HomeMy WebLinkAboutContract 63098Transportation Impact Fee Credit Agreement- CA-21-021 Page 1 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
________
TRANSPORTATION IMPACT FEE CREDIT AGREEMENT
THIS TRANSPORTATION IMPACT FEE CREDIT AGREEMENT (the
Agreement) is made and entered into effective as of the Effective Date (as defined below), by
and among THE CITY OF FORT WORTH, TEXAS (the City), a Texas home rule municipal
corporation, and Wayfare Cibolo Hills LLC, a Delaware limited liability company authorized to
do business in Texas (the Owner) (the City and the Owner a Party, and collectively, the
Parties).
RECITALS
WHEREAS, the Owner is the owner of approximately 53.537 acres in Tarrant County,
Texas, as described by metes and bounds in Exhibit A (the Property) located within the
corporate boundaries of the City. A map of the Property showing its location is attached hereto as
Exhibit B; and
WHEREAS, the Owner desires to proceed with development of the Property as described
or illustrated on the Development Plan, attached hereto as Exhibit C, which identifies the on-
site and/or off-site transportation facilities necessary for serving full development of the Property;
and
WHEREAS, the City has adopted a Transportation Impact Fee program pursuant to Texas
Local Government Code Chapter 395, codified in City Code Chapter 30, Article VIII, as amended,
under which transportation impact fees are imposed on new development for impacts to the Citys
transportation facilities as a result of said development; and
WHEREAS, transportation impact fees are collected and must be spent by the City on
impact fee eligible transportation facilities identified within the Citys adopted Transportation
Improvements Plan (TIP), as amended, within the service area(s) in which the new development
is located; and
WHEREAS, the Transportation Impact Fee Program provides for credits against impact
fees for dedication of right-of-way and/or construction of transportation improvements identified
as impact fee eligible on the adopted TIP; and
WHEREAS, the Property is located within service area E; and
WHEREAS, certain transportation facilities depicted on Exhibit D are identified as
impact fee eligible within the Citys adopted TIP and therefore eligible for impact fee credit; and
WHEREAS, Owner has agreed to dedicate the right-of-way and/or construct the
transportation improvements shown on Exhibit D for which credits against transportation
impact fees shall be granted; and
WHEREAS, the Owner has received preliminary plat approval for Wayfare Multifamily,
PP-21-034, on 09/21/2021; and
Transportation Impact Fee Credit Agreement- CA-21-021 Page 2 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
WHEREAS, the Owner has dedicated 150,901.10 square feet of right-of-way for Cibolo
Hills Parkway with FP-21-150, recorded as Instrument D222054967, on 03/02/2022; and
WHEREAS, the Owner has received approval for construction plans (IPRC21-0090) on
11/29/2021, and executed a Community Facilities Agreement (CFA21-0104, CSCO 57087), on
01/31/2022 and obtained final acceptance by the City for Cibolo Hills Parkway, City Project
Number 103516, on 10/20/2023.
NOW, THEREFORE, for and in consideration of the mutual agreements, covenants, and
conditions contained herein, and other good and valuable consideration, the City and the Owner
hereby covenant and agree as follows:
1. Recitals. The recitals contained in this Agreement are true and correct as of the
Effective Date and form the basis upon which the Parties negotiated and entered into this
Agreement.
2. Transportation Improvements. Owner agrees to dedicate the rights-of-way for
and/or construct the system facilities identified in Exhibit D. For any transportation
improvement which has been previously dedicated or constructed by Owner on the Property and
accepted by the City prior to execution of this Agreement, the improvement shall be identified as
completed on Exhibit D.
3. Credits. The Parties agree that the estimated value of the credits for each
transportation improvement, expressed in current dollars, shall be as set forth in Exhibit E. The
value of credits associated with the improvements first shall be reduced by the Schedule 2 impact
fee associated with any lot for which a building permit has previously been issued, and the net
value of credits shown on Exhibit E shall be considered as exact.
