HomeMy WebLinkAboutContract 58490-A2CSC No. 58490-A2
AMENDMENT No . 2
TO CITY SECRETARY CONTRACT No. 58490
WHEREAS, the City of Fort Worth (CITY) and Freese and Nichols, Inc.,
(ENGINEER) made and entered into City Secretary Contract No. 58490, (the
CONTRACT) which was authorized by M&C 22-0846 on the llth day of October,
2022 in the amount of $ $275,895.00; and
WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1
in the amount of $35,000.00 which was administratively authorized on
July 28, 2023; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Forest Hill Drive and Royal Crest Drive Intersection Improvements,
CPN 103308; and
WHEREAS, it has become necessary to execute Amendment No. 2 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $20,700.00. (See Attached Funding Breakdown Sheet, Page
-4-)
OFFICIAL RECORD
CITY SECRETARY
2 FT. WORTH, TX
Article IT of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $331,595.00.
City of Fort Worth, Texas Forest Hill Drive and Royal Crest Drive Intersection Improvements
Prof Services Agreement Amendment Template CPN 103308
Revision Date: 03/08/2024
Page 1 of 3
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
EXECUTED and EFFECTIVE as of the date subscribed by the City"s
designated Assistant City Manager.
APPROVED:
City of Fort Worth
ov�
Jesica McEachern
Assistant City Manager
DATE: Apr 20, 2025
ATTEST: pps°°��R..*&d
v�o1 °- 0
ycwn.n.�-+�. A .�lb$QeRq adCp nE44 gaav
Jannette Goodall
City Secretary
Apr 21, 2025
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Apr 16, 202513:28 CDT)
Apr 16, 2025
Douglas W. Black
Sr. Assistant City Attorney
ENGINEER
Freese and Nichols, Inc.
Chris Bosco (Apr 1, 2025 08:45 CDT)
Chris Bosco
Principal
DATE: Apr 1, 2025
M&C No.#: _N/A
M&C Date: _N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Forest Hill Drive and Royal Crest Drive Intersection Improvements
Prof Services Agreement Amendment Template CPN 103308
Revision Date: 03/08/2024
Page 2 of 3
FUNDING BREAKDOWN SHEET
City Secretary No. 58490
Amendment No. 2
Project CF1- CF2 -
Fund Dept ID Account Bond
ID Activity
Reference
34027 0200431 5330500 103308 003930 22010204
Total:
Amount
$20,700.00
$20,700.00
City of Fort Worth, Texas Forest Hill Drive and Royal Crest Drive Intersection Improvements
Prof Services Agreement Amendment Template CPN 103308
Revision Date: 03/08/2024
Page 3 of 3
FORT WORTH
ATTACHMENT "A"
Scope for Enaineerina Design Related Services for Intersection Improvements
The scope set forth herein defines the work to be performed by the ENGINEER in
completing the project. Both the CITY and ENGINEER have attempted to clearly define the
work to be performed and address the needs of the Project.
OBJECTIVE
The objective of the Forest Hill Drive and Royal Crest Drive Intersection Improvement
project is to improve the intersection safety and capacity by the construction and installation
of dedicated left turn lanes for the northbound and southbound direction, traffic signal
replacement (pole, mast arm, signal heads, detection, communication), pedestrian curb
ramps, signing, striping, and utility adjustments. The improvements will be completed using
City of Fort Worth — 2022 Bond Program funds. Based on the intersection traffic analysis
performed by the ENGINEER (on 4/4/2023), the CITY (on 6/7/2023) requested that the
ENGINEER proceed with the design of the widening of the western leg of the intersection
from two lanes to three lanes. Work to be performed under this agreement is as follows and
is in addition to the previous agreement:
WORK TO BE PERFORMED
Task 1. Pasinn Managernen+
Task `'. GeneoptUCI DSSigR (301%)
Task 3. Pri�iminary Design (60
Task 4. Final Design (90% and 100%)
Tools E. Big' Phase SerViGes
Tack 62 Cons n D o Services
--���,,�tra �t+o n . ����
Task 7 C?( WlEasement ServTC�S
Task 8. ✓irvey and ✓ibourfaGe Utility Engineering SerViGes
Task 9. Pig
Task 1 Q. Quality Centre!/ Quality Ass irnnno
�-c�����a r-ca.JararTcc
City of Fort Worth, Texas
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 07.23.2012 CPN 103308
Page 1 of 23
FORT WORTH®
TASK 1. DESIGN MANAGEMENT.
ENGINEER ill manage the work OUtlineyd- in this 3Gepe to eps„re efFisiept aprd effentiye use
ef-INEEP.'o sPA-CITY'o timeand reseyrGes-.-E-R:-INEER W11
Gv-nmwni--
ad4r^3^ i`,we^ withGShe the Pr ' �3 " nee ssary fe make nregre.
on the work.
1.1. M, nagiRgt ;GTE„ :
* Lead, manage anrd Aire^} design team aGtiyitie^
Enou ;mvran n) io prs^ti^eyd OR perfermange
of the werk Refer to Task 40 for further details
* Communi^ate internally amens team members
Took and akin^ate team rese,,rses
1.2. -GommNnizatiops aR d Repnr+ipn•
• Attend a pre_ydesign proieet kinknff/^horter meeting With CITY Staff to ^enfirm apyd
Glar,rfy aEBpn URd erstanyCITY ehin�ives, andreKaure eEBRelrmrty GaI aR�d fapn ti8grar
desiS-ns ths; meet CITY reg,,irements
• AtteRd up te two (2) field review rneetiRgS with CITY represeRtatives, iRGludiRg
Trafficc Management, prier to the 30 a�ooOC oubmlttsls-.
• Geprdi,st aR d rdey+, iment menthAy preiest update meetings CITY PrajeGt
Manager (up to 9)
• GGREI,,et review meetings With the CITY at the enyd of each design phas o
-34
oNmont hiweeLAz ipternal .desigp team meetings /, ip to 124
• Genyd,,nt site visits (up to 3)
• CE)RdUGt QGQA reviews and dOGUITIeRt these aGtOvmtOes. Refer te Task 10 fer
further details
• Prepare in�yo ines in anserrdapne with Attachment 13 to this Standard Agreement
and oubmit monthly in the fermat requested by the CITY
• Prepare anrd 9ubmlt M9121thly Prejeot 9tatu\-) Rexp3rto in the -format prqvided by the
respeEtivo Trsnopertatinp aprd Public Werks Departmnpt
• Prepare and oubmit bMi else Preiest Cshey-d„le initially, yd anPrelent Cshed-
upydates with a snhey^I, ,Ic nsrrotive monthly, as required in Attachment D to this
Stall daFd Agreement ip ^omplianse with the Cit�pe^cifTGaLien 00 31 16 8121titled
ERgipeer Rreiest SGherdl J3 This PRQ IEGT requires a Tier 4 sherd, ale as
d efiRed OR the Cit�y's Spen�l+��n nn 31 15 titled Engineer Dreiest Schedule
�.r p ��en RR �r�ynTccr-r-rvJcGrvcrr urn
Prepare An� 3Nbmit a prelimipary Dr*3t Ri3k Register, preliminary Stakehelyder
Register, anrd preliminary Project Comm,,piea#9no Plan.
fin
City of Fort Worth, Texas Page 2 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 2 of 23
FORT WORTH
Complete Monthly M/WBE Deport Corm and Final SNrnmary Payment Report
Form at the end of +he nroieG+
0 With respeGt #e Geordina#ion with permitting authorities, Cnlr`CCD
��.. o a
communicate with permitting aiitherities suoh that their regi.late.Y I-1 lire men#s
are appropriately refleG#ed in the designs,. ENGINEER ohsll \yerk with regulator
authorities to oatsin approval of the desigps and make Ghanges ne Gessary to
meet their requi.em iiremanto, sJ` psrt of the design sGepe
InGatlene the EN_INEER sr --a f ito oub sensu tcnts shad) Garry readily visible
ASSUMPTIONS
• One (I) pre design preieGt kiGkeff/Ghartering meeting
• Up #e twe (2) field review meetings
• Up to nine (9) menthly pre eGt update meetings during design phoos
I I • p to three (3) plsn raview meetings :1
• Up to twelve (12) biweekly internal design team meetings
---All cul mittralc to the CITY will he quality GheGLed prier to s� �hmissinp.
