HomeMy WebLinkAboutContract 61692-CO1CSC No. 61692-COI FORT WORTH® City of Fort Worth Change Order Request Project Name 8 Playground Replacement I City Sec # l 61692 Client Project #(s)l 103940, 104941,103942,103943, 103944, 103945,103946,103947 Project Description Replace 8 playgrounds to include: inclusive play equipment, picnic tables, benches and cookers. Contractor Northstar Construction Change Order #1 1 1 Datel City Project Mgr.1 Patrick Vicknair City Inspectorl Dept. Original Contract Amount Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date Amount of Proposed Change Order Revised Contract Amount Original Funds Available for Change Orders Remaining Funds Available for this CO Additional Funding (if necessary) PARD $2,174,833.00 $0.00 $0.00 $0.00 $2,174,833.00 $39,108.50 $2,213,941.50 $108,741.00 $108,741.00 4/1 /2025 John Eitel Contract Time Totals (CD` $2,174,833.00 260 $2,174,833.00 260 $39,108.50 $2,213,941.50 260 $108,741.00 $108,741.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1.80% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $2,718,541.25 JUSTIFICATION (REASONS) FOR CHANGE ORDER Replace the existing ADA parking spaces and sidewalks to comply with inclusive access to and from the playground. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. MVContractor's Company Name Irontractor Name Contract Si natu IF Date Northstar Construction Inc. Luke or Mike Heimlich jApr3,2025 Inspector/In Q«f— 7ou6. x- Date Apr 7, 2025 Pro'ectan Compliance Manaer ✓ 2 Date A r 7, 2025 Pro ram Manager Date Senior Capital Project Officer Date Apr8,2025 -`"ac Apr8,2025 sistant Director Dept Date Director, Contracting Department Dept Date Apr 14, 2025 JApr15,2025 ssistant City Attorney Date Assistant City Manager Date Apr 16, 2025 Apr 18, 2025 Council Action if re uire M&C Number I I M&C Date Approved ATTEST: A fig— � on I Gonzales Jannette Goodall, City Secretary FOgjq'pa a;0°° o° �pdd l.g OFFICIAL RECORD aA°anaza 44` CITY SECRETARY FT. WORTH, TX FORTWORTH City of Fort Worth "_` Change Order Additions Project Name 8 Playground Replacement City Sec # 61692 Client Project # 103940, 104941, 103942, 103943, 103944, 103945, 103946, 103947 Contractorl Norlhstar Construction PMI Patrick Vicknair I Inspector) John Eitel I Change Order Submittal # 0 Date 1 4/1/2025 ADDITIONS IIEM UESCRIPIIUN UEPI Uty Unit Unit Gost total Glenwood Park 1 Mobilization, bond, surveying PARD 1.00000000 LS $2,400.00 $2,4UU.UUI 2 Demolition of existing ADA parking spaces PARD 815.00000000 SF $3.50 �2,852.501 3 Demolition of existing concrete curb and gutter PARD 40.00OOOOOU LF $10.0U 00.001 4 Demolition and replacement of existing concrete walk PARD 438.00OOOOOU SF $3.00 $1,314.001 5 Unclassified excavation PARD 20.00OOOOOU CY $70.OU $1,400.001 6 New 5" concrete sidewalk PARD 438.00OOOOOU SF $11.50 �5,037.001 7 New 7" concrete paving for ADA spaces PARD 815.000OOOO1J SF $13.5U $11,002.501 8 New ADA pavement markings and signs PARD 1.000OOOOU LS $2,085.00 $2,085.001 9 New concrete low water crossing PARD 1.000OOOOU EA $3,100.OU $3,100.001 1 Marine Creek Linear Park 1 10 Unclassified excavation PARD 90.000OOOO1J CY $70.00 $6,300.001 11 New 4" concrete sidewalk PARD 292.5000000U SF $11.00 $3,217.501 PARD $39,108.501 1 1 1 Sub Total Additions $39,108.501 Change Order Additions Page 2 of 4 FORT WORTH City of Fort Worth Change Order Deletions Project Name 1 8 Playground Replacement City Sec # 1 61692 Client Project # 1 103940, 104941, 103942, 103943, 103944, 103945, 103946, 103947 1 Contractorl Northstar Construction PMI Patrick Vicknair I Inspectorl John Eitel Change Order Submittal # 0 Date 1 4/1/2025 1 DELETIONS IItM Ut:bUNIF'I IUN DEFT Uty unit unit Gost Iotal 1 wt.t 1 cot.z 1 cot.z 1 cot.z 1 cot.1 1 cot.1 1 cot.1 I PQRD $0.001 1 1 1 Sub Total Deletions $0.001 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service T Amount for this CO Total $0.00 Previous Change Orders co # DATE I AMOUNT Total I $0.00 1