4. Phasing. The Parties acknowledge that, where it is anticipated that the project will
be developed in phases, the anticipated construction of improvements by phase shall be as depicted
in Exhibit D, which is attached hereto and incorporated herein by reference.
5. Allocation of Credits by Phase. The general allocation of credits to each phase of
the development shall be as shown on Exhibit F, which is attached hereto and incorporated
herein by reference. The Parties agree that the credits identified in this Agreement shall not be
deemed to have been created until the system facility for which credit is to be granted has been
dedicated and accepted (in the case of right-of-way) or constructed through an executed
Community Facilities Agreement (for 75% of the eligible roadway construction credit) and final
acceptance by the City has been obtained (for 100% of the eligible roadway construction credit).
6. Term and Effective Date. The term of this Agreement shall be ten (10) years from
its Effective Date.
7. Assignment. Owner shall have the right to assign this Agreement to any person or
entity (Owners Assignee) with the written consent of the City, provided: (a) the assignment is
in writing executed by the Owner and its assignee; and (b) the assignment incorporates this
Agreement by reference and binds the Owners Assignee to perform (to the extent of the
Transportation Impact Fee Credit Agreement- CA-21-021 Page 3 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
obligations assigned) in accordance with this Agreement. Each Owners Assignee shall become a
Party to this Agreement upon the execution of such assignment. In no event may this Agreement
be construed to authorize assignment of any credits attributable to a system facility to be dedicated
or constructed hereunder for use outside the boundaries of the Property. A credit agreement
amendment executed by the City, any remaining Owners, and the Owners Assignee will be
required to formally transfer any credits for use.
8. Amendment. This Agreement shall not be modified or amended except as follows:
(a) Any revision, amendment, assignment, or modification to this Agreement
or any Exhibit or schedule hereto shall be in writing and signed by the Parties.
(b)Any revision, amendment, assignment, or modification to this Agreement,
the Development Plan, or any Exhibit or schedule thereto, shall become effective on the date
executed by the Parties or, as applicable, upon the date of approval by the City Council or
designated city official.
9. Exhibits. The exhibits attached to this Agreement are incorporated as part of this
Agreement for all purposes as if set forth in full in the body of this Agreement.
(Remainder of Page Intentionally Left Blank)
Transportation Impact Fee Credit Agreement- CA-21-021 Page 4 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
IN WITNESS WHEREOF, the undersigned parties have executed this Agreement to be
effective as of the date subscribed by the Citys Assistant City Manager.
CITY OF FORT WORTH, TEXAS
_______________________________
Jesica McEachern
Assistant City Manager
Date:
Recommended By:
DJ Harrell
Director, Development Services
Approved as to Form and Legality:
Douglas Black
Assistant City Attorney
M&C: None required
Form 1295: None required
ATTEST:
Jannette Goodall
City Secretary
OWNER
Wayfare Cibolo Hills, LLC
a Delaware limited liability company
By: Wayfare Development Group
Cibolo Hills, LLC,
Its: Manager
H. Jackson Wallace
Authorized Agent
City Contract Compliance Manager:
By signing, I acknowledge that I am the
person responsible for the monitoring and
administration of this contract, including
ensuring all performance and reporting
requirements.
Jennifer H. Roberts
Assistant Director, Development Services
Department
Transportation Impact Fee Credit Agreement- CA-21-021 Page 5 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
EXHIBIT LIST
A Description of the Property
B Map of Property
C Development Plan
D Eligible Transportation Improvements
E Credits Against Transportation Impact Fees
F Allocation of Credits
Transportation Impact Fee Credit Agreement- CA-21-021 Page 6 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
EXHIBIT A
Description of Property: Wayfare Multifamily Preliminary Plat, PP-21-034
LEGAL DESCRIPTION
DESCRIPTION FOR A TRACT OF LAND IN THE BENJAMIN THOMAS SURVEY,
ABSTRACT NO. 1497, THE J.A. GILL SURVEY, ABSTRACT NO. 570, AND THE S.C.T.
