe Group
L%Le�4'X �b1
AS
I8/282023 334910
Man6o
Oldcasden
PPrecast 46xjtacE�
AS C478
18282023 334910
3 49 10
Manhole
Oldcasde
Precast 5'. 8' Smmt Junction Box (Size -5' X 81
AS C478
18/28/2023 334910
MaMote
Oldc ale
Prxest4'x4'Smrmlunc—Box(Sae-4'X4)
AS C478
18/28/2023 33 49 10
Manhole
Oldcastle
Precast 5' x 5' Stomt Junction Box (Size -5' X 5)
ASTM C478
18/28/2023 33 49 10
MaMote
Old —do
Precast 6' x 6' Storm J m.,_ Box (Sae - 6' X 6)
AS C478
18282023 33 49 10
Manhole
Old —tie
Precast 8' x 8' Stomt Junction Box Base (Sae - 8' X 8)
AS C478
18/28/2023 33 49 10
MaMole
Old —do
Precast 5'.8' Storm Junctmn Box Base (Size - 5' X 8)
AS C478
18282023 33 49 10
Manhole
Rinker Materials
Reintbrmd 48" Diameter Spread Footin¢ Manhole (Size -4' X 41
AS C433
18/28/2023 333920
Curb Inlet 10k3'Riser
Thompeov Pipe Group
Inlet Riser(Sae-3FT)
AS C913-16
18282023 333920
Curb Inlet 15'x 3'Riser
Thompson Pipe Group
mle[Riaer (Sae-3 FT)
AS C913-16
18/28/2023 333920
Curb Inlet 20'x3'Risx
Thump —Pipe Group
Inlet Riff (Soo,-3 FT)
AS C913-16
11/12/2024 33 49 20
Drop Inlet
AmeriTex Pipe &Products
Drop Inlet (4' X 4)
AS C913
11/12/2024 33 49 20
Drop Inlet
Am,,T" Pipe &Products
Drop Inlet (5' X 51
AS C913
11/19/2024 33 49 20
Manhole
AmeriTex Pipe &Products
Precast 4k4' Storm Junction Box
ASTM C913
3 49 20
11/19/2024 334920
Manhole
AmenTex Pipe &Products
Prxast 5S5' Storm Junctlon Box
ASTM C913
11/19/2024 33 49 20
Manhole
AmeriTex P�e &Products
5' Precast Tersition MH (4' MH on the top of 5' JB)
ASTM C913
11/19/2024 33 49 20
Manhole
A. -Tex Pipe &Products
Precast 6W Storm Jmo, . Box
ASTM C913
11/19/2024 33 49 20
Manhole
Acr_Tex Pie &Products
6' Precast Tersition MH (4' MH on the top of 6' JB)
ASTM C913
11/19/2024 33 49 20
Manhole
A. -Tex Pyle &Products
Precast 8'x8' Storm luncticm Box
ASTM C913
11/192024 33 49 20
Manhole
AnicuTex Pipe &Products
8' Precast Tersition MH (4' MH on the top of 8' JB)
ASTM C913
3 49 20
11/192024 334920
M.Oh le
AmeriTex Pipe &Products
Tvue C Sh mi Dmitt Manhole on Box (4' MH on the top of RCB)
ASTM C913
17/162024 33 49 20
Lliib Inets
Air —Tex Pipe &Products
10x3 Prxast" (S ze 10' x 31
ASTM C913
17/16/2024 334920
Q lidets
Air —Tex Pipe &Pmducta
I Sx3 Prxast"' (S ze I5' x 31
ASTM C913
•*Note: Pre aielevare Opovedfor the agelpode ofthe velure(basin)only. Stage Hp -don of Me
s.ruc—o, required ro be oroin-place.
No ecopdons to Mis requirementsha(I be allowed.
FORT WORTH-. CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT
STANDARD PRODUCTS LIST AS OF 2/4/2025
I y$torm Sewer-�ives & Boxes 3345-13
14/9/2021 3341 13
Sm. Drain Pipes
Advanced D x—ge Systems, Inc (ADS)
ADS HP Storm Polvmowleme (PP) Pine (S--12"- 60")
ASTM F2881 & AASHTO M33o
1828/2023 3341 10
Storm Dram Pipes
Rinker Matenals
Reinforced Concrete Pipe Tongue and Groove Joint Ptpe (Sze- 21" or larger)
ASTM C76, C655
18/22023 334110
Culvert Be.
Rinker Materials
Reinforced Concrete Box Culvert(Sze - Various)
ASTM C789, C850
110/122023 3341 10
Storm Doom Pipes
AmenTex Pipe &Pmduas
Reinforced Concrete Pipe Tongue and Groove Joint Pipe" (Size -15" or Img)
ASTM C76, C506
110/12/2023 344110
Culvert Be,
AmmTez Pippe&Pmduots
Reiufrced Concrete Box Culvert (size -Various))
ASTMC1433,C1577
110/18/2 23 3541 10
Stom Dram Pipes
The T_ Co.
Reinforced Concrete Pipe Tongue and Groove Joint Pipe" (Size -15" or lmger)
ASTM C76, C506
110/18/2 23 3341 10
Cohen Be.
The Tumer Co.
Reinforced Concrete Box Culvert (size- Vanous)
ASTM C1433,C1577
14/12/2 24 3341 10
Storm Dmm Pipes
Thompson Pipe Group
Reinforced Concrete Pipe Tongue and Groove Joint Pipe" (Soee Vanous)
ASTM C76, C506
16252024 3341 10
Culvert Box
Oldcastle
Reinfrced Conceta Be. Culvert
ABTM C1433,C1577
16/25/2024 3341 10
So— Diain Pipes
Oldcastle
Reinforced Concrete Pipe Tongue and Groove Joint PiW (Size Various)
ASTM C76, C506