HomeMy WebLinkAboutContract 61572-CO1CSC No. 61572-COI
FoxT�W�ORTH .,
Project Name 2024 Concrete Restoration Contract 3
Client Project #(s)� 105193
Project Description
Contractor Capko Concrete Structures, LLC
City Project Mgr.1 Iretomiwa Otuyelu
City of Fort Worth
Change Order Request
Concrete panel replacement at various locations
Change Order #I 1
City Inspectorl
City Sec # j 61572
Datel 1/22/2025
Charles Hayes
Dept.
TPW
Contract Time
Totals
(CD)
Original Contract Amount
$2,593,525.00
$2,593,525.00
210
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$2,593,525.00
$2,593,525.00
210
Amount of Proposed Change Order
$195,290.00
$195,290.00
50
Revised Contract Amount
$2,788,815.00
$2,788,815.00
260
Original Funds Available for Change Orders
$130,000.00
$130,000.00
Remaining Funds Available for this CO
$130,000.00
$130,000.00
Additional Funding (if necessary) $65,290.00 $65,290.00
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 7.53%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $3,241,906.25
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order increases the bid item quantities for concrete pavement removal and replacement due to unforeseen pavement alignment issues encountered during
construction. A reassessment of the streets revealed that certain areas required additional pavement removal and replacement —exceeding the original estimate by 2,500 square
yards —to properly align the new pavement with the existing grade. These adjustments are necessary to ensure the structural integrity and longevity of the roadway. Also, this
change order will reduce quantities for bid items that are not needed.
Additionally, staff supports the contractor's request for a 50-day contract extension. This additional time accounts for the approval process of the change order and the expanded
scope of work, ensuring the contractor can complete the project without compromising quality.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
Contractor's Company Name Contractor (Name) Contract Signature Date
Capko Concrete Structures, LLC John Capko oy4ft Apr 11, 2025
Supervisor
Date
Project and Contract Compliance Manager
Date
Apr11,2025
Apr14,2025
r
Date
Senior Capital Project Officer
Date
Velion
Apr14,2025
ny►y
Apr14,2025
r (Dept)
Date
Director, Contracting Department (Dept)
Date
Apr14,2025
dC,.,.,.7�,
Apr14,2025
orney
Date
Assistant City Manager
Date
�!s12
Apr 16, 2025
Council Action (if required)
vnyn
M&C Number I 25-0304 M&C Date Approved 1 4/8/20251
ATTEST: - 1 FORT!yoada
Pig o910
GvS 8=d_
Jannette Goodall, City Secretary
ann �Ez6gga
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH
—V1---
City of Fort Worth
Change Order Additions
Project Name 1 2024 Concrete Restoration Contract 3
City Sec # 1 61572 1
Client Project # 1 105193
1
Contractorl Capko Concrete Structures, LLC
I PMI Iretomiwa Otuyelu
Inspectorl Charles Hayes
l
Change Order Submittal # 0
Date 1 1/22/2025
ADDITIONS
I I tM DESCRIP I ION
DEP I City
Unit Unit Cost
I otal 1
4 0241.1000 Remove Concrete Pavement
TPW 2,500.000OO000
SY $28.OU
$70,000.001
5 3213.0102 7" Concrete Pavement
TPW 2,500.00000000
SY $109.00
$272,500.001
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
TPW
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
$342,500,001
1
Sub Total Additions
1
1
$342,500.001
Change Order Additions Page 2 of 5
FORT W�
City of Fort Worth
Change Order Deletions
Project Name 2024 Concrete Restoration Contract 3
City Sec # 61572
Client Project # 105193
1
Contractorl Capko Concrete Structures, LLC
I PMI Iretomiwa Otuyelu
Inspectorl Charles Hayes
l
Change Order Submittal # 0
Date 1 1 /22/2025
DELETIONS
I I EM
UESCKIP I ION
UEP I
Oty
Unit
Unit Cost
I otal
8
3306.0203 Imported Embedment/ Backtill, CLSM
TPW
50.00000000
CY
$160.00
$7,500.001
9
3211.0122 6" Flex base Type A, GR-2
TPW
480.00000000
CY
$132.00
$63,360.00 1
14
0241.0300 Remove ADA Ramp
TPW
6.00000000
EA
$700.00
$4,200.00 1
15
3213.0506 Barrier Free Ramp, Type P-1/P-2
TPW
5.00000000
EA
$2,850.00
$14,250.001
17
0241.0100 Remove Sidewalk
TPW
2,000.00000000
SF
$2.00
$4,000.001
18
3213.0301 4" Conc Sidewalk
TPW
2,000.00000000
SF
$15.00
$30,000.001
21
3232.0100 Conc Rat Wall Adjacent to Sidewalk
TPW
100.00000000
SF
$60.00
$6,000.00 1
22
3213.0322 Conc Curb at Back of Sidewalk
TPW
100.00000000
LF
$30.00
$3,000.00 1
24
3213.0311 4" Conc Sidewalk, Adjacent to Curb
TPW
200.00000000
SF
$19.00
$3,800.00 1
25
3213.0321 Conc Sidewalk, Adjacent to Rat Wall
TPW
120.00000000
SF
$30.00
$3,600.00 1
27
9999.0002 Miscellaneous Utility Adjustment (Irrigation)
TPW
0.75000000
LS
$10,000.00
$7,500.001
Change Order )eletions Page 4 of 5
i
i
i
i
i
i
i
i
TM $147,210.001
1
1
1
Sub Total Deletions $147,210.001
Change Order Deletions Page 4 of 5
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Q Roberts Trucking