FORD SURVEY, ABSTRACT NO. 1497, TARRANT COUNTY, TEXAS, AND BEING A
PORTION OF A CALLED 1027.711 ACRE TRACT OF LAND DESCRIBED IN A DEED TO
CHAPEL HILL WEST, LLC, A TEXAS LIMITED LIABILITY COMPANY, ACCORDING
TO THE DOCUMENT FILED OF RECORD IN INSTRUMENT NO. D218219521 OF THE
DEED RECORDS OF TARRANT COUNTY, TEXAS (D.R.T.C.T.), AND BEING MORE
PARTICULARLY DESCRIBED BY METES AND BOUNDS AS FOLLOWS:
BEGINNING AT A 5/8 INCH IRON ROD FOUND FOR THE SOUTHERLY MOST
SOUTHEAST CORNER OF SAID 1027.711 ACRE TRACT, SAME BEING THE
SOUTHWEST CORNER OF LOT 2, BLOCK 1, OF THE CORRECTION PLAT OF EAGLE
MOUNTAIN-SAGINAW MAINTENANCE AND TRANSPORTATION FACILITY
ADDITION, AN ADDITION TO TARRANT COUNTY, TEXAS, ACCORDING TO THE
PLAT FILED OF RECORD IN INSTRUMENT NO. D209031826 OF THE PLAT RECORDS
OF TARRANT COUNTY, TEXAS (P.R.T.C.T.), SAME ALSO BEING ON THE NORTH
LINE OF A CALLED 44.874 ACRE TRACT OF LAND DESCRIBED AS "TRACT 6" IN A
DEED TO TEXAS ELECTRIC SERVICE COMPANY ACCORDING TO THE DOCUMENT
FILED OF RECORD IN VOL. 2542, PG. 1 (D.R.T.C.T.);
THENCE WITH THE COMMON LINE BETWEEN SAID 1027.711 ACRE TRACT AND
SAID 44.874 ACRE TRACT, THE FOLLOWING BEARINGS AND DISTANCES:
SOUTH 89°39'36" WEST, A DISTANCE OF 1086.06 FEET TO A 5/8 INCH IRON ROD
WITH CAP STAMPED "PELOTON" SET;
SOUTH 89°39'22" WEST, A DISTANCE OF 418.96 FEET TO A 5/8 INCH IRON ROD WITH
CAP STAMPED "PELOTON" SET;
THENCE LEAVING SAID COMMON LINE, OVER AND ACROSS SAID 1027.711 ACRE
TRACT, THE FOLLOWING BEARINGS AND DISTANCES:
NORTH 00°19'48" WEST, A DISTANCE OF 1248.00 FEET TO A 5/8 INCH IRON ROD
WITH CAP STAMPED "PELOTON" SET AT THE BEGINNING OF A CURVE TO THE
RIGHT HAVING A CENTRAL ANGLE OF 23°26'39", A RADIUS OF 1100.00 FEET, AND A
LONG CHORD WHICH BEARS NORTH 79°18'31" EAST, 446.96 FEET;
EASTERLY ALONG SAID CURVE TO THE RIGHT, PASSING AT A DISTANCE OF
333.52 FEET A 5/8 INCH IRON ROD WITH CAP STAMPED PELOTON FOUND FOR
THE SOUTHWEST CORNER OF A CALLED 216.083 ACRE TRACT OF LAND
DESCRIBED IN A DEED TO MERITAGE HOMES OF TEXAS, LLC, AND GRBK
EDGEWOOD, LLC, ACCORDING TO THE DOCUMENT FILED OF RECORD IN
INSTRUMENT NO. D219292876 (D.R.T.C.T.), CONTINUING WITH THE SOUTH LINE OF
Transportation Impact Fee Credit Agreement- CA-21-021 Page 7 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
SAID 216.083 ACRE TRACT FOR A TOTAL ARC DISTANCE OF 450.09 FEET TO A 5/8
INCH IRON ROD WITH CAP STAMPED PELOTON FOUND;
THENCE CONTINUING WITH THE SOUTH LINE OF SAID 216.083 ACRE TRACT, THE
FOLLOWING BEARINGS AND DISTANCES:
SOUTH 88°58'46" EAST, A DISTANCE OF 500.00 FEET TO A 5/8 INCH IRON ROD WITH
CAP STAMPED "PELOTON" FOUND AT THE BEGINNING OF A CURVE TO THE LEFT
HAVING A CENTRAL ANGLE OF 43°20'47", A RADIUS OF 1100.00 FEET, AND A LONG