DreieG# design phsoc i.G. witl Vipated to take nine (9) months
Dreier+ Genstri iGtion phs\oC i0 ontisgated to take six (6) months.
Up #e eighteen (1 Q) mnpthly updates of Drniaat S-Iatao Deports �AWBE forms
• o 0
TPI?E, Diok Register, and prejeGt SGhedule.
DELIVERABLES
A. —Meeten ournmsries with aG+yen i+ems
B. Q /QA do m +a#inn
D. QGQ,TfefITCITfOIZ
G. BaJ licrrRe desiggrn,schedule
D. Preliminary Pro aOt Ri0(Register, preliminary CtaLehelder Degister, and
preliminary oreieG# Communira0ono Plsn
E. Monthly Sc;hedule updates with SGhedule narrative deSGribing any c;urrent e
F. MORthly Projeot Ctatuo Reports
City of Fort Worth, Texas Page 3 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 3 of 23
FORT WORTH®
4-.�lcn ✓jbmittcl Gheckfis+s (ceo TwI( 1-0)
K. �Aen AAA/QC Report Cerm apd C• I Summary.
` i Payment Repert Corm
err ���rr,--orrrr-aT,�.. m a, ., �: m m sr)
TASK 2. CONCEPTUAL DESIGN (30%).
The Gvrrccj tucG Design shallshe rwkmltted to CITY per the approved Drniec+ Schedule.
The p, ,rpeGG of +he copceptual design is for the Cnlr_'I CCU
eammunic
s, innessfi lly addresses the design prehlern and to obtain the- GITV's endorsement o
+f +his
GGRGep
r
•' NEFah will develop the cencep+,,al design of the infrns+rUc+,,re as fellews.
2.1. "to GelleEtiGR
-INECR Will cnllec+ 7/—hour turn* nnmnt intersectien ceunts /incL,lipg
rian^ hieyslists and basic elassifiea+ion
(lights/merdiums/artic,,laterd tr6,ck4.
TraffiG Count DotaX MOGFesef+ CVicel spreadsheet of Raw 24 heu,r and TuFning
Meyement Co, ant data gathered at 15 min„+e o s� a MiR*Rq6lFR on all raw
data GGI!eEted Prev de Daily Summaries by Appreash anrd Peak Peried
Summaries by Appr 3h. ✓prea4&hevt :hall Ice uplearderd to the lion, amen+
�A� g�ggemeRtt folraep`TPW TrafFin (amount r_\vta' \GurreRtly RIBA ` 60)
In addition to data ehtaipord frem tho CITY, 6NGINEER %%sill research arK make
efforts to obtain pertinent informatien to and in ceorrdination of the proposed
im pre�ie ments with any planned future impre.,emDnta that may influence the
p.preiec+ Cnlf_INEER will also identify and seek to ehtain data for evicting
eORd+t+ons that msy impact the prefect inelu ding• utilities agencies (TXDQT anrd
ranlreads), City r Plains, --\nd preperty e or:hip cc n°ailahle from the Tax
Assesser's Office
Th�aINEFoR will c��ho JTY'3 TranopaFtatien and Public VVerks
Department Water Department anrd other CITY rdepartRg3nto, public Utrtc- tilities,
private utilities, rd private utilities angovernment agencies to determine the
(s61rrent and fUt,,ra) that havo an impost or influepse OR the preiest
C, e Utility Cpgineering SUE) 3 �.a 3U a.,s� p3r sa(.,4
.
2.2. InteFseEtion Traffic ARalysis
0 EN INSFoR will prepare an Intnrsns+ien Traffic Analysis to inslu de the fellinn•
f Prepare data cellectiop plan
it Review ape cummorize and traffic cn, ants
eDevel3p Eid3tiRg anrd Future Traffic VE)Iumes for Analysis
City of Fort Worth, Texas Page 4 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 4 of 23
FORT WORTH®
w Compile TxDQT #raffia nvyntc c+v4 able in #ho aroa
t
t Develop a nrewth rate
* Ias\imate future ire #raffia veliumes (for existing 1 20 year)
• Develop G`\/nnhro moriol fnr #ho in#oroon#inn
t Evalua#n oviStinn #raffia opera#ief cs
• Evaluate fi t ire year #raffia opnra#iono
• Develop ronommnnda#inns fnr iRte FSen#inn lane nnnfig era#inn
0 CITY will previde tFaffiG signsl timing plan fnr nrninn#
� N INSFoR will provide 30 Design seFVOnnn to the CITY with the followipg
sign plans. ThQ—, aoWal nNmber of shoo#c may vary from the list below; all
M nfermatmen listed will be plrevided en the design plsns:
City of Fort Worth, Texas Page 5 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 5 of 23
FORT WORTH
2.5
City of Fort Worth, Texas Page 6 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 6 of 23
FORT WORTH®
2-. E.
ENGINEER will develop ap epinion of probable eonstn ietion cost (QPGG) based
9R '1ign. SeEFr^E-nd.Ata used On the -prepara ie�f thke norlQ in 14o, bNt are
pn+ limited +n, cnns+ri infinn data aggrega+inn sepiicaO, oimilsr pwt pra}eet
perfermed by CAI(_INEER bid results from previous CITY prsjeGt&-ef aimilar tyi3c-,
and prefessiepal evperiepce and engipeeripg ii iidgement
Utility GGRflict Geerrlina}inn Package
ENGINEER will develop the design of CITY facilities to avoid or mipimi-e
fulti ire utilities in designs Where conflicts Gannet he ayeirlerl cnnrrlinatinn of
,
Utility GGRfliGtS will in at the-SeeeaptNal Psi n ph&\os,-
In the case of a public Utility conflict the iCf\I CCU C
avemd er monknoze GeRfliGtS with existing utilities, and where knewn and pessible
sORSide"ontial future utilities in rdesigno
private WtOATIRMORa
reguiwd
In the case of a private Utility conflict the iF=49NEER w4kpfovida S DDC cJst-Of
plans with the Utility cenflicts highlighted and a UtilityGenfliotoTable of these
Genflicts to he inch iiie In C Utility Glearance Letter far cnnrdinatinn.
ENGINEER Will eenrdUGt Up to Mein (2) inrdiyi�al private
meetings to e3mmuni^ate the prnieet and enmmi initiate the
required private utility relocatien
The iCAI(_ EER ohs!! uplead s PDC file of the appreyeld pre"Minary plan set to
the designated prefect folder in the Gity's idecUrnont mcnagement system (BIM
360) for forwarding to all Utility eempaniesrl (te he ceMpleteby CITY) whieh have
facilities A,ithin thDe llmlte of the PrGjeGt. Thee-r -D F= fiit� ulgald be G'.reateddirertIly
• Three (3) conies of half size (19"v97"i plsm.
• Three (3) conies of opinion of probable cnnstn ictien cast
• Clectrenic sand (PDF=) of the plena can
DELIVERABLES
A. aptusl Qas+gn Pisno
R Traffic Count data
G. Interserst4an Traffic Analysis Technical Memerandwrn
D. GGReaptaal ONM rhe,.h
E. QPipien of Drehahle GE)RGtFW 'GR GeSt
FBI Utility GGRfIiGtGkage
City of Fort Worth, Texas Page 7 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 7 of 23
FORT WORTH®
TASK 3. PRELIMINARY DESIGN (60 PERCENT).
ENGINEER Will ROt PFE)Geed with Preliminwy DesiglPll aGtivities without wFitteR appFE)Val by
+hn CITY of fhn CnrnapWd ncBKg„TaEIE'cg@. Rrniminery Design will h.J 9Gbmltt�`� fca-cv-vrTrT
per the appFeyed Drninnt C`nhed iln
ENGINEER will develop the prellITIORary desigR of the iRfraStFUGtUre as follows:
3.1. -1240iminer-De&l%n PISno:
ENGINEER will progress update, or Fevise the desinn plano listed e
Gen optual D" gn gu mittel Cnd the additional design plane.
e CITY OF FORT W-ORT44 c►GNING AND AVEME=NT n4AR► 4NG DETAILS
City of Fort Worth, Texas Page 8 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 8 of 23
FORT WORTH®
tt�eTtan"�I:tiT:a■Tzarr.��sa�����r.�srsTs�:r.��r�etrsstnsral
EN NEER will prepare the Dr^inn+ Manual /Gen+rant and C,edfi-a+inns\ using the
CITY's frllnt enrd and teehnieal spe-ifi-a+iono. The ENGINEER will si ipplement the
teehni-al spedfi-a+iano, ao needed.