Materials and Trucking Services
Straight Line Sawing and Sealing Saw cut, Joint Sealing and Demo Concrete
$2,590.29
$46,232.21
Total $48,822.50
Previous Change Orders
Co # DATE I AMOUNT
Total 1 $0.00 I
City of Fort Worth, Texas
Mayor and Council Communication
DATE: 04/08/25 M&C FILE NUMBER: M&C 25-0304
LOG NAME: 202024 CONCRETE RESTORATION CONTRACT 3 — CO1
SUBJECT
(CD 6, CD 8 and CD 11) Authorize Execution of Change Order No. 1, in the Amount of $195,290.00 and the Addition of 50 Calendar Days to the
Construction Contract with Capko Concrete Structures, LLC for the 2024 Concrete Restoration Contract No. 3 Project for a Revised Contract
Amount of $2,788,815.00
RECOMMENDATION:
It is recommended that the City Council authorize execution of Change Order No. 1, in the amount of $195,290.00, and the addition of 50 calendar
days to the City Secretary Contract No. 61572 with Capko Concrete Structures, LLC, for the construction of the 2024 Concrete Restoration
Contract No. 3 Project (City Project No. 105193) for a revised contract amount of $2,788,815.00.
DISCUSSION:
On May 14, 2024, Mayor & Council Communication (M&C) 24-0384, awarded the City Secretary Contract No. 61572 with Capko Concrete
Structures, LLC, in the amount of $2,593,525.00 for the construction of the 2024 Concrete Restoration Contract No. 3 Project (City Project No
105193) at various locations.
During construction, unforeseen pavement alignment issues were identified on several streets within the project. To ensure proper integration of
the new pavement with the existing grade, the required quantity of concrete pavement removal and replacement has exceeded initial estimates.
This change order increases bid item quantities accordingly to ensure the structural integrity and longevity of the roadway.
The staff has reviewed and verified the quantities for the additional work under this Change Order No. 1. In addition, to complete the work, the staff
recommends extending the contract time by 50 calendar days.
The following table summarizes previous contract action and change orders:
Construction Contract Date Amount
IlOriginal Contract Amount (M&C 24-0384) 105/14/2024 $2,593,525.00
Change Order No. 1 I This M&C $195,290.00 1
Revised Contract Amount I $2,788,815.001
This change order will have no impact on the Transportation and Public Works Department's annual operating budget. Funding is budgeted in the
General Capital Projects Fund for the Transportation and Public Works Department for the purpose of funding the 2024 Concrete Restoration
Contract No. 3 project, as appropriated.
DVIN/Business Equity — Capko Concrete Structures, LLC agrees to maintain its initial M/WBE commitment of 25% that it made on the original
contract and extend and maintain that same M/WBE commitment of 25% to this first change order. Therefore, Capko Concrete Structures, LLC
remains in compliance with the City's M/WBE Ordinance and attests to its commitment by its signature on the Acceptance of Previous M/WBE
Commitment form executed by an authorized representative of its company.
This project is located in COUNCIL DISTRICTS 6, 8 and 11.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the General Capital Projects
Fund for the 2024 Concrete Restoration 3 project to support the approval of the above recommendation and the execution of the change order.
Prior to any expenditure being incurred, the Transportation & Public Works Department has the responsibility to validate the availability of funds.
Submitted for Citv Manaaer's Office bv: Jesica McEachern 5804
Oriainatina Business Unit Head: Lauren Prieur 6035
Additional Information Contact: Monty Hall 8662
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: 2024 CONCRETE RESTORATION CONTRACT 3 — CO 1
M&C: 25- 0304 CPN: 105193
Date:
To:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
Name
LaKeshia Lynch
Capko Concrete Structures, LLC
Charles Hayes
Emanuel Nieto
Iretomiwa Otuyelu
Zelalem Arega
Mary Hanna
Patricia Wadsack
Lauren Prieur
Doug Black
Jesica McEachern
Jannette Goodall
TPW Contracts
CSO: 64572 DOC#: 2
Department
In
Bus-Sppt
Vendor
"a
JON
TPW - Inspector
C�„.yPS
TPW — Sr.Inspector
TPW
TPWZelalem
A,eg.
TPW
N/"
TPW AD
PL.
TPW Director
a f�
Legal
o
CMO
CSO
1G
JG
TPW
itials
V
Date Out
Apr14,2025
Apr 11, 2025
Apr 11, 2025
Apr14,2025
Apr14,2025
Apr14,2025
Apr14,2025
Apr14,2025
Apr14,2025
Apr 16, 2025
Apr20,2025
Apr21,2025
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts
ALSO List: - Bus Sppt: LaKeshia Lynch; Prg Mgr.: Zelalem Ane a; Sr CPO — Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ❑No NEXT DAY: ❑YES [:]No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: Please notify TPWContracts(n,fortworthtexas.2ov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!