CHORD WHICH BEARS NORTH 69°20'51" EAST, 812.49 FEET;
EASTERLY AND NORTHEASTERLY ALONG SAID CURVE TO THE LEFT, AN ARC
DISTANCE OF 832.19 FEET TO A 5/8 INCH IRON ROD WITH CAP STAMPED
PELOTON FOUND;
NORTH 47°40'27 EAST, A DISTANCE OF 250.00 FEET TO A 5/8 INCH IRON ROD WITH
CAP STAMPED PELOTON FOUND AT THE BEGINNING OF A CURVE TO THE
RIGHT, HAVING A CENTRAL ANGLE OF 19°57'22, A RADIUS OF 1100.00 FEET, AND
A LONG CHORD WHICH BEARS NORTH 57°39'08 EAST, 381.20 FEET;
NORTHEASTERLY ALONG SAID CURVE TO THE RIGHT, AN ARC DISTANCE OF
383.13 FEET TO A 5/8 INCH IRON ROD WITH CAP STAMPED PELOTON FOUND;
NORTH 67°37'49 EAST, A DISTANCE OF 316.78 FEET TO A 5/8 INCH IRON ROD WITH
CAP STAMPED PELOTON FOUND ON THE SOUTHWESTERLY RIGHT-OF-WAY
LINE OF SAGINAW BOULEVARD, A VARIABLE WIDTH RIGHT-OF-WAY;
THENCE SOUTH 22°13'27 EAST, WITH SAID SOUTHWESTERLY RIGHT-OF-WAY
LINE, A DISTANCE OF 55.00 FEET TO A 5/8 INCH IRON ROD WITH CAP STAMPED
PELOTON SET;
THENCE LEAVING SAID SOUTHWESTERLY RIGHT-OF-WAY LINE, OVER AND
ACROSS SAID 1027.711 ACRE TRACT, THE FOLLOWING BEARINGS AND
DISTANCES:
SOUTH 67°37'49 WEST, 316.64 FEET TO A 5/8 INCH IRON ROD WITH CAP STAMPED
PELOTON SET AT THE BEGINNING OF A CURVE TO THE LEFT HAVING A
CENTRAL ANGLE OF 19°57'22, A RADIUS OF 1045.00 FEET, AND A LONG CHORD
WHICH BEARS SOUTH 57°39'08 WEST, 362.14 FEET;
SOUTHWESTERLY ALONG SAID CURVE TO THE LEFT, AN ARC DISTANCE OF
363.97 FEET TO A 5/8 INCH IRON ROD WITH CAP STAMPED PELOTON SET;
SOUTH 47°40'27 WEST, A DISTANCE OF 250.00 FEET TO A 5/8 INCH IRON ROD WITH
CAP STAMPED PELOTON SET AT THE BEGINNING OF A CURVE TO THE RIGHT,
HAVING A CENTRAL ANGLE OF 05°28'42, A RADIUS OF 1155.00 FEET, AND A LONG
CHORD WHICH BEARS SOUTH 50°24'48 WEST, 110.39 FEET;
SOUTHWESTERLY ALONG SAID CURVE TO THE RIGHT, AN ARC DISTANCE OF
110.43 FEET TO A 5/8 INCH IRON ROD WITH CAP STAMPED PELOTON SET;
SOUTH 82°10'21" EAST, A DISTANCE OF 248.00 FEET TO A 5/8 INCH IRON ROD WITH
CAP STAMPED "PELOTON" SET;
SOUTH 26°44'01 EAST, A DISTANCE OF 485.19 FEET TO A 5/8 INCH IRON ROD WITH
CAP STAMPED PELOTON SET FOR A CORNER OF THIS TRACT;
Transportation Impact Fee Credit Agreement- CA-21-021 Page 8 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
SOUTH 00°16'43 EAST, A DISTANCE OF 60.27 FEET TO A 5/8 INCH IRON ROD WITH
CAP STAMPED PELOTON SET ON THE NORTH LINE OF SAID EAGLE MOUNTAIN-
SAGINAW ADDITION;
THENCE WITH THE NORTH AND WEST LINE OF SAID EAGLE MOUNTAIN-SAGINAW
ADDITION, THE FOLLOWING BEARINGS AND DISTANCES:
SOUTH 89°42'13 WEST, A DISTANCE OF 596.33 FEET TO A 5/8 INCH IRON ROD
FOUND FOR AN 'ELL' CORNER OF THIS TRACT, SAME BEING THE NORTHWEST
CORNER OF SAID EAGLE MOUNTAIN-SAGINAW ADDITION;