3.3. Genstn Untability Review Meeting
Drier to the Preliminary- Deoign Review Meetipg With the CITY, the-E-14GINEER
idi i shall s-hele anrd a++eprd a preie-+ site visit with the JTY 1-nr^ieet ManageF �a�,n,d
l � Gen-tretien persennel to walk anrd review the preieet (in-IU diRg TronopartatieR
MaRag ant otsff). The `JEER ohall oammsrize the CITY'S enmmentc
from the field visit and QUbmit this infnrma+inn +n +he f ITY in \"grit
3.1. Publia MeetuRg
After the preliminani plsno hsve been reviewed aR d approved by +he CITY, the.
ENGINEERIshall pr.,+ exhibits, and,rein-anattend ene (9) p� �bli- meeting +e help
ENGINEER .
mrcplain the pre, -nerd ,rate-t +e resi,donto. The -CITY ohall oeleot a ouitable I�-�,T
+fine ;4A d rl a+e. The CITY will pre ^ara msilin^ list of all affen+ert nrener+y eWners anrd
send all pi ibli- meeting nntifi-atieps
fr7� ■:tiFiS�Jr�7�:Sd FIS'ti7T'T%1itiS�R:7 � �LT.T-�
IEER will develop the -design of -CITY-ilities to avoid or minimize
utilities,GORfliGtS with existing
future utilities in designs. Where-enfli-ts Gannet be ayeided-eerdina+ien of
,
Utility Cenfli-ts will he identified at the Con-vp-t d phCne and begin at the
DreliminaFy Design phaos-
• In the ease of a ni iblin Utility -eRfkt the CNICJ EER st`de
sign esign CITY fa -tildes to
I\��.. \
utilities, and where knewn and possible
-o- .de"ontisl future utilities OR design-
• EN INdGP (Will-enrdUGt up to twe (2) individual private Utility-eeri-dina+ien
ammani-ate the imnreyemen+s preie-+ and -ommi ini-ate +he
required private i 1tility rein-atinn
• In the ease of a private Utility Cnnfli-+'NIICC� the CG D Coat-of�I n � �.. \�+�I-pFe�I�a s . !� oat -of
plans with the Utility -e,fli-ts highlighte
d anal- ; Utility-Gen#I+ato Table efeevf these
-enfli-ts to he in-IUrde� in a Utility Clearan-e Letter fer neeF dinatien at ea-h
rdesigp milestone
The CNI(_I CCU all u „leard a PPIC file of the a„reyerd prelimilclwy plan set to
the designated prnie-t felyder in the Ci+a's de-i'mQnt monogement system (RIBA
3
60) for felcwaarrding +e all Utility -mmpanies hiah ha\o Iimita 9f
theprs}eEt.Tho PDF file sheulld he-reateid dire -thy frem the CAM files
City of Fort Worth, Texas Page 9 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 9 of 23
FORT WORTH®
• Three /2\ eepiec of half size (1 910v'17"i Plano.
• Two (2) set of the PreleGt Mani gal /Geptran4 an,d Spenlfleatlepc.\
• Three (3) eepies of opinion of probable eenstRinfirm nest
• Elentrenie nrinv (PnC) of the plane preieot msnaal, snd QPGG (uploaded to
Y
•AEI oubmitted de^''ments and eheGkIists will he uploaded to the designate rd
preieet folder in the GITV's rdeei int ms+nsgement system (BIM 360)
• e (`ITV'. front rd anrd I i ns will he used. The IG IEER
Thy-�,-r-�-„�reg�,�tec�if�+Earepes+fTcat+en���e���€� a I � � �. .
shall supplement the teehnir.al spedfinatiense rdif neeerd
One (1 ) P blip MeetiN is rrcvm24-.
DELIVERABLES
APT Iimipary Design Plano
BB Preliminary Design Preler.t MaR a4Gontrmt and Sper.ifieatieps)
nn Greliminary Design ` G. PQA/Q ��ceptat• om Took 194
F. Utility ieRGkage
CN nn�-Meet;nr Exhkito
City of Fort Worth, Texas Page 10 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 10 of 23
FORT WORTH
TASK 4. FINAL DESIGN (90% AND 100%).
• ENGINEER will not proceed with Final Design activities without written approval by
the CITY of the Preliminary Design Package. Final Design will be submitted to
CITY per the approved Project Schedule.
• ENGINEER will develop the Final Design of the improvements as follows:
Final Design (100%) Plans:
• ENGINEER will progress, update, or revise the design plans based on CITY
feedback for intersection improvements before the construction of the Forest Hill
Drive widening:
• GENERAL IMPROVEMENTS
• TRAFFIC CONTROL
• ROADWAY IMPROVEMENTS
• DRAINAGE IMPROVEMENTS
• UTILITY IMPROVEMENTS
• TRAFFIC SIGNAL IMPROVEMENTS
• PAVEMENT MARKING AND SIGNAGE IMPROVEMENTS
• EROSION CONTROL IMPROVEMENTS
• CROSS SECTIONS
Final Desiqn (100%) Project Manual (Contract and Specifications)
• ENGINEER will prepare the Project Manual (Contract and Specifications) using the
CITY's front end and technical specifications. The ENGINEER will supplement the
technical specifications, as needed.
Opinion of Probable Construction Cost
ENGINEER will develop an opinion of probable construction cost (OPCC) based
on design plans. Sources of data used in the preparation of the OPCC include, but
are not limited to, construction data aggregation services, similar past project
performed by ENGINEER, and professional experience and engineering
judgement.
ASSUMPTIONS
• Electronic copy (PDF) of the plans, project manual, and OPCC (uploaded to e-Builder)
for 100% Design. Electronic copy of plan submittal (PDF) will be created from design
CAD drawings.
DELIVERABLES
A. Final Design Plans (100%)
B. Final Design Project Manual (Contract and Specifications) (100%)
C. Opinion of Probable Construction Cost (100%)
City of Fort Worth, Texas Page 11 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 11 of 23
FORT WORTH
TASK 5. BID PHASE SERVICES.
The CITY Fesepves the Fight to bid the projeGt either via tFaditiGRal prE)JeGt bid to ;,a N:nit prime
alteMatmye d ivpy��€NGINEER,mill supp \r+ the hid phase of the n.—'eGt as fellr\nic
The ENIC_ EER ohcll upload all plcno and Gentrnr4 den„ments onto the Gi+a's
des t�'l+ mWncgemen+ system (BIM 360) for aggess +o pe+Cnti&� bites.
.Contrs\,jt deGlUmont3 3hc'l be uploaded in a single PDF file
Unit Price Proposal dorv,ments are to he nreated „tilizing 4he Gty�o unit priGe too!
only and nombine� in s OP86fied spreadsheet werkbeek Rid Prepesal
I.Naheet Template that will he pep„lated and nenfig„red so thst sl' pages are
r+emplete and tho &immary Warksheet(s) in the workbook detail and
a„tematinalhi ze the te4als from the inserte I D
o�:mman� nit Price
• Plan gets are to he ,ipleaded to the City's dGGIJrn'nt mL\•lwgement system (RIBA
360) on ormato, Pas: and °yes. Trio PaF will ^ensist of one file of the
eta plan set,
If requested by prespentiye bidders, ENGINEERthENGINEERR w4kse Gontrwt'�'"'"cwrtsurnen
Gest.TTrhT CITY Will not sell hard GG9piesef the GeeRtraa GttddGGLIrne RtS.
MEN
"Expressions of Interest" frem prespentiye bidders and frem uploaded Plan
Holder Registrationo in the ' nt mancgement system (BIM 360 �
GE)RtraG#crc. ENGINEER w II maintsin s plan h9lders list.
Th�GINEER will develop and implement prenedi Tres fer receiving and
sw ng bidders' questions and requests jests for additional information The
a�a�,.era�aer��n�Teq�T
preeedu-Pvc ch--�l inel„de a log of all signifinan+ bidders questions and requosts
and the response thereto. The leg chsll h., housed andmintlned 'ihc
preient's folder titled Request fer informstion. The ENGINEER EER will previde
responses to all bidder'squestions and reg„DOto, in the fermvm of addenda. The
€-14GINEEP, ohsll upload
management system (131M ` 60) and moil addenda-te-all &n hems.