SOUTH 00°25'27 WEST, PASSING AT A DISTANCE OF 287.50 FEET THE COMMON
CORNER OF LOT 1 AND LOT 2, BLOCK 1 OF SAID EAGLE MOUNTAIN-SAGINAW
ADDITION, CONTINUING FOR A TOTAL DISTANCE OF 958.16 FEET TO THE POINT
OF BEGINNING AND CONTAINING 53.537 ACRES (2,332,061 SQUARE FEET) OF
LAND, MORE OR LESS
Transportation Impact Fee Credit Agreement- CA-21-021 Page 9 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
EXHIBIT B
Map of Property: Wayfare Multifamily Preliminary Plat, PP-21-034
Transportation Impact Fee Credit Agreement- CA-21-021 Page 10 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
EXHIBIT C
Development Plan: Wayfare Multifamily Preliminary Plat, PP-21-034
Transportation Impact Fee Credit Agreement- CA-21-021 Page 11 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
EXHIBIT D
Eligible Transportation Improvements
Wayfare Multifamily-Cibolo Hills
Eligible Transportation Improvements
for Credit against Transportation Impact
Fees
Key
Development Plan Area
Right-of-Way Dedication /
Roadway Construction
Eligible Improvements Reference # Limits
Cibolo Hills Parkway FP-21-150 Right-of-way dedication for Cibolo Hills
CFA21-0104
Cibolo Hills Parkway CPN 103516
IPRC21-0090
Construction paving, sidewalks, streetlights &
drainage
Transportation Impact Fee Credit Agreement- CA-21-021 Page 12 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
EXHIBIT E
Credits Against Transportation Impact Fees
Wayfare Multifamily
Transportation Impact Fee Credit Overview
Value of ROW Dedication
Instrument # Final Plat # Eligible Arterial Value
D222054967 FP-21-150 Cibolo Hills Parkway $273,130.99
ROW Transportation Impact Fee Credit $273,130.99
TrIF Eligible Community Facilities Agreement Construction - 100% Eligible
City Secretary # CFA # Eligible Arterial Value
CFA21-0104
57087 CPN 103516 Cibolo Hills Parkway $1,945,958.69
IPRC21-0090
Total Transportation Impact Fee Eligible
Community Facilities Agreement Value $1,945,958.69
Engineering, Surveying, and Material Testing = 20% of total
eligible construction costs $389,191.74
Transportation Impact Fee Credit $2,608,281.42
Transportation Impact Fee Credit Applied to Date Value
Building Permits 49 $546,039.00
Total Transportation Impact Fee Credit Remaining $2,062,242.42
Transportation Impact Fee Credit Agreement- CA-21-021 Page 13 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
Right-of-Way Valuation for Wayfare
Multifamily
Valuation Method 1 - Percentage of TIP Project Cost
Eligible Arterial Cibolo Hills
2017 Transportation Improvements Plan Project Number E-2
Estimated Construction Costs from 2022 Transportation
Improvements Plan
$1,904,325
Value of Total Project Right-of-Way (20% Construction Cost) $380,865
Total Project Length (LF) $5,825
Arterial Cross-Section Width (LF) $110
Additional ROW needed for Roundabout (SF) $0
Total Project Right-of-Way (SF) 640750
Right-of-Way Value Per Square Foot $0.60
Valuation Method 2 - Percentage of Construction Project
Cost
Eligible Arterial Cibolo Hills
City Project Number 103516
Final Construction Costs from Notice of Completion (Green
Sheet) 3587000
Value of Total Project Right-of-Way (20% Construction Cost) $717,400
Total Project Length (LF) 3610
Arterial Cross-Section Width (LF) 110
Additional ROW needed for Roundabout (SF) 0
Total Project Right-of-Way (SF) 397,100
Right-of-Way Value Per Square Foot $1.81
Valuation Method 3 - TAD appraised value
TAD Value as of 08/9/2023 Cibolo Hills
TAD Account 40473945
Total Area (SF) 2,554,358
Appraised Value $2,052,400.00
Value per Square Foot $0.81
Right-of-Way Dedication
Cibolo Hills
Recording Instrument Number D222054967
Final Plat Number FP-21-150
Recording Date 2/28/2022
Total area of ROW dedicated (SF) 150,901
Value per SF $1.81
ROW Credit Available $273,130.99
Transportation Impact Fee Credit Agreement- CA-21-021 Page 14 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
Wayfare Multifamily
Value of Eligible Community Facilities Agreement Construction, CPN 103516
Bidlist
Item
No.
Description Unit Completed
Quantity
Eligible
Quantity Unit Price Credit
Available
UNIT III: DRAINAGE IMPROVEMENTS
1 REMOVE RIP RAP EA 1,706 1,706 $
2.06 $3,514.36
2 REMOVE HEADWALL/SET SY 1 1 $
4,150.00 $4,150.00
3 LARGE STONE RIPRAP DRY LF 270 270 $
90.00 $24,300.00
4 TRENCH SAFETY LF 2,621 2,621 $
1.00 $2,621.00
5 21" RCP CLASS III LF 193 193 $
56.00 $10,808.00
6 21" RCP CLASS IV LF 8 8 $
66.00 $528.00
7 24" RCP CLASS III LF 1,280 1,280 $
68.00 $87,040.00
8 30" RCP CLASS III LF 183 183 $
125.00 $22,875.00
9 30" RCP CLASS IV LF 248 248 $
135.00 $33,480.00
10 42" RCP CLASS III EA 339 339 $
175.00 $59,325.00
11 7X3 BOX CULVERT EA 370 370 $
475.00 $175,750.00
12 4' STORM JUNCTION BOX EA 9 9 $
7,600.00 $68,400.00
13 5' STORM JUNCTION BOX CY 1 1 $
9,500.00 $9,500.00
14 4' MANHOLE RISER EA 2 2 $
6,500.00 $13,000.00
15 10' RECESSED CURB INLET EA 9 9 $
5,100.00 $45,900.00
16 20' RECESSED CURB INLET EA 1 1 $
8,100.00 $8,100.00
17 HEADWALL (CH-FW-O) (DIA=42
IN)
EA 1 1 $
6,200.00 $6,200.00
18 WINGWALL (PW-1) (HW=3FT) EA 1 1 $
41,350.00 $41,350.00
TOTAL UNIT III: DRAINAGE IMPROVEMENTS $616,841.36
Transportation Impact Fee Credit Agreement- CA-21-021 Page 15 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
UNIT IV: PAVING IMPROVEMENTS
1 REMOVE SIDEWALK SF 49 49 $
1.00 $49.00
2 REMOVE CONC CURB & GUTTER LF 1,016 1,016 $
12.00 $12,192.00
2 SITE CLEARING LS 1 1 $
2,640.00 $2,640.00