/Attend the
(�
pre bid nonferenna in oNpport of the i'ITV.
the-C.TY in determiping the qualifinatiens and anneptahility of prespestiye
GeRtraGWrc SV Ven4ranters and E; ippliers.
Whan oubotit�:tion prior to award of wntraoto is allowed in the con4rag+
don„ments the ENGINEER W411 advise the -CITY s\9 to the aesep4ahility of
alternate mat iolc ond equipmeRt preposed by bidders.
Attend the hid opening in ouppor+ of the CITY
Tsbulste and review all bids reneiyed fer the nenstr„n4ien proient ass�iis, mot, the CITY
'i n-revaluating bids, -and rem enaward of the Genrtra Gt. A GOPFy of th Bid
City of Fort Worth, Texas Page 12 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 12 of 23
FORT WORTH
ToLuIctien and the f`C\A/ Data Spreadsheet are to he uploaded info the proiec+'s
Bid Posi ilts feldor OR the Gity's document management system (BIM 3604
After the hid opening ENI(''_INEER will provide yip to five (5) fall ol'e-,2'k'-)"1(./I")
sets and up to seven (7) half size (1 1 "v1 7") sets of the Conformed Plano and -up
Genstn intien doci invents will only he made available on the Gity's doci iment
management system (RIBA ` 60) far plan holders and/or given to plan viewing
reOMS.
• PE\c' an nt mancgernenf system
• The project will he hid Via the design hid apd build process
DELIVERABLES
A. Addenda (up to t,rh7ree4-34)
B-.--Eu TchalatiqPs
G. ReGOMmendatmen of Award -Letter
D. GE)R e� Plano and Proiec+ Manual
TASK 6. CONSTRUCTION PHASE SERVICES.
ENGCER will si ippert the constr��cti a of the prefect as fellews
�1��.. � on phao
6.1 GenStn Goon ✓jppgt
• Th�GINEER Jisll Mond the ore_ cons+riiction conference.
• After the pre -G0RStrlJG iC) GOnfereRc , the he 04 II\CCR ohaII prepyide preiec+
Q)lhibito and attend epe (1 ) public meeting to help o)(plain the
r-esldonto. The-JTY ohc!l seleot a ouitable 19Gatien or media and mail net�o
Th�oINGEP ch&ll attend hi_weekly nepstFlJGtien progress meetings dwing the
di lFation of constn action The CN GINGER will prepare or nnllahOFat{e with the CITY
PM on a renstp Uction Progress Report using the r%TY'o otandard Format and
i iplead in the Gity's deGlUrni )t manLigemenf system (RIBA 360).!ring f.�-me-biiweekly GeRStrldGtOOR pFegress meetings, the ENGINEER will meet with the PrejeGt
DeliveryTcwn and Gentrac+or on site to review any field changes
City of Fort Worth, Texas Page 13 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 13 of 23
FORT WORTH
_ Th�GINEER will attend meetings with concerned citizens in coordination with
the�Y.
- Th�GINEER ohall review chop drawingo, +oha,,mplaFs, and eirhror `.�Fj,Lbm�i�t.�a, & ,,h
general GGMpliaRGe with requirements of the Gentsctt fv��Jt1�Gti0R. Such
review shall not relieve the GentraGtnr from its responsibility for performance in
S►.&rtee that
the �n�rvvnkGovered by the hop r•dr , samples ans oubmittals is free of errors
inconsistencies or emissiono. The EN INEER ohall
drawingg, oamplac and ethor oubmitta!o in Buz--aaw-.
As requested by the 'ITV, thea. NGI ECR ohall provide neGeccar„ interpretations
ld from the contractor, review change erders anmake recemmenrdationo ao t3��e
acceptability of the werL
The Cnl('_IA!EER ohall sttend tho Find" prniect walk three igh and assist with
preparation offinal panoh list.
E.2 R9GGrd Drawings
rznrtrr.....................
..ssfrs . .lT■:tti7.
i MIA
e--\o Quilt Survey
6 Red - inn Msrk�:po from the Gentracter
e Red- inn "Isrkupo from Git y Inspente• Cepies of Approved Change Orders
e A;;d 8ubstituti9FIS
The CNI('_ EER ohall medify ho Final Drawings eleotronioally and shall place a
stamp on the plane inldinatiRS thst they represent Rennrrl Drawings of the preient
ns Th J I he signed and dated by the ENGII� CCU
as c�,,�truEted�,,� otcml� d,�al whether
+�., ��" , and
shall he planer! on each plan oheet, whether there are an, re�iisinns In the sheet
or not. Each sheet shall clearly indicate all changes whi3h spply-to that oheet4
clef irding aR d R rnbering er ethv- ouitublg '"'"'m e aeaRS..
I�rT�T.111.�11T.�:1lS�MM.*.T1=11:L11■T71:T,rr.Mr.MI fn.9nTMLoMMIMM.01
Th�GINEER oholl oubmit a oat of sealed Final Drawings modified and
stamped as Recerld Drawings in Adobe Acrobat PDF format (version 6.0 or
City of Fort Worth, Texas Page 14 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 14 of 23
FORT WORTH®
higher)The ENGINGEP may ILeep eepies of the inferMatien previ ded by the
CITY fer their filoo but all original Fed I. Red drawings shall be reti Flerd to the
CITY with the digital files
� he c .,hell lh� ORe (1 ) Df1fil
e p
C e onrd ono (1 ) DVVF= file for the TPVV plan cot said a
sa�raio PC1C and DVVF file fer the Water plan oet, if required. Eaoh PC`C and
DWF file shall mnlw�n 0 Qacesiated sheets of the particbilcr plan get. Cinciular
PDF files for each chest of a plan set mill net he aiaeptey PDF and-BVVF=
files shall sonferm to naming senventiens as fellewsc
I. Fi"`n�nrrange—example "W-1956- ^n g4 .pdfr' where"W-195 " io the
assigned
filo n5;mber obtained from tho JTY, "_arg" 'designating the file is
efan-er+ginal plan o , " " ohsll be the atsl nNmber ef sheetio in thin fHA--
Gnarnple. \A/_0053—org`2 prlf and I.!_n27(1_arg5 W
II Waater�CQewer file name example "X 356— rg3L: pv-pdfi where "X
356&7" ie the assigned f,„epi--er ebt-amRed fry �"e CITY, "_> �,'
designating the file is of an eriginsl plan oet, "36" shall be the otal number-4
sheet3 in thio file
Exam pk\ y_17755_erg1Q pilf
PDF Mee ohcll be upleaded to the preieGt's TeE Drawing felderr ORthe Gity-L
dGGU ent msnsrement system (BIM 360)
on tho prapor msnnar4a 3Nbmit fileand to obtain s file number far
the e
preleGte HIthe CC-INCEP ohei slid eeerrlinate with the Gity nreieot manager. Fiic
numbers Will pet he issi field to a preiest i finless the apprepriate preieot nambers--and
fund seldes have been assigner) and are in the Departmept of Trcno
per-tation and
ASSUMPTIONS
• (lee (I) Pre _(;epstn Intion Meeting
• QRe (1 ) Publis Meetipg
Upto Twelve (17) Ri_Weekly Genstnistien Progress Meetings
Upto Three (3) Meetings with Genl.erne/d Citizens
Up to Ten (1(J) Submittal Reviews.
Upto Three (3) Requests fer Infermatien
Up to Two (2) (change Orders.
�--Q. ( ) Final Walk Through Meeting
DELIVERABLES
A. Public Meeting Exhibits
G. ResPE)Rscte rya r's Request f9F Inferma GR
D. 1 Review of Ghange Orders
City of Fort Worth, Texas Page 15 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 15 of 23
FORT WORTH
E. Review of SuLmittcls
F. Final Walk Through Dunah l iat Itoma
TASK 7. ROW/EASEMENT SERVICES.
`tttttt� -x, s�ea'wLgM-ma�srm--
Th�GINEER -.h&ll determine rights _of_way, easements needs far Genstnistion
ef the projeGt. Required temporary and permanent easements will be identified
based on available information and reeeMmen`tations will he made fer approval
by the
7 0 Right _of_Way/Easement Preparation aF4 • ✓abmittal.
Th�GINEER ch&ll prepare dOGUments to he rised to obtoin right of way anrt
ENGINEERThe will pFepaFe a ROW and Easernontt f t
showing and designating all land interest for projeGt. The map will b=:-ed]
Right _of_Way resocroh in^ludes review of propertWrieht_of_way repents based on
current inter�net based Tarrant Apj� res tv-1 District (TAD) information available at
the start of the project ground property information (i.e. iron
rods, fenEes stakes, etCTit does notnnl ode effort for nhain of title
r seaarrh an,
parent Cra Gk Te JearGh, addltl/lpal researGGh fereasernentS Ret included In th�The TAB
brayyanationse i Tand street nlesres
City of Fort Worth, Texas Page 16 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 16 of 23
FORT WORTH
TASK 8. SURVEY AND SUBSURFACE UTILITY ENGINEERING SERVICES.
--E-14G-INEER will perferm field surveys to collect herizontsl and vertical elevations
and
y1�other infermation neededy1by C� I��1IGINECD, in design and preparation of plans
for the prefe^t. In�ation_ gathered ring the
s
er
v
e
\/ 9hall Inry
rdat , eleyatt lions of all sanitary
a1 Rd adjanent storm seoro, rim invert elevations
relevant to the find plcn oh&Wm. Emoting rlraipage at iptersectiens will he verified
by field surveys. Spet elevatiens will be sheWR en interseGtOOR layouts with GFOSS
slope to fit intersecting grade lines
The Frimnimum ourVey 0Rfermatien to be provided on the p_Icna ahcll inGlude the
ig-.-
a Identified (Existing. CITY Mona in4& #8199'i PK Nsil, 5/ " iron Rod)
h. Y., Y and Z Geordo oo, in an identified GeOrd'Rate system, and a
referred bearing base Z Geer,dinate ep CITY !�tum anJy-.
G. DeSsrip�eLesaf�(Ex. Set i�EenTerline of the inlet in the Sec ith
cUrb line of Nerth Side Drive at the Cast end of radluo of the Southeast
corner of North Side Drove and North Main Streetl
Coordinates on sII P.C.'o, P.T.'o, , Janhe*les Valves, etc.,in��trh'rce
same Georrdipate system, &\o the GE)Rtrel.
Ne lov thin two ho4zental henoh msrieo, per Iipe or lecation
Bearings given cn all pr9posed nenterlinese or baselines
.it--V.on equations relating utilities to paving when oeppropr
Right ef Way researGh ORGludes review of preperty/right of way reGOrds based OR
ci irrent internet_bases Tarrant A rcbal L\ .rist (TAD) information available at
the start the prejeGt and available eR greURd preperty infermatien (i.e. iron
reds, feRGes, stakes eta \ It does net ind de effort for chain of title research
parent track resocroh, additional res rch for easements not inclu ded in the TAD
additional vcTrT r.�-rrva�rrcruc` �
' right of
way vacations anstreet close 1res rd
Drier to accessof private property for the collection of evicting conditiono ourvey
data, Flu -I NEER \^sill p o, mail, and meniter up to ten (10) temporary
right of entry letters
City of Fort Worth, Texas Page 17 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 17 of 23
FORT WORTH
2.3. Os:bourfa Ge Utility Engineering
• EN INEEE will nerferm the I eviel n ►" EuboNrfa% Utility Engineering (SUE)
work required for thio pro;e--t in general a----orrdan--e with the re--ommenrderd
p rraGtiGes and vGed �reCITes Tcc7GribCG in ACf C P bliGa+ien GI(ASGE 38 02
(Standard Guideline fer the Gelle--+ien aR d lien; --';on of G)tioting SubourfaE@
I tiI4 Data). As rdecnrihed OR the mentioned AQCC p�:blinn+ien, fear levels have
been i,3k1bllJherd +e rdes--rihe the quality of utility IeGatinn and sttribst9
; nferme+;en used on plsno. The feur quality levels are as fellows:
Quality Level D (Q"P") Inferme+ien derived frem existing utility renerds;
e
Quality Level r (nl "r") OI " e" informs ion ospplementeid with information
obtained by surveying visible above gFOURd utility features SLJGh as valves,
Iydrsnto, matoro, manholes
Quality I eyel 13 /QI "lV) Twe_ rdimensienol (x y) infermatien eh+g;nerd three igh the
onnli--otion and interpretation of nen_rdootruotive s�aseegeeeY1yaiGall me hcrrer.
Also knOWR as as
desigRating" this quality level provides the horizental position 0
si bsi irfa--e utilities -within approximately ene feet.
Quality Level A (Q "/;") Three --dimensional (x z) utility information obtainedoyr �
i itiliZing nen_rdes+n;--tideyaGI n im ex--ayatien equipment to expose utilities at
Titt� points �e ihi--h ore then toed by surveying. yeying. Alse known as "I
this q ial;ty level preyirdes pre--ise herizontsl snrd'77� ��r��e��``JJr+iGal nositiening of Utilities
within cpproxima+el., n nG fee+
• Utilities to be desigRated ORGIude gas, e e drainage,
water an� cvq4n, sewer.
• EN INEFoR will --designate the Lnown oabourfa% utilities Withip the pre;e--t limits
utilizing geephysi--al equipment (ele--tromagneti-- inrdl Gtien magneti--)to
desigRate metal! iG/Gend HGtive utilities (e.g. steel pope, eIeGtriGaI Gable, telephone
--o
J\rill\IdJ�71AA1■:4J�1G StI�1:S711■::7Zt'lf1TT�1'.ti'T171S7:►Lt't1:T.'
ENGINEER Will not attempt te prebe er eXGavate test heles en any AG wa
lines unlc\3c vWoval is ebtained frern the -CITY in advanGe. ENGINEER will
recerd the utility type, size, material, depth te top, and general direGt on. Each
numbqF and will be marked ith s n--A!-�i-i
number
� N INEFoR will provide up +e feeit (n) test holes (estimated to he hetweon 8 and
12 feet in --depth anrd Within evicting payernant) Subourfsse Utility Engineering
City of Fort Worth, Texas Page 18 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 18 of 23
FORT WORTH®
C)(pnse and Ienate r r}iIi c rat Sp9dfir+ Iona}ions.
A Top her�ra�'antal andyertinal Inner}inn of utility to survey non}rel
e Previde utility size and snnfigr rra}inn
6•Der^vvide paViRgthiGk ess type, �ii�azype, where appliGable.
A- Preyide general cell tripe nerd site no Pditiens nerd sr rah other Pertinent
'nf^ VCn Sr. ie reao^nahly ashy \oiNih.le fi r�rern eaGhrtest hole site.
A BaGkfill nered holes Within evicting senerete pavement with temporaPi
0 a M, inimurn ^f 9" in depth
&RTdMPTIIGNS r�
In to ferrr (4) Level A test holes are included (estimated to he hetweon Q and
feetiR dopth and Within evicting Payemen+�
DELIVERABLES
A DraWing of the preieGt layout with dimensions aPd neordinate lisf
li, .SUE plan drawings sealed by a prefessienal engineer registered in the State of
Texas.
TASK 9. PERMITTING.
ENG CER still provide permitting support for the CITY to and all agreements
��.. � obtain and
and/or permits normally required for a
f this oize and type as follows
9.1 Texas Department of I inensing and Regulation (TD R)
• Idenzifaed analyze theFequirerneRtsel--the Texas ArGhi}el:;Lral SuriersAGt,
ChapterTexas Administrative Code, a-nd henome familiar with the
goveMmivitO cuthnrities having it rrisdiGtinn to approve the design of the Prefer+}.
•--€N INSFoR io responsible for providiRS plans that are OR nemplianne ,. ith TPUR
rear rirements
• Submit
r+nnstrr r^tion deny rments to tho TD R
• Gemple}ipg all TQ4LR ferms/applisatiens necessary
—Obtain the Nref ✓ubotantial Gomplianoe f�rto TAR
• Beet an imypeGfisn rn a Tni R Iogalhr apprGved Registered An+n�e�ssib4itn
r r
r than Z9 calendar days after sanstre}ion oNbotsn#al
Gemplet.en Advise the CITY In writing of the results of the ins Pentien.
• Responding to agennv nemments and requests
nGia}e�,1h T61R plan review and inspestiens are to he paid hrr }he
€PfGINEER dr wing the nor rrse of the proient.
9.2 Grading Perini+
---E-NCINEER will prepare and submit a Grading Permit Applination.
0 All appliGahle appliGa}ion fees will he paid for by the CITY
0.3 S,�nrrn Water Pollution Prerren}ien Plan (SVVPPP)
City of Fort Worth, Texas Page 19 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 19 of 23
FORT WORTH®
t
• ••• reMe e
SAkDDD ky
IiC�Z��ITI S�T�I\C
• Pajlrnald Pormlt to not required rd fer the prejen+
• rI OMIR OF I (AVID jo not required fop the prnjent
• Tree Removal Permit io not required for the project
• Urn Cnreotni Permit pet required for the prnjen+
. Stermwater Permit not required rd for the project
rd • Prnjent pan he nnmpleteIthln Ug AGE MAP anrd a PGN !nr VeFifiGatin�ooff
cauthorizatian` is net req irerd for thio pr9}ec4
V lic irnproyemepto prnjent.
• SVVPPP rdocU rnentation and Grading Permit will begin after i`nnn.Optual L
+ TGlP permit will be completed wi:h Final C
DELIVERABLES
A Copies of Permit Appljnationo
B. Copies of A ppreyerd Pern•,jtc
City of Fort Worth, Texas Page 20 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 20 of 23
FORT WORTH
TASK 10. QUALITY CONTROL / QUALITY ASSURANCE
ENGINEER to provide to the City a Quality G9RtFGV Quality AssUFaRGe PaR (QG�QA PIaR)
ni i+Iininn +he CNI �InCC�'O 171e+hod of ensuring the highest levels of design and anni Ira n" are
i nnerperated into the nalGl ilatieno plane OP86fiGa+iens and estimates
ENG CCU responsible fer and shall Gnerdinate all s� ihn ii fide
��.. to r.,eonou ts,n+ anti"'+" to nnl
quality and Gnnsis+enGy of plans
If, c� cn)° time during the Gee arse c Calili++al of any item it henomN c� Fu
t�CITY ths; tho oabmittal vnntainc errors omissinps and innnr�wcu�r�� �t1e CIITI�Y may
Geese its i--w apd return the oL,�mittsl to +ho-arts- v-rli��CC� immediately for onnrnnrio+n
re"
'"taccMAA -A oubmittsl rofi,rne,d to the ENGINEER for this reesen may he reiente,d by the CITY
DrnieG+ Manager.
10.1. QG/Q4 of Curve" and SUE l3to
Th�cINSFaIR.'o Sure- shall perferm Quality Gentreli Quaky-Ac/curcrise-9R
all proGedl Tres field surveys, Ots. snd predi JG#s prier to deliver" to the CITY. The
CITY may also require the ENG!NGGP.'c CurVe"er +e perferm a Qua! ty
AssuraRGe review of the survey and/or oNbourfsse utility engineering (SUE) werk
performed by other surveyors ai d CUE pros.
ENGInIEER.'-- C6!rve"or shall per#if" in writing via a le#tor thst the survey
provided haa undergone a Quality Gen+rnl/ ni,a t , 1\1mvrzn e
prec;ess.
ENGIIICCC'o S/jbo:�l-fare Utility Engineering nre� ..r J.Icll Certify in writing via a
lector thst tho ELIE lnfermatien pre"idedd h&\o Nndergene a Quality ren+rel/ Quality
Ammcnce PrGGess.
*---=-%GNSFnR sh2.11 pes-• .
0-% _0% '
■w'thiR the form whe is net en the desigR team.
-
� N INEER Is to aGknewledge that eanh item en the Detailed ChenLliot hsa been
inGl� �ded by GLing "done" on the Gheoliliot. If c pertis.."lar GheGLlist item is net
irn�uv C -Fe vrrcrn. crrc
i ilyd h ndi + by ing "N/A" an tiro a lis s
Flo, this ohaa,a-ae�Ea�e��c�eelC�r-1�,�,-r-en�c�-i�c�n�t��
not a, this shoe i d he indiGa+ed by nhe-II'ii --z' item on the list as
"N/A""/4" and still innluded with the o�,�mlttsl. The EN INNER shall use the Metalled
RW—MM MA
hetwee., re.,ie,e,ers and to highlight GemmrmO mcie by the C .TY that the
ENGI CCG1 s n � in# innorpora#ing into the design dnGnvents along with the
__. , I„
snGia#ed n t'on The ENGINEER shall use the Comment Resnli itiop Leg
;��o��� �Tcrtnnn.l I ��..
provided by CITY.
• The dens amentatien of a QG/QA review innli ides (1) a pep" of the neler_nerderl
original marked_up doGi amen+ (nr "Gheoh print") 'developed during the Q4
GheGking PrOGess andler review forms whiGh sequentially lost deGUmen;1-,;4Ad1
assoGla+ed Gnmmonto; cnd,Z QG g'R eff sheet with
n�ignatLAF"l'es 7TLhe
City of Fort Worth, Texas Page 21 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 21 of 23
FORT WORTH®
personnel involved in the nheeLine presess "Mirk bps mcy also he rloe,,men+eid
i isipe the Gemmept Reseh,tien Log-.
Eymdepee of the QGQA review will he required to ennampany-a!1 Clubmittalo.
Hon, imentotian ohsll inGluda, but to n"+ limited to the fellGW!Re items.
.,���s�:r_�� i1�TT:■■TE'L'f1iTr�7TTd►11TS'�
PDF of the C G/QA eheGk Print of the Gale, �l ono, Tana `J DeifisatiePs aPrd
p p ,
estimates rdemonstFatinryJ that s review has been i R dertake-R
,
If aRy of the abode information io miooinn'is innom ple+e or if aRy eommePts are
adequatelynet adequately addresseid•, the CITY mayAI(_ eon#ant the CINSFoR rxid request
n inferma�P if ENGINEER r�C rdeeS not resPOPrd to they uest
c mI�In9��,A ,T � � eq
within 21 hvvr&� th�-.CITY ahcll rmejeGt thG 66kmittsL N ens` time
grail+erd for a retuMe� 3Nbmittsl.
a If the CHIC-inCCR hw nn+ adequately is#ehi addressed the eommen+s +ho oubmitt
shall he reieeteid aprl retuMeid to the ENGINEER immediately to address the
iss, ,es
�T
�A I oubmittsls to the CITY will he quality nheGked prier to s, bmissinn
A PDF of the Q /QA ldos,,mentatien Will he uploaded to the preieet fender in the
Gity's rdeeUmi9t m&miagemen# system /RIIV!360
DELIVERABLES
A. QG/QA documentation
City of Fort Worth, Texas Page 22 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 22 of 23
FORT WORTH®
ADDITIONAL SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF SERVICES
Additional Services not included in the existinq Scope of Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services described in
the tasks above. However, ENGINEER can provide these services, if needed, upon — be sure
to track changes. The CITY's written request. Any additional amounts paid to the ENGINEER
as a result of any material change to the Scope of the Project shall be agreed upon — be sure
to track changes. In writing by both parties before the services are performed. These
additional services include the following:
• Negotiation of easements or property acquisition.
• Services related to development of the CITY's project financing and/or budget.
• Services related to disputes over pre -qualification, bid protests, bid rejection and re-
bidding of the contract for construction.
• Construction management and inspection services
• Performance of materials testing or specialty testing services.
• Services necessary due to the default of the contractor.
• Services related to damages caused by fire, flood, earthquake or other acts of God.
• Services related to warranty claims, enforcement and inspection after final completion.
• Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
• Performance of miscellaneous and supplemental services related to the project as
requested by the CITY.
• Effort exceeding those outlined in the "Assumptions" section of each task description.
City of Fort Worth, Texas Page 23 of 23
Attachment A Forest Hill Drive and Royal Crest Drive Intersection Improvements
PMO Release Date: 02.06.2015 CPN 103308
Page 23 of 23
ATTACHMENT B
COMPENSATION
Design Services for
Forest Hill Drive and Royal Crest Drive Intersection Improvements
City Project No. 103308
Time and Materials with Rate Schedule Project
Compensation
A. The ENGINEER shall be compensated for personnel time, non -labor expenses,
and subcontract expenses in performing services enumerated in Attachment A as
follows:
i. Personnel Time. Personnel time shall be compensated based upon hours
worked directly in performing the PROJECT multiplied by the appropriate Labor
Cateqory Rate for the ENGINEER's team member performing the work.
Labor Cateqory Rate as presented in the rate schedule table below is the rate for
each labor category performing the work and includes all direct salaries, overhead,
and profit.
Labor Category
Rate
($/Hour) **
Professional - 1
132
Professional - 2
162
Professional - 3
180
Professional - 4
208
Professional - 5
243
Professional - 6
278
Construction Manager - 1
114
Construction Manager - 2
141
Construction Manager - 3
154
Construction Manager - 4
193
Construction Manager - 5
232
Construction Manager - 6
265
Construction Representative - 1
102
Construction Representative - 2
114
Construction Representative - 3
141
Construction Representative - 4
154
CAD Technician/Designer - 1
112
CAD Technician/Designer - 2
144
CAD Technician/Designer - 3
179
Corporate Project Support - 1
107
Corporate Project Support - 2
129
Corporate Project Support - 3
172
Intern/ Coop
72
Professional - 1
132
" Provided rates are 2025 rates, which will be
adjusted annually in February.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 1 of 4
Forest Hill Drive and Royal Crest Drive Intersection Improvements
CPN 103308
1:151
ATTACHMENT B
COMPENSATION
ii. Non -Labor Expenses. Non -labor expenses shall be reimbursed as Direct
Expenses at invoice or internal office cost.
Direct Expenses (non -labor) include, but are not limited to, mileage, travel and
lodging expenses, mail, supplies, printing and reproduction services, other direct
expenses associated with delivery of the work; plus applicable sales, use, value
added, business transfer, gross receipts, or other similar taxes.
iii. Subcontract Expenses. Subcontract expenses and outside services shall be
reimbursed at cost to ENGINEER plus a markup of ten percent (10%).
iv. Budgets. ENGINEER will make reasonable efforts to complete the work within
the budget and will keep the City informed of progress toward that end so that
the budget or work effort can be adjusted if found necessary.
ENGINEER is not obligated to incur costs beyond the indicated budgets, as may be
adjusted, nor is the City obligated to pay ENGINEER beyond these limits.
If ENGINEER projects, in the course of providing the necessary services, that the
PROJECT cost presented in Article 2 of this Agreement will be exceeded, whether
by change in scope of the project, increased costs or other conditions, the
ENGINEER shall immediately report such fact to the City and, if so instructed by the
City, shall suspend all work hereunder.
When any budget has been increased, ENGINEER's excess costs expended prior
to such increase will be allowable to the same extent as if such costs had been
incurred after the approved increase.
B. The ENGINEER shall be paid monthly payments as described in Section II -
Method of Payment.
II. Method of Payment
A. The ENGINEER shall be paid by the City based upon an invoice created on the
basis of statements prepared from the books and records of account of the
ENGINEER, based on the actual hours and costs expended by the ENGINEER in
performing the work.
B. Each invoice shall be verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
C. ENGINEER shall prepare and submit invoices in the format and including content
as presented in Exhibit B-1.
D. Payment of invoices will be subject to certification by the City that such work has
been performed.
City of Fort Worth, Texas
Attachment B Forest Hill Drive and Royal Crest Drive Intersection Improvements
Revised Date: 12/9/2022 CPN 103308
Page 2 of 4
B-2
ATTACHMENT B
COMPENSATION
III. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works Department monthly progress reports and
schedules in the format required by the City.
IV. Summary of Total Project Fees
Firm Primary Responsibility
Prime Consultant
Freese and Nichols, Inc. Project Management and
Design Services
Prime Consultant Total
Proposed MWBE Sub -Consultants
MWBE Sub -Consultants Total
Non-MWBE Consultants
Fee Amount I %
$20,700.00 100.0%
$20,700.00 100.0%
$0.00 I 0.0%
Non-MWBE Consultants Total: $0.00 0.0%
TOTAL $20,700.00 100.0%
Project Number & Name
(CPN 103308 — Forest Hill Drive and Royal
Crest Drive Intersection Improvements)
Original Agreement
Addendum No. 1
Addendum No. 2
Total (Original Agreement + Addendum No. 1)
City MWBE Goal = 14.0%
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 3 of 4
Total Fee MWBE Fee MWBE %
$275,895.00 $40,750.00 14.8%
$35,000.00 $5,800.00 16.6%
$20,700.00 $0.00 16.6%
$331,595.00 $46,550.00 14.0%
Consultant Committed Goal = 14.0%
Forest Hill Drive and Royal Crest Drive Intersection Improvements
CPN 103308
B-3
EXHIBIT "B-1"
ENGINEER INVOICE
(Supplement to Attachment B)
Insert required invoice format following this page, including negotiated total budget and
allocations of budgets across desired work types and work phases.
City of Fort Worth, Texas
Attachment B
Revised Date: 12/9/2022
Page 4 of 4
Forest Hill Drive and Royal Crest Drive Intersection Improvements
CPN 103308
M,
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Intersection Improvements at Forest Hill Drive at Royal Crest Drive (CPN 103308)
Expense
Todd Bryant Frihart Zach Garlock
Task Task Description Buckingham Total Labor Total Expense Task Sub Total
No. Cost Cost
PM ROADWAYENG CADD Subconsultanl
Ratel $2431 $1621 $1441 MBE/SBE I Non-MBEISBEI Travel I Reproduction
besIUM PfAhs - y6 %
Update and Revise Design Plans Based on City Feedback
GENERAL IMPROVEMENTS
GENERAL NO IE5
UUAN I I I Y SUMMARY
TYPICAL SECTIONS
REMOVAL PLAN
ROADWAY IMPROVEMENTS
ROADWAY PLAN AND PROFILE
CURB RAMP GRADING INTERSECTION QUADRANT DETAILS
UTILITY IMPROVEMENTS
U I ILI I Y ADJU51 MEN ITLAN
TK"Fr�i��TOiI 3N �lFIY.'N�JS
EXIST N(i 5GNAL IS KEMUV S
SIGNAL LAYOUT
SIGNAL EG UIPMENT DETAIL INTERSECTION QUADRANTS
SIGNAL SUMMARY
UHANNELASSIUNMENI DIAGRAM
SIGNAL SIGNAGE PLAN
PAVEMENT MARKING AND SIGNAGE IMPROVEMENTS
PAVEMENT MARKING AND SIGNAGE PLAN
EROSION CONTROL IMPROVEMENTS
ISWM CONSTRUCTION PLAN
CROSS SECTIONS
GROSS SECTIONS
Update Opinion of Probable Construction Cost
Update Specifications
Design Plans - 100"/0
Update and Revise Design Plans Based on City Feedback
GENERALIMPROVEMENTS
TRAFFIC CONTROL
ROADWAY IMPROVEMENTS
DRAINAGE IMPROVEMENTS
UTILITY IMPROVEMENTS
TRAFFIC 516NAL IMPROVEMENTS
PAVEMENT MARKING AND SIGNAGE IMPROVEMENTS
EROSION CONTROL IMPROVEMENTS
CROSS SEC I IONS
Update Opinion of Probable Construction Cost
Update Specifications
Lissette Acevedo, PE, PTOE, PMP
Sr. Capital Projects Officer
Transportation and Public Works
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
1 of 1 Print Date: 2/202025
2
2
4 2J
L B
T 2
I
L 11
L 11
12
f 2
1 2
1 4
2
1 1
1 tt
1 1L
1 2
1L
4 G
L 4
1 4
4 S
2
1 2
2
I
1
$18
Project Summary
I olal Hou
1"
otal Lab
$20'b
Total Expens
$1
MBE/SBE Subconsulta
Non-MBE/SBE Subcorlsulta
10% Sub Marku
0.
MBE/SBE Panccipa[id
.0%
Total Project Cosh
$20,70
ID Task Name
1 City of Fort Worth - Forest HIII Drive and Royal Crest Dri
2 Notice to Proceed
3 Design Management
5 Conceptual Design (30%)
11 CFW Review 30% Design
14 Preliminary Design(60%)
18 CFW Review 60%Design
21 Final Design (90 %)
25 CFW Review 90%Design
29 PROJECT ON HOLD BASED ON NCTCOG PROJECT
30 Wirral Design (95°/a and 100%)
31 Prepare 95% Design
32 Internal 95% Design QC
33 External 95% Design Submittal
34 City Review 95% Design
35 Prepare 100% Design
36 Internal 100% Design QC
37 External 100% Design Submittal
38 Approve Final Submittal and Route for Signatures
39 Establish MWBE Goal
40 Prepare Bid Package
41
42 Advertising and Letting
43 Contractor Selection
44 Review and Approve MWBE Compliance Documents
45 M&C Approval and Construction Contracting
46 Construction Phase Services
50 Survey and Subsurface Utility Engineering Services
57 Permitting
60 Quality Control/ Quality Assurance
Task
Date: Tue 2125/25 Split
Milestone
Duration I
Start Finish
59.26 mons
Fri 1212122 Thu 6117127
0 days
Fri 12/2/22 Fri 12022
18 mons
Fri 12/2122 Thu 4118124
4.4 mons
Fri 12/2122 Tue 414/23I
0.7 mons
Wed 415123 Mon 4124123
4.15 mons
Tue 4/25123 Thu 8117/23
0.8 mons
Fri 8/18/23 Fri 118123
2.55 mons
on 9/11/23 Mon 11/20123
1.95 mons
Tue 11/21/23 Fri 1112124
6 mons
Mon 2/24125
Fri 8181251
25 days
Mon 2/24125
Fri 3/28/25
10 days
Mon 3131/25
Fri 4111/25
0 days
Fit 4/11125
Fn 4111125
20 days
Mon 4/14/25
Fri 519/25
20 days
Mon 5/12125
Fri 616125
10 days
Mon 6/9/25
Fri 6/20/25
0 days
Fri 6120/25
Fri 6/20/2511
15 days
Mon 6/23125
Fri 7/11/25
10 days
Mon 7114125
Fit 7125/25
10 days
Mon 7/28/25
Fri 8/8/25
6.25 mons
Mon 8/25125
Fri 1116/26
20 days
Mon 8/25125
Fri 9119/25
6 days
Mon 9122125
Mon 9129125
9 days
Tue 9/30125
Fri 10/10/25
70 days
Mon 10/13/25
Fri 1116/26
18.45 mons
Mon 1119126
Thu 6117/27'
15.05 mons
Fri 12/2122
Fri 1126/24
20.4 mons
on 61R-5 Wed 12130/26
9 mons
,old&
Fri 12/2122
Thu 8110/23
2023 2024 2025 2026
ID JIFIMIAIMIJ JIAISIOINID JIFIMIAIMIJJIAISIOINID JIFIMIA IMI J J IAISIOINID JIFIMIAIMI JI JIAISIOINID JIFIMI
City of Fort Worth - Forest HIII Drive and Royal Crest Ddrve Intersection (CPN 103306)
♦ Notice to Proceed
Summary External Milestone
....... Project Summary Inactive Task
♦ External Tasks Inactive Milestone
,; Management
Conceptual Design (30%)
VV CFW Review 30 % Design
V Rp Preliminary Design (60%)
W: CFW Review 60%Design
all Final Design (90%)
V w CFW Review 90 % Design
Page 1
Forest Hill Dnve aM Royal Crest Drive Interseclbn Improvements
CPN 103308
PROJECT ON HOLD BASED ON NCTCOG PROJECT
Final Design (95% and 100%)
Prepare 95% Design
Internal 95% Design QC
4111 External 95% Design Submittal
City Review 95% Design
Prepare 100% Design
Internal 100% Design QC
6120 External 100% Design Submittal
Approve Final Submittal and Route for Signatures
Establish MWBE Goal
Prepare Bid Package
u Bid Phase Services
L Advertising and Letting
T Contractor Selection
i Review and Approve MWBE Compliance Documents
M&C Approval and Construction Contracting
Survey and Subsurface Utility Engineering Services
Quality Control/ Quality Assurance
Inactive Summary Manual Summary Rollup Finish -only ]
Manual Task Manual Summary Progress
Durationonly Start -only C Deadline lS
103308-EPAM-Forest Hill Dr & Royal Crest
Dr Intersection Improvements - Engineering
Contract Amendment #2
Final Audit Report 2025-04-01
Created: 2025-03-28
By: Andrea Munoz (Andrea. Mu noz@fortworthtexas.gov)
Status: Signed
Transaction ID: CBJCHBCAABAA21TOzDVYfNhQ2K6uVs8yXNCyT12gnMzB
"103308-EPAM-Forest Hill Dr & Royal Crest Dr Intersection Impr
ovements - Engineering Contract Amendment #2" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2025-03-28 - 6:11:17 PM GMT- IP address: 204.10.90.100
Document emailed to Jessica Ramos (Jessica.Ramos@fortworthtexas.gov) for filling
2025-03-28 - 6:15:27 PM GMT
Email viewed by Jessica Ramos (Jessica.Ramos@fortworthtexas.gov)
2025-03-28 - 7:00:59 PM GMT- IP address: 204.10.90.100
Form filled by Jessica Ramos (Jessica.Ramos@fortworthtexas.gov)
Form filling Date: 2025-03-28 - 7:02:16 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Fanta Kaba (fanta.kaba@fortworthtexas.gov) for filling
2025-03-28 - 7:02:17 PM GMT
Email viewed by Fanta Kaba (fanta.kaba@fortworthtexas.gov)
2025-04-01 - 1:31:30 PM GMT- IP address: 208.184.124.181
"6 Form filled by Fanta Kaba (fanta.kaba@fortworthtexas.gov)
Form filling Date: 2025-04-01 - 1:32:09 PM GMT - Time Source: server- IP address: 208.184.124.181
Document emailed to Chris Bosco (cb@freese.com) for signature
2025-04-01 - 1:32:12 PM GMT
-_� Email viewed by Chris Bosco (cb@freese.com)
2025-04-01 - 1:43:05 PM GMT- IP address: 107.77.221.64
FDRTW❑RTHg I P°He1d y
Adobe
Acrobat Sign
C 6 Document e-signed by Chris Bosco (cb@freese.com)
Signature Date: 2025-04-01 - 1:45:48 PM GMT - Time Source: server- IP address: 107.77.221.64
Agreement completed.
2025-04-01 - 1:45:48 PM GMT
FDRTW❑RTHg I P--d6y
Adobe
Acrobat Sign
FORTWORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Forest Hill Dr & Royal Crest Dr Intersection Improvements -
Engineering Contract Amendment #2
M&C: 22-0846 CPN: 103308 CSO: 58490 DOC#:
Date:
To:
Name
Department
Initials
Date Out
1.
Jessica Rodriguez
TPW - initial
,R
Mar 28, 2025
2.
Fanta Kaba
TPW - signature
FT_k
Apr 1, 2025
3.
Chris Bosco
Consultant
-C„,,�
Apr 1, 2025
4.
Chad Allen
TPW - initial
App%rd ;n AF)lnft
TT- • 1 7An
5.
Lissette Acevedo
TPW -initial
if of
6.
Patricia Wadsack
TPW - initial
" "
7
Lauren Prieur
TPW - signature
" "
8
Doug Black
Legal - signature
�ougBlacy
Apr 16, 2025
9
Jesica McEachern
CMO - signature
CA
Apr 20, 2025
10.
Jannette Goodall
CSO - signature
,�
Apr 21, 2025
11.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST
BE ROUTED TO THE APPROPRIATE
ACM for approval first. Once the ACM has signed the routing slip,
Jay will review and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES ❑No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContractsaFortWorthTexas.2ov at ext. 7233 or 8363, for pick up when
completed. Thank you!
Updated 08.22.2022,
mdhm
Amendment Purpose Statement:
The purpose of this engineering amendment is to provide additional funding for remaining design services
for the Forest Hill Dr & Royal Crest Dr traffic signal project. The design for the project initially began in
November 2022, under a scope that included improvements to traffic flow and pedestrian safety. The
original scope of work outlined the construction of new traffic signals, intersection upgrades, installation
of ADA compliant pedestrian infrastructure, and widening of Forest Hill Drive and Royal Crest Drive to
accommodate dedicated left turn lanes. During design the city became aware of the North Central Texas
Council of Governments (NCTCOG) corridor project, we began coordination with NCTCOG to modify the
scope of this project for interim improvements until NCTCOG's completion.
The NCTCOG project, which spans from Lon Stephenson Rd & Shelby Rd and is expected to be completed
around 2030, will impact the Forest Hill Dr & Royal Crest Dr intersection project. This is because the
NCTCOG project will widen the Forest Hill two-lane rural roadway to a four -lane divided roadway with
sidewalks and new intersections at all major crossings. The consultant revised the scope to reflect interim
improvements for safety including, upgrading the traffic signal equipment, widening the northbound and
southbound lanes to include dedicated left -turn lanes, and installing ADA compliant pedestrian ramps.
These changes were made to address immediate traffic and pedestrian needs while anticipating the future
improvements of the NCTCOG project.
The funding in this amendment will be used to cover the costs associated with the redesign including
coordination with stakeholders.