3 UNCLASSIFIED EXCAVATION CY 12,656 12,656 $
3.50 $44,296.00
4 EMBANKMENT BY PLAN CY 5,573 5,573 $
3.00 $16,719.00
5 SWPPP 1 ACRE LS 1 1 $
18,700.00 $18,700.00
6 LAREGE STONE RIPRAP DRY SY 24 24 $
90.00 $2,160.00
7 HYDRATED LIME TN 179 179 $
160.40 $28,711.60
8 8" LIME TREATMENT SY 8,530 8,530 $
3.25 $27,722.50
9 4" CONC SIDEWALK SY 2,750 2,750 $
55.13 $151,607.50
10 BARRIER FREE RAMP, TYPE R-1 EA 2 2 $
1,942.50 $3,885.00
11 BARRIER FREE RAMP, TYPE P-1 EA 2 2 $
1,942.50 $3,885.00
12 4" SLD PVMT MARKING HAS (W) LF 712 712 $
1.33 $946.96
13 4" BRK PVMT MARKING HAS (W) LF 4,304 4,304 $
1.33 $5,724.32
14 8" SLD PVMT MARKING HAS (W) LF 712 712 $
2.65 $1,886.80
15 24" SLD PVMT MARKING HAE (W) LF 176 176 $
16.10 $2,833.60
16 LANE LEGEND ARROW EA 8 8 $
247.25 $1,978.00
17 LANE LEGEND ONLY EA 8 8 $
287.50 $2,300.00
18 REFL RAISEDE MARKER TY II-C-R EA 108 108 $
4.92 $531.36
19 6" TOPSOIL CY 650 650 $
13.80 $8,970.00
20 SEEDING, HYDROMULCH SY 5,714 5,714 $
1.17 $6,685.38
21 FURNISH/INSATLL ALUM SIGN
GROUND MOUNT CITY STD.
EA 12 12 $
416.98 $5,003.76
22 REMOVE SIGN PANEL AND POST EA 1 1 $
169.76 $169.76
23 TRAFFIC CONTROL MO 1 1 $
3,750.00 $3,750.00
24 RAIL (HANDRAIL) (TY E) LF 108 108 $
162.00 $17,496.00
Transportation Impact Fee Credit Agreement- CA-21-021 Page 16 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
25 10.5" CONC PAVEMENT SY 7,793 7,793 $
95.03 $740,568.79
26 10.5" COMMERCIAL DRIVE APPROACH EA 2 2 $
22,575.00 $45,150.00
27 END OF ROAD BARRICADE EA 1 1 $
914.25 $914.25
28 CURB RAMP AT CIBOLO HILLS PKWY
AND BUS 287
EA 2 2 $
1,942.50 $3,885.00
TOTAL UNIT IV: PAVING IMPROVEMENTS $1,161,361.58
UNIT V: STREET LIGHTING IMPROVEMENTS
1 2" CONDT PVC SCH 80 (T) LF 1105 1,105 $
22.00 $24,310.00
2 RDWY ILLUM FOUNDATION TY 3,5,6,
AND 8
EA 19 19 $
1,600.00 $30,400.00
3 FURNISH/INSTALL RDWAY ILLUM TY
18 POLE
EA 15 15 $
2,555.00 $38,325.00
4 FURNISH/INSTALL TYPE 33A ARM EA 16 16 $
479.00 $7,664.00
5 FURNISH/INSTALL LED LIGHTING
FIXTURE (137 WATT ATB2)
EA 16 16 $
700.00 $11,200.00
6 RELOCATE STREET LIGHT POLE EA 4 4 $
1,970.00 $7,880.00
7 GROUND BOX TYPE B W/APRON EA 19 19 $
1,000.00 $19,000.00
8 RECONNECT CONDUCTOR EA 40 40 $
155.00 $6,200.00
9 NO 10 INSULATED ELEC CONDR LF 2330 2,330 $
1.55 $3,611.50
10 NO 6 INSULATED ELEC CONDR LF 6695 6,695 $
2.65 $17,741.75
11 REMOVE EXISTING GROUND BOX EA 1 1 $
400.00 $400.00
12 REMOVE EXISTING CONDUIT AND
CONDUCTORS
LF 890 890 $
1.15 $1,023.50
TOTAL UNIT V: STREET LIGHTING
IMPROVEMENTS $167,755.75
Bid Summary
UNIT III: DRAINAGE IMPROVEMENTS $616,841.36
UNIT IV: PAVING IMPROVEMENTS $1,161,361.58
UNIT V: STREET LIGHTING IMPROVEMENTS $167,755.75
UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS $0.00
VALUE OF CFA21-0104, CPN 103516 ELIGIBLE
CONSTRUCTION SUBTOTAL $1,945,958.69
Transportation Impact Fee Credit Agreement- CA-21-021 Page 17 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
Transportation Impact Fee Credit Applied to Date
Number of Permits 49
Street No Street Permit No. Collection Rate
2424 Craftsman Ave PB22-07772 $8,472.00
2416 Craftsman Ave PB22-07773 $8,472.00
2408 Craftsman Ave PB22-07774 $8,472.00
2400 Craftsman Ave PB22-07775 $8,472.00
2501 Craftsman Ave PB22-07776 $8,472.00
2509 Craftsman Ave PB22-07777 $8,472.00
2517 Craftsman Ave PB22-07778 $8,472.00
2523 Craftsman Ave PB22-07780 $8,472.00
10256 Greenland Park PB22-07781 $8,472.00
10248 Greenland Park PB22-07782 $8,427.00
10208 Greenland Park PB22-07783 $8,427.00
10200 Greenland Park PB22-07786 $8,427.00
10208 Mantle St PB22-07787 $8,427.00
10212 Mantle St PB22-07788 $8,427.00
10216 Mantle St PB22-07790 $8,427.00
10220 Mantle St PB22-07792 $8,427.00
10225 Mantle St PB22-07793 $8,427.00
10229 Mantle St PB22-07794 $8,427.00
2425 Craftsman Ave PB22-07802 $12,708.00
2417 Craftsman Ave PB22-07804 $12,708.00
2401 Craftsman Ave PB22-07808 $12,708.00
2508 Craftsman Ave PB22-07811 $12,708.00
2500 Craftsman Ave PB22-07814 $12,708.00
2528 Craftsman Ave PB22-07816 $12,708.00
2536 Craftsman Ave PB22-07819 $12,708.00
2535 Craftsman Ave PB22-07821 $12,708.00
2541 Craftsman Ave PB22-07823 $12,708.00
10272 Greenland Park PB22-07826 $12,708.00
10264 Greenland Park PB22-07827 $12,708.00
10273 Greenland Park PB22-07831 $12,708.00
10265 Greenland Park PB22-07833 $12,708.00
10257 Greenland Park PB22-07835 $12,708.00
10249 Greenland Park PB22-07838 $12,708.00
10241 Greenland Park PB22-07840 $12,708.00
10233 Greenland Park PB22-07841 $12,708.00
10224 Greenland Park PB22-07842 $12,708.00
10216 Greenland Park PB22-07844 $12,708.00
10225 Greenland Park PB22-07846 $12,708.00
10217 Greenland Park PB22-07847 $12,708.00
10209 Greenland Park PB22-07848 $12,708.00
10201 Greenland Park PB22-07849 $12,708.00
10200 Mantle St PB22-07850 $12,708.00
10204 Mantle St PB22-07851 $12,708.00
10217 Mantle St PB22--07852 $12,708.00
10221 Mantle St PB22-07853 $12,708.00
10224 Mantle St PB22-07858 $12,708.00
10228 Mantle St PB22-07860 $12,708.00
10233 Mantle St PB22-07861 $12,708.00
10237 Mantle St PB22-07862 $12,708.00
Transportation Impact Fee Credit Applied to Date $546,039.00
Transportation Impact Fee Credit Agreement- CA-21-021 Page 18 of 18
Wayfare Multifamily-Cibolo Hills 03/28/2025
EXHIBIT F
Allocation of Credits
Credit shall be allocated on a first-come, first-served basis to building permits within the
preliminary plat boundary of Wayfare Multifamily Preliminary Plat, PP-21-034 and shall run
with